Gateway Distriparks share price today
Gateway Distriparks Ltd · NSE: GATEWAY · Logistics · price as of the 4 November 2026 close, updated every trading day · results updated weekly · research updated 28 October 2026
Gateway Distriparks share price today: ₹46.43 at the NSE close on 4 November 2026, down 24.7% in a year. Gateway Distriparks (NSE: GATEWAY) is worth ₹2,318 crore, trades at a P/E of 9.8 and has closed between ₹42.87 and ₹61.86 over the past 52 weeks. Latest change: indian funds and insurers (DIIs) cut their stake for 9 quarters in a row.
Gateway Distriparks Ltd's share price, valuation and earnings point in different directions. The next one or two quarters should make it clearer.
The main question: foreign institutions moved −3.7 percentage points over 8 quarters while the business went the other way.
The price has been falling for 109 weeks, and the P/E is lower than 99% of its own last 4.6 years. Over the last four quarters, results have been improving, with profit −10.6% on a year earlier, and 132% of the last 3 years' profit came in as cash. What will decide it: whether the owners’ moves turn back in line with the business.
What is the Gateway Distriparks share price today?
Gateway Distriparks Ltd's share price was ₹46.43 at the close on 4 November 2026. It has been falling for 109 weeks. That is 17.2% below its average price over the last 200 trading days. In the last 52 weeks it traded between ₹43 and ₹62, and at that close it sat 19% of the way up from that low.
A share price tends to move through four phases: moving sideways (stage 1), rising (stage 2), stalling near a high (stage 3) and falling (stage 4). Today Gateway Distriparks Ltd is in stage 4. The phase helps read everything below.
Over the past 13 weeks it has done worse than the NIFTY 500, and it has been behind for 16 weeks running.
1Y
Nov 2026: ₹46.4, 17.2% below its 200-day average. The price has been falling for 109 weeks.
- Price ₹46.4
- 50-day avg ₹51
- 200-day avg ₹56
| Week | Price | 50-day avg | 200-day avg |
|---|---|---|---|
| 31 Oct 2025 | ₹64 | ₹64 | ₹69 |
| 7 Nov 2025 | ₹62 | ₹64 | ₹68 |
| 14 Nov 2025 | ₹61 | ₹63 | ₹68 |
| 21 Nov 2025 | ₹60 | ₹63 | ₹68 |
| 28 Nov 2025 | ₹59 | ₹62 | ₹67 |
| 5 Dec 2025 | ₹60 | ₹61 | ₹67 |
| 12 Dec 2025 | ₹60 | ₹61 | ₹66 |
| 19 Dec 2025 | ₹60 | ₹61 | ₹66 |
| 26 Dec 2025 | ₹61 | ₹61 | ₹66 |
| 2 Jan 2026 | ₹61 | ₹61 | ₹66 |
| 9 Jan 2026 | ₹58 | ₹61 | ₹65 |
| 16 Jan 2026 | ₹56 | ₹60 | ₹65 |
| 23 Jan 2026 | ₹57 | ₹59 | ₹65 |
| 1 Feb 2026 | ₹58 | ₹59 | ₹64 |
| 6 Feb 2026 | ₹61 | ₹59 | ₹64 |
| 13 Feb 2026 | ₹59 | ₹60 | ₹64 |
| 20 Feb 2026 | ₹60 | ₹60 | ₹64 |
| 27 Feb 2026 | ₹59 | ₹60 | ₹64 |
| 6 Mar 2026 | ₹57 | ₹59 | ₹63 |
| 13 Mar 2026 | ₹54 | ₹59 | ₹63 |
| 20 Mar 2026 | ₹51 | ₹57 | ₹62 |
| 27 Mar 2026 | ₹54 | ₹57 | ₹62 |
| 17 Apr 2026 | ₹59 | ₹56 | ₹61 |
| 24 Apr 2026 | ₹57 | ₹57 | ₹61 |
| 30 Apr 2026 | ₹57 | ₹57 | ₹61 |
| 8 May 2026 | ₹60 | ₹57 | ₹61 |
| 15 May 2026 | ₹57 | ₹57 | ₹61 |
| 22 May 2026 | ₹55 | ₹57 | ₹61 |
| 29 May 2026 | ₹56 | ₹57 | ₹60 |
| 4 Jun 2026 | ₹56 | ₹57 | ₹60 |
| 5 Jun 2026 | ₹56 | ₹57 | ₹60 |
| 10 Jun 2026 | ₹58 | ₹57 | ₹60 |
| 12 Jun 2026 | ₹58 | ₹57 | ₹60 |
| 17 Jun 2026 | ₹60 | ₹57 | ₹60 |
| 19 Jun 2026 | ₹61 | ₹57 | ₹60 |
| 24 Jun 2026 | ₹62 | ₹58 | ₹60 |
| 25 Jun 2026 | ₹59 | ₹58 | ₹60 |
| 1 Jul 2026 | ₹59 | ₹58 | ₹60 |
| 3 Jul 2026 | ₹62 | ₹58 | ₹60 |
| 10 Jul 2026 | ₹59 | ₹58 | ₹60 |
| 17 Jul 2026 | ₹58 | ₹59 | ₹60 |
| 24 Jul 2026 | ₹56 | ₹58 | ₹60 |
| 31 Jul 2026 | ₹58 | ₹58 | ₹60 |
| 7 Aug 2026 | ₹57 | ₹58 | ₹60 |
| 14 Aug 2026 | ₹55 | ₹58 | ₹59 |
| 21 Aug 2026 | ₹54 | ₹57 | ₹59 |
| 28 Aug 2026 | ₹54 | ₹57 | ₹59 |
| 4 Sep 2026 | ₹55 | ₹56 | ₹59 |
| 11 Sep 2026 | ₹53 | ₹56 | ₹58 |
| 18 Sep 2026 | ₹53 | ₹55 | ₹58 |
| 25 Sep 2026 | ₹53 | ₹55 | ₹58 |
| 1 Oct 2026 | ₹52 | ₹54 | ₹58 |
| 9 Oct 2026 | ₹51 | ₹54 | ₹57 |
| 16 Oct 2026 | ₹50 | ₹53 | ₹57 |
| 23 Oct 2026 | ₹47 | ₹52 | ₹57 |
| 30 Oct 2026 | ₹43 | ₹51 | ₹56 |
| 4 Nov 2026 | ₹46 | ₹51 | ₹56 |
3Y
Nov 2026: ₹46.4, 17.2% below its 200-day average. The price has been falling for 109 weeks.
- Price ₹46.4
- 50-day avg ₹51
- 200-day avg ₹56
| Week | Price | 50-day avg | 200-day avg |
|---|---|---|---|
| 3 Nov 2023 | ₹88 | ₹87 | ₹77 |
| 12 Nov 2023 | ₹91 | ₹88 | ₹78 |
| 17 Nov 2023 | ₹100 | ₹89 | ₹79 |
| 24 Nov 2023 | ₹108 | ₹92 | ₹80 |
| 1 Dec 2023 | ₹102 | ₹94 | ₹81 |
| 8 Dec 2023 | ₹102 | ₹96 | ₹82 |
| 15 Dec 2023 | ₹102 | ₹97 | ₹83 |
| 22 Dec 2023 | ₹101 | ₹98 | ₹84 |
| 29 Dec 2023 | ₹104 | ₹98 | ₹85 |
| 5 Jan 2024 | ₹111 | ₹100 | ₹86 |
| 12 Jan 2024 | ₹116 | ₹103 | ₹87 |
| 20 Jan 2024 | ₹114 | ₹105 | ₹89 |
| 25 Jan 2024 | ₹109 | ₹105 | ₹89 |
| 2 Feb 2024 | ₹112 | ₹106 | ₹90 |
| 9 Feb 2024 | ₹111 | ₹107 | ₹92 |
| 16 Feb 2024 | ₹109 | ₹108 | ₹92 |
| 23 Feb 2024 | ₹108 | ₹108 | ₹93 |
| 2 Mar 2024 | ₹107 | ₹108 | ₹94 |
| 7 Mar 2024 | ₹105 | ₹107 | ₹94 |
| 15 Mar 2024 | ₹100 | ₹106 | ₹95 |
| 22 Mar 2024 | ₹103 | ₹105 | ₹95 |
| 28 Mar 2024 | ₹100 | ₹104 | ₹95 |
| 5 Apr 2024 | ₹113 | ₹105 | ₹96 |
| 12 Apr 2024 | ₹107 | ₹106 | ₹96 |
| 19 Apr 2024 | ₹103 | ₹106 | ₹97 |
| 26 Apr 2024 | ₹107 | ₹106 | ₹97 |
| 3 May 2024 | ₹105 | ₹106 | ₹97 |
| 10 May 2024 | ₹101 | ₹105 | ₹98 |
| 18 May 2024 | ₹107 | ₹105 | ₹98 |
| 24 May 2024 | ₹105 | ₹106 | ₹98 |
| 31 May 2024 | ₹98 | ₹105 | ₹99 |
| 7 Jun 2024 | ₹98 | ₹103 | ₹98 |
| 14 Jun 2024 | ₹105 | ₹103 | ₹99 |
| 21 Jun 2024 | ₹103 | ₹103 | ₹99 |
| 28 Jun 2024 | ₹103 | ₹103 | ₹99 |
| 5 Jul 2024 | ₹106 | ₹104 | ₹99 |
| 12 Jul 2024 | ₹112 | ₹105 | ₹100 |
| 19 Jul 2024 | ₹110 | ₹105 | ₹100 |
| 26 Jul 2024 | ₹112 | ₹106 | ₹101 |
| 2 Aug 2024 | ₹109 | ₹107 | ₹101 |
| 9 Aug 2024 | ₹101 | ₹106 | ₹101 |
| 16 Aug 2024 | ₹100 | ₹105 | ₹101 |
| 23 Aug 2024 | ₹100 | ₹104 | ₹101 |
| 30 Aug 2024 | ₹100 | ₹104 | ₹101 |
| 6 Sep 2024 | ₹98 | ₹103 | ₹101 |
| 13 Sep 2024 | ₹97 | ₹102 | ₹101 |
| 20 Sep 2024 | ₹94 | ₹101 | ₹101 |
| 27 Sep 2024 | ₹92 | ₹99 | ₹100 |
| 4 Oct 2024 | ₹89 | ₹98 | ₹100 |
| 11 Oct 2024 | ₹88 | ₹96 | ₹99 |
| 18 Oct 2024 | ₹86 | ₹95 | ₹99 |
| 25 Oct 2024 | ₹83 | ₹93 | ₹98 |
| 1 Nov 2024 | ₹89 | ₹92 | ₹97 |
| 8 Nov 2024 | ₹87 | ₹91 | ₹97 |
| 14 Nov 2024 | ₹84 | ₹90 | ₹97 |
| 22 Nov 2024 | ₹83 | ₹89 | ₹96 |
| 29 Nov 2024 | ₹83 | ₹88 | ₹95 |
| 6 Dec 2024 | ₹82 | ₹87 | ₹95 |
| 13 Dec 2024 | ₹88 | ₹87 | ₹94 |
| 20 Dec 2024 | ₹81 | ₹87 | ₹94 |
| 27 Dec 2024 | ₹80 | ₹86 | ₹93 |
| 3 Jan 2025 | ₹82 | ₹85 | ₹93 |
| 10 Jan 2025 | ₹80 | ₹84 | ₹92 |
| 17 Jan 2025 | ₹79 | ₹83 | ₹91 |
| 24 Jan 2025 | ₹78 | ₹82 | ₹91 |
| 1 Feb 2025 | ₹76 | ₹81 | ₹90 |
| 7 Feb 2025 | ₹75 | ₹80 | ₹89 |
| 14 Feb 2025 | ₹71 | ₹78 | ₹88 |
| 21 Feb 2025 | ₹68 | ₹77 | ₹88 |
| 28 Feb 2025 | ₹60 | ₹75 | ₹87 |
| 7 Mar 2025 | ₹63 | ₹72 | ₹85 |
| 13 Mar 2025 | ₹58 | ₹71 | ₹84 |
| 21 Mar 2025 | ₹62 | ₹69 | ₹83 |
| 28 Mar 2025 | ₹60 | ₹67 | ₹82 |
| 4 Apr 2025 | ₹61 | ₹67 | ₹81 |
| 11 Apr 2025 | ₹61 | ₹66 | ₹81 |
| 17 Apr 2025 | ₹63 | ₹65 | ₹80 |
| 25 Apr 2025 | ₹62 | ₹65 | ₹79 |
| 2 May 2025 | ₹60 | ₹65 | ₹79 |
| 9 May 2025 | ₹60 | ₹64 | ₹78 |
| 16 May 2025 | ₹65 | ₹64 | ₹77 |
| 23 May 2025 | ₹62 | ₹64 | ₹76 |
| 30 May 2025 | ₹64 | ₹64 | ₹76 |
| 6 Jun 2025 | ₹67 | ₹64 | ₹75 |
| 13 Jun 2025 | ₹66 | ₹65 | ₹75 |
| 20 Jun 2025 | ₹62 | ₹64 | ₹74 |
| 27 Jun 2025 | ₹66 | ₹64 | ₹74 |
| 4 Jul 2025 | ₹66 | ₹65 | ₹73 |
| 11 Jul 2025 | ₹66 | ₹65 | ₹73 |
| 18 Jul 2025 | ₹66 | ₹65 | ₹73 |
| 25 Jul 2025 | ₹65 | ₹65 | ₹72 |
| 1 Aug 2025 | ₹68 | ₹66 | ₹72 |
| 8 Aug 2025 | ₹66 | ₹66 | ₹72 |
| 14 Aug 2025 | ₹67 | ₹66 | ₹72 |
| 22 Aug 2025 | ₹69 | ₹67 | ₹72 |
| 29 Aug 2025 | ₹64 | ₹67 | ₹71 |
| 5 Sep 2025 | ₹65 | ₹66 | ₹71 |
| 12 Sep 2025 | ₹64 | ₹66 | ₹71 |
| 19 Sep 2025 | ₹65 | ₹66 | ₹70 |
| 26 Sep 2025 | ₹62 | ₹65 | ₹70 |
| 3 Oct 2025 | ₹63 | ₹65 | ₹70 |
| 10 Oct 2025 | ₹62 | ₹64 | ₹69 |
| 17 Oct 2025 | ₹63 | ₹64 | ₹69 |
| 24 Oct 2025 | ₹63 | ₹64 | ₹69 |
| 31 Oct 2025 | ₹64 | ₹64 | ₹69 |
| 7 Nov 2025 | ₹62 | ₹64 | ₹68 |
| 14 Nov 2025 | ₹61 | ₹63 | ₹68 |
| 21 Nov 2025 | ₹60 | ₹63 | ₹68 |
| 28 Nov 2025 | ₹59 | ₹62 | ₹67 |
| 5 Dec 2025 | ₹60 | ₹61 | ₹67 |
| 12 Dec 2025 | ₹60 | ₹61 | ₹66 |
| 19 Dec 2025 | ₹60 | ₹61 | ₹66 |
| 26 Dec 2025 | ₹61 | ₹61 | ₹66 |
| 2 Jan 2026 | ₹61 | ₹61 | ₹66 |
| 9 Jan 2026 | ₹58 | ₹61 | ₹65 |
| 16 Jan 2026 | ₹56 | ₹60 | ₹65 |
| 23 Jan 2026 | ₹57 | ₹59 | ₹65 |
| 1 Feb 2026 | ₹58 | ₹59 | ₹64 |
| 6 Feb 2026 | ₹61 | ₹59 | ₹64 |
| 13 Feb 2026 | ₹59 | ₹60 | ₹64 |
| 20 Feb 2026 | ₹60 | ₹60 | ₹64 |
| 27 Feb 2026 | ₹59 | ₹60 | ₹64 |
| 6 Mar 2026 | ₹57 | ₹59 | ₹63 |
| 13 Mar 2026 | ₹54 | ₹59 | ₹63 |
| 20 Mar 2026 | ₹51 | ₹57 | ₹62 |
| 27 Mar 2026 | ₹54 | ₹57 | ₹62 |
| 17 Apr 2026 | ₹59 | ₹56 | ₹61 |
| 24 Apr 2026 | ₹57 | ₹57 | ₹61 |
| 30 Apr 2026 | ₹57 | ₹57 | ₹61 |
| 8 May 2026 | ₹60 | ₹57 | ₹61 |
| 15 May 2026 | ₹57 | ₹57 | ₹61 |
| 22 May 2026 | ₹55 | ₹57 | ₹61 |
| 29 May 2026 | ₹56 | ₹57 | ₹60 |
| 4 Jun 2026 | ₹56 | ₹57 | ₹60 |
| 5 Jun 2026 | ₹56 | ₹57 | ₹60 |
| 10 Jun 2026 | ₹58 | ₹57 | ₹60 |
| 12 Jun 2026 | ₹58 | ₹57 | ₹60 |
| 17 Jun 2026 | ₹60 | ₹57 | ₹60 |
| 19 Jun 2026 | ₹61 | ₹57 | ₹60 |
| 24 Jun 2026 | ₹62 | ₹58 | ₹60 |
| 25 Jun 2026 | ₹59 | ₹58 | ₹60 |
| 1 Jul 2026 | ₹59 | ₹58 | ₹60 |
| 3 Jul 2026 | ₹62 | ₹58 | ₹60 |
| 10 Jul 2026 | ₹59 | ₹58 | ₹60 |
| 17 Jul 2026 | ₹58 | ₹59 | ₹60 |
| 24 Jul 2026 | ₹56 | ₹58 | ₹60 |
| 31 Jul 2026 | ₹58 | ₹58 | ₹60 |
| 7 Aug 2026 | ₹57 | ₹58 | ₹60 |
| 14 Aug 2026 | ₹55 | ₹58 | ₹59 |
| 21 Aug 2026 | ₹54 | ₹57 | ₹59 |
| 28 Aug 2026 | ₹54 | ₹57 | ₹59 |
| 4 Sep 2026 | ₹55 | ₹56 | ₹59 |
| 11 Sep 2026 | ₹53 | ₹56 | ₹58 |
| 18 Sep 2026 | ₹53 | ₹55 | ₹58 |
| 25 Sep 2026 | ₹53 | ₹55 | ₹58 |
| 1 Oct 2026 | ₹52 | ₹54 | ₹58 |
| 9 Oct 2026 | ₹51 | ₹54 | ₹57 |
| 16 Oct 2026 | ₹50 | ₹53 | ₹57 |
| 23 Oct 2026 | ₹47 | ₹52 | ₹57 |
| 30 Oct 2026 | ₹43 | ₹51 | ₹56 |
| 4 Nov 2026 | ₹46 | ₹51 | ₹56 |
5Y
Nov 2026: ₹46.4, 17.2% below its 200-day average. The price has been falling for 109 weeks.
- Price ₹46.4
- 50-day avg ₹51
- 200-day avg ₹56
| Week | Price | 50-day avg | 200-day avg |
|---|---|---|---|
| 25 Mar 2022 | ₹70 | ₹72 | ₹72 |
| 8 Apr 2022 | ₹79 | ₹72 | ₹72 |
| 22 Apr 2022 | ₹82 | ₹74 | ₹73 |
| 6 May 2022 | ₹73 | ₹74 | ₹73 |
| 20 May 2022 | ₹75 | ₹74 | ₹73 |
| 3 Jun 2022 | ₹73 | ₹74 | ₹73 |
| 17 Jun 2022 | ₹67 | ₹73 | ₹73 |
| 1 Jul 2022 | ₹66 | ₹71 | ₹72 |
| 15 Jul 2022 | ₹68 | ₹70 | ₹72 |
| 29 Jul 2022 | ₹74 | ₹70 | ₹72 |
| 12 Aug 2022 | ₹69 | ₹71 | ₹72 |
| 26 Aug 2022 | ₹68 | ₹70 | ₹72 |
| 9 Sep 2022 | ₹67 | ₹69 | ₹71 |
| 23 Sep 2022 | ₹71 | ₹70 | ₹71 |
| 7 Oct 2022 | ₹70 | ₹69 | ₹71 |
| 21 Oct 2022 | ₹68 | ₹70 | ₹71 |
| 4 Nov 2022 | ₹72 | ₹70 | ₹71 |
| 18 Nov 2022 | ₹70 | ₹71 | ₹71 |
| 2 Dec 2022 | ₹68 | ₹70 | ₹71 |
| 16 Dec 2022 | ₹68 | ₹70 | ₹71 |
| 30 Dec 2022 | ₹68 | ₹69 | ₹70 |
| 13 Jan 2023 | ₹68 | ₹69 | ₹70 |
| 27 Jan 2023 | ₹64 | ₹68 | ₹70 |
| 10 Feb 2023 | ₹63 | ₹66 | ₹69 |
| 24 Feb 2023 | ₹60 | ₹65 | ₹68 |
| 10 Mar 2023 | ₹64 | ₹64 | ₹68 |
| 24 Mar 2023 | ₹60 | ₹63 | ₹67 |
| 6 Apr 2023 | ₹64 | ₹63 | ₹67 |
| 21 Apr 2023 | ₹64 | ₹63 | ₹67 |
| 5 May 2023 | ₹64 | ₹63 | ₹66 |
| 19 May 2023 | ₹65 | ₹63 | ₹66 |
| 2 Jun 2023 | ₹69 | ₹64 | ₹66 |
| 16 Jun 2023 | ₹73 | ₹67 | ₹67 |
| 30 Jun 2023 | ₹72 | ₹69 | ₹67 |
| 14 Jul 2023 | ₹72 | ₹70 | ₹68 |
| 28 Jul 2023 | ₹78 | ₹72 | ₹68 |
| 11 Aug 2023 | ₹83 | ₹74 | ₹69 |
| 25 Aug 2023 | ₹87 | ₹78 | ₹71 |
| 8 Sep 2023 | ₹88 | ₹81 | ₹72 |
| 22 Sep 2023 | ₹85 | ₹82 | ₹74 |
| 6 Oct 2023 | ₹93 | ₹84 | ₹75 |
| 20 Oct 2023 | ₹92 | ₹86 | ₹76 |
| 3 Nov 2023 | ₹88 | ₹87 | ₹77 |
| 17 Nov 2023 | ₹100 | ₹89 | ₹79 |
| 1 Dec 2023 | ₹102 | ₹94 | ₹81 |
| 15 Dec 2023 | ₹102 | ₹97 | ₹83 |
| 29 Dec 2023 | ₹104 | ₹98 | ₹85 |
| 12 Jan 2024 | ₹116 | ₹103 | ₹87 |
| 25 Jan 2024 | ₹109 | ₹105 | ₹89 |
| 9 Feb 2024 | ₹111 | ₹107 | ₹92 |
| 23 Feb 2024 | ₹108 | ₹108 | ₹93 |
| 7 Mar 2024 | ₹105 | ₹107 | ₹94 |
| 22 Mar 2024 | ₹103 | ₹105 | ₹95 |
| 5 Apr 2024 | ₹113 | ₹105 | ₹96 |
| 19 Apr 2024 | ₹103 | ₹106 | ₹97 |
| 3 May 2024 | ₹105 | ₹106 | ₹97 |
| 18 May 2024 | ₹107 | ₹105 | ₹98 |
| 31 May 2024 | ₹98 | ₹105 | ₹99 |
| 14 Jun 2024 | ₹105 | ₹103 | ₹99 |
| 28 Jun 2024 | ₹103 | ₹103 | ₹99 |
| 12 Jul 2024 | ₹112 | ₹105 | ₹100 |
| 26 Jul 2024 | ₹112 | ₹106 | ₹101 |
| 9 Aug 2024 | ₹101 | ₹106 | ₹101 |
| 23 Aug 2024 | ₹100 | ₹104 | ₹101 |
| 6 Sep 2024 | ₹98 | ₹103 | ₹101 |
| 20 Sep 2024 | ₹94 | ₹101 | ₹101 |
| 4 Oct 2024 | ₹89 | ₹98 | ₹100 |
| 18 Oct 2024 | ₹86 | ₹95 | ₹99 |
| 1 Nov 2024 | ₹89 | ₹92 | ₹97 |
| 14 Nov 2024 | ₹84 | ₹90 | ₹97 |
| 29 Nov 2024 | ₹83 | ₹88 | ₹95 |
| 13 Dec 2024 | ₹88 | ₹87 | ₹94 |
| 27 Dec 2024 | ₹80 | ₹86 | ₹93 |
| 10 Jan 2025 | ₹80 | ₹84 | ₹92 |
| 24 Jan 2025 | ₹78 | ₹82 | ₹91 |
| 7 Feb 2025 | ₹75 | ₹80 | ₹89 |
| 21 Feb 2025 | ₹68 | ₹77 | ₹88 |
| 7 Mar 2025 | ₹63 | ₹72 | ₹85 |
| 21 Mar 2025 | ₹62 | ₹69 | ₹83 |
| 4 Apr 2025 | ₹61 | ₹67 | ₹81 |
| 17 Apr 2025 | ₹63 | ₹65 | ₹80 |
| 2 May 2025 | ₹60 | ₹65 | ₹79 |
| 16 May 2025 | ₹65 | ₹64 | ₹77 |
| 30 May 2025 | ₹64 | ₹64 | ₹76 |
| 13 Jun 2025 | ₹66 | ₹65 | ₹75 |
| 27 Jun 2025 | ₹66 | ₹64 | ₹74 |
| 11 Jul 2025 | ₹66 | ₹65 | ₹73 |
| 25 Jul 2025 | ₹65 | ₹65 | ₹72 |
| 8 Aug 2025 | ₹66 | ₹66 | ₹72 |
| 22 Aug 2025 | ₹69 | ₹67 | ₹72 |
| 5 Sep 2025 | ₹65 | ₹66 | ₹71 |
| 19 Sep 2025 | ₹65 | ₹66 | ₹70 |
| 3 Oct 2025 | ₹63 | ₹65 | ₹70 |
| 17 Oct 2025 | ₹63 | ₹64 | ₹69 |
| 31 Oct 2025 | ₹64 | ₹64 | ₹69 |
| 14 Nov 2025 | ₹61 | ₹63 | ₹68 |
| 28 Nov 2025 | ₹59 | ₹62 | ₹67 |
| 12 Dec 2025 | ₹60 | ₹61 | ₹66 |
| 26 Dec 2025 | ₹61 | ₹61 | ₹66 |
| 9 Jan 2026 | ₹58 | ₹61 | ₹65 |
| 23 Jan 2026 | ₹57 | ₹59 | ₹65 |
| 6 Feb 2026 | ₹61 | ₹59 | ₹64 |
| 20 Feb 2026 | ₹60 | ₹60 | ₹64 |
| 6 Mar 2026 | ₹57 | ₹59 | ₹63 |
| 20 Mar 2026 | ₹51 | ₹57 | ₹62 |
| 17 Apr 2026 | ₹59 | ₹56 | ₹61 |
| 30 Apr 2026 | ₹57 | ₹57 | ₹61 |
| 15 May 2026 | ₹57 | ₹57 | ₹61 |
| 29 May 2026 | ₹56 | ₹57 | ₹60 |
| 5 Jun 2026 | ₹56 | ₹57 | ₹60 |
| 12 Jun 2026 | ₹58 | ₹57 | ₹60 |
| 19 Jun 2026 | ₹61 | ₹57 | ₹60 |
| 25 Jun 2026 | ₹59 | ₹58 | ₹60 |
| 3 Jul 2026 | ₹62 | ₹58 | ₹60 |
| 17 Jul 2026 | ₹58 | ₹59 | ₹60 |
| 31 Jul 2026 | ₹58 | ₹58 | ₹60 |
| 14 Aug 2026 | ₹55 | ₹58 | ₹59 |
| 28 Aug 2026 | ₹54 | ₹57 | ₹59 |
| 11 Sep 2026 | ₹53 | ₹56 | ₹58 |
| 25 Sep 2026 | ₹53 | ₹55 | ₹58 |
| 9 Oct 2026 | ₹51 | ₹54 | ₹57 |
| 23 Oct 2026 | ₹47 | ₹52 | ₹57 |
| 4 Nov 2026 | ₹46 | ₹51 | ₹56 |
Price stage: Falling from Oct 2025 to Oct 2026.
Price stage: Rising from Nov 2023 to Sep 2024; Falling from Oct 2024 to Oct 2026.
Price stage: Falling from Mar 2022 to Nov 2022; Sideways from Nov 2022 to Dec 2022; Falling from Dec 2022 to Jun 2023; Rising from Jul 2023 to Sep 2024; Falling from Oct 2024 to Oct 2026.
Week by week since 2022: did it beat the NIFTY 500 over the past 13 weeks?
Ahead in 68 of 232 weeks
| Week | 13-week return vs NIFTY 500 |
|---|---|
| 25 Mar 2022 | no NIFTY 500 reading |
| 1 Apr 2022 | no NIFTY 500 reading |
| 8 Apr 2022 | no NIFTY 500 reading |
| 13 Apr 2022 | no NIFTY 500 reading |
| 22 Apr 2022 | no NIFTY 500 reading |
| 29 Apr 2022 | no NIFTY 500 reading |
| 6 May 2022 | no NIFTY 500 reading |
| 13 May 2022 | no NIFTY 500 reading |
| 20 May 2022 | no NIFTY 500 reading |
| 27 May 2022 | no NIFTY 500 reading |
| 3 Jun 2022 | no NIFTY 500 reading |
| 10 Jun 2022 | no NIFTY 500 reading |
| 17 Jun 2022 | no NIFTY 500 reading |
| 24 Jun 2022 | +6.4% |
| 1 Jul 2022 | +5.7% |
| 8 Jul 2022 | −2.4% |
| 15 Jul 2022 | −6.7% |
| 22 Jul 2022 | −9.0% |
| 29 Jul 2022 | −4.8% |
| 5 Aug 2022 | −11.9% |
| 12 Aug 2022 | −15.3% |
| 19 Aug 2022 | −17.7% |
| 26 Aug 2022 | −18.6% |
| 2 Sep 2022 | −17.0% |
| 9 Sep 2022 | −25.9% |
| 16 Sep 2022 | −14.0% |
| 23 Sep 2022 | −4.1% |
| 30 Sep 2022 | −7.3% |
| 7 Oct 2022 | −7.0% |
| 14 Oct 2022 | +0.4% |
| 21 Oct 2022 | −11.3% |
| 28 Oct 2022 | −7.5% |
| 4 Nov 2022 | −1.8% |
| 11 Nov 2022 | +5.8% |
| 18 Nov 2022 | −3.2% |
| 25 Nov 2022 | −0.9% |
| 2 Dec 2022 | −4.3% |
| 9 Dec 2022 | +1.6% |
| 16 Dec 2022 | −4.1% |
| 23 Dec 2022 | −13.2% |
| 30 Dec 2022 | −3.1% |
| 6 Jan 2023 | −6.5% |
| 13 Jan 2023 | −8.6% |
| 20 Jan 2023 | −1.8% |
| 27 Jan 2023 | −5.2% |
| 3 Feb 2023 | −11.2% |
| 10 Feb 2023 | −11.1% |
| 17 Feb 2023 | −4.5% |
| 24 Feb 2023 | −6.6% |
| 3 Mar 2023 | −2.6% |
| 10 Mar 2023 | +2.0% |
| 17 Mar 2023 | −4.1% |
| 24 Mar 2023 | −0.9% |
| 31 Mar 2023 | −3.5% |
| 6 Apr 2023 | −2.9% |
| 13 Apr 2023 | −1.9% |
| 21 Apr 2023 | −2.7% |
| 28 Apr 2023 | −3.9% |
| 5 May 2023 | +0.4% |
| 12 May 2023 | −6.5% |
| 19 May 2023 | −3.2% |
| 26 May 2023 | −0.3% |
| 2 Jun 2023 | +4.6% |
| 9 Jun 2023 | +3.2% |
| 16 Jun 2023 | +9.3% |
| 23 Jun 2023 | +7.1% |
| 30 Jun 2023 | +2.9% |
| 7 Jul 2023 | +1.3% |
| 14 Jul 2023 | −2.0% |
| 21 Jul 2023 | +2.5% |
| 28 Jul 2023 | +11.9% |
| 4 Aug 2023 | +13.3% |
| 11 Aug 2023 | +27.4% |
| 18 Aug 2023 | +20.7% |
| 25 Aug 2023 | +28.7% |
| 1 Sep 2023 | +16.1% |
| 8 Sep 2023 | +11.0% |
| 15 Sep 2023 | +10.8% |
| 22 Sep 2023 | +10.7% |
| 29 Sep 2023 | +17.4% |
| 6 Oct 2023 | +23.1% |
| 13 Oct 2023 | +25.1% |
| 20 Oct 2023 | +25.0% |
| 27 Oct 2023 | +16.8% |
| 3 Nov 2023 | +11.3% |
| 12 Nov 2023 | +5.3% |
| 17 Nov 2023 | +15.1% |
| 24 Nov 2023 | +18.4% |
| 1 Dec 2023 | +10.8% |
| 8 Dec 2023 | +8.8% |
| 15 Dec 2023 | +10.3% |
| 22 Dec 2023 | +7.1% |
| 29 Dec 2023 | +6.1% |
| 5 Jan 2024 | +7.4% |
| 12 Jan 2024 | +15.2% |
| 20 Jan 2024 | +8.2% |
| 25 Jan 2024 | +2.7% |
| 2 Feb 2024 | +9.9% |
| 9 Feb 2024 | +8.9% |
| 16 Feb 2024 | −5.1% |
| 23 Feb 2024 | −11.4% |
| 2 Mar 2024 | −0.7% |
| 7 Mar 2024 | −2.0% |
| 15 Mar 2024 | −7.1% |
| 22 Mar 2024 | −1.8% |
| 28 Mar 2024 | −9.8% |
| 5 Apr 2024 | −5.2% |
| 12 Apr 2024 | −12.8% |
| 19 Apr 2024 | −16.7% |
| 26 Apr 2024 | −8.0% |
| 3 May 2024 | −9.1% |
| 10 May 2024 | −13.2% |
| 18 May 2024 | −7.3% |
| 24 May 2024 | −9.5% |
| 31 May 2024 | −15.1% |
| 7 Jun 2024 | −18.4% |
| 14 Jun 2024 | −7.7% |
| 21 Jun 2024 | −12.0% |
| 28 Jun 2024 | −8.6% |
| 5 Jul 2024 | −15.9% |
| 12 Jul 2024 | −8.8% |
| 19 Jul 2024 | −3.0% |
| 26 Jul 2024 | −7.9% |
| 2 Aug 2024 | −6.7% |
| 9 Aug 2024 | −9.6% |
| 16 Aug 2024 | −16.6% |
| 23 Aug 2024 | −15.2% |
| 30 Aug 2024 | −11.1% |
| 6 Sep 2024 | −7.2% |
| 13 Sep 2024 | −14.9% |
| 20 Sep 2024 | −16.9% |
| 27 Sep 2024 | −16.5% |
| 4 Oct 2024 | −18.8% |
| 11 Oct 2024 | −23.6% |
| 18 Oct 2024 | −21.7% |
| 25 Oct 2024 | −22.6% |
| 1 Nov 2024 | −18.8% |
| 8 Nov 2024 | −10.5% |
| 14 Nov 2024 | −10.0% |
| 22 Nov 2024 | −13.6% |
| 29 Nov 2024 | −14.6% |
| 6 Dec 2024 | −16.0% |
| 13 Dec 2024 | −6.0% |
| 20 Dec 2024 | −6.3% |
| 27 Dec 2024 | −5.3% |
| 3 Jan 2025 | −1.6% |
| 10 Jan 2025 | −0.3% |
| 17 Jan 2025 | −1.4% |
| 24 Jan 2025 | +0.1% |
| 1 Feb 2025 | −9.4% |
| 7 Feb 2025 | −9.4% |
| 14 Feb 2025 | −9.8% |
| 21 Feb 2025 | −7.9% |
| 28 Feb 2025 | −15.2% |
| 7 Mar 2025 | −9.2% |
| 13 Mar 2025 | −24.4% |
| 21 Mar 2025 | −18.5% |
| 28 Mar 2025 | −20.1% |
| 4 Apr 2025 | −17.0% |
| 11 Apr 2025 | −22.2% |
| 17 Apr 2025 | −24.5% |
| 25 Apr 2025 | −23.2% |
| 2 May 2025 | −22.8% |
| 9 May 2025 | −28.2% |
| 16 May 2025 | −17.8% |
| 23 May 2025 | −20.8% |
| 30 May 2025 | −6.2% |
| 6 Jun 2025 | −9.7% |
| 13 Jun 2025 | +2.5% |
| 20 Jun 2025 | −8.8% |
| 27 Jun 2025 | −0.8% |
| 4 Jul 2025 | −8.0% |
| 11 Jul 2025 | −3.1% |
| 18 Jul 2025 | −0.8% |
| 25 Jul 2025 | −1.0% |
| 1 Aug 2025 | +12.0% |
| 8 Aug 2025 | +10.7% |
| 14 Aug 2025 | +0.8% |
| 22 Aug 2025 | +11.6% |
| 29 Aug 2025 | +0.8% |
| 5 Sep 2025 | −2.3% |
| 12 Sep 2025 | −4.6% |
| 19 Sep 2025 | +5.5% |
| 26 Sep 2025 | −3.6% |
| 3 Oct 2025 | −2.9% |
| 10 Oct 2025 | −4.2% |
| 17 Oct 2025 | −6.5% |
| 24 Oct 2025 | −6.4% |
| 31 Oct 2025 | −10.9% |
| 7 Nov 2025 | −12.0% |
| 14 Nov 2025 | −12.8% |
| 21 Nov 2025 | −18.5% |
| 28 Nov 2025 | −12.3% |
| 5 Dec 2025 | −8.5% |
| 12 Dec 2025 | −6.0% |
| 19 Dec 2025 | −11.4% |
| 26 Dec 2025 | −5.2% |
| 2 Jan 2026 | −7.7% |
| 9 Jan 2026 | −8.1% |
| 16 Jan 2026 | −5.9% |
| 23 Jan 2026 | −6.8% |
| 1 Feb 2026 | −8.4% |
| 6 Feb 2026 | −1.3% |
| 13 Feb 2026 | −1.8% |
| 20 Feb 2026 | +2.2% |
| 27 Feb 2026 | +5.5% |
| 6 Mar 2026 | −0.8% |
| 13 Mar 2026 | −4.0% |
| 20 Mar 2026 | −4.3% |
| 27 Mar 2026 | +0.8% |
| 17 Apr 2026 | +2.2% |
| 24 Apr 2026 | +1.5% |
| 30 Apr 2026 | +0.4% |
| 8 May 2026 | +8.5% |
| 15 May 2026 | +1.6% |
| 22 May 2026 | −4.2% |
| 29 May 2026 | −0.6% |
| 4 Jun 2026 | −2.3% |
| 5 Jun 2026 | −4.8% |
| 10 Jun 2026 | +0.6% |
| 12 Jun 2026 | +4.8% |
| 17 Jun 2026 | +9.9% |
| 19 Jun 2026 | +2.3% |
| 24 Jun 2026 | +3.7% |
| 25 Jun 2026 | +1.8% |
| 1 Jul 2026 | +2.9% |
| 3 Jul 2026 | −0.2% |
| 10 Jul 2026 | +0.1% |
| 17 Jul 2026 | +2.0% |
| 24 Jul 2026 | −0.5% |
| 31 Jul 2026 | −0.8% |
| 7 Aug 2026 | −4.9% |
| 14 Aug 2026 | −9.3% |
| 21 Aug 2026 | −11.8% |
| 28 Aug 2026 | −12.5% |
| 4 Sep 2026 | −10.7% |
| 11 Sep 2026 | −12.7% |
| 18 Sep 2026 | −8.7% |
| 25 Sep 2026 | −8.7% |
| 1 Oct 2026 | −9.9% |
| 9 Oct 2026 | −6.8% |
| 16 Oct 2026 | −9.1% |
| 23 Oct 2026 | −10.1% |
| 30 Oct 2026 | −19.4% |
| 4 Nov 2026 | −10.2% |
Over the last 4.6 years the share price moved −34% while the NIFTY 500 moved +47%, so it is behind the index over that whole period. It was last ahead over 13 weeks in the week of 17 July 2026. The chart above shows the 13-week comparison for every week.
This page treats a rise as over when the price closes below its 200-day average on two Fridays in a row.
What changed at Gateway Distriparks this quarter?
Two changes stood out: indian funds and insurers (DIIs) cut their stake for 9 quarters in a row and highest quarterly revenue in 16 quarters.
Indian funds and insurers (DIIs) cut their stake for 9 quarters in a row
From 43.6% to 29.7% of the company by the September 2026 quarter.
Highest quarterly revenue in 16 quarters
Revenue of ₹580 crore in the September 2026 quarter is the highest of the last 16 quarters.
Why: Revenue hit a record because price increases were passed through to customers.
Next results: check whether rail volumes hit the bare minimum of 100,000 a quarter that management is targeting for the rest of the year.
From the earnings call on 28 Oct 2026.
What dividend does Gateway Distriparks pay?
Gateway Distriparks paid ₹2 a share in regular dividends in the 12 months to 5 November 2026 (2 payments), a yield of 4.31% at the ₹46.43 close on 4 November 2026. The last was an interim dividend of ₹1.25 a share, ex-date 11 August 2026.
Gateway Distriparks dividends since 1 April 2021
| Ex-date | Dividend per share | Type | Record date |
|---|---|---|---|
| 11 Aug 2026Interim | ₹1.25 | Interim | same day |
| 12 Feb 2026Interim + Special | ₹2 | Interim + Special | same day |
| 1 Aug 2025Interim | ₹1.25 | Interim | 2 Aug 2025 |
| 7 Feb 2025Interim | ₹0.75 | Interim | same day |
| 21 Aug 2024Interim | ₹1.25 | Interim | same day |
| 26 Feb 2024Interim | ₹0.75 | Interim | same day |
| 14 Aug 2023Interim | ₹1.25 | Interim | same day |
| 14 Feb 2023Interim | ₹0.75 | Interim | same day |
| 4 May 2022Interim | ₹1.25 | Interim | 5 May 2022 |
Amounts as the company declared them on the NSE. A dividend goes to whoever owns the shares before the ex-date.
Yes. Gateway Distriparks Ltd paid out 64% of its profit as dividends in FY26, and it paid a dividend in 6 of its last 9 reported years.
From the NSE corporate-actions record, read 5 November 2026.
What are Gateway Distriparks' latest quarterly results?
For July to September 2026 (the quarter ended 30 September 2026), Gateway Distriparks reported revenue of ₹580 crore, up 2.3% from ₹567 crore a year earlier, and a profit of ₹59.0 crore, down 10.6% from ₹66.0 crore.
Gateway Distriparks results: July to September 2026 against a year earlier
| Measure | July to September 2026 | July to September 2025 | Change |
|---|---|---|---|
| Revenue | ₹580 crore | ₹567 crore | +2.3% |
| Profit | ₹59.0 crore | ₹66.0 crore | −10.6% |
| Earnings per share | ₹1.16 | ₹1.34 | −13.4% |
| Operating margin | 22.0% | 21.0% | +1.0 points |
The next results, for October to December 2026, are due by 14 February 2027: listed companies must publish quarterly results within 45 days of the quarter's end (60 days for the January to March quarter).
Gateway Distriparks' management discussed these results on a call held on 28 October 2026; what it said is further down this page.
From the company's reported quarterly results (quarter ended 30 September 2026). Revenue and profit in ₹ crore.
What is the Gateway Distriparks share price history?
Gateway Distriparks closed at ₹46.43 on 4 November 2026, down 24.7% from ₹61.68 a year earlier (7 November 2025) and down 47.4% over three years. Its highest weekly close since March 2022 was ₹116.15 on 12 January 2024.
Gateway Distriparks share price: then and now
| When | Close | Change to 4 Nov 2026 |
|---|---|---|
| 1 week ago · 30 Oct 2026 | ₹42.87 | +8.3% |
| 1 month ago · 1 Oct 2026 | ₹51.88 | −10.5% |
| 6 months ago · 8 May 2026 | ₹59.96 | −22.6% |
| 1 year ago · 7 Nov 2025 | ₹61.68 | −24.7% |
| 3 years ago · 3 Nov 2023 | ₹88.30 | −47.4% |
| Earliest weekly close in our records · 25 Mar 2022 | ₹69.95 | −33.6% |
| Highest weekly close since March 2022 · 12 Jan 2024 | ₹116.15 | −60.0% |
| Lowest weekly close since March 2022, also the 52-week low · 30 Oct 2026 | ₹42.87 | +8.3% |
| 52-week high (weekly close) · 3 Jul 2026 | ₹61.86 | −24.9% |
Weekly closing prices. Each change is the move from that price to the 4 Nov 2026 close. A day's intraday high or low can go beyond these weekly closes.
245 weekly closes from 25 March 2022 to 4 November 2026.
What is the latest news on Gateway Distriparks?
4 Nov 2026: Gateway Distriparks closed at ₹46.43, up 8.3% on the week and down 10.5% on the month. 28 Oct 2026: Gateway Distriparks held its results call for July to September 2026. Management guided: H2 rail volumes at 100,000 TEUs per quarter bare minimum for rest of year.
Earlier
- Results for July to September 2026: Revenue up 2.3% and profit down 10.6% on a year earlier.
- 11 Aug 2026: ex-date for an interim dividend of ₹1.25 a share.
- 12 Feb 2026: ex-date for an interim + special dividend of ₹2 a share.
What did Gateway Distriparks management say on the latest results call?
On the call for July to September 2026, held on 28 October 2026, Gateway Distriparks' management guided: H2 rail volumes at 100,000 TEUs per quarter bare minimum for rest of year.
“For the rest of the year, 100,000 in rail volumes is the bare minimum that we are targeting for the quarter.”Management, on the call for July to September 2026
What management guided
- Next-year double-digit volume growth maintained, current full year under review after weak Q1.
- Snowman full-year operating profit to cross ₹100 crore on operating recovery.
- Ankleshwar EXIM volumes to commence in Q3 with full-year contribution next year.
- Indore ICD operational December 2027 with meaningful volumes 6 months later and 2-year ramp.
Management’s own plans and goals, from our notes of the call. A plan is not a result.
Source: the call transcript.
From the call for July to September 2026, 28 October 2026.
What to watch in Gateway Distriparks' next results?
When Gateway Distriparks reports October to December 2026, these are the 4 checks that show whether the story is still on course. First: Rail volumes against flagged H2 quarterly floor - checks whether monthly volatility still allows bare-minimum delivery.
| What to check (from the call) |
|---|
| Rail volumes against flagged H2 quarterly floor - checks whether monthly volatility still allows bare-minimum delivery. |
| Ankleshwar EXIM ramp after BL opening - checks whether mixed-train start lifts H2 volumes as planned. |
| Snowman operating profit progress toward flagged full-year threshold - checks whether utilisation recovery and cost pass-through close gap. |
| Jaipur tribunal outcome and Indore build progress - checks whether legal clearance and civil works stay on flagged timelines. |
Which stock lists is Gateway Distriparks on?
Gateway Distriparks is on 3 of our India lists: 52 week high & low, Dividend stocks and Penny stocks.
Is Gateway Distriparks profitable?
Gateway Distriparks Ltd earned ₹59.0 Cr of net profit in the Sep 2026 quarter, −10.6% on the same quarter a year earlier. Full-year FY26 profit was ₹259 Cr. Over 11 years profit has grown 8.6% a year on average. That is 10.2% of the quarter's revenue. The same quarter a year earlier earned ₹66.0 Cr.
Net profit is what is left after every cost, interest and tax. Earnings per share, dividends and book value all grow from it.
1 of the last 12 reported quarters were loss-making.
For the full year, FY26 profit was ₹259 Cr (−30.7% on the year before).
FY26 profit ₹259 Cr (−30.7% on the year before), 8.6% a year over 11 years
- Net profit ₹259
| Quarter | Net profit |
|---|---|
| FY15 | ₹105 |
| FY16 | ₹61 |
| FY20 | ₹104 |
| FY21 | ₹94 |
| FY22 | ₹224 |
| FY23 | ₹242 |
| FY24 | ₹258 |
| FY25 | ₹374 |
| FY26 | ₹259 |
Growth on a year earlier
- Growth on a year earlier −30.7%
| Quarter | Growth on a year earlier |
|---|---|
| FY15 | – |
| FY16 | −41.9% |
| FY20 | 70.5% |
| FY21 | −9.6% |
| FY22 | 138.3% |
| FY23 | 8% |
| FY24 | 6.6% |
| FY25 | 45% |
| FY26 | −30.7% |
Sep 2026: ₹59.0 Cr (−10.6% on a year earlier)
- Net profit (quarterly) ₹59.0
| Quarter | Net profit (quarterly) |
|---|---|
| Dec 2023 | ₹65 |
| Mar 2024 | ₹56 |
| Jun 2024 | ₹49 |
| Sep 2024 | ₹60 |
| Dec 2024 | ₹456 |
| Mar 2025 | −₹191 |
| Jun 2025 | ₹62 |
| Sep 2025 | ₹66 |
| Dec 2025 | ₹67 |
| Mar 2026 | ₹64 |
| Jun 2026 | ₹51 |
| Sep 2026 | ₹59 |
Growth on a year earlier
- Growth on a year earlier −10.6%
| Quarter | Growth on a year earlier |
|---|---|
| Dec 2023 | 18.2% |
| Mar 2024 | −18.8% |
| Jun 2024 | −23.4% |
| Sep 2024 | −18.9% |
| Dec 2024 | 601.5% |
| Mar 2025 | −441.1% |
| Jun 2025 | 26.5% |
| Sep 2025 | 10% |
| Dec 2025 | −85.3% |
| Mar 2026 | – |
| Jun 2026 | −17.7% |
| Sep 2026 | −10.6% |
Why profit moved: revenue changed +2.3% on a year earlier and the margin moved +1.0 percentage points. Sales did the work, and the margin was about flat.
On average over the last four quarters, profit changed −37.9% and revenue +10.2%. Profit is growing slower than sales: rising costs are taking part of the growth.
How much revenue does Gateway Distriparks make, and is it growing?
Gateway Distriparks Ltd reported ₹580 Cr of revenue in the Sep 2026 quarter, +2.3% on the same quarter a year earlier. Over 11 years it has grown 11.2% a year on average. The last full year, FY26, came in at ₹2,212 Cr. The last four reported quarters add to ₹2,223 Cr.
Revenue is everything the company billed its customers in the period.
FY26 revenue was ₹2,212 Cr, +31.6% on the year before.
FY26 revenue ₹2,212 Cr (+31.6% on the year before), 11.2% a year over 11 years
- Revenue ₹2,212
| Quarter | Revenue |
|---|---|
| FY15 | ₹691 |
| FY16 | ₹730 |
| FY20 | ₹1,292 |
| FY21 | ₹1,179 |
| FY22 | ₹1,374 |
| FY23 | ₹1,421 |
| FY24 | ₹1,536 |
| FY25 | ₹1,681 |
| FY26 | ₹2,212 |
Growth on a year earlier
- Growth on a year earlier 31.6%
| Quarter | Growth on a year earlier |
|---|---|
| FY15 | – |
| FY16 | 5.6% |
| FY20 | 77% |
| FY21 | −8.7% |
| FY22 | 16.5% |
| FY23 | 3.4% |
| FY24 | 8.1% |
| FY25 | 9.4% |
| FY26 | 31.6% |
Sep 2026: ₹580 Cr (+2.3% on a year earlier)
- Revenue (quarterly) ₹580
| Quarter | Revenue (quarterly) |
|---|---|
| Dec 2023 | ₹393 |
| Mar 2024 | ₹375 |
| Jun 2024 | ₹353 |
| Sep 2024 | ₹390 |
| Dec 2024 | ₹403 |
| Mar 2025 | ₹535 |
| Jun 2025 | ₹550 |
| Sep 2025 | ₹567 |
| Dec 2025 | ₹560 |
| Mar 2026 | ₹534 |
| Jun 2026 | ₹549 |
| Sep 2026 | ₹580 |
Growth on a year earlier
- Growth on a year earlier 2.3%
| Quarter | Growth on a year earlier |
|---|---|
| Dec 2023 | 15.2% |
| Mar 2024 | −0.5% |
| Jun 2024 | −4.6% |
| Sep 2024 | −2.3% |
| Dec 2024 | 2.5% |
| Mar 2025 | 42.7% |
| Jun 2025 | 55.8% |
| Sep 2025 | 45.4% |
| Dec 2025 | 39% |
| Mar 2026 | −0.2% |
| Jun 2026 | −0.2% |
| Sep 2026 | 2.3% |
Recent pace: the last four quarters grew +10.2% on average, against 11.2% a year over the longer run, so this year is growing at about the same pace as its own long-run rate.
Is growth speeding up? Revenue over the last 12 months grew +8.2%, against +21.3% a year over the last 8 quarters (rolling over); profit over the last 12 months grew −38.7%, against +2.4% a year (rolling over).
How much of every ₹100 of sales does Gateway Distriparks keep?
Gateway Distriparks Ltd's operating margin was 22.0% in the Sep 2026 quarter, 1.0 percentage points higher than the same quarter a year ago. Across 9 years it has been between 20.0% and 27.0%. The latest quarter is within that range.
Operating margin is what is left from every ₹100 of sales after the costs of running the business, before interest and tax. It shows pricing power and cost control.
Why the margin moved: operating margin changed +0.5 percentage points on the year while gross margin changed +0.4 points. So the gain came mostly from the gross margin, which means input costs and prices charged.
FY26: 22.0%, within a range of 20.0% to 27.0% over 9 years
- Operating margin 22.0%
| Quarter | Operating margin |
|---|---|
| FY15 | 25% |
| FY16 | 20% |
| FY20 | 24% |
| FY21 | 27% |
| FY22 | 27% |
| FY23 | 26% |
| FY24 | 25% |
| FY25 | 23% |
| FY26 | 22% |
Change on the year before (points)
- Change on the year before (points) −1.0 pts
| Quarter | Change on the year before (points) |
|---|---|
| FY15 | – |
| FY16 | −5.0 pts |
| FY20 | +4.0 pts |
| FY21 | +3.0 pts |
| FY22 | 0.0 pts |
| FY23 | −1.0 pts |
| FY24 | −1.0 pts |
| FY25 | −2.0 pts |
| FY26 | −1.0 pts |
Sep 2026: operating margin 22.0% (+1.0 points on a year earlier)
- Operating margin 22.0%
| Quarter | Operating margin |
|---|---|
| Dec 2023 | 25% |
| Mar 2024 | 22% |
| Jun 2024 | 24% |
| Sep 2024 | 25% |
| Dec 2024 | 24% |
| Mar 2025 | 20% |
| Jun 2025 | 22% |
| Sep 2025 | 21% |
| Dec 2025 | 22% |
| Mar 2026 | 22% |
| Jun 2026 | 21% |
| Sep 2026 | 22% |
Change on a year earlier (points)
- Change on a year earlier (points) +1.0 pts
| Quarter | Change on a year earlier (points) |
|---|---|
| Dec 2023 | −2.0 pts |
| Mar 2024 | −3.0 pts |
| Jun 2024 | −2.0 pts |
| Sep 2024 | −1.0 pts |
| Dec 2024 | −1.0 pts |
| Mar 2025 | −2.0 pts |
| Jun 2025 | −2.0 pts |
| Sep 2025 | −4.0 pts |
| Dec 2025 | −2.0 pts |
| Mar 2026 | +2.0 pts |
| Jun 2026 | −1.0 pts |
| Sep 2026 | +1.0 pts |
Is Gateway Distriparks' profit turning into cash?
Over the last 3 years, 132% of Gateway Distriparks Ltd's reported profit came in as cash from its operations, so the profit is backed by cash. In FY26 it brought in ₹469 Cr of operating cash against ₹259 Cr of profit. After ₹154 Cr of spending on assets, ₹315 Cr was left over as free cash.
The profit and loss account shows what was earned. The cash-flow statement shows the cash that actually came in. Comparing operating cash flow with profit is one of the best checks that a profit is real.
Cash-flow figures here are yearly, because quarterly cash statements are not published, so this section changes once a year.
FY26: operating cash ₹469 Cr against profit ₹259 Cr; 132% of 3 years' profit came in as cash
- Operating cash ₹469
- Net profit ₹259
- Free cash ₹315
| Quarter | Operating cash | Net profit | Free cash |
|---|---|---|---|
| FY15 | ₹132 | ₹105 | – |
| FY16 | ₹140 | ₹61 | ₹4 |
| FY20 | ₹303 | ₹104 | – |
| FY21 | ₹308 | ₹94 | ₹271 |
| FY22 | ₹363 | ₹224 | ₹309 |
| FY23 | ₹324 | ₹242 | ₹108 |
| FY24 | ₹321 | ₹258 | ₹180 |
| FY25 | ₹385 | ₹374 | −₹462 |
| FY26 | ₹469 | ₹259 | ₹315 |
FY26: operating cash was 181% of profit (132% over three years)
- Operating cash as % of profit 181%
- Break-even line 100%
| Quarter | Operating cash as % of profit | Break-even line |
|---|---|---|
| FY15 | 126% | 100% |
| FY16 | 230% | 100% |
| FY20 | 291% | 100% |
| FY21 | 300% | 100% |
| FY22 | 162% | 100% |
| FY23 | 134% | 100% |
| FY24 | 124% | 100% |
| FY25 | 103% | 100% |
| FY26 | 181% | 100% |
Why 132% of profit came in as cash: the cash cycle got 318 days shorter between FY21 and FY26, so cash that used to wait in the business now arrives sooner.
What to look at next: the bigger use of cash is spending on new assets, at 3.1× depreciation over three years. The next section checks what that spending is building.
Where does Gateway Distriparks' cash go?
Gateway Distriparks Ltd's cash cycle, the days between paying suppliers and getting paid by customers, was −278 days in FY26, down from 40 days in FY21. It spent ₹1,142 Cr on assets over the last 3 years. Customers take 44 days to pay, and stock sits for 23 days on average.
Working capital is the cash tied up between paying suppliers and getting paid. Debtor days: how long customers take to pay. Inventory days: how long stock sits. The cash cycle: the whole loop, in days of sales.
At FY26 sales of ₹2,212 Cr, each day of that cycle ties up about ₹6.1 Cr, so roughly −₹1,685 Cr is tied up in the business at any time.
FY26: customers took 44 days to pay and stock sat for 23 days, about 0.8 months of sales sitting as stock, for a full cycle of −278 days, shorter than FY21's 40.
The full loop: cash goes out to suppliers and production on day 0. Stock sits for 23 days. Customers pay about 44 days after that. Suppliers are paid at 345 days. Together that makes the −278-day cycle.
FY26: a −278-day cash cycle, −318 days compared with FY21
- Cash cycle −278d
- Inventory days 23d
- Debtor days 44d
- Payable days 345d
| Quarter | Cash cycle | Inventory days | Debtor days | Payable days |
|---|---|---|---|---|
| FY15 | 38d | – | 38d | – |
| FY16 | 30d | – | 30d | – |
| FY20 | 37d | – | 37d | – |
| FY21 | 40d | – | 40d | – |
| FY22 | 31d | – | 31d | – |
| FY23 | 35d | – | 35d | – |
| FY24 | 37d | – | 37d | – |
| FY25 | 59d | – | 59d | – |
| FY26 | −278d | 23d | 44d | 345d |
Spending on assets: ₹1,142 Cr over the last 3 years, against ₹363 Cr of depreciation (the yearly wear and tear on existing assets). So it is building well beyond replacing what wears out. Work still in progress is ₹29.0 Cr (FY26): assets paid for that are not earning yet.
FY26: capex ₹154 Cr, work in progress ₹29.0 Cr, a build-out
- Capex ₹154
- Work-in-progress ₹29.0
| Quarter | Capex | Work-in-progress |
|---|---|---|
| FY16 | ₹136 | ₹56 |
| FY21 | ₹37 | ₹29 |
| FY22 | ₹54 | ₹10 |
| FY23 | ₹216 | ₹15 |
| FY24 | ₹141 | ₹36 |
| FY25 | ₹847 | ₹63 |
| FY26 | ₹154 | ₹29 |
In short: the cash is going into new capacity, not getting stuck in the daily cycle. The question is whether the new capacity earns.
What is Gateway Distriparks' P/E ratio, and how does it compare with its own history?
Gateway Distriparks Ltd's P/E is 9.8×, about the lowest it has ever been. Its usual P/E (the middle reading) is 14.7×, over 4.6 years of weekly prices. This compares the share price with the company’s own past. It does not say what the business is worth.
P/E is the share price divided by a year's profit per share: how many rupees the market pays for each rupee of yearly profit.
P/E 9.8× against a usual 14.7×: about the lowest it has ever been
- P/E 9.10×
- Median 14.7×
| Week | P/E | Median |
|---|---|---|
| 25 Mar 2022 | 37.1× | 14.7× |
| 8 Apr 2022 | 39.8× | 14.7× |
| 22 Apr 2022 | 39.8× | 14.7× |
| 6 May 2022 | 38.6× | 14.7× |
| 20 May 2022 | 39.8× | 14.7× |
| 3 Jun 2022 | 38.8× | 14.7× |
| 17 Jun 2022 | 35.7× | 14.7× |
| 1 Jul 2022 | 35.1× | 14.7× |
| 15 Jul 2022 | 35.8× | 14.7× |
| 29 Jul 2022 | 39.0× | 14.7× |
| 12 Aug 2022 | 36.8× | 14.7× |
| 26 Aug 2022 | 15.7× | 14.7× |
| 9 Sep 2022 | 15.5× | 14.7× |
| 23 Sep 2022 | 16.4× | 14.7× |
| 7 Oct 2022 | 16.3× | 14.7× |
| 21 Oct 2022 | 15.7× | 14.7× |
| 4 Nov 2022 | 16.7× | 14.7× |
| 18 Nov 2022 | 14.0× | 14.7× |
| 2 Dec 2022 | 13.6× | 14.7× |
| 16 Dec 2022 | 13.5× | 14.7× |
| 30 Dec 2022 | 13.6× | 14.7× |
| 13 Jan 2023 | 13.5× | 14.7× |
| 27 Jan 2023 | 12.6× | 14.7× |
| 10 Feb 2023 | 12.3× | 14.7× |
| 24 Feb 2023 | 11.6× | 14.7× |
| 10 Mar 2023 | 12.4× | 14.7× |
| 24 Mar 2023 | 11.7× | 14.7× |
| 6 Apr 2023 | 12.5× | 14.7× |
| 21 Apr 2023 | 12.5× | 14.7× |
| 5 May 2023 | 12.4× | 14.7× |
| 19 May 2023 | 12.6× | 14.7× |
| 2 Jun 2023 | 14.4× | 14.7× |
| 16 Jun 2023 | 15.3× | 14.7× |
| 30 Jun 2023 | 15.0× | 14.7× |
| 14 Jul 2023 | 14.9× | 14.7× |
| 28 Jul 2023 | 16.2× | 14.7× |
| 11 Aug 2023 | 16.9× | 14.7× |
| 25 Aug 2023 | 17.7× | 14.7× |
| 8 Sep 2023 | 18.0× | 14.7× |
| 22 Sep 2023 | 17.3× | 14.7× |
| 6 Oct 2023 | 18.9× | 14.7× |
| 20 Oct 2023 | 18.7× | 14.7× |
| 3 Nov 2023 | 18.0× | 14.7× |
| 17 Nov 2023 | 19.2× | 14.7× |
| 1 Dec 2023 | 19.7× | 14.7× |
| 15 Dec 2023 | 19.7× | 14.7× |
| 29 Dec 2023 | 20.0× | 14.7× |
| 12 Jan 2024 | 22.4× | 14.7× |
| 25 Jan 2024 | 21.1× | 14.7× |
| 9 Feb 2024 | 21.5× | 14.7× |
| 23 Feb 2024 | 20.2× | 14.7× |
| 7 Mar 2024 | 19.6× | 14.7× |
| 22 Mar 2024 | 19.2× | 14.7× |
| 5 Apr 2024 | 21.1× | 14.7× |
| 19 Apr 2024 | 19.1× | 14.7× |
| 3 May 2024 | 19.6× | 14.7× |
| 18 May 2024 | 19.9× | 14.7× |
| 31 May 2024 | 19.3× | 14.7× |
| 14 Jun 2024 | 20.6× | 14.7× |
| 28 Jun 2024 | 20.1× | 14.7× |
| 12 Jul 2024 | 22.0× | 14.7× |
| 26 Jul 2024 | 22.0× | 14.7× |
| 9 Aug 2024 | 21.1× | 14.7× |
| 23 Aug 2024 | 20.9× | 14.7× |
| 6 Sep 2024 | 20.4× | 14.7× |
| 20 Sep 2024 | 19.6× | 14.7× |
| 4 Oct 2024 | 18.5× | 14.7× |
| 18 Oct 2024 | 17.9× | 14.7× |
| 1 Nov 2024 | 18.6× | 14.7× |
| 14 Nov 2024 | 18.5× | 14.7× |
| 29 Nov 2024 | 18.2× | 14.7× |
| 13 Dec 2024 | 19.3× | 14.7× |
| 27 Dec 2024 | 17.6× | 14.7× |
| 10 Jan 2025 | 17.6× | 14.7× |
| 24 Jan 2025 | 17.1× | 14.7× |
| 7 Feb 2025 | 15.7× | 14.7× |
| 21 Feb 2025 | 14.3× | 14.7× |
| 7 Mar 2025 | 13.3× | 14.7× |
| 21 Mar 2025 | 12.9× | 14.7× |
| 4 Apr 2025 | 12.9× | 14.7× |
| 17 Apr 2025 | 13.2× | 14.7× |
| 2 May 2025 | 12.5× | 14.7× |
| 16 May 2025 | 13.7× | 14.7× |
| 30 May 2025 | 13.8× | 14.7× |
| 13 Jun 2025 | 14.1× | 14.7× |
| 27 Jun 2025 | 14.2× | 14.7× |
| 11 Jul 2025 | 14.1× | 14.7× |
| 25 Jul 2025 | 13.9× | 14.7× |
| 8 Aug 2025 | 13.6× | 14.7× |
| 22 Aug 2025 | 14.2× | 14.7× |
| 5 Sep 2025 | 13.2× | 14.7× |
| 19 Sep 2025 | 13.4× | 14.7× |
| 3 Oct 2025 | 12.9× | 14.7× |
| 17 Oct 2025 | 12.8× | 14.7× |
| 31 Oct 2025 | 13.1× | 14.7× |
| 14 Nov 2025 | 12.1× | 14.7× |
| 28 Nov 2025 | 11.8× | 14.7× |
| 12 Dec 2025 | 12.0× | 14.7× |
| 26 Dec 2025 | 12.2× | 14.7× |
| 9 Jan 2026 | 11.5× | 14.7× |
| 23 Jan 2026 | 11.3× | 14.7× |
| 6 Feb 2026 | 12.4× | 14.7× |
| 20 Feb 2026 | 12.2× | 14.7× |
| 6 Mar 2026 | 11.6× | 14.7× |
| 20 Mar 2026 | 10.4× | 14.7× |
| 2 Apr 2026 | 11.1× | 14.7× |
| 17 Apr 2026 | 12.1× | 14.7× |
| 30 Apr 2026 | 11.7× | 14.7× |
| 15 May 2026 | 11.0× | 14.7× |
| 29 May 2026 | 10.9× | 14.7× |
| 5 Jun 2026 | 10.9× | 14.7× |
| 12 Jun 2026 | 11.3× | 14.7× |
| 19 Jun 2026 | 11.8× | 14.7× |
| 25 Jun 2026 | 11.4× | 14.7× |
| 3 Jul 2026 | 12.0× | 14.7× |
| 17 Jul 2026 | 11.3× | 14.7× |
| 31 Jul 2026 | 11.2× | 14.7× |
| 14 Aug 2026 | 11.2× | 14.7× |
| 28 Aug 2026 | 10.9× | 14.7× |
| 11 Sep 2026 | 10.9× | 14.7× |
| 25 Sep 2026 | 10.7× | 14.7× |
| 9 Oct 2026 | 10.4× | 14.7× |
| 23 Oct 2026 | 9.60× | 14.7× |
| 30 Oct 2026 | 9.10× | 14.7× |
Earnings per share, 12 months
- Earnings per share, 12 months ₹5
| Week | Earnings per share, 12 months |
|---|---|
| 25 Mar 2022 | ₹2 |
| 8 Apr 2022 | ₹2 |
| 22 Apr 2022 | ₹2 |
| 6 May 2022 | ₹2 |
| 20 May 2022 | ₹2 |
| 3 Jun 2022 | ₹2 |
| 17 Jun 2022 | ₹2 |
| 1 Jul 2022 | ₹2 |
| 15 Jul 2022 | ₹2 |
| 29 Jul 2022 | ₹2 |
| 12 Aug 2022 | ₹2 |
| 26 Aug 2022 | ₹2 |
| 9 Sep 2022 | ₹2 |
| 23 Sep 2022 | ₹4 |
| 7 Oct 2022 | ₹4 |
| 21 Oct 2022 | ₹4 |
| 4 Nov 2022 | ₹4 |
| 18 Nov 2022 | ₹4 |
| 2 Dec 2022 | ₹4 |
| 16 Dec 2022 | ₹4 |
| 30 Dec 2022 | ₹5 |
| 13 Jan 2023 | ₹5 |
| 27 Jan 2023 | ₹5 |
| 10 Feb 2023 | ₹5 |
| 24 Feb 2023 | ₹5 |
| 10 Mar 2023 | ₹5 |
| 24 Mar 2023 | ₹5 |
| 6 Apr 2023 | ₹5 |
| 21 Apr 2023 | ₹5 |
| 5 May 2023 | ₹5 |
| 19 May 2023 | ₹5 |
| 2 Jun 2023 | ₹5 |
| 16 Jun 2023 | ₹5 |
| 30 Jun 2023 | ₹5 |
| 14 Jul 2023 | ₹5 |
| 28 Jul 2023 | ₹5 |
| 11 Aug 2023 | ₹5 |
| 25 Aug 2023 | ₹5 |
| 8 Sep 2023 | ₹5 |
| 22 Sep 2023 | ₹5 |
| 6 Oct 2023 | ₹5 |
| 20 Oct 2023 | ₹5 |
| 3 Nov 2023 | ₹5 |
| 17 Nov 2023 | ₹5 |
| 1 Dec 2023 | ₹5 |
| 15 Dec 2023 | ₹5 |
| 29 Dec 2023 | ₹5 |
| 12 Jan 2024 | ₹5 |
| 25 Jan 2024 | ₹5 |
| 9 Feb 2024 | ₹5 |
| 23 Feb 2024 | ₹5 |
| 7 Mar 2024 | ₹5 |
| 22 Mar 2024 | ₹5 |
| 5 Apr 2024 | ₹5 |
| 19 Apr 2024 | ₹5 |
| 3 May 2024 | ₹5 |
| 18 May 2024 | ₹5 |
| 31 May 2024 | ₹5 |
| 14 Jun 2024 | ₹5 |
| 28 Jun 2024 | ₹5 |
| 12 Jul 2024 | ₹5 |
| 26 Jul 2024 | ₹5 |
| 9 Aug 2024 | ₹5 |
| 23 Aug 2024 | ₹5 |
| 6 Sep 2024 | ₹5 |
| 20 Sep 2024 | ₹5 |
| 4 Oct 2024 | ₹5 |
| 18 Oct 2024 | ₹5 |
| 1 Nov 2024 | ₹5 |
| 14 Nov 2024 | ₹5 |
| 29 Nov 2024 | ₹5 |
| 13 Dec 2024 | ₹5 |
| 27 Dec 2024 | ₹5 |
| 10 Jan 2025 | ₹5 |
| 24 Jan 2025 | ₹5 |
| 7 Feb 2025 | ₹5 |
| 21 Feb 2025 | ₹5 |
| 7 Mar 2025 | ₹5 |
| 21 Mar 2025 | ₹5 |
| 4 Apr 2025 | ₹5 |
| 17 Apr 2025 | ₹5 |
| 2 May 2025 | ₹5 |
| 16 May 2025 | ₹5 |
| 30 May 2025 | ₹5 |
| 13 Jun 2025 | ₹5 |
| 27 Jun 2025 | ₹5 |
| 11 Jul 2025 | ₹5 |
| 25 Jul 2025 | ₹5 |
| 8 Aug 2025 | ₹5 |
| 22 Aug 2025 | ₹5 |
| 5 Sep 2025 | ₹5 |
| 19 Sep 2025 | ₹5 |
| 3 Oct 2025 | ₹5 |
| 17 Oct 2025 | ₹5 |
| 31 Oct 2025 | ₹5 |
| 14 Nov 2025 | ₹5 |
| 28 Nov 2025 | ₹5 |
| 12 Dec 2025 | ₹5 |
| 26 Dec 2025 | ₹5 |
| 9 Jan 2026 | ₹5 |
| 23 Jan 2026 | ₹5 |
| 6 Feb 2026 | ₹5 |
| 20 Feb 2026 | ₹5 |
| 6 Mar 2026 | ₹5 |
| 20 Mar 2026 | ₹5 |
| 2 Apr 2026 | ₹5 |
| 17 Apr 2026 | ₹5 |
| 30 Apr 2026 | ₹5 |
| 15 May 2026 | ₹5 |
| 29 May 2026 | ₹5 |
| 5 Jun 2026 | ₹5 |
| 12 Jun 2026 | ₹5 |
| 19 Jun 2026 | ₹5 |
| 25 Jun 2026 | ₹5 |
| 3 Jul 2026 | ₹5 |
| 17 Jul 2026 | ₹5 |
| 31 Jul 2026 | ₹5 |
| 14 Aug 2026 | ₹5 |
| 28 Aug 2026 | ₹5 |
| 11 Sep 2026 | ₹5 |
| 25 Sep 2026 | ₹5 |
| 9 Oct 2026 | ₹5 |
| 23 Oct 2026 | ₹5 |
| 30 Oct 2026 | ₹5 |
PEG 1.66: above 1.0, so the P/E is bigger than the earnings growth rate
- PEG 1.66×
- PEG = 1.0 1.00×
| Quarter | PEG | PEG = 1.0 |
|---|---|---|
| Q1 FY23 | 0.58× | 1.00× |
| Q2 FY23 | 0.98× | 1.00× |
| Q3 FY23 | 0.98× | 1.00× |
| Q4 FY23 | 1.46× | 1.00× |
| Q1 FY24 | 1.88× | 1.00× |
| Q2 FY24 | 1.67× | 1.00× |
| Q3 FY24 | 1.44× | 1.00× |
| Q4 FY24 | 1.16× | 1.00× |
| Q1 FY25 | 1.44× | 1.00× |
| Q2 FY25 | 1.83× | 1.00× |
| Q3 FY25 | 1.71× | 1.00× |
| Q4 FY25 | 1.49× | 1.00× |
| Q1 FY26 | 1.77× | 1.00× |
| Q2 FY26 | 1.68× | 1.00× |
| Q3 FY26 | 1.66× | 1.00× |
| Q4 FY26 | 1.66× | 1.00× |
| Q1 FY27 | 1.66× | 1.00× |
| Q2 FY27 | 1.66× | 1.00× |
Why the multiple is where it is: over the past year earnings per share moved −31.0% while the price moved −24.7%. The price did better than earnings, which pushed the multiple up within its own range.
Where the price move came from: over 3 years the price moved −19.3% a year; about −1.4% a year came from earnings growth and about −17.9 percentage points from the multiple (the market paying less). The split is approximate (price return minus earnings growth). It shows how much of the move came from the market paying a different multiple.
In short: the multiple is low against its own past, so the earnings trend underneath matters more than the multiple.
Is the Gateway Distriparks business getting better or worse?
Gateway Distriparks Ltd's business is getting worse. Profit and EPS growth are shrinking: profit growth is −38.7% in the latest quarter, against +128.3% at its best in 12 quarters, with ROCE rising at 11.2%. This is based on 12 quarters of 4 measures.
Every business is somewhere on a path of getting better or worse, and this section names where. The last 12 quarters of growth in revenue, profit and earnings per share, plus the return the business earns on its capital, are read as lines. Getting worse: the lines are falling. Turning around: a low point has just formed and the last few quarters are rising from it. Getting better: the rise from the low has lasted. Growing steadily: steady growth with healthy returns. Slowing from a peak: still high, but slowing. When the lines disagree the result is mixed; too little history means no reading. CAGR (compound annual growth rate) is the steady yearly rate that would turn the starting value into the latest one. It is the fairest way to compare growth over different periods. If the 1-year figure is much bigger than the 10-year one, recent growth is running faster than the long-run trend. A dash means there is no figure for that period, or the starting year was a loss, where a growth rate means nothing.
Growth year by year: revenue +31.6% in FY26, profit −30.7%
- Revenue growth 31.6%
| Quarter | Revenue growth |
|---|---|
| FY15 | – |
| FY16 | 5.6% |
| FY20 | 77% |
| FY21 | −8.7% |
| FY22 | 16.5% |
| FY23 | 3.4% |
| FY24 | 8.1% |
| FY25 | 9.4% |
| FY26 | 31.6% |
Profit growth, EPS growth
- Profit growth −30.7%
- EPS growth −31%
| Quarter | Profit growth | EPS growth |
|---|---|---|
| FY15 | – | – |
| FY16 | −41.9% | −42.2% |
| FY20 | 70.5% | 69.8% |
| FY21 | −9.6% | −8.2% |
| FY22 | 138.3% | −4.5% |
| FY23 | 8% | 7.1% |
| FY24 | 6.6% | 6.9% |
| FY25 | 45% | 44.6% |
| FY26 | −30.7% | −31% |
Three growth lines over twelve quarters: revenue rolling over, profit rolling over
- Revenue 8.2%
| Quarter | Revenue |
|---|---|
| Dec 2023 | 10.4% |
| Mar 2024 | 7.7% |
| Jun 2024 | 4.8% |
| Sep 2024 | 1.6% |
| Dec 2024 | −1.2% |
| Mar 2025 | 9.4% |
| Jun 2025 | 23.6% |
| Sep 2025 | 36% |
| Dec 2025 | 45.4% |
| Mar 2026 | 31.5% |
| Jun 2026 | 17.7% |
| Sep 2026 | 8.2% |
Profit, EPS
- Profit −38.7%
- EPS −39.6%
| Quarter | Profit | EPS |
|---|---|---|
| Dec 2023 | 5.8% | 3.8% |
| Mar 2024 | 7.5% | 5.4% |
| Jun 2024 | −1.2% | −2.4% |
| Sep 2024 | −12.2% | −12.5% |
| Dec 2024 | 128.3% | 131% |
| Mar 2025 | 44.4% | 45.8% |
| Jun 2025 | 58.6% | 59.6% |
| Sep 2025 | 70.9% | 71.8% |
| Dec 2025 | −99.4% | −99.6% |
| Mar 2026 | −30.7% | −31% |
| Jun 2026 | −35.9% | −36.2% |
| Sep 2026 | −38.7% | −39.6% |
ROCE: the return line, worked out each quarter
- ROCE 11.2%
| Quarter | ROCE |
|---|---|
| Dec 2023 | 14.8% |
| Mar 2024 | 13.7% |
| Jun 2024 | 13.1% |
| Sep 2024 | 12.4% |
| Dec 2024 | – |
| Mar 2025 | – |
| Jun 2025 | – |
| Sep 2025 | – |
| Dec 2025 | 3.2% |
| Mar 2026 | 11.1% |
| Jun 2026 | 11% |
| Sep 2026 | 11.2% |
Why it matters: falling lines mean any ratio below that looks low should be read with that direction in mind.
Compound annual growth rate (%)
Compound annual growth rate over each period, %. Revenue, profit and EPS come from yearly figures; the share price row is price growth over the same periods. A dash means no figure for that period, or the starting year was a loss.
| Measure | 1yr | 3yr | 5yr | 10yr |
|---|---|---|---|---|
| Revenue | +31.6% | +15.9% | +13.4% | +11.7% |
| Profit | −30.7% | +2.3% | +22.5% | +15.6% |
| EPS | −31.0% | +2.2% | +1.8% | +5.5% |
| Share price | −24.7% | −19.3% | — | — |
How much does Gateway Distriparks earn on its capital?
Gateway Distriparks Ltd earned a ROCE of 11% in FY26. That is up from a low of 9% in FY21. Its return on capital used (ROIC) is 3.2 percentage points below its cost of capital, so growth here does not yet pay for the capital it uses.
Return on capital employed (ROCE) is the profit the whole business earns on all the money in it, from shareholders and lenders together. It is the best single test of whether growth adds value or just size.
It comes from a 11.7% net margin and 0.63× asset turnover (sales divided by assets).
Why the return is what it is (FY26): a 11.7% net margin × 0.63× asset turnover × 1.53× leverage (assets divided by equity) ≈ 11.3% on equity. The margin does its share; borrowing plays a small part, so this return is earned, not borrowed.
The key test, return on capital used minus the cost of capital: 8.8% − 12.0% = −3.2 percentage points. The 12.0% is a standard assumption for the cost of capital in India, not an estimate for this company. Read the sign and size of the gap, not the decimals. Negative: growth at these returns loses value until returns improve.
The 8.8% ROIC above is the latest reading, as reported. The yearly chart below shows FY26 at 9.8%, and the quarterly chart works out each 12-month window from the quarterly figures, so the readings differ by date, not by method.
FY26: ROCE 11%, the climb back from FY21's 9%
- ROCE 11%
- ROIC (annual) 9.8%
- Cost of capital 12%
| Quarter | ROCE | ROIC (annual) | Cost of capital |
|---|---|---|---|
| FY16 | 11% | – | 12% |
| FY21 | 9% | – | 12% |
| FY22 | 12% | 11.7% | 12% |
| FY23 | 13% | 12.2% | 12% |
| FY24 | 13% | 12.2% | 12% |
| FY25 | 11% | 9.7% | 12% |
| FY26 | 11% | 9.8% | 12% |
Q2 FY27: ROCE 10.7% (last 12 months) against a 12.0% cost of capital
- ROCE (12 months) 10.7%
- ROIC (12 months) 9.3%
- Cost of capital 12.0%
| Quarter | ROCE (12 months) | ROIC (12 months) | Cost of capital |
|---|---|---|---|
| Q3 FY24 | – | 12.5% | 12% |
| Q4 FY24 | 12.2% | 12.5% | 12% |
| Q1 FY25 | – | 12.3% | 12% |
| Q2 FY25 | 11.2% | 11.5% | 12% |
| Q3 FY25 | – | 10.7% | 12% |
| Q4 FY25 | 9% | 10.5% | 12% |
| Q1 FY26 | – | 10.7% | 12% |
| Q2 FY26 | 10.2% | 10.8% | 12% |
| Q3 FY26 | – | 10.7% | 12% |
| Q4 FY26 | 10.8% | 10.3% | 12% |
| Q1 FY27 | – | 9.8% | 12% |
| Q2 FY27 | 10.7% | 9.3% | 12% |
Does Gateway Distriparks have too much debt?
Gateway Distriparks Ltd has total debt of ₹603 Cr against shareholder equity of ₹2,594 Cr as of Sep 2026, so its debt is 0.23× its equity, which is very little. Year by year, that ratio went from 0.38 in FY22 to 0.25 in FY26. So the returns on this page come from the business, not from borrowed money.
Debt-to-equity shows how much of the business is paid for with borrowed money. Lower is safer, and the direction matters as much as the level.
FY26: debt ₹646 Cr, 0.25× equity
- Total debt ₹646
| Quarter | Total debt |
|---|---|
| FY22 | ₹619 |
| FY23 | ₹530 |
| FY24 | ₹510 |
| FY25 | ₹720 |
| FY26 | ₹646 |
Debt-to-equity
- Debt-to-equity 0.25×
| Quarter | Debt-to-equity |
|---|---|
| FY22 | 0.38× |
| FY23 | 0.30× |
| FY24 | 0.26× |
| FY25 | 0.29× |
| FY26 | 0.25× |
Sep 2026: debt ₹603 Cr, debt-to-equity 0.23
- Total debt (quarterly) ₹603
| Quarter | Total debt (quarterly) |
|---|---|
| Dec 2023 | ₹511 |
| Mar 2024 | ₹510 |
| Jun 2024 | ₹510 |
| Sep 2024 | ₹480 |
| Dec 2024 | ₹480 |
| Mar 2025 | ₹720 |
| Jun 2025 | ₹720 |
| Sep 2025 | ₹716 |
| Dec 2025 | ₹716 |
| Mar 2026 | ₹646 |
| Jun 2026 | ₹646 |
| Sep 2026 | ₹603 |
Debt-to-equity
- Debt-to-equity 0.23×
| Quarter | Debt-to-equity |
|---|---|
| Dec 2023 | 0.27× |
| Mar 2024 | 0.26× |
| Jun 2024 | 0.26× |
| Sep 2024 | 0.24× |
| Dec 2024 | 0.24× |
| Mar 2025 | 0.29× |
| Jun 2025 | 0.29× |
| Sep 2025 | 0.28× |
| Dec 2025 | 0.28× |
| Mar 2026 | 0.25× |
| Jun 2026 | 0.25× |
| Sep 2026 | 0.23× |
What is the Gateway Distriparks shareholding pattern?
Domestic institutions cut their stake in Gateway Distriparks Ltd by 13.2 percentage points over 8 quarters, the biggest change among its owners. Domestic institutions now own 29.6% of the company. Foreign institutions moved −3.7 points over the same period, to 6.8%. This uses the four owner groups that companies report every quarter; nothing is guessed between filings.
Who owns the company each quarter: promoters (the founders or controlling owners), foreign institutions, domestic institutions such as mutual funds, and the public. When people close to the business steadily raise their stake, that is worth noticing; a quiet list is also an answer.
Over the last two years: Domestic institutions: −13.2 points over 8 quarters, to 29.6%; Foreign institutions: −3.7 points over 8 quarters, to 6.8%; Promoters: +1.6 points over 8 quarters, to 33.9%.
Why the owners changed: domestic institutions drove it (−13.2 points), together with foreign institutions (−3.7 points). They reduced their stake.
Year ends: promoters +1.6 points from Mar 2024 to Mar 2026
- Promoters 33.93%
- Foreign inst. 6.66%
- Domestic inst. 33.99%
- Public 25.43%
| Quarter | Promoters | Foreign inst. | Domestic inst. | Public |
|---|---|---|---|---|
| Mar 2024 | 32.32% | 12.39% | 42.65% | 12.65% |
| Mar 2025 | 32.32% | 8.43% | 39.34% | 19.93% |
| Mar 2026 | 33.93% | 6.66% | 33.99% | 25.43% |
Domestic institutions cut their stake by 13.2 points over 8 quarters
- Promoters 33.93%
- Foreign inst. 6.77%
- Domestic inst. 29.65%
- Public 29.66%
| Quarter | Promoters | Foreign inst. | Domestic inst. | Public |
|---|---|---|---|---|
| Sep 2023 | 32.33% | 12.85% | 41.79% | 13.04% |
| Dec 2023 | 32.33% | 13.43% | 41.56% | 12.69% |
| Mar 2024 | 32.32% | 12.39% | 42.65% | 12.65% |
| Jun 2024 | 32.32% | 11.82% | 43.6% | 12.26% |
| Sep 2024 | 32.32% | 10.51% | 42.88% | 14.28% |
| Dec 2024 | 32.32% | 9.64% | 39.73% | 18.31% |
| Mar 2025 | 32.32% | 8.43% | 39.34% | 19.93% |
| Jun 2025 | 32.32% | 7.64% | 37.55% | 22.49% |
| Sep 2025 | 32.32% | 7.69% | 36.03% | 23.95% |
| Dec 2025 | 33.03% | 6.49% | 35.67% | 24.8% |
| Mar 2026 | 33.93% | 6.66% | 33.99% | 25.43% |
| Jun 2026 | 33.93% | 6.98% | 32.42% | 26.68% |
| Sep 2026 | 33.93% | 6.77% | 29.65% | 29.66% |
How far is Gateway Distriparks from balance-sheet trouble?
For Gateway Distriparks Ltd, the Z-score is not available, so we say so rather than guess one. It estimates how far the balance sheet is from trouble; it is not a forecast of failure. The debt, cash-flow and return sections show the balance-sheet figures we do have, each with its own date.
The Z-score estimates how far a company is from balance-sheet trouble. Above about 3 is safe; below about 1.8 is the danger zone. It was built for manufacturers, so it is not used for banks and lenders.
How does Gateway Distriparks rank in its industry?
52.5 out of 100, rank 5 of 18 in Logistics, with 85% of the evidence available.
Gateway Distriparks Ltd scores 52.5 out of 100 against the 18 companies it is compared with in Logistics, ranking 5. The valuation scores well, but earnings are not improving yet, so the business does not back up the low multiple so far.
The four parts add up to the total exactly: 14.3 + 13.3 + 17.4 + 7.5 = 52.5. This is the same number shown on the industry page; it is worked out once for the whole group and read here.
What would change it: The score would fall if profit growth turns negative or margins stop improving while the share price lags its sector.
Which companies is Gateway Distriparks compared with?
Gateway Distriparks ranks 5 of 18 Logistics companies on the 4-Factor Sector Score, with 52.5 out of 100.
- 1Allcargo Terminals LtdATL · breaking out · Most evidence points up · 96% evidence66.2out of 100
How the score adds up
Growth & earnings 23.0/35 · Revenue 12.3% · Profit 39.2% · Operating margin change 3.7 points · 88% evidenceCapital efficiency 15.2/25 · ROCE 11.2% · Operating margin 22.1% · 100% evidenceValuation 15.7/20 · P/E 16.5× · PEG 0.43 · 100% evidenceRelative strength 12.3/20 · Lead over its industry -4.9% · Lead over NIFTY 500 -1.2% · 1 year -25.4% · 100% evidence · 7 of 12 weeks aheadExact sum: 23 + 15.2 + 15.7 + 12.3 = 66.2 · What this means: The evidence is balanced: no factor stands out, so another reported quarter is needed before the picture is clearer. - 2Aegis Logistics LtdAEGISLOG · losing its lead · Most evidence points up · 82% evidence65.4out of 100
How the score adds up
Growth & earnings 27.1/35 · Revenue 19.7% · Profit 73.1% · Operating margin change 7 points · 95% evidenceCapital efficiency 16.3/25 · ROCE 13.3% · Operating margin 20% · 76% evidenceValuation 8.2/20 · P/E 28.9× · PEG — · 50% evidenceRelative strength 13.8/20 · Lead over its industry 20.5% · Lead over NIFTY 500 22.7% · 1 year 46.2% · 100% evidence · 9 of 12 weeks aheadExact sum: 27.1 + 16.3 + 8.2 + 13.8 = 65.4 · What this means: Earnings, capital efficiency and relative strength all agree. The open questions are about management, upcoming events and risks. - 3Shadowfax Technologies LtdSHADOWFAX · breaking out · Evidence leans up · 63% evidence64.1out of 100
How the score adds up
Growth & earnings 40.3/43.75 · Revenue 64.4% · Profit 100% · Operating margin change 3 points · 100% evidenceCapital efficiency 12.5/31.25 · ROCE 10% · Operating margin 7% · 100% evidenceValuation 11.3/25 · P/E 71.2× · PEG — · 15% evidenceRelative strength: no reading this week · its 20 points are shared across the other threeExact sum: 40.3 + 12.5 + 11.3 = 64.1 (no relative-strength reading this week; its 20 points are shared across the other three) · What this means: There is no relative-strength reading for this week, so the score is built from earnings, capital efficiency and valuation alone. - 4Blue Dart Express LtdBLUEDART · quiet · Evidence leans up · 81% evidence54.3out of 100
How the score adds up
Growth & earnings 20.4/35 · Revenue 9.2% · Profit 15.3% · Operating margin change 2 points · 88% evidenceCapital efficiency 17.3/25 · ROCE 15.8% · Operating margin 16% · 100% evidenceValuation 8.9/20 · P/E 30.5× · PEG 3.26 · 100% evidenceRelative strength 7.7/20 · Lead over its industry — · Lead over NIFTY 500 -15.3% · 1 year -36.5% · 25% evidence · 1 of 12 weeks aheadExact sum: 20.4 + 17.3 + 8.9 + 7.7 = 54.3 · What this means: The evidence is balanced: no factor stands out, so another reported quarter is needed before the picture is clearer. - 5Gateway Distriparks Ltd this pageGATEWAY · quiet · Evidence leans up · 85% evidence52.5out of 100
How the score adds up
Growth & earnings 14.3/35 · Revenue 8.2% · Profit -38.7% · Operating margin change 1 points · 100% evidenceCapital efficiency 13.3/25 · ROCE 10.8% · Operating margin 22% · 100% evidenceValuation 17.4/20 · P/E 9.1× · PEG 1.02 · 100% evidenceRelative strength 7.5/20 · Lead over its industry — · Lead over NIFTY 500 -20.4% · 1 year -32.9% · 25% evidence · 0 of 12 weeks aheadExact sum: 14.3 + 13.3 + 17.4 + 7.5 = 52.5 · What this means: The valuation scores well, but earnings are not improving yet, so the business does not back up the low multiple so far. - 6Transport Corporation of India LtdTCI · turning · Evidence leans up · 100% evidence50.7out of 100
How the score adds up
Growth & earnings 15.3/35 · Revenue 11.5% · Profit 5.9% · Operating margin change -1 points · 100% evidenceCapital efficiency 16.8/25 · ROCE 19.4% · Operating margin 10% · 100% evidenceValuation 11.6/20 · P/E 14.7× · PEG 2.3 · 100% evidenceRelative strength 7.0/20 · Lead over its industry -9.2% · Lead over NIFTY 500 -5.3% · 1 year -27.3% · 100% evidence · 0 of 12 weeks aheadExact sum: 15.3 + 16.8 + 11.6 + 7 = 50.7 · What this means: The evidence is balanced: no factor stands out, so another reported quarter is needed before the picture is clearer. - 7Ritco Logistics LtdRITCO · losing its lead · Evidence leans down · 78% evidence46.0out of 100
How the score adds up
Growth & earnings 13.2/35 · Revenue 16.9% · Profit -35.4% · Operating margin change -1.1 points · 83% evidenceCapital efficiency 10.4/25 · ROCE 10.2% · Operating margin 6% · 76% evidenceValuation 7.9/20 · P/E 23.8× · PEG — · 50% evidenceRelative strength 14.5/20 · Lead over its industry 4.6% · Lead over NIFTY 500 8% · 1 year 3.6% · 100% evidence · 8 of 12 weeks aheadExact sum: 13.2 + 10.4 + 7.9 + 14.5 = 46 · What this means: Relative strength against the index is 8%, and revenue and profit growth are weak. - 8TransIndia Real Estate LtdTREL · breaking out · Evidence leans down · 78% evidence44.5out of 100
How the score adds up
Growth & earnings 12.1/35 · Revenue 1.2% · Profit -26.8% · Operating margin change -11 points · 83% evidenceCapital efficiency 9.3/25 · ROCE 2.9% · Operating margin 55% · 76% evidenceValuation 13.7/20 · P/E 15.2× · PEG — · 50% evidenceRelative strength 9.4/20 · Lead over its industry -7.2% · Lead over NIFTY 500 -3.6% · 1 year -17.2% · 100% evidence · 9 of 12 weeks aheadExact sum: 12.1 + 9.3 + 13.7 + 9.4 = 44.5 · What this means: The valuation scores well, but earnings are not improving yet, so the business does not back up the low multiple so far. - 9Blackbuck LtdBLACKBUCK · breaking out · Evidence leans down · 78% evidence41.8out of 100
How the score adds up
Growth & earnings 8.3/35 · Revenue 49.9% · Profit -38.6% · Operating margin change -2 points · 100% evidenceCapital efficiency 15.2/25 · ROCE 12.8% · Operating margin 22% · 100% evidenceValuation 7.6/20 · P/E 55.9× · PEG 2.37 · 65% evidenceRelative strength 10.7/20 · Lead over its industry — · Lead over NIFTY 500 -0.3% · 1 year -17.6% · 25% evidence · 11 of 12 weeks aheadExact sum: 8.3 + 15.2 + 7.6 + 10.7 = 41.8 · What this means: The evidence is balanced: no factor stands out, so another reported quarter is needed before the picture is clearer. - 10Sindhu Trade Links LtdSINDHUTRAD · basing · Too little evidence to rank firmly · 56% evidence38.6out of 100
How the score adds up
Growth & earnings 13.8/35 · Revenue -63.7% · Profit 11.4% · Operating margin change 8 points · 83% evidenceCapital efficiency 7.4/25 · ROCE 4.5% · Operating margin 16% · 76% evidenceValuation 9.4/20 · P/E 46.4× · PEG — · 15% evidenceRelative strength 8.0/20 · Lead over its industry — · Lead over NIFTY 500 -12.9% · 1 year -18.8% · 25% evidence · 0 of 12 weeks aheadExact sum: 13.8 + 7.4 + 9.4 + 8 = 38.6 · What this means: Some evidence is missing, so the score is pulled toward the middle on purpose. - 11Western Carriers (India) LtdWCIL · breaking out · Evidence leans down · 64% evidence37.3out of 100
- 12Container Corporation Of India LtdCONCOR · quiet · Evidence leans down · 96% evidence36.5out of 100
- 13Reliance Industrial Infrastructure LtdRIIL · basing · Most evidence points down · 85% evidence26.3out of 100
- 14S J Logistics (India) LtdSJLOGISTIC · Too little evidence to rank firmly · 40% evidence66.9out of 100
- 15Tejas Cargo India LtdTEJASCARGO · turning · Too little evidence to rank firmly · 32% evidence52.3out of 100
- 16JITF Infra Logistics LtdJITFINFRA · quiet · Too little evidence to rank firmly · 46% evidence52.1out of 100
- 17Sical Logistics LtdSICALLOG · quiet · Too little evidence to rank firmly · 49% evidence46.4out of 100
- 18Allcargo Gati Ltd(Merged)ACLGATI · Too little evidence to rank firmly · 24% evidence38.8out of 100
Missing figures are not scored as bad. They lower the confidence and pull the final score toward the middle. Relative strength counts only when the company has a reading for this week; with no reading, that factor is left out and its 20 points are shared across the other three in proportion. PEG is not shown when the ratio cannot mean anything: the company must be making a profit, its price-to-earnings must be positive, and its three-year earnings growth must fall between 5% and 60%. Dividing a price multiple by a loss, or by growth measured off a tiny base, produces a number that looks precise and tells you nothing. Under relative strength, one mark per week shows the last 12 weeks: a mark is filled where the company led NIFTY 500 by 5% or more over the 13 weeks ending that week, which is the same test used everywhere on this site. Price stage places the company on the same six-step path the industry is placed on (basing, turning, breaking out, leader, fading, asleep), read from how many weeks running it has led NIFTY 500 and whether that lead is growing or shrinking. It describes where the share price stands, not the direction of earnings, and it is not a recommendation; it is left blank for a company whose weekly history is too short or too stale to read.
The figures in this ranking come from the industry comparison: results through the Sep 2026 quarter, and the P/E at that quarter's end. The sections above use the latest weekly price, so a P/E or return there can differ a little from the one here. The stage words in this ranking (such as losing its lead or breaking out) describe the lead over the index, not the price phase in the price section.
Related companies: Logistics, all 18 compared on one page.
Which companies are close to Gateway Distriparks in size?
Gateway Distriparks is the 8th largest of 18 Logistics companies on Sector Alpha by market value (scores of 30 October 2026). Just above it: Blue Dart Express, Transport Corporation of India and Sindhu Trade Links. Just below it: Reliance Industrial Infrastructure, Allcargo Gati Ltd(Merged) and Western Carriers (India).
Logistics companies close in size
- Blue Dart Express Ltd ₹9,897 crore
- Transport Corporation of India Ltd ₹6,745 crore
- Sindhu Trade Links Ltd ₹3,591 crore
- Gateway Distriparks Ltd ₹2,142 crore
- Reliance Industrial Infrastructure Ltd ₹1,013 crore
- Allcargo Gati Ltd(Merged) ₹971 crore
- Western Carriers (India) Ltd ₹960 crore
All 18 Logistics companies, largest first
Companies close in size in other industries
- Rajratan Global Wire Ltd ₹2,155 crore · Tyres & Tubes
- Algoquant Fintech Ltd ₹2,143 crore · Finance & Investments - Others
- Gateway Distriparks Ltd ₹2,142 crore
- Kody Technolab Ltd ₹2,138 crore · IT - Software
- Globus Spirits Ltd ₹2,136 crore · Alcoholic Beverages
What else do people ask about Gateway Distriparks?
What is Gateway Distriparks's share price today?
Gateway Distriparks Ltd's share price is ₹46.43, −24.7% over the past year. The whole company is worth ₹2,318 Cr on the market.
In the last 52 weeks it traded between ₹43 to ₹62; today it is 19% of the way up from the low, 17.2% below its 200-day average (as of 4 November 2026).
What were Gateway Distriparks's latest quarterly results?
Gateway Distriparks Ltd reported revenue of ₹580 Cr and net profit of ₹59.0 Cr for the Sep 2026 quarter. Revenue rose 2.3% and profit fell 10.6% compared with a year earlier. Earnings per share were ₹1.16.
The operating margin was 22.0%, 1.0 percentage points higher than a year earlier (as of 4 November 2026).
What is Gateway Distriparks's market cap?
Gateway Distriparks Ltd's market capitalisation is ₹2,318 Cr at a share price of ₹46.43. Market cap is the share price times the number of shares, so it changes whenever the price moves (as of 4 November 2026).
What is Gateway Distriparks's P/E ratio?
Gateway Distriparks Ltd's P/E is 9.8×, higher than 1% of its own last 5 years. Its usual level (the middle reading) is 14.7×. This compares the price with the company's own past; it is not a view on what the shares are worth (as of 4 November 2026).
How is Gateway Distriparks valued against its own history?
Against its own history, Gateway Distriparks Ltd's valuation is low: its P/E of 9.8× has been lower only 1% of the time in 5 years (usual level 14.7×).
This compares the price with the company's own past; it is not a view on what the shares are worth or where the price goes next (as of 4 November 2026).
How is Gateway Distriparks performing?
Gateway Distriparks Ltd's share price has been falling for 109 weeks. In its latest quarter, revenue rose 2.3% and profit fell 10.6% compared with a year earlier. Over the past 13 weeks it has done worse than the NIFTY 500, for 16 weeks running (as of 4 November 2026).
Will Gateway Distriparks's share price go up?
This page does not forecast Gateway Distriparks Ltd's share price. What it shows instead: the share price is ₹46.43, and it has been falling for 109 weeks. Its P/E of 9.8× is higher than 1% of its own last 5 years (as of 4 November 2026).
Does Gateway Distriparks have too much debt?
No, Gateway Distriparks Ltd has little debt: its debt is 0.28× its equity, and its operating profit is 8 times its interest bill. FY26 borrowings were ₹646 Cr against equity of ₹2,293 Cr.
So the returns on this page come from the business, not borrowed money (as of 4 November 2026).
Where is Gateway Distriparks in its business cycle?
Gateway Distriparks Ltd's FY26 operating margin was 22.0%, against a 9-year range of 20.0% to 27.0%: the middle of its own range, neither a peak nor a low. The latest quarter was 22.0%.
Comparing margins with a company's own long history is a good way to see where it is in its cycle (as of 4 November 2026).
What could break the Gateway Distriparks story?
The main question: foreign institutions moved −3.7 percentage points over 8 quarters while the business went the other way. On price, this page treats a rise as over when the share price closes below its 200-day average on two Fridays in a row (as of 4 November 2026).
Is Gateway Distriparks a stock worth studying right now?
What the numbers show: Gateway Distriparks Ltd's share price, valuation and earnings point in different directions. The next one or two quarters should make it clearer. The main open question: whether the owners’ moves turn back in line with the business.
Every number on this page is worked out by code from the published figures, with no forecasts and no price opinions (as of 4 November 2026).
Is there a Gateway Distriparks share price forecast for 2026?
What management itself guided: H2 rail volumes at 100,000 TEUs per quarter bare minimum for rest of year.
Where do these numbers come from?
Sector Alpha, written by code from the published numbers. Data as of 4 November 2026.
Every chart on this page is drawn by code from the published figures, with no forecasts and no price opinions.
See the plain-text version of this page.
More lists
Every Sector Alpha list, grouped
Stock screens
Market lists
Themes
Sectors
US stocks
X · Instagram · YouTube · About · Newsletter · Newsletter archive
This is research, not advice. We’re not SEBI-registered.