Skip to content
Industry
This is research, not advice. We’re not SEBI-registered.

Patel Engineering share price today

Patel Engineering Ltd · NSE: PATELENG · Infra - Construction & Contracting · price as of the 4 November 2026 close, updated every trading day · results updated weekly · research updated 29 September 2026

Patel Engineering share price today: ₹25.26 at the NSE close on 4 November 2026, down 26.2% in a year. Patel Engineering (NSE: PATELENG) is worth ₹2,511 crore, trades at a P/E of 6.4 and has closed between ₹22.36 and ₹35.09 over the past 52 weeks. Latest change: highest quarterly profit in 9 quarters.

MixedBusiness trend from the last 12 quarters
₹25.26Price −26.2% in a year
6.4×P/E lower than 89% of the last 8.1 years
₹1,281 CrRevenue (Jun 2026) +3.9% on a year ago
₹98.0 CrProfit (Jun 2026) +21.0% on a year ago
14.0%Operating margin +1.0 points on a year ago
13%ROCE FY26
11.0%ROIC against a 12.0% cost of capital: −1.0 points

Patel Engineering Ltd's earnings have grown faster than its share price. Earnings per share grew +8.4% in a year while the price moved −26.2%.

The main question: yearly earnings per share moved +8.4% while the share price moved −26.2%.

The price has been falling for 108 weeks, and the P/E is lower than 89% of its own last 8.1 years. Over the last four quarters, results have been improving, with profit +21.0% on a year earlier, and 189% of the last 3 years' profit came in as cash. What will decide it: whether the price catches up with earnings that have already grown.

What is the Patel Engineering share price today?

Patel Engineering Ltd's share price was ₹25.26 at the close on 4 November 2026. It has been falling for 108 weeks. That is 11.8% below its average price over the last 200 trading days. In the last 52 weeks it traded between ₹22 and ₹35, and at that close it sat 23% of the way up from that low.

A share price tends to move through four phases: moving sideways (stage 1), rising (stage 2), stalling near a high (stage 3) and falling (stage 4). Today Patel Engineering Ltd is in stage 4. The phase helps read everything below.

Over the past 13 weeks it has done worse than the NIFTY 500, and it has been behind for 12 weeks running.

1Y

Nov 2026: ₹25.3, 11.8% below its 200-day average. The price has been falling for 108 weeks.

  • Price ₹25.3
  • 50-day avg ₹26
  • 200-day avg ₹29
Nov 2026: ₹25.3, 11.8% below its 200-day average. The price has been falling for 108 weeks.
WeekPrice50-day avg200-day avg
31 Oct 2025₹36₹37₹40
7 Nov 2025₹34₹36₹40
14 Nov 2025₹35₹36₹40
21 Nov 2025₹33₹36₹40
28 Nov 2025₹35₹35₹39
5 Dec 2025₹33₹35₹39
12 Dec 2025₹30₹34₹39
19 Dec 2025₹31₹33₹38
26 Dec 2025₹29₹33₹38
2 Jan 2026₹29₹32₹37
9 Jan 2026₹27₹31₹37
16 Jan 2026₹30₹31₹37
23 Jan 2026₹28₹30₹36
1 Feb 2026₹28₹30₹36
6 Feb 2026₹29₹30₹36
13 Feb 2026₹30₹30₹35
20 Feb 2026₹27₹30₹35
27 Feb 2026₹28₹29₹35
6 Mar 2026₹26₹29₹34
13 Mar 2026₹25₹28₹34
20 Mar 2026₹25₹28₹33
27 Mar 2026₹24₹27₹33
2 Apr 2026₹24₹27₹33
10 Apr 2026₹27₹27₹32
17 Apr 2026₹29₹27₹32
24 Apr 2026₹28₹27₹32
30 Apr 2026₹28₹27₹32
8 May 2026₹29₹27₹32
15 May 2026₹26₹27₹31
22 May 2026₹26₹27₹31
29 May 2026₹27₹27₹31
4 Jun 2026₹27₹27₹31
5 Jun 2026₹27₹27₹31
10 Jun 2026₹27₹27₹31
12 Jun 2026₹27₹27₹31
17 Jun 2026₹31₹27₹31
19 Jun 2026₹31₹28₹31
24 Jun 2026₹35₹28₹31
25 Jun 2026₹34₹28₹31
1 Jul 2026₹34₹29₹31
3 Jul 2026₹34₹29₹31
10 Jul 2026₹32₹30₹31
17 Jul 2026₹30₹30₹31
24 Jul 2026₹28₹30₹31
31 Jul 2026₹27₹29₹31
7 Aug 2026₹29₹29₹31
14 Aug 2026₹28₹29₹31
21 Aug 2026₹28₹29₹30
28 Aug 2026₹28₹29₹30
4 Sep 2026₹27₹29₹30
11 Sep 2026₹27₹28₹30
18 Sep 2026₹26₹28₹30
25 Sep 2026₹28₹28₹30
1 Oct 2026₹26₹28₹30
9 Oct 2026₹25₹27₹29
16 Oct 2026₹25₹27₹29
23 Oct 2026₹22₹26₹29
30 Oct 2026₹23₹26₹29
4 Nov 2026₹25₹26₹29
Weekly closing price (₹) with its 50-day and 200-day averages. The strip under the chart shows the phase: tan sideways, green rising, yellow stalling near a high, orange falling. 1-year window.

3Y

Nov 2026: ₹25.3, 11.8% below its 200-day average. The price has been falling for 108 weeks.

  • Price ₹25.3
  • 50-day avg ₹26
  • 200-day avg ₹29
Nov 2026: ₹25.3, 11.8% below its 200-day average. The price has been falling for 108 weeks.
WeekPrice50-day avg200-day avg
3 Nov 2023₹47₹48₹37
12 Nov 2023₹46₹47₹37
17 Nov 2023₹47₹47₹37
24 Nov 2023₹49₹48₹38
1 Dec 2023₹47₹48₹38
8 Dec 2023₹60₹49₹39
15 Dec 2023₹61₹51₹40
22 Dec 2023₹60₹53₹41
29 Dec 2023₹58₹54₹42
5 Jan 2024₹62₹55₹43
12 Jan 2024₹62₹56₹44
20 Jan 2024₹61₹57₹45
25 Jan 2024₹58₹57₹45
2 Feb 2024₹67₹59₹46
9 Feb 2024₹69₹61₹47
16 Feb 2024₹67₹62₹48
23 Feb 2024₹68₹63₹49
2 Mar 2024₹66₹64₹50
7 Mar 2024₹61₹64₹51
15 Mar 2024₹54₹62₹51
22 Mar 2024₹55₹61₹51
28 Mar 2024₹55₹60₹51
5 Apr 2024₹60₹60₹52
12 Apr 2024₹59₹60₹52
19 Apr 2024₹57₹59₹52
26 Apr 2024₹62₹60₹53
3 May 2024₹57₹59₹53
10 May 2024₹54₹59₹53
18 May 2024₹57₹58₹53
24 May 2024₹60₹58₹53
31 May 2024₹60₹58₹54
7 Jun 2024₹58₹58₹54
14 Jun 2024₹65₹59₹54
21 Jun 2024₹67₹60₹55
28 Jun 2024₹64₹61₹55
5 Jul 2024₹67₹62₹56
12 Jul 2024₹59₹62₹56
19 Jul 2024₹57₹61₹56
26 Jul 2024₹58₹60₹56
2 Aug 2024₹55₹60₹56
9 Aug 2024₹52₹58₹56
16 Aug 2024₹53₹57₹56
23 Aug 2024₹53₹57₹56
30 Aug 2024₹55₹56₹56
6 Sep 2024₹55₹56₹56
13 Sep 2024₹58₹56₹56
20 Sep 2024₹57₹56₹56
27 Sep 2024₹56₹56₹56
4 Oct 2024₹54₹56₹56
11 Oct 2024₹53₹56₹56
18 Oct 2024₹53₹55₹55
25 Oct 2024₹46₹54₹55
1 Nov 2024₹50₹53₹55
8 Nov 2024₹50₹52₹55
14 Nov 2024₹49₹52₹54
22 Nov 2024₹50₹52₹54
29 Nov 2024₹51₹52₹54
6 Dec 2024₹56₹52₹54
13 Dec 2024₹56₹53₹54
20 Dec 2024₹51₹53₹54
27 Dec 2024₹50₹53₹54
3 Jan 2025₹51₹52₹54
10 Jan 2025₹47₹51₹53
17 Jan 2025₹50₹51₹53
24 Jan 2025₹48₹51₹53
1 Feb 2025₹47₹50₹53
7 Feb 2025₹46₹49₹52
14 Feb 2025₹43₹48₹52
21 Feb 2025₹43₹47₹51
28 Feb 2025₹42₹46₹51
7 Mar 2025₹42₹45₹51
13 Mar 2025₹39₹45₹50
21 Mar 2025₹42₹44₹50
28 Mar 2025₹38₹43₹49
4 Apr 2025₹39₹42₹49
11 Apr 2025₹39₹42₹48
17 Apr 2025₹41₹42₹48
25 Apr 2025₹44₹42₹48
2 May 2025₹41₹42₹48
9 May 2025₹40₹42₹47
16 May 2025₹42₹42₹47
23 May 2025₹40₹42₹47
30 May 2025₹39₹41₹46
6 Jun 2025₹41₹41₹46
13 Jun 2025₹41₹41₹46
20 Jun 2025₹39₹41₹46
27 Jun 2025₹40₹41₹45
4 Jul 2025₹39₹40₹45
11 Jul 2025₹39₹40₹45
18 Jul 2025₹38₹40₹44
25 Jul 2025₹38₹40₹44
1 Aug 2025₹36₹39₹44
8 Aug 2025₹35₹38₹43
14 Aug 2025₹37₹38₹43
22 Aug 2025₹38₹38₹43
29 Aug 2025₹36₹38₹43
5 Sep 2025₹36₹38₹42
12 Sep 2025₹37₹37₹42
19 Sep 2025₹39₹38₹42
26 Sep 2025₹36₹38₹42
3 Oct 2025₹37₹37₹41
10 Oct 2025₹36₹37₹41
17 Oct 2025₹35₹37₹41
24 Oct 2025₹36₹37₹41
31 Oct 2025₹36₹37₹40
7 Nov 2025₹34₹36₹40
14 Nov 2025₹35₹36₹40
21 Nov 2025₹33₹36₹40
28 Nov 2025₹35₹35₹39
5 Dec 2025₹33₹35₹39
12 Dec 2025₹30₹34₹39
19 Dec 2025₹31₹33₹38
26 Dec 2025₹29₹33₹38
2 Jan 2026₹29₹32₹37
9 Jan 2026₹27₹31₹37
16 Jan 2026₹30₹31₹37
23 Jan 2026₹28₹30₹36
1 Feb 2026₹28₹30₹36
6 Feb 2026₹29₹30₹36
13 Feb 2026₹30₹30₹35
20 Feb 2026₹27₹30₹35
27 Feb 2026₹28₹29₹35
6 Mar 2026₹26₹29₹34
13 Mar 2026₹25₹28₹34
20 Mar 2026₹25₹28₹33
27 Mar 2026₹24₹27₹33
2 Apr 2026₹24₹27₹33
10 Apr 2026₹27₹27₹32
17 Apr 2026₹29₹27₹32
24 Apr 2026₹28₹27₹32
30 Apr 2026₹28₹27₹32
8 May 2026₹29₹27₹32
15 May 2026₹26₹27₹31
22 May 2026₹26₹27₹31
29 May 2026₹27₹27₹31
4 Jun 2026₹27₹27₹31
5 Jun 2026₹27₹27₹31
10 Jun 2026₹27₹27₹31
12 Jun 2026₹27₹27₹31
17 Jun 2026₹31₹27₹31
19 Jun 2026₹31₹28₹31
24 Jun 2026₹35₹28₹31
25 Jun 2026₹34₹28₹31
1 Jul 2026₹34₹29₹31
3 Jul 2026₹34₹29₹31
10 Jul 2026₹32₹30₹31
17 Jul 2026₹30₹30₹31
24 Jul 2026₹28₹30₹31
31 Jul 2026₹27₹29₹31
7 Aug 2026₹29₹29₹31
14 Aug 2026₹28₹29₹31
21 Aug 2026₹28₹29₹30
28 Aug 2026₹28₹29₹30
4 Sep 2026₹27₹29₹30
11 Sep 2026₹27₹28₹30
18 Sep 2026₹26₹28₹30
25 Sep 2026₹28₹28₹30
1 Oct 2026₹26₹28₹30
9 Oct 2026₹25₹27₹29
16 Oct 2026₹25₹27₹29
23 Oct 2026₹22₹26₹29
30 Oct 2026₹23₹26₹29
4 Nov 2026₹25₹26₹29
Weekly closing price (₹) with its 50-day and 200-day averages. The strip under the chart shows the phase: tan sideways, green rising, yellow stalling near a high, orange falling. 3-year window.

5Y

Nov 2026: ₹25.3, 11.8% below its 200-day average. The price has been falling for 108 weeks.

  • Price ₹25.3
  • 50-day avg ₹26
  • 200-day avg ₹29
Nov 2026: ₹25.3, 11.8% below its 200-day average. The price has been falling for 108 weeks.
WeekPrice50-day avg200-day avg
29 Oct 2021₹21₹19₹15
12 Nov 2021₹21₹20₹16
26 Nov 2021₹20₹20₹16
10 Dec 2021₹24₹20₹17
24 Dec 2021₹26₹22₹18
7 Jan 2022₹27₹24₹18
21 Jan 2022₹26₹25₹19
4 Feb 2022₹26₹25₹20
18 Feb 2022₹24₹25₹20
4 Mar 2022₹21₹24₹21
17 Mar 2022₹22₹23₹21
1 Apr 2022₹23₹23₹21
13 Apr 2022₹25₹23₹21
29 Apr 2022₹23₹24₹21
13 May 2022₹19₹23₹21
27 May 2022₹21₹22₹21
10 Jun 2022₹21₹22₹21
24 Jun 2022₹20₹21₹21
8 Jul 2022₹19₹20₹21
22 Jul 2022₹21₹20₹21
5 Aug 2022₹21₹21₹21
19 Aug 2022₹25₹21₹21
2 Sep 2022₹23₹22₹21
16 Sep 2022₹21₹22₹21
30 Sep 2022₹18₹21₹21
14 Oct 2022₹19₹21₹21
28 Oct 2022₹19₹20₹21
11 Nov 2022₹20₹20₹21
25 Nov 2022₹19₹20₹21
9 Dec 2022₹19₹19₹20
23 Dec 2022₹15₹19₹20
6 Jan 2023₹17₹18₹20
20 Jan 2023₹16₹17₹19
3 Feb 2023₹15₹17₹19
17 Feb 2023₹13₹16₹19
3 Mar 2023₹15₹15₹18
17 Mar 2023₹14₹15₹18
31 Mar 2023₹14₹15₹18
13 Apr 2023₹14₹15₹17
28 Apr 2023₹20₹16₹17
12 May 2023₹26₹18₹18
26 May 2023₹25₹21₹19
9 Jun 2023₹28₹23₹19
23 Jun 2023₹28₹24₹20
7 Jul 2023₹35₹27₹21
21 Jul 2023₹45₹32₹23
4 Aug 2023₹47₹36₹25
18 Aug 2023₹53₹40₹27
1 Sep 2023₹55₹45₹30
15 Sep 2023₹54₹47₹32
29 Sep 2023₹50₹48₹34
13 Oct 2023₹49₹49₹35
27 Oct 2023₹45₹48₹36
12 Nov 2023₹46₹47₹37
24 Nov 2023₹49₹48₹38
8 Dec 2023₹60₹49₹39
22 Dec 2023₹60₹53₹41
5 Jan 2024₹62₹55₹43
20 Jan 2024₹61₹57₹45
2 Feb 2024₹67₹59₹46
16 Feb 2024₹67₹62₹48
2 Mar 2024₹66₹64₹50
15 Mar 2024₹54₹62₹51
28 Mar 2024₹55₹60₹51
12 Apr 2024₹59₹60₹52
26 Apr 2024₹62₹60₹53
10 May 2024₹54₹59₹53
24 May 2024₹60₹58₹53
7 Jun 2024₹58₹58₹54
21 Jun 2024₹67₹60₹55
5 Jul 2024₹67₹62₹56
19 Jul 2024₹57₹61₹56
2 Aug 2024₹55₹60₹56
16 Aug 2024₹53₹57₹56
30 Aug 2024₹55₹56₹56
13 Sep 2024₹58₹56₹56
27 Sep 2024₹56₹56₹56
11 Oct 2024₹53₹56₹56
25 Oct 2024₹46₹54₹55
8 Nov 2024₹50₹52₹55
22 Nov 2024₹50₹52₹54
6 Dec 2024₹56₹52₹54
20 Dec 2024₹51₹53₹54
3 Jan 2025₹51₹52₹54
17 Jan 2025₹50₹51₹53
1 Feb 2025₹47₹50₹53
14 Feb 2025₹43₹48₹52
28 Feb 2025₹42₹46₹51
13 Mar 2025₹39₹45₹50
28 Mar 2025₹38₹43₹49
11 Apr 2025₹39₹42₹48
25 Apr 2025₹44₹42₹48
9 May 2025₹40₹42₹47
23 May 2025₹40₹42₹47
6 Jun 2025₹41₹41₹46
20 Jun 2025₹39₹41₹46
4 Jul 2025₹39₹40₹45
18 Jul 2025₹38₹40₹44
1 Aug 2025₹36₹39₹44
14 Aug 2025₹37₹38₹43
29 Aug 2025₹36₹38₹43
12 Sep 2025₹37₹37₹42
26 Sep 2025₹36₹38₹42
10 Oct 2025₹36₹37₹41
24 Oct 2025₹36₹37₹41
7 Nov 2025₹34₹36₹40
21 Nov 2025₹33₹36₹40
5 Dec 2025₹33₹35₹39
19 Dec 2025₹31₹33₹38
2 Jan 2026₹29₹32₹37
16 Jan 2026₹30₹31₹37
1 Feb 2026₹28₹30₹36
13 Feb 2026₹30₹30₹35
27 Feb 2026₹28₹29₹35
13 Mar 2026₹25₹28₹34
27 Mar 2026₹24₹27₹33
10 Apr 2026₹27₹27₹32
24 Apr 2026₹28₹27₹32
8 May 2026₹29₹27₹32
22 May 2026₹26₹27₹31
4 Jun 2026₹27₹27₹31
10 Jun 2026₹27₹27₹31
17 Jun 2026₹31₹27₹31
24 Jun 2026₹35₹28₹31
1 Jul 2026₹34₹29₹31
10 Jul 2026₹32₹30₹31
24 Jul 2026₹28₹30₹31
7 Aug 2026₹29₹29₹31
21 Aug 2026₹28₹29₹30
4 Sep 2026₹27₹29₹30
18 Sep 2026₹26₹28₹30
1 Oct 2026₹26₹28₹30
16 Oct 2026₹25₹27₹29
30 Oct 2026₹23₹26₹29
4 Nov 2026₹25₹26₹29
Weekly closing price (₹) with its 50-day and 200-day averages. The strip under the chart shows the phase: tan sideways, green rising, yellow stalling near a high, orange falling. 5-year window.

10Y

Nov 2026: ₹25.3, 11.8% below its 200-day average. The price has been falling for 108 weeks.

  • Price ₹25.3
  • 50-day avg ₹26
  • 200-day avg ₹29
Nov 2026: ₹25.3, 11.8% below its 200-day average. The price has been falling for 108 weeks.
WeekPrice50-day avg200-day avg
30 Oct 2016₹57₹56₹46
18 Nov 2016₹44₹53₹47
9 Dec 2016₹56₹52₹47
30 Dec 2016₹51₹52₹48
20 Jan 2017₹57₹54₹49
10 Feb 2017₹56₹55₹50
3 Mar 2017₹52₹54₹50
24 Mar 2017₹51₹53₹51
13 Apr 2017₹61₹55₹51
5 May 2017₹59₹59₹53
26 May 2017₹59₹60₹54
16 Jun 2017₹61₹60₹55
7 Jul 2017₹57₹58₹55
28 Jul 2017₹56₹57₹55
18 Aug 2017₹48₹54₹55
8 Sep 2017₹51₹52₹54
29 Sep 2017₹49₹52₹54
19 Oct 2017₹51₹52₹53
10 Nov 2017₹52₹52₹53
1 Dec 2017₹56₹54₹54
22 Dec 2017₹52₹54₹54
12 Jan 2018₹60₹54₹54
2 Feb 2018₹46₹53₹54
23 Feb 2018₹49₹51₹53
16 Mar 2018₹46₹49₹52
6 Apr 2018₹45₹47₹51
27 Apr 2018₹42₹45₹50
18 May 2018₹32₹42₹48
8 Jun 2018₹34₹38₹46
29 Jun 2018₹28₹35₹44
20 Jul 2018₹25₹32₹42
10 Aug 2018₹31₹31₹40
31 Aug 2018₹32₹32₹39
21 Sep 2018₹27₹31₹38
12 Oct 2018₹24₹28₹36
2 Nov 2018₹26₹27₹35
22 Nov 2018₹26₹27₹34
14 Dec 2018₹24₹26₹33
4 Jan 2019₹25₹26₹32
25 Jan 2019₹21₹24₹30
15 Feb 2019₹17₹21₹29
8 Mar 2019₹19₹20₹27
29 Mar 2019₹17₹19₹26
18 Apr 2019₹17₹19₹25
10 May 2019₹16₹18₹24
31 May 2019₹16₹17₹23
21 Jun 2019₹13₹16₹22
12 Jul 2019₹12₹15₹21
2 Aug 2019₹8₹13₹19
23 Aug 2019₹8₹11₹18
13 Sep 2019₹10₹10₹17
4 Oct 2019₹9₹10₹16
27 Oct 2019₹11₹9₹15
15 Nov 2019₹13₹11₹15
6 Dec 2019₹13₹12₹14
27 Dec 2019₹12₹12₹14
17 Jan 2020₹17₹14₹14
7 Feb 2020₹18₹15₹15
28 Feb 2020₹13₹15₹15
20 Mar 2020₹8₹13₹14
9 Apr 2020₹12₹11₹14
30 Apr 2020₹11₹11₹13
22 May 2020₹10₹11₹13
12 Jun 2020₹12₹11₹13
3 Jul 2020₹14₹12₹13
24 Jul 2020₹13₹13₹13
14 Aug 2020₹13₹12₹13
4 Sep 2020₹12₹12₹13
25 Sep 2020₹11₹12₹12
16 Oct 2020₹10₹11₹12
6 Nov 2020₹9₹10₹12
27 Nov 2020₹10₹10₹11
18 Dec 2020₹13₹11₹12
8 Jan 2021₹13₹12₹12
29 Jan 2021₹11₹12₹12
19 Feb 2021₹12₹12₹12
12 Mar 2021₹12₹12₹12
1 Apr 2021₹11₹12₹12
23 Apr 2021₹10₹11₹12
14 May 2021₹12₹11₹12
4 Jun 2021₹13₹12₹12
25 Jun 2021₹16₹14₹12
16 Jul 2021₹17₹15₹13
6 Aug 2021₹15₹15₹13
27 Aug 2021₹14₹15₹13
17 Sep 2021₹15₹15₹13
8 Oct 2021₹23₹17₹14
29 Oct 2021₹21₹19₹15
18 Nov 2021₹21₹20₹16
10 Dec 2021₹24₹20₹17
31 Dec 2021₹28₹23₹18
21 Jan 2022₹26₹25₹19
11 Feb 2022₹27₹25₹20
4 Mar 2022₹21₹24₹21
25 Mar 2022₹22₹23₹21
13 Apr 2022₹25₹23₹21
6 May 2022₹21₹23₹21
27 May 2022₹21₹22₹21
17 Jun 2022₹18₹22₹21
8 Jul 2022₹19₹20₹21
29 Jul 2022₹20₹20₹21
19 Aug 2022₹25₹21₹21
9 Sep 2022₹24₹22₹21
30 Sep 2022₹18₹21₹21
21 Oct 2022₹19₹21₹21
11 Nov 2022₹20₹20₹21
2 Dec 2022₹17₹19₹20
23 Dec 2022₹15₹19₹20
13 Jan 2023₹16₹18₹20
3 Feb 2023₹15₹17₹19
24 Feb 2023₹13₹15₹18
17 Mar 2023₹14₹15₹18
6 Apr 2023₹15₹15₹17
28 Apr 2023₹20₹16₹17
19 May 2023₹26₹20₹18
9 Jun 2023₹28₹23₹19
30 Jun 2023₹33₹25₹21
21 Jul 2023₹45₹32₹23
11 Aug 2023₹46₹38₹26
1 Sep 2023₹55₹45₹30
22 Sep 2023₹52₹48₹33
13 Oct 2023₹49₹49₹35
3 Nov 2023₹47₹48₹37
24 Nov 2023₹49₹48₹38
15 Dec 2023₹61₹51₹40
5 Jan 2024₹62₹55₹43
25 Jan 2024₹58₹57₹45
16 Feb 2024₹67₹62₹48
7 Mar 2024₹61₹64₹51
28 Mar 2024₹55₹60₹51
19 Apr 2024₹57₹59₹52
10 May 2024₹54₹59₹53
31 May 2024₹60₹58₹54
21 Jun 2024₹67₹60₹55
12 Jul 2024₹59₹62₹56
2 Aug 2024₹55₹60₹56
23 Aug 2024₹53₹57₹56
13 Sep 2024₹58₹56₹56
4 Oct 2024₹54₹56₹56
25 Oct 2024₹46₹54₹55
14 Nov 2024₹49₹52₹54
6 Dec 2024₹56₹52₹54
27 Dec 2024₹50₹53₹54
17 Jan 2025₹50₹51₹53
7 Feb 2025₹46₹49₹52
28 Feb 2025₹42₹46₹51
21 Mar 2025₹42₹44₹50
11 Apr 2025₹39₹42₹48
2 May 2025₹41₹42₹48
23 May 2025₹40₹42₹47
13 Jun 2025₹41₹41₹46
4 Jul 2025₹39₹40₹45
25 Jul 2025₹38₹40₹44
14 Aug 2025₹37₹38₹43
5 Sep 2025₹36₹38₹42
26 Sep 2025₹36₹38₹42
17 Oct 2025₹35₹37₹41
7 Nov 2025₹34₹36₹40
28 Nov 2025₹35₹35₹39
19 Dec 2025₹31₹33₹38
9 Jan 2026₹27₹31₹37
1 Feb 2026₹28₹30₹36
20 Feb 2026₹27₹30₹35
13 Mar 2026₹25₹28₹34
2 Apr 2026₹24₹27₹33
24 Apr 2026₹28₹27₹32
15 May 2026₹26₹27₹31
4 Jun 2026₹27₹27₹31
12 Jun 2026₹27₹27₹31
24 Jun 2026₹35₹28₹31
3 Jul 2026₹34₹29₹31
24 Jul 2026₹28₹30₹31
14 Aug 2026₹28₹29₹31
4 Sep 2026₹27₹29₹30
25 Sep 2026₹28₹28₹30
16 Oct 2026₹25₹27₹29
4 Nov 2026₹25₹26₹29
Weekly closing price (₹) with its 50-day and 200-day averages. The strip under the chart shows the phase: tan sideways, green rising, yellow stalling near a high, orange falling. 10-year window.

Price stage: Falling from Oct 2025 to Oct 2026.

Price stage: Rising from Nov 2023 to Sep 2024; Sideways from Sep 2024 to Oct 2024; Falling from Oct 2024 to Oct 2026.

Price stage: Rising from Oct 2021 to Jun 2022; Falling from Jul 2022 to Sep 2022; Rising from Sep 2022 to Oct 2022; Falling from Nov 2022 to May 2023; Rising from Jun 2023 to Sep 2024; Falling from Oct 2024 to Oct 2026.

Price stage: Rising from Oct 2016 to Aug 2017; Falling from Sep 2017 to Jan 2021; Rising from Jan 2021 to Apr 2021; Falling from Apr 2021 to Jun 2021; Rising from Jun 2021 to Jun 2022; Falling from Jul 2022 to May 2023; Rising from Jun 2023 to Oct 2024; Falling from Oct 2024 to Oct 2026.

Week by week since 2016: did it beat the NIFTY 500 over the past 13 weeks?

Ahead in 183 of 549 weeks

Week by week since 2016: did it beat the NIFTY 500 over the past 13 weeks?
Week13-week return vs NIFTY 500
11 Mar 2016no NIFTY 500 reading
18 Mar 2016no NIFTY 500 reading
23 Mar 2016no NIFTY 500 reading
1 Apr 2016no NIFTY 500 reading
8 Apr 2016no NIFTY 500 reading
13 Apr 2016no NIFTY 500 reading
22 Apr 2016no NIFTY 500 reading
29 Apr 2016no NIFTY 500 reading
6 May 2016no NIFTY 500 reading
13 May 2016no NIFTY 500 reading
20 May 2016no NIFTY 500 reading
27 May 2016no NIFTY 500 reading
3 Jun 2016no NIFTY 500 reading
10 Jun 2016−22.0%
17 Jun 2016−16.8%
24 Jun 2016−25.4%
1 Jul 2016−19.7%
8 Jul 2016−18.0%
15 Jul 2016−18.6%
22 Jul 2016−22.5%
29 Jul 2016−26.6%
5 Aug 2016−22.7%
12 Aug 2016−24.4%
19 Aug 2016−23.1%
26 Aug 2016−24.2%
2 Sep 2016+16.2%
9 Sep 2016+89.3%
16 Sep 2016+105.1%
23 Sep 2016+101.5%
30 Sep 2016+70.8%
7 Oct 2016+92.3%
14 Oct 2016+81.4%
21 Oct 2016+60.7%
30 Oct 2016+77.8%
4 Nov 2016+66.6%
11 Nov 2016+61.5%
18 Nov 2016+54.7%
25 Nov 2016+60.1%
2 Dec 2016+34.0%
9 Dec 2016−12.8%
16 Dec 2016−19.7%
23 Dec 2016−17.2%
30 Dec 2016−9.7%
6 Jan 2017−16.0%
13 Jan 2017−7.2%
20 Jan 2017+7.2%
27 Jan 2017−5.6%
3 Feb 2017+0.8%
10 Feb 2017+10.1%
17 Feb 2017+5.9%
23 Feb 2017−2.7%
3 Mar 2017−15.3%
10 Mar 2017−23.5%
17 Mar 2017−14.0%
24 Mar 2017−13.4%
31 Mar 2017−12.6%
7 Apr 2017−3.9%
13 Apr 2017−4.2%
21 Apr 2017+0.9%
28 Apr 2017+6.0%
5 May 2017−2.6%
12 May 2017+1.5%
19 May 2017+17.2%
26 May 2017+6.2%
2 Jun 2017+5.5%
9 Jun 2017+9.0%
16 Jun 2017+5.7%
23 Jun 2017+6.3%
30 Jun 2017+0.7%
7 Jul 2017−9.6%
14 Jul 2017−17.2%
21 Jul 2017−18.6%
28 Jul 2017−20.6%
4 Aug 2017−14.5%
11 Aug 2017−29.6%
18 Aug 2017−30.5%
24 Aug 2017−22.7%
1 Sep 2017−20.5%
8 Sep 2017−17.2%
15 Sep 2017−17.6%
22 Sep 2017−15.1%
29 Sep 2017−14.2%
6 Oct 2017−11.0%
13 Oct 2017−9.6%
19 Oct 2017−13.1%
27 Oct 2017−5.5%
3 Nov 2017−3.6%
10 Nov 2017+8.9%
17 Nov 2017+0.7%
24 Nov 2017+18.3%
1 Dec 2017+9.7%
8 Dec 2017+6.0%
15 Dec 2017−5.7%
22 Dec 2017−6.6%
29 Dec 2017−2.3%
5 Jan 2018−2.0%
12 Jan 2018+7.4%
19 Jan 2018−2.0%
25 Jan 2018−10.2%
2 Feb 2018−15.3%
9 Feb 2018−12.0%
16 Feb 2018−2.5%
23 Feb 2018−18.1%
1 Mar 2018−14.5%
9 Mar 2018−20.8%
16 Mar 2018−9.6%
23 Mar 2018−14.0%
28 Mar 2018−17.8%
6 Apr 2018−15.4%
13 Apr 2018−23.3%
20 Apr 2018−13.5%
27 Apr 2018−17.9%
4 May 2018−13.3%
11 May 2018−21.1%
18 May 2018−35.7%
25 May 2018−34.3%
1 Jun 2018−29.9%
8 Jun 2018−25.6%
15 Jun 2018−28.2%
22 Jun 2018−26.3%
29 Jun 2018−34.0%
6 Jul 2018−38.8%
13 Jul 2018−37.3%
20 Jul 2018−44.1%
27 Jul 2018−36.7%
3 Aug 2018−29.8%
10 Aug 2018−22.5%
17 Aug 2018+5.0%
24 Aug 2018−4.6%
31 Aug 2018−13.3%
7 Sep 2018−10.5%
14 Sep 2018−13.2%
21 Sep 2018−16.8%
28 Sep 2018−17.8%
5 Oct 2018−8.5%
12 Oct 2018−5.5%
19 Oct 2018+11.1%
26 Oct 2018−5.8%
2 Nov 2018−6.1%
9 Nov 2018−9.4%
16 Nov 2018−16.5%
22 Nov 2018−12.8%
30 Nov 2018−14.6%
7 Dec 2018−18.7%
14 Dec 2018−18.7%
21 Dec 2018−5.1%
28 Dec 2018+12.5%
4 Jan 2019+1.0%
11 Jan 2019−6.8%
18 Jan 2019−16.9%
25 Jan 2019−11.8%
1 Feb 2019−23.6%
8 Feb 2019−34.3%
15 Feb 2019−36.8%
22 Feb 2019−35.1%
1 Mar 2019−33.1%
8 Mar 2019−24.7%
15 Mar 2019−23.8%
22 Mar 2019−32.0%
29 Mar 2019−38.7%
5 Apr 2019−35.6%
12 Apr 2019−32.9%
18 Apr 2019−30.4%
26 Apr 2019−25.3%
3 May 2019−19.0%
10 May 2019−8.4%
17 May 2019−19.2%
24 May 2019−3.6%
31 May 2019−11.9%
7 Jun 2019−14.1%
14 Jun 2019−20.1%
21 Jun 2019−31.4%
28 Jun 2019−25.0%
5 Jul 2019−24.2%
12 Jul 2019−26.7%
19 Jul 2019−25.2%
26 Jul 2019−31.9%
2 Aug 2019−49.6%
9 Aug 2019−49.0%
16 Aug 2019−35.1%
23 Aug 2019−48.1%
30 Aug 2019−47.0%
6 Sep 2019−46.6%
13 Sep 2019−29.8%
20 Sep 2019−20.8%
27 Sep 2019−26.7%
4 Oct 2019−29.3%
11 Oct 2019−30.0%
18 Oct 2019−29.7%
27 Oct 2019−3.3%
1 Nov 2019+66.5%
8 Nov 2019+75.3%
15 Nov 2019+38.8%
22 Nov 2019+72.7%
29 Nov 2019+68.5%
6 Dec 2019+61.6%
13 Dec 2019+15.2%
20 Dec 2019+24.8%
27 Dec 2019+29.9%
3 Jan 2020+50.4%
10 Jan 2020+76.4%
17 Jan 2020+82.3%
24 Jan 2020+45.0%
1 Feb 2020+20.8%
7 Feb 2020+21.1%
14 Feb 2020+14.4%
20 Feb 2020+10.6%
28 Feb 2020+12.3%
6 Mar 2020+4.8%
13 Mar 2020+7.0%
20 Mar 2020−3.2%
27 Mar 2020+0.2%
3 Apr 2020−14.6%
9 Apr 2020+2.8%
17 Apr 2020−0.4%
24 Apr 2020−12.5%
30 Apr 2020−10.0%
8 May 2020−20.0%
15 May 2020−3.6%
22 May 2020−12.8%
29 May 2020−13.6%
5 Jun 2020+3.4%
12 Jun 2020+8.2%
19 Jun 2020+32.0%
26 Jun 2020+39.0%
3 Jul 2020+48.4%
10 Jul 2020−3.7%
17 Jul 2020−17.0%
24 Jul 2020+0.0%
31 Jul 2020−8.4%
7 Aug 2020+0.0%
14 Aug 2020−7.1%
21 Aug 2020−0.8%
28 Aug 2020+10.3%
4 Sep 2020−16.0%
11 Sep 2020−23.5%
18 Sep 2020−23.1%
25 Sep 2020−27.9%
1 Oct 2020−30.8%
9 Oct 2020−34.1%
16 Oct 2020−28.3%
23 Oct 2020−31.3%
30 Oct 2020−39.4%
6 Nov 2020−38.9%
14 Nov 2020−40.6%
20 Nov 2020−34.9%
27 Nov 2020−32.9%
4 Dec 2020−18.9%
11 Dec 2020−4.6%
18 Dec 2020−1.5%
24 Dec 2020−2.6%
1 Jan 2021−1.9%
8 Jan 2021+1.1%
15 Jan 2021−4.5%
22 Jan 2021−3.1%
29 Jan 2021+12.9%
5 Feb 2021+12.3%
12 Feb 2021+20.1%
19 Feb 2021+9.7%
26 Feb 2021+0.4%
5 Mar 2021−8.3%
12 Mar 2021−16.4%
19 Mar 2021−27.4%
26 Mar 2021−27.0%
1 Apr 2021−23.1%
9 Apr 2021−17.4%
16 Apr 2021−15.7%
23 Apr 2021−16.0%
30 Apr 2021−7.7%
7 May 2021+3.1%
14 May 2021−4.2%
21 May 2021+3.5%
28 May 2021+8.3%
4 Jun 2021−0.6%
11 Jun 2021+2.6%
18 Jun 2021+50.3%
25 Jun 2021+43.4%
2 Jul 2021+42.0%
9 Jul 2021+35.6%
16 Jul 2021+49.7%
23 Jul 2021+39.9%
30 Jul 2021+9.9%
6 Aug 2021+10.2%
13 Aug 2021+15.6%
20 Aug 2021+1.3%
27 Aug 2021−7.6%
3 Sep 2021−4.5%
9 Sep 2021−4.2%
17 Sep 2021−26.8%
24 Sep 2021−23.3%
1 Oct 2021−4.1%
8 Oct 2021+27.4%
14 Oct 2021+31.5%
22 Oct 2021+28.8%
29 Oct 2021+50.3%
4 Nov 2021+35.9%
12 Nov 2021+29.5%
18 Nov 2021+37.8%
26 Nov 2021+38.9%
3 Dec 2021+41.4%
10 Dec 2021+72.6%
17 Dec 2021+76.5%
24 Dec 2021+78.0%
31 Dec 2021+57.4%
7 Jan 2022+16.9%
14 Jan 2022+19.7%
21 Jan 2022+25.7%
28 Jan 2022+18.9%
4 Feb 2022+25.3%
11 Feb 2022+31.3%
18 Feb 2022+19.2%
25 Feb 2022+14.3%
4 Mar 2022+14.8%
11 Mar 2022−6.6%
17 Mar 2022−15.3%
25 Mar 2022−14.6%
1 Apr 2022−18.2%
8 Apr 2022−5.1%
13 Apr 2022−10.8%
22 Apr 2022−5.2%
29 Apr 2022−3.4%
6 May 2022−12.5%
13 May 2022−22.6%
20 May 2022+5.8%
27 May 2022−2.5%
3 Jun 2022+4.6%
10 Jun 2022+1.8%
17 Jun 2022−5.1%
24 Jun 2022+1.5%
1 Jul 2022−3.0%
8 Jul 2022−14.6%
15 Jul 2022−16.5%
22 Jul 2022−12.3%
29 Jul 2022−13.4%
5 Aug 2022−7.8%
12 Aug 2022−0.5%
19 Aug 2022−5.3%
26 Aug 2022+1.1%
2 Sep 2022−6.3%
9 Sep 2022−3.1%
16 Sep 2022−3.6%
23 Sep 2022−9.4%
30 Sep 2022−15.8%
7 Oct 2022+1.6%
14 Oct 2022−7.0%
21 Oct 2022−15.6%
28 Oct 2022−9.9%
4 Nov 2022−12.5%
11 Nov 2022−9.0%
18 Nov 2022−25.8%
25 Nov 2022−21.3%
2 Dec 2022−30.7%
9 Dec 2022−21.9%
16 Dec 2022−13.0%
23 Dec 2022−29.0%
30 Dec 2022−12.4%
6 Jan 2023−21.9%
13 Jan 2023−20.8%
20 Jan 2023−16.9%
27 Jan 2023−18.9%
3 Feb 2023−17.6%
10 Feb 2023−23.8%
17 Feb 2023−25.4%
24 Feb 2023−23.4%
3 Mar 2023−5.2%
10 Mar 2023−6.9%
17 Mar 2023−14.7%
24 Mar 2023+0.2%
31 Mar 2023−8.9%
6 Apr 2023−10.7%
13 Apr 2023−6.0%
21 Apr 2023+11.4%
28 Apr 2023+30.7%
5 May 2023+49.1%
12 May 2023+77.1%
19 May 2023+92.3%
26 May 2023+84.3%
2 Jun 2023+60.1%
9 Jun 2023+65.1%
16 Jun 2023+85.1%
23 Jun 2023+79.8%
30 Jun 2023+112.9%
7 Jul 2023+129.6%
14 Jul 2023+192.3%
21 Jul 2023+144.9%
28 Jul 2023+102.1%
4 Aug 2023+93.2%
11 Aug 2023+71.4%
18 Aug 2023+90.6%
25 Aug 2023+102.8%
1 Sep 2023+110.6%
8 Sep 2023+84.3%
15 Sep 2023+80.3%
22 Sep 2023+79.8%
29 Sep 2023+50.2%
6 Oct 2023+38.8%
13 Oct 2023+9.5%
20 Oct 2023+7.3%
27 Oct 2023+8.3%
3 Nov 2023−0.8%
12 Nov 2023−5.7%
17 Nov 2023−14.1%
24 Nov 2023−11.5%
1 Dec 2023−21.3%
8 Dec 2023+4.4%
15 Dec 2023+6.1%
22 Dec 2023+4.9%
29 Dec 2023+3.1%
5 Jan 2024+11.9%
12 Jan 2024+13.9%
20 Jan 2024+11.8%
25 Jan 2024+9.7%
2 Feb 2024+25.2%
9 Feb 2024+37.5%
16 Feb 2024+27.4%
23 Feb 2024+26.8%
2 Mar 2024+33.4%
7 Mar 2024−2.2%
15 Mar 2024−16.2%
22 Mar 2024−12.3%
28 Mar 2024−11.8%
5 Apr 2024−10.7%
12 Apr 2024−9.8%
19 Apr 2024−12.4%
26 Apr 2024+1.6%
3 May 2024−17.3%
10 May 2024−25.8%
18 May 2024−21.1%
24 May 2024−17.8%
31 May 2024−16.2%
7 Jun 2024−17.2%
14 Jun 2024+8.4%
21 Jun 2024+10.4%
28 Jun 2024+4.7%
5 Jul 2024+1.3%
12 Jul 2024−13.0%
19 Jul 2024−10.7%
26 Jul 2024−18.5%
2 Aug 2024−14.3%
9 Aug 2024−13.2%
16 Aug 2024−16.7%
23 Aug 2024−23.9%
30 Aug 2024−20.2%
6 Sep 2024−12.1%
13 Sep 2024−19.1%
20 Sep 2024−24.0%
27 Sep 2024−18.1%
4 Oct 2024−22.0%
11 Oct 2024−12.8%
18 Oct 2024−5.8%
25 Oct 2024−17.8%
1 Nov 2024−9.3%
8 Nov 2024−1.0%
14 Nov 2024−0.7%
22 Nov 2024−1.3%
29 Nov 2024−4.3%
6 Dec 2024+1.5%
13 Dec 2024+0.9%
20 Dec 2024−1.6%
27 Dec 2024−2.5%
3 Jan 2025+0.3%
10 Jan 2025−2.6%
17 Jan 2025−0.4%
24 Jan 2025+10.7%
1 Feb 2025−1.1%
7 Feb 2025−3.3%
14 Feb 2025−7.1%
21 Feb 2025−3.0%
28 Feb 2025−6.1%
7 Mar 2025−11.1%
13 Mar 2025−21.5%
21 Mar 2025−13.5%
28 Mar 2025−19.9%
4 Apr 2025−15.5%
11 Apr 2025−16.7%
17 Apr 2025−21.8%
25 Apr 2025−12.3%
2 May 2025−13.9%
9 May 2025−20.2%
16 May 2025−12.8%
23 May 2025−18.4%
30 May 2025−20.0%
6 Jun 2025−17.0%
13 Jun 2025−4.7%
20 Jun 2025−16.5%
27 Jun 2025−5.8%
4 Jul 2025−14.0%
11 Jul 2025−9.3%
18 Jul 2025−12.1%
25 Jul 2025−18.1%
1 Aug 2025−15.7%
8 Aug 2025−12.9%
14 Aug 2025−14.2%
22 Aug 2025−6.7%
29 Aug 2025−8.0%
5 Sep 2025−11.1%
12 Sep 2025−12.8%
19 Sep 2025+1.7%
26 Sep 2025−6.3%
3 Oct 2025−4.9%
10 Oct 2025−6.4%
17 Oct 2025−9.2%
24 Oct 2025−9.6%
31 Oct 2025−3.6%
7 Nov 2025−7.8%
14 Nov 2025−8.3%
21 Nov 2025−17.5%
28 Nov 2025−5.8%
5 Dec 2025−11.5%
12 Dec 2025−17.8%
19 Dec 2025−23.8%
26 Dec 2025−22.6%
2 Jan 2026−25.3%
9 Jan 2026−25.5%
16 Jan 2026−11.3%
23 Jan 2026−18.0%
1 Feb 2026−21.2%
6 Feb 2026−16.0%
13 Feb 2026−11.6%
20 Feb 2026−15.3%
27 Feb 2026−15.9%
6 Mar 2026−16.6%
13 Mar 2026−11.8%
20 Mar 2026−9.9%
27 Mar 2026−7.8%
2 Apr 2026−7.5%
10 Apr 2026+4.1%
17 Apr 2026−5.2%
24 Apr 2026−0.2%
30 Apr 2026+2.5%
8 May 2026+5.7%
15 May 2026−8.6%
22 May 2026−1.2%
29 May 2026−1.7%
4 Jun 2026+2.6%
5 Jun 2026+8.3%
10 Jun 2026+2.8%
12 Jun 2026+8.3%
17 Jun 2026+21.2%
19 Jun 2026+12.1%
24 Jun 2026+21.0%
25 Jun 2026+21.2%
1 Jul 2026+20.6%
3 Jul 2026+14.6%
10 Jul 2026+17.3%
17 Jul 2026+10.6%
24 Jul 2026+1.0%
31 Jul 2026−1.4%
7 Aug 2026−0.5%
14 Aug 2026+1.3%
21 Aug 2026−1.0%
28 Aug 2026−9.3%
4 Sep 2026−12.5%
11 Sep 2026−21.9%
18 Sep 2026−23.2%
25 Sep 2026−16.6%
1 Oct 2026−17.5%
9 Oct 2026−15.0%
16 Oct 2026−11.8%
23 Oct 2026−13.7%
30 Oct 2026−9.0%
4 Nov 2026−4.0%
Each bar is one week, from 2016 to now (549 weeks with a reading). Green means the stock's return over the previous 13 weeks beat the NIFTY 500; red means it trailed. The colour is strongest at a gap of 25 percentage points or more. A gap means there is no reading for that week.

Over the last 11 years the share price moved −36% while the NIFTY 500 moved +251%, so it is behind the index over that whole period. It was last ahead over 13 weeks in the week of 14 August 2026. The chart above shows the 13-week comparison for every week.

This page treats a rise as over when the price closes below its 200-day average on two Fridays in a row.

What changed at Patel Engineering this quarter?

One change stood out: highest quarterly profit in 9 quarters.

  1. Highest quarterly profit in 9 quarters

    Profit of ₹98 crore in the June 2026 quarter is the highest of the last 9 quarters.

What are Patel Engineering's latest quarterly results?

For April to June 2026 (the quarter ended 30 June 2026), Patel Engineering reported revenue of ₹1,281 crore, up 3.9% from ₹1,233 crore a year earlier, and a profit of ₹98.0 crore, up 21.0% from ₹81.0 crore.

Patel Engineering results: April to June 2026 against a year earlier

Patel Engineering results: April to June 2026 against a year earlier
MeasureApril to June 2026April to June 2025Change
Revenue₹1,281 crore₹1,233 crore+3.9%
Profit₹98.0 crore₹81.0 crore+21.0%
Earnings per share₹0.98₹0.78+25.6%
Operating margin14.0%13.0%+1.0 points

The next results, for July to September 2026, are due by 14 November 2026: listed companies must publish quarterly results within 45 days of the quarter's end (60 days for the January to March quarter).

Patel Engineering's management discussed these results on a call held on 29 September 2026; what it said is further down this page.

From the company's reported quarterly results (quarter ended 30 June 2026). Revenue and profit in ₹ crore.

What is the Patel Engineering share price history?

Patel Engineering closed at ₹25.26 on 4 November 2026, down 26.2% from ₹34.25 a year earlier (7 November 2025) and up 17.5% over five years. Its highest weekly close since March 2016 was ₹74.38 on 16 September 2016.

Patel Engineering share price: then and now

Patel Engineering share price: then and now
WhenCloseChange to 4 Nov 2026
1 week ago · 30 Oct 2026₹23.04+9.6%
1 month ago · 1 Oct 2026₹25.94−2.6%
6 months ago · 8 May 2026₹28.82−12.4%
1 year ago · 7 Nov 2025₹34.25−26.2%
3 years ago · 3 Nov 2023₹47.14−46.4%
5 years ago · 4 Nov 2021₹21.50+17.5%
10 years ago · 4 Nov 2016₹52.11−51.5%
Earliest weekly close in our records · 11 Mar 2016₹39.62−36.2%
Highest weekly close since March 2016 · 16 Sep 2016₹74.38−66.0%
Lowest weekly close since March 2016 · 30 Aug 2019₹6.97+262.4%
52-week high (weekly close) · 28 Nov 2025₹35.09−28.0%
52-week low (weekly close) · 23 Oct 2026₹22.36+13.0%

Weekly closing prices. Each change is the move from that price to the 4 Nov 2026 close. A day's intraday high or low can go beyond these weekly closes.

562 weekly closes from 11 March 2016 to 4 November 2026.

What is the latest news on Patel Engineering?

4 Nov 2026: Patel Engineering closed at ₹25.26, up 9.6% on the week and down 2.6% on the month. 29 Sep 2026: Patel Engineering held its results call for April to June 2026. Management guided: New order inflow ₹8,000-10,000 crore annually for the next 4-5 years, approximately ₹50,000 crore over 5 years.

Earlier

  • Results for April to June 2026: Revenue up 3.9% and profit up 21.0% on a year earlier.

What dividend does Patel Engineering pay?

Patel Engineering has paid no dividend on the NSE since 1 April 2021, the start of the period we checked.

No. Patel Engineering Ltd paid out 0% of its profit as dividends in each of its last 13 reported years, so there is no payout history to show. That comes from the filed annual statements, not an estimate.

From the NSE corporate-actions record, read 5 November 2026.

What did Patel Engineering management say on the latest results call?

On the call for April to June 2026, held on 29 September 2026, Patel Engineering's management guided: New order inflow ₹8,000-10,000 crore annually for the next 4-5 years, approximately ₹50,000 crore over 5 years.

“It is difficult to say that the pledge will come down to zero in 1 or 2 years. We have reduced it this year, as we had guided earlier, and we expect further reductions going forward depending on the company's performance.”Rahul Agarwal, CFO, on the call for April to June 2026

What management guided

  • Revenue yearly growth above 10-12% over 4-5 years; closing vision added revenue and profit yearly growth of 13-15% over 5 years.
  • Operating margin maintained at 13-14% over the outlook period.
  • Non-core cash generation ₹150-200 crore annually for 4-5 years; arbitration recovery may take around 5 years overall.
  • Additional ₹40,000 crore bids by March, with 15-20% conversion expected.

Management’s own plans and goals, from our notes of the call. A plan is not a result.

Source: the call transcript.

From the call for April to June 2026, 29 September 2026.

What to watch in Patel Engineering's next results?

When Patel Engineering reports July to September 2026, these are the 4 checks that show whether the story is still on course. First: New order awards from the current government tender pipeline - check whether replenishment is accelerating enough to support the stated annual intake plan.

Patel Engineering: what to watch next quarter
What to check (from the call)
New order awards from the current government tender pipeline - check whether replenishment is accelerating enough to support the stated annual intake plan.
Core EPC margin mix - check whether hydro share continues to support the stated consolidated margin framework.
Next land, road-project equity or arbitration monetisation - check cash realisation and debt application.
Next pledge disclosure and project debt - check further lender-pool reduction without balance-sheet expansion.

Which stock lists is Patel Engineering on?

Patel Engineering is on 2 of our India lists: 52 week high & low and Penny stocks.

Is Patel Engineering profitable?

Patel Engineering Ltd earned ₹98.0 Cr of net profit in the Jun 2026 quarter, +21.0% on the same quarter a year earlier. That is the 2nd quarter in a row of profit growth. Full-year FY26 profit was ₹269 Cr. That is 7.7% of the quarter's revenue. The same quarter a year earlier earned ₹81.0 Cr.

Net profit is what is left after every cost, interest and tax. Earnings per share, dividends and book value all grow from it.

For the full year, FY26 profit was ₹269 Cr (+8.5% on the year before).

FY26 profit ₹269 Cr (+8.5% on the year before)

  • Net profit ₹269
FY26 profit ₹269 Cr (+8.5% on the year before)
QuarterNet profit
FY16−₹196
FY17−₹103
FY18₹105
FY19₹154
FY20₹11
FY21−₹291
FY22₹72
FY23₹183
FY24₹290
FY25₹248
FY26₹269

Growth on a year earlier

  • Growth on a year earlier 8.5%
Growth on a year earlier
QuarterGrowth on a year earlier
FY16−2,060%
FY17–
FY18–
FY1946.7%
FY20−92.9%
FY21−2,745.5%
FY22–
FY23154.2%
FY2458.5%
FY25−14.5%
FY268.5%
Top: net profit each year, ₹ Cr. Below: growth on the year before, %. 11-year window. A grey bar is lower than the year before.

Jun 2026: ₹98.0 Cr (+21.0% on a year earlier), the 2nd quarter in a row of growth

  • Net profit (quarterly) ₹98.0
Jun 2026: ₹98.0 Cr (+21.0% on a year earlier), the 2nd quarter in a row of growth
QuarterNet profit (quarterly)
Sep 2023₹38
Dec 2023₹69
Mar 2024₹140
Jun 2024₹55
Sep 2024₹73
Dec 2024₹82
Mar 2025₹38
Jun 2025₹81
Sep 2025₹73
Dec 2025₹72
Mar 2026₹44
Jun 2026₹98

Growth on a year earlier

  • Growth on a year earlier 21%
Growth on a year earlier
QuarterGrowth on a year earlier
Sep 202346.2%
Dec 2023187.5%
Mar 202470.7%
Jun 202427.9%
Sep 202492.1%
Dec 202418.8%
Mar 2025−72.9%
Jun 202547.3%
Sep 20250%
Dec 2025−12.2%
Mar 202615.8%
Jun 202621%
Top: net profit each quarter, ₹ Cr. Below: growth on the same quarter a year earlier, %. Last 12 quarters. A grey bar is lower than the quarter before.

Why profit moved: revenue changed +3.9% on a year earlier and the margin moved +1.0 percentage points. Sales did the work, and the margin was about flat.

On average over the last four quarters, profit changed +6.2% and revenue −0.6%. Profit is growing faster than sales: fixed costs are spread over more sales, so each extra rupee of revenue adds more to profit.

How much revenue does Patel Engineering make, and is it growing?

Patel Engineering Ltd reported ₹1,281 Cr of revenue in the Jun 2026 quarter, +3.9% on the same quarter a year earlier. Over 10 years it has grown 2.4% a year on average. The last full year, FY26, came in at ₹5,103 Cr. The last four reported quarters add to ₹5,149 Cr.

Revenue is everything the company billed its customers in the period.

FY26 revenue was ₹5,103 Cr, +0.2% on the year before.

FY26 revenue ₹5,103 Cr (+0.2% on the year before), 2.4% a year over 10 years

  • Revenue ₹5,103
FY26 revenue ₹5,103 Cr (+0.2% on the year before), 2.4% a year over 10 years
QuarterRevenue
FY16₹4,041
FY17₹3,884
FY18₹2,275
FY19₹2,362
FY20₹2,617
FY21₹1,995
FY22₹3,380
FY23₹3,891
FY24₹4,544
FY25₹5,093
FY26₹5,103

Growth on a year earlier

  • Growth on a year earlier 0.2%
Growth on a year earlier
QuarterGrowth on a year earlier
FY1618.3%
FY17−3.9%
FY18−41.4%
FY193.8%
FY2010.8%
FY21−23.8%
FY2269.4%
FY2315.1%
FY2416.8%
FY2512.1%
FY260.2%
Top: revenue each year, ₹ Cr. Below: growth on the year before, %. 11-year window. A grey bar is lower than the year before.

Jun 2026: ₹1,281 Cr (+3.9% on a year earlier)

  • Revenue (quarterly) ₹1,281
Jun 2026: ₹1,281 Cr (+3.9% on a year earlier)
QuarterRevenue (quarterly)
Sep 2023₹1,021
Dec 2023₹1,061
Mar 2024₹1,343
Jun 2024₹1,102
Sep 2024₹1,174
Dec 2024₹1,206
Mar 2025₹1,612
Jun 2025₹1,233
Sep 2025₹1,208
Dec 2025₹1,239
Mar 2026₹1,421
Jun 2026₹1,281

Growth on a year earlier

  • Growth on a year earlier 3.9%
Growth on a year earlier
QuarterGrowth on a year earlier
Sep 202314.3%
Dec 202311.1%
Mar 202411.5%
Jun 2024−1.5%
Sep 202415%
Dec 202413.7%
Mar 202520%
Jun 202511.9%
Sep 20252.9%
Dec 20252.7%
Mar 2026−11.8%
Jun 20263.9%
Top: revenue each quarter, ₹ Cr. Below: growth on the same quarter a year earlier, %. Last 12 quarters. A grey bar is lower than the quarter before.

Recent pace: the last four quarters grew −0.6% on average, against 2.4% a year over the longer run, so this year is growing slower than its own long-run rate.

Is growth speeding up? Revenue over the last 12 months grew −1.5%, against +6.6% a year over the last 8 quarters (rolling over); profit over the last 12 months grew +4.7%, against −2.5% a year (accelerating).

How much of every ₹100 of sales does Patel Engineering keep?

Patel Engineering Ltd's operating margin was 14.0% in the Jun 2026 quarter, 1.0 percentage points higher than the same quarter a year ago. Across 13 years it has been between 7.0% and 23.0%. The latest quarter is within that range.

Operating margin is what is left from every ₹100 of sales after the costs of running the business, before interest and tax. It shows pricing power and cost control.

Why the margin moved: operating margin changed +0.6 percentage points on the year while gross margin changed +0.8 points. So the gain came mostly from the gross margin, which means input costs and prices charged.

FY26: 13.0%, within a range of 7.0% to 23.0% over 13 years

  • Operating margin 13.0%
FY26: 13.0%, within a range of 7.0% to 23.0% over 13 years
QuarterOperating margin
FY1413%
FY1515%
FY1610%
FY1711%
FY1823%
FY1916%
FY207%
FY2112%
FY2216%
FY2314%
FY2415%
FY2515%
FY2613%

Change on the year before (points)

  • Change on the year before (points) −2.0 pts
Change on the year before (points)
QuarterChange on the year before (points)
FY14–
FY15+2.0 pts
FY16−5.0 pts
FY17+1.0 pts
FY18+12.0 pts
FY19−7.0 pts
FY20−9.0 pts
FY21+5.0 pts
FY22+4.0 pts
FY23−2.0 pts
FY24+1.0 pts
FY250.0 pts
FY26−2.0 pts
Operating margin each year, % (top). Below: change on the year before, in percentage points. 13-year window.

Jun 2026: operating margin 14.0% (+1.0 points on a year earlier)

  • Operating margin 14.0%
Jun 2026: operating margin 14.0% (+1.0 points on a year earlier)
QuarterOperating margin
Sep 202314%
Dec 202313%
Mar 202418%
Jun 202415%
Sep 202414%
Dec 202415%
Mar 202514%
Jun 202513%
Sep 202513%
Dec 202512%
Mar 202615%
Jun 202614%

Change on a year earlier (points)

  • Change on a year earlier (points) +1.0 pts
Change on a year earlier (points)
QuarterChange on a year earlier (points)
Sep 2023–
Dec 2023−2.0 pts
Mar 2024+4.0 pts
Jun 20240.0 pts
Sep 20240.0 pts
Dec 2024+2.0 pts
Mar 2025−4.0 pts
Jun 2025−2.0 pts
Sep 2025−1.0 pts
Dec 2025−3.0 pts
Mar 2026+1.0 pts
Jun 2026+1.0 pts
Top: quarterly operating margin, %. Below: change on the same quarter a year earlier, in percentage points. Last 12 quarters. Operating profit as a share of revenue, each quarter.

Is Patel Engineering's profit turning into cash?

Over the last 3 years, 189% of Patel Engineering Ltd's reported profit came in as cash from its operations, so the profit is backed by cash. In FY26 it brought in ₹560 Cr of operating cash against ₹269 Cr of profit. After ₹69.0 Cr of spending on assets, ₹491 Cr was left over as free cash.

The profit and loss account shows what was earned. The cash-flow statement shows the cash that actually came in. Comparing operating cash flow with profit is one of the best checks that a profit is real.

Cash-flow figures here are yearly, because quarterly cash statements are not published, so this section changes once a year.

FY26: operating cash ₹560 Cr against profit ₹269 Cr; 189% of 3 years' profit came in as cash

  • Operating cash ₹560
  • Net profit ₹269
  • Free cash ₹491
FY26: operating cash ₹560 Cr against profit ₹269 Cr; 189% of 3 years' profit came in as cash
QuarterOperating cashNet profitFree cash
FY16−₹48−₹196₹78
FY17₹567−₹103₹451
FY18₹403₹105₹498
FY19₹836₹154₹493
FY20₹407₹11₹234
FY21₹389−₹291₹703
FY22₹514₹72₹330
FY23₹702₹183₹560
FY24₹688₹290₹563
FY25₹279₹248₹232
FY26₹560₹269₹491
Operating cash flow and net profit each year, ₹ Cr. The line is free cash flow: operating cash minus spending on assets. 11-year window, yearly figures.

FY26: operating cash was 208% of profit (189% over three years)

  • Operating cash as % of profit 208%
  • Break-even line 100%
FY26: operating cash was 208% of profit (189% over three years)
QuarterOperating cash as % of profitBreak-even line
FY16–100%
FY17–100%
FY18300%100%
FY19300%100%
FY20300%100%
FY21–100%
FY22300%100%
FY23300%100%
FY24237%100%
FY25113%100%
FY26208%100%
Operating cash as a share of net profit, each year, % (line). The flat line marks 100%, meaning all of the profit came in as cash; unusual years are drawn at the edge.

Why 189% of profit came in as cash: the cash cycle got 36 days shorter between FY21 and FY26, so cash that used to wait in the business now arrives sooner.

What to look at next: no single use of cash stands out. The next section checks both the cash tied up in daily operations and the spending on assets.

Where does Patel Engineering's cash go?

Patel Engineering Ltd's cash cycle, the days between paying suppliers and getting paid by customers, was 43 days in FY26, down from 79 days in FY21. It spent ₹241 Cr on assets over the last 3 years. Customers take 43 days to pay, and stock sits for 95 days on average.

Working capital is the cash tied up between paying suppliers and getting paid. Debtor days: how long customers take to pay. Inventory days: how long stock sits. The cash cycle: the whole loop, in days of sales.

At FY26 sales of ₹5,103 Cr, each day of that cycle ties up about ₹14.0 Cr, so roughly ₹601 Cr is tied up in the business at any time.

FY26: customers took 43 days to pay and stock sat for 95 days, about 3.1 months of sales sitting as stock, for a full cycle of 43 days, shorter than FY21's 79.

The full loop: cash goes out to suppliers and production on day 0. Stock sits for 95 days. Customers pay about 43 days after that. Suppliers are paid at 210 days. Together that makes the 43-day cycle.

FY26: a 43-day cash cycle, −36 days compared with FY21

  • Cash cycle 43d
  • Inventory days 95d
  • Debtor days 43d
  • Payable days 210d
FY26: a 43-day cash cycle, −36 days compared with FY21
QuarterCash cycleInventory daysDebtor daysPayable days
FY1453d–53d–
FY1561d–61d–
FY1646d–46d–
FY1724d–24d–
FY1839d–39d–
FY1935d–35d–
FY2046d–46d–
FY2179d–79d–
FY2261d–61d–
FY2347d–47d–
FY2444d–44d–
FY2554d–54d–
FY2643d95d43d210d
Debtor days, inventory days, payable days and the full cash cycle, each year. 13-year window.

Spending on assets: ₹241 Cr over the last 3 years, against ₹302 Cr of depreciation (the yearly wear and tear on existing assets). So it is spending about what it takes to replace what wears out, or less. Work still in progress is ₹126 Cr (FY26): assets paid for that are not earning yet.

FY26: capex ₹69.0 Cr, work in progress ₹126 Cr, steady spending

  • Capex ₹69.0
  • Work-in-progress ₹126
FY26: capex ₹69.0 Cr, work in progress ₹126 Cr, steady spending
QuarterCapexWork-in-progress
FY16−₹126₹837
FY17₹116₹868
FY18−₹95₹792
FY19₹343₹1,063
FY20₹173₹1,141
FY21−₹314₹679
FY22₹184₹283
FY23₹142₹294
FY24₹125₹233
FY25₹47₹171
FY26₹69₹126
Capital spending each year, ₹ Cr, with work in progress, ₹ Cr, as the line. Quarterly capital-spending figures are not available for India, so this is yearly.

In short: neither the daily cycle nor new spending is soaking up the cash, so the picture is fairly clean.

What is Patel Engineering's P/E ratio, and how does it compare with its own history?

Patel Engineering Ltd's P/E is 6.4×, near the low end of its own history: it has been lower only 11% of the time. Its usual P/E (the middle reading) is 12.0×, over 8.1 years of weekly prices. This compares the share price with the company’s own past. It does not say what the business is worth.

P/E is the share price divided by a year's profit per share: how many rupees the market pays for each rupee of yearly profit.

The P/E here, and its history, use a profit figure that can leave out one-off items, so it can differ from a P/E worked out on the quarterly results. Those results' earnings per share for the four quarters to Jun 2026 add up to ₹2.83.

P/E 6.4× against a usual 12.0×: near the low end of its own history: it has been lower only 11% of the time

  • P/E 5.80×
  • Median 12.0×
P/E 6.4× against a usual 12.0×: near the low end of its own history: it has been lower only 11% of the time
WeekP/EMedian
14 Sep 201810.6×12.0×
28 Sep 20187.70×12.0×
12 Oct 20188.30×12.0×
26 Oct 20188.00×12.0×
9 Nov 20188.80×12.0×
22 Nov 20188.80×12.0×
7 Dec 20188.10×12.0×
21 Dec 20188.60×12.0×
4 Jan 20199.10×12.0×
18 Jan 20198.10×12.0×
1 Feb 20197.20×12.0×
15 Feb 20195.90×12.0×
1 Mar 20196.20×12.0×
15 Mar 20196.90×12.0×
29 Mar 20196.10×12.0×
12 Apr 20196.30×12.0×
26 Apr 20196.20×12.0×
10 May 20195.60×12.0×
24 May 20196.20×12.0×
7 Jun 20196.00×12.0×
21 Jun 20194.60×12.0×
5 Jul 20194.60×12.0×
19 Jul 20194.30×12.0×
2 Aug 20192.80×12.0×
16 Aug 20193.10×12.0×
30 Aug 20194.30×12.0×
13 Sep 20196.00×12.0×
27 Sep 20195.30×12.0×
11 Oct 20195.10×12.0×
27 Oct 20196.80×12.0×
8 Nov 20198.60×12.0×
22 Nov 201915.9×12.0×
6 Dec 201914.9×12.0×
20 Dec 201914.7×12.0×
3 Jan 202016.0×12.0×
17 Jan 202019.3×12.0×
1 Feb 202019.1×12.0×
14 Feb 202015.9×12.0×
28 Feb 202014.4×12.0×
13 Mar 202010.4×12.0×
27 Mar 20209.30×12.0×
9 Apr 202013.3×12.0×
24 Apr 202012.6×12.0×
8 May 202011.6×12.0×
22 May 202011.6×12.0×
5 Jun 202014.1×12.0×
19 Jun 202015.1×12.0×
12 Nov 202136.0×12.0×
26 Nov 202136.0×12.0×
10 Dec 202136.0×12.0×
24 Dec 202136.0×12.0×
7 Jan 202236.0×12.0×
21 Jan 202236.0×12.0×
4 Feb 202236.0×12.0×
18 Feb 202217.7×12.0×
4 Mar 202216.0×12.0×
17 Mar 202216.4×12.0×
1 Apr 202217.0×12.0×
13 Apr 202218.5×12.0×
29 Apr 202216.9×12.0×
13 May 202214.5×12.0×
27 May 202219.0×12.0×
10 Jun 202218.8×12.0×
24 Jun 202218.4×12.0×
8 Jul 202216.9×12.0×
22 Jul 202218.9×12.0×
5 Aug 202220.2×12.0×
19 Aug 202217.7×12.0×
2 Sep 202216.3×12.0×
16 Sep 202215.1×12.0×
30 Sep 202213.4×12.0×
14 Oct 202214.1×12.0×
28 Oct 202213.9×12.0×
11 Nov 202212.7×12.0×
25 Nov 202212.2×12.0×
9 Dec 202212.2×12.0×
23 Dec 20229.90×12.0×
6 Jan 202310.7×12.0×
20 Jan 202310.2×12.0×
3 Feb 20239.80×12.0×
17 Feb 20239.30×12.0×
3 Mar 202310.3×12.0×
17 Mar 202310.0×12.0×
31 Mar 202310.0×12.0×
13 Apr 20239.90×12.0×
28 Apr 202313.7×12.0×
12 May 202317.8×12.0×
26 May 202314.5×12.0×
9 Jun 202316.2×12.0×
23 Jun 202316.0×12.0×
7 Jul 202320.3×12.0×
21 Jul 202326.0×12.0×
4 Aug 202327.2×12.0×
18 Aug 202328.8×12.0×
1 Sep 202329.8×12.0×
15 Sep 202329.2×12.0×
29 Sep 202327.3×12.0×
13 Oct 202326.7×12.0×
27 Oct 202324.7×12.0×
12 Nov 202322.9×12.0×
24 Nov 202324.6×12.0×
8 Dec 202329.8×12.0×
22 Dec 202329.8×12.0×
5 Jan 202430.9×12.0×
20 Jan 202430.2×12.0×
2 Feb 202433.3×12.0×
16 Feb 202431.0×12.0×
2 Mar 202430.4×12.0×
15 Mar 202424.9×12.0×
28 Mar 202425.4×12.0×
12 Apr 202427.1×12.0×
26 Apr 202431.5×12.0×
10 May 202427.3×12.0×
24 May 202427.3×12.0×
7 Jun 202426.2×12.0×
21 Jun 202430.3×12.0×
5 Jul 202430.1×12.0×
19 Jul 202425.7×12.0×
2 Aug 202424.9×12.0×
16 Aug 202422.7×12.0×
30 Aug 202423.8×12.0×
13 Sep 202424.9×12.0×
27 Sep 202424.1×12.0×
11 Oct 202422.7×12.0×
25 Oct 202419.8×12.0×
8 Nov 202421.4×12.0×
22 Nov 202418.1×12.0×
6 Dec 202420.2×12.0×
20 Dec 202418.6×12.0×
3 Jan 202518.5×12.0×
17 Jan 202518.1×12.0×
1 Feb 202517.1×12.0×
14 Feb 202512.1×12.0×
28 Feb 202511.8×12.0×
13 Mar 202510.9×12.0×
28 Mar 202510.6×12.0×
11 Apr 202510.8×12.0×
25 Apr 202512.3×12.0×
9 May 202511.3×12.0×
23 May 202511.4×12.0×
6 Jun 202511.6×12.0×
20 Jun 202510.9×12.0×
4 Jul 202511.1×12.0×
18 Jul 202510.7×12.0×
1 Aug 202510.1×12.0×
14 Aug 20259.60×12.0×
29 Aug 20259.40×12.0×
12 Sep 20259.60×12.0×
26 Sep 20259.50×12.0×
10 Oct 20259.50×12.0×
24 Oct 20259.40×12.0×
7 Nov 20259.00×12.0×
21 Nov 20258.40×12.0×
5 Dec 20258.30×12.0×
19 Dec 20258.00×12.0×
2 Jan 20267.30×12.0×
16 Jan 20267.60×12.0×
1 Feb 20267.20×12.0×
13 Feb 20267.70×12.0×
27 Feb 20267.20×12.0×
13 Mar 20266.40×12.0×
27 Mar 20266.20×12.0×
10 Apr 20267.10×12.0×
24 Apr 20267.20×12.0×
8 May 20267.50×12.0×
22 May 20266.90×12.0×
4 Jun 20266.60×12.0×
10 Jun 20266.70×12.0×
17 Jun 20267.70×12.0×
24 Jun 20268.60×12.0×
1 Jul 20268.60×12.0×
10 Jul 20268.40×12.0×
24 Jul 20267.50×12.0×
7 Aug 20267.60×12.0×
21 Aug 20267.10×12.0×
4 Sep 20266.90×12.0×
18 Sep 20266.50×12.0×
1 Oct 20266.60×12.0×
16 Oct 20266.30×12.0×
30 Oct 20265.80×12.0×

Earnings per share, 12 months

  • Earnings per share, 12 months ₹4
Earnings per share, 12 months
WeekEarnings per share, 12 months
14 Sep 2018–
28 Sep 2018₹3
12 Oct 2018₹3
26 Oct 2018₹3
9 Nov 2018₹3
22 Nov 2018₹3
7 Dec 2018₹3
21 Dec 2018₹3
4 Jan 2019₹3
18 Jan 2019₹3
1 Feb 2019₹3
15 Feb 2019₹3
1 Mar 2019₹3
15 Mar 2019₹3
29 Mar 2019₹3
12 Apr 2019₹3
26 Apr 2019₹3
10 May 2019₹3
24 May 2019₹3
7 Jun 2019₹3
21 Jun 2019₹3
5 Jul 2019₹3
19 Jul 2019₹3
2 Aug 2019₹3
16 Aug 2019₹3
30 Aug 2019₹3
13 Sep 2019₹3
27 Sep 2019₹2
11 Oct 2019₹2
27 Oct 2019₹2
8 Nov 2019₹2
22 Nov 2019₹2
6 Dec 2019₹2
20 Dec 2019₹2
3 Jan 2020₹1
17 Jan 2020₹1
1 Feb 2020₹1
14 Feb 2020₹1
28 Feb 2020₹1
13 Mar 2020₹1
27 Mar 2020₹1
9 Apr 2020₹1
24 Apr 2020₹1
8 May 2020₹1
22 May 2020₹1
5 Jun 2020₹1
19 Jun 2020₹1
12 Nov 2021₹1
26 Nov 2021₹1
10 Dec 2021₹1
24 Dec 2021₹1
7 Jan 2022₹1
21 Jan 2022₹1
4 Feb 2022₹1
18 Feb 2022₹1
4 Mar 2022₹1
17 Mar 2022₹1
1 Apr 2022₹1
13 Apr 2022₹1
29 Apr 2022₹1
13 May 2022₹1
27 May 2022₹1
10 Jun 2022₹1
24 Jun 2022₹1
8 Jul 2022₹1
22 Jul 2022₹1
5 Aug 2022₹1
19 Aug 2022₹1
2 Sep 2022₹1
16 Sep 2022₹1
30 Sep 2022₹1
14 Oct 2022₹1
28 Oct 2022₹1
11 Nov 2022₹1
25 Nov 2022₹1
9 Dec 2022₹1
23 Dec 2022₹1
6 Jan 2023₹2
20 Jan 2023₹2
3 Feb 2023₹2
17 Feb 2023₹2
3 Mar 2023₹2
17 Mar 2023₹2
31 Mar 2023₹1
13 Apr 2023₹1
28 Apr 2023₹1
12 May 2023₹1
26 May 2023₹1
9 Jun 2023₹1
23 Jun 2023₹2
7 Jul 2023₹2
21 Jul 2023₹2
4 Aug 2023₹2
18 Aug 2023₹2
1 Sep 2023₹2
15 Sep 2023₹2
29 Sep 2023₹2
13 Oct 2023₹2
27 Oct 2023₹2
12 Nov 2023₹2
24 Nov 2023₹2
8 Dec 2023₹2
22 Dec 2023₹2
5 Jan 2024₹2
20 Jan 2024₹2
2 Feb 2024₹2
16 Feb 2024₹2
2 Mar 2024₹2
15 Mar 2024₹2
28 Mar 2024₹2
12 Apr 2024₹2
26 Apr 2024₹2
10 May 2024₹2
24 May 2024₹2
7 Jun 2024₹2
21 Jun 2024₹2
5 Jul 2024₹2
19 Jul 2024₹2
2 Aug 2024₹2
16 Aug 2024₹2
30 Aug 2024₹2
13 Sep 2024₹2
27 Sep 2024₹2
11 Oct 2024₹2
25 Oct 2024₹2
8 Nov 2024₹2
22 Nov 2024₹2
6 Dec 2024₹2
20 Dec 2024₹2
3 Jan 2025₹3
17 Jan 2025₹3
1 Feb 2025₹3
14 Feb 2025₹3
28 Feb 2025₹3
13 Mar 2025₹3
28 Mar 2025₹4
11 Apr 2025₹4
25 Apr 2025₹4
9 May 2025₹4
23 May 2025₹4
6 Jun 2025₹4
20 Jun 2025₹4
4 Jul 2025₹4
18 Jul 2025₹4
1 Aug 2025₹4
14 Aug 2025₹4
29 Aug 2025₹4
12 Sep 2025₹4
26 Sep 2025₹4
10 Oct 2025₹4
24 Oct 2025₹4
7 Nov 2025₹4
21 Nov 2025₹4
5 Dec 2025₹4
19 Dec 2025₹4
2 Jan 2026₹4
16 Jan 2026₹4
1 Feb 2026₹4
13 Feb 2026₹4
27 Feb 2026₹4
13 Mar 2026₹4
27 Mar 2026₹4
10 Apr 2026₹4
24 Apr 2026₹4
8 May 2026₹4
22 May 2026₹4
4 Jun 2026₹4
10 Jun 2026₹4
17 Jun 2026₹4
24 Jun 2026₹4
1 Jul 2026₹4
10 Jul 2026₹4
24 Jul 2026₹4
7 Aug 2026₹4
21 Aug 2026₹4
4 Sep 2026₹4
18 Sep 2026₹4
1 Oct 2026₹4
16 Oct 2026₹4
30 Oct 2026₹4
Top: P/E each week. Below: earnings per share, trailing twelve months, leaving out one-off items, a step line that moves once a quarter; 8.1 years of history; short peaks above 36× are drawn at the top edge.

PEG 2.16: above 1.0, so the P/E is bigger than the earnings growth rate

  • PEG 2.16×
  • PEG = 1.0 1.00×
PEG 2.16: above 1.0, so the P/E is bigger than the earnings growth rate
QuarterPEGPEG = 1.0
Q3 FY246.00×1.00×
Q4 FY240.93×1.00×
Q1 FY250.41×1.00×
Q2 FY250.20×1.00×
Q3 FY250.33×1.00×
Q4 FY261.05×1.00×
Q1 FY272.16×1.00×
PEG each quarter: the P/E divided by the yearly growth rate of earnings. The flat line marks 1.0. Below it the P/E is smaller than the growth rate; above it the P/E is bigger. Worked out here as the quarter-end P/E divided by the growth in earnings per share over the last 12 months (only quarters with positive growth), because a reported quarterly PEG is not available for this stock. Last 7 quarters; values above 6 are drawn at the top edge.
6.4×P/E · lower than 89% of its last 8.1 years
n/mPEG · cannot be worked out, because 3-year earnings growth is not available

Why the multiple is where it is: over the past year earnings per share moved +8.4% while the price moved −26.2%. Earnings did better than the price, which pulled the multiple down within its own range.

Where the price move came from: over 5 years the price moved +3.3% a year; about +53.9% a year came from earnings growth and about −50.6 percentage points from the multiple (the market paying less). The split is approximate (price return minus earnings growth). It shows how much of the move came from the market paying a different multiple.

In short: the multiple is low against its own past, so the earnings trend underneath matters more than the multiple.

Is the Patel Engineering business getting better or worse?

Patel Engineering Ltd's business is giving mixed signals. Growth has been steadily positive, but ROCE at 10.4% is below the 15% level needed to call it steady growth. This is based on 12 quarters of 4 measures.

Every business is somewhere on a path of getting better or worse, and this section names where. The last 12 quarters of growth in revenue, profit and earnings per share, plus the return the business earns on its capital, are read as lines. Getting worse: the lines are falling. Turning around: a low point has just formed and the last few quarters are rising from it. Getting better: the rise from the low has lasted. Growing steadily: steady growth with healthy returns. Slowing from a peak: still high, but slowing. When the lines disagree the result is mixed; too little history means no reading. CAGR (compound annual growth rate) is the steady yearly rate that would turn the starting value into the latest one. It is the fairest way to compare growth over different periods. If the 1-year figure is much bigger than the 10-year one, recent growth is running faster than the long-run trend. A dash means there is no figure for that period, or the starting year was a loss, where a growth rate means nothing.

Growth year by year: revenue +0.2% in FY26, profit +8.5%

  • Revenue growth 0.2%
Growth year by year: revenue +0.2% in FY26, profit +8.5%
QuarterRevenue growth
FY1618.3%
FY17−3.9%
FY18−41.4%
FY193.8%
FY2010.8%
FY21−23.8%
FY2269.4%
FY2315.1%
FY2416.8%
FY2512.1%
FY260.2%

Profit growth, EPS growth

  • Profit growth 8.5%
  • EPS growth 8.4%
Profit growth, EPS growth
QuarterProfit growthEPS growth
FY16−300%−300%
FY17––
FY18––
FY1946.7%40.5%
FY20−92.9%−93.2%
FY21−300%−300%
FY22––
FY23154.2%137.6%
FY2458.5%57.9%
FY25−14.5%−21.6%
FY268.5%8.4%
Growth on the year before, each year, %. Top: revenue. Below: net profit and earnings per share, on their own scale because profit growth swings much more. Zero line drawn. Turnaround-year jumps are drawn at the edge (▲).

Three growth lines over twelve quarters: revenue rolling over, profit accelerating

  • Revenue −1.5%
Three growth lines over twelve quarters: revenue rolling over, profit accelerating
QuarterRevenue
Sep 202311.5%
Dec 202312%
Mar 202412.8%
Jun 20248.5%
Sep 20248.8%
Dec 20249.5%
Mar 202512.1%
Jun 202515.4%
Sep 202512.4%
Dec 20259.7%
Mar 20260.1%
Jun 2026−1.5%

Profit, EPS

  • Profit 4.7%
  • EPS 5.6%
Profit, EPS
QuarterProfitEPS
Sep 202341.7%−27.6%
Dec 202379.8%1.4%
Mar 202467.6%16.4%
Jun 202472.6%45.1%
Sep 202480.2%70.1%
Dec 202450.9%38.4%
Mar 2025−14.5%−18.1%
Jun 2025−9.3%−13.3%
Sep 2025−18.7%−22.2%
Dec 2025−24.6%−25.7%
Mar 20268.9%7.8%
Jun 20264.7%5.6%
Growth on a year earlier, % at each quarter end. Top: revenue. Below: profit and earnings per share, on their own scale because they swing much more. Each is measured over the last 12 months. A gap means there is no reading for that quarter.

ROCE: the return line, worked out each quarter

  • ROCE 10.4%
ROCE: the return line, worked out each quarter
QuarterROCE
Sep 2023–
Dec 2023–
Mar 2024–
Jun 2024–
Sep 2024–
Dec 2024–
Mar 202512.4%
Jun 202512.6%
Sep 202511.6%
Dec 202510.5%
Mar 202610.4%
Jun 202610.4%
Operating profit over the last 12 months (before interest and tax) as a share of average capital employed (total assets minus current liabilities), %.
FallingRevenue growth · latest −1.5%, range −1.5% to +15.4%
RisingProfit growth · latest +4.7%, range −24.6% to +80.2%
RisingEPS growth · latest +5.6%, range −27.6% to +70.1%
Stuck lowROCE · latest 10.4%, range 10.4% to 12.6%

Why it matters: when the lines disagree, each line above matters more than any single label.

Compound annual growth rate (%)

Compound annual growth rate over each period, %. Revenue, profit and EPS come from yearly figures; the share price row is price growth over the same periods. A dash means no figure for that period, or the starting year was a loss.

Compound annual growth rate (%)
Measure1yr3yr5yr10yr
Revenue+0.2%+9.5%+20.7%+2.4%
Profit+8.5%+13.7%——
EPS+8.4%+10.3%——
Share price−26.2%−18.8%+3.3%−7.0%
+3.9%Revenue growth (Jun 2026) · latest quarter against a year ago
+21.0%Profit growth (Jun 2026) · latest quarter against a year ago
2.4%Revenue, 10 years · yearly growth over the long run

How much does Patel Engineering earn on its capital?

Patel Engineering Ltd earned a ROCE of 13% in FY26. That is up from a low of 6% in FY20. Its return on capital used (ROIC) is 1.0 percentage points below its cost of capital, so growth here does not yet pay for the capital it uses.

Return on capital employed (ROCE) is the profit the whole business earns on all the money in it, from shareholders and lenders together. It is the best single test of whether growth adds value or just size.

It comes from a 5.3% net margin and 0.54× asset turnover (sales divided by assets).

Why the return is what it is (FY26): a 5.3% net margin × 0.54× asset turnover × 2.14× leverage (assets divided by equity) ≈ 6.1% on equity. The margin does its share; borrowing is a big part of it.

The key test, return on capital used minus the cost of capital: 11.0% − 12.0% = −1.0 percentage points. The 12.0% is a standard assumption for the cost of capital in India, not an estimate for this company. Read the sign and size of the gap, not the decimals. Negative: growth at these returns loses value until returns improve.

FY26: ROCE 13%, the climb back from FY20's 6%

  • ROCE 13%
  • ROIC (annual) 11.1%
  • Cost of capital 12%
FY26: ROCE 13%, the climb back from FY20's 6%
QuarterROCEROIC (annual)Cost of capital
FY148%–12%
FY158%–12%
FY167%–12%
FY178%–12%
FY1811%–12%
FY1910%–12%
FY206%–12%
FY216%–12%
FY2212%6.2%12%
FY2313%8.5%12%
FY2414%9.6%12%
FY2515%10%12%
FY2613%11.1%12%
Return on capital employed each year, % (line); ROIC each year, % (line). 13-year window, low years included. The flat line is the 12.0% cost of capital used on this page.

Q4 FY26: ROCE 10.2% (last 12 months) against a 12.0% cost of capital

  • ROCE (12 months) 10.2%
  • ROIC (12 months) 9.2%
  • Cost of capital 12.0%
Q4 FY26: ROCE 10.2% (last 12 months) against a 12.0% cost of capital
QuarterROCE (12 months)ROIC (12 months)Cost of capital
Q2 FY2411.6%–12%
Q3 FY2411%–12%
Q4 FY2411.9%9.5%12%
Q1 FY25–9.4%12%
Q2 FY2511.1%9.1%12%
Q3 FY25–9.3%12%
Q4 FY2512%10.3%12%
Q1 FY26–10.1%12%
Q2 FY2611.5%10.5%12%
Q3 FY26–10.4%12%
Q4 FY2610.2%9.7%12%
Q1 FY27–9.2%12%
ROCE and ROIC over the last 12 months, each quarter, %; the flat line is the cost of capital. Last 12 quarters, lined up with the yearly figure.

Does Patel Engineering have too much debt?

Patel Engineering Ltd has total debt of ₹1,216 Cr against shareholder equity of ₹4,442 Cr as of Jun 2026, so its debt is 0.27× its equity, which is very little. Year by year, that ratio went from 0.93 in FY22 to 0.27 in FY26. So the returns on this page come from the business, not from borrowed money.

Debt-to-equity shows how much of the business is paid for with borrowed money. Lower is safer, and the direction matters as much as the level.

FY26: debt ₹1,216 Cr, 0.27× equity

  • Total debt ₹1,216
FY26: debt ₹1,216 Cr, 0.27× equity
QuarterTotal debt
FY22₹2,292
FY23₹1,758
FY24₹1,910
FY25₹1,664
FY26₹1,216

Debt-to-equity

  • Debt-to-equity 0.27×
Debt-to-equity
QuarterDebt-to-equity
FY220.93×
FY230.59×
FY240.60×
FY250.44×
FY260.27×
Top: total debt each year, ₹ Cr. Below: debt-to-equity, ×. 5-year window.

Jun 2026: debt ₹1,216 Cr, debt-to-equity 0.27

  • Total debt (quarterly) ₹1,216
Jun 2026: debt ₹1,216 Cr, debt-to-equity 0.27
QuarterTotal debt (quarterly)
Sep 2023₹2,005
Dec 2023₹1,983
Mar 2024₹1,910
Jun 2024₹1,910
Sep 2024₹1,455
Dec 2024₹1,455
Mar 2025₹1,664
Jun 2025₹1,615
Sep 2025₹1,560
Dec 2025₹1,560
Mar 2026₹1,216
Jun 2026₹1,216

Debt-to-equity

  • Debt-to-equity 0.27×
Debt-to-equity
QuarterDebt-to-equity
Sep 20230.68×
Dec 20230.66×
Mar 20240.60×
Jun 20240.60×
Sep 20240.40×
Dec 20240.40×
Mar 20250.44×
Jun 20250.43×
Sep 20250.40×
Dec 20250.40×
Mar 20260.27×
Jun 20260.27×
Top: total debt each quarter, ₹ Cr. Below: debt-to-equity, ×. Last 12 quarters. Indian companies report the full balance sheet every six months, so the quarter in between repeats the last reading.

What is the Patel Engineering shareholding pattern?

Promoters cut their stake in Patel Engineering Ltd by 4.6 percentage points over 8 quarters, the biggest change among its owners. Promoters now own 31.5% of the company. Domestic institutions moved −0.6 points over the same period, to 3.9%. This uses the four owner groups that companies report every quarter; nothing is guessed between filings.

Who owns the company each quarter: promoters (the founders or controlling owners), foreign institutions, domestic institutions such as mutual funds, and the public. When people close to the business steadily raise their stake, that is worth noticing; a quiet list is also an answer.

Over the last two years: Promoters: −4.6 points over 8 quarters, to 31.5%; Domestic institutions: −0.6 points over 8 quarters, to 3.9%; Foreign institutions: −0.1 points over 8 quarters, to 3.0%.

Why the owners changed: promoters drove it (−4.6 points), together with domestic institutions (−0.6 points). They reduced their stake.

Year ends: promoters −7.9 points from Mar 2024 to Mar 2026

  • Promoters 31.48%
  • Foreign inst. 2.86%
  • Domestic inst. 6.17%
  • Public 55.74%
Year ends: promoters −7.9 points from Mar 2024 to Mar 2026
QuarterPromotersForeign inst.Domestic inst.Public
Mar 202439.42%3.37%4.48%47.93%
Mar 202536.11%5.01%4.7%49.8%
Mar 202631.48%2.86%6.17%55.74%
Shareholding at each year end (March quarter), % of the company. 3 year ends on file.

Promoters cut their stake by 4.6 points over 8 quarters

  • Promoters 31.49%
  • Foreign inst. 2.98%
  • Domestic inst. 3.88%
  • Public 57.92%
Promoters cut their stake by 4.6 points over 8 quarters
QuarterPromotersForeign inst.Domestic inst.Public
Sep 202339.42%2.36%6.25%47.18%
Dec 202339.42%2.83%5.59%47.37%
Mar 202439.42%3.37%4.48%47.93%
Jun 202436.11%3.68%6.22%49.59%
Sep 202436.11%3.09%4.45%51.96%
Dec 202436.11%4.74%4.51%50.23%
Mar 202536.11%5.01%4.7%49.8%
Jun 202536.11%2.71%4.91%51.88%
Sep 202536.11%2.53%4.75%52.21%
Dec 202531.48%2.52%5.81%56.43%
Mar 202631.48%2.86%6.17%55.74%
Jun 202631.49%3.28%4.76%56.71%
Sep 202631.49%2.98%3.88%57.92%
Shareholding by owner group, % of the company, each quarter, last 13 quarters.

How far is Patel Engineering from balance-sheet trouble?

For Patel Engineering Ltd, the Z-score is not available, so we say so rather than guess one. It estimates how far the balance sheet is from trouble; it is not a forecast of failure. The debt, cash-flow and return sections show the balance-sheet figures we do have, each with its own date.

The Z-score estimates how far a company is from balance-sheet trouble. Above about 3 is safe; below about 1.8 is the danger zone. It was built for manufacturers, so it is not used for banks and lenders.

How does Patel Engineering rank in its industry?

55.6 out of 100, rank 4 of 18 in Infra - Construction & Contracting, with 96% of the evidence available.

Patel Engineering Ltd scores 55.6 out of 100 against the 18 companies it is compared with in Infra - Construction & Contracting, ranking 4. The valuation scores well, but earnings are not improving yet, so the business does not back up the low multiple so far.

The four parts add up to the total exactly: 15.4 + 15.6 + 15.1 + 9.5 = 55.6. This is the same number shown on the industry page; it is worked out once for the whole group and read here.

What would change it: The score would fall if profit growth turns negative or margins stop improving while the share price lags its sector.

Which companies is Patel Engineering compared with?

Patel Engineering ranks 4 of 18 Infra - Construction & Contracting companies on the 4-Factor Sector Score, with 55.6 out of 100.

  1. 1Mold-Tek Technologies LtdMOLDTECH · breaking out · Most evidence points up · 85% evidence69.1out of 100GrowthCapitalValuationRelative
    How the score adds upGrowth & earnings 33.0/35 · Revenue 48.7% · Profit 100% · Operating margin change 11.4 points · 100% evidenceCapital efficiency 11.7/25 · ROCE 9.5% · Operating margin 22.5% · 100% evidenceValuation 12.1/20 · P/E 22.8× · PEG 0.62 · 100% evidenceRelative strength 12.3/20 · Lead over its industry — · Lead over NIFTY 500 23.2% · 1 year — · 25% evidence · 7 of 7 weeks aheadExact sum: 33 + 11.7 + 12.1 + 12.3 = 69.1 · What this means: The evidence is balanced: no factor stands out, so another reported quarter is needed before the picture is clearer.
  2. 2Cemindia Projects LtdCEMPRO · quiet · Evidence leans up · 96% evidence61.6out of 100GrowthCapitalValuationRelative
    How the score adds upGrowth & earnings 25.9/35 · Revenue 8.9% · Profit 47.2% · Operating margin change 1 points · 88% evidenceCapital efficiency 18.7/25 · ROCE 32.8% · Operating margin 10% · 100% evidenceValuation 2.5/20 · P/E 38.8× · PEG 5.81 · 100% evidenceRelative strength 14.5/20 · Lead over its industry 54.3% · Lead over NIFTY 500 38.4% · 1 year 55.9% · 100% evidence · 6 of 12 weeks aheadExact sum: 25.9 + 18.7 + 2.5 + 14.5 = 61.6 · What this means: Earnings, capital efficiency and relative strength all agree. The open questions are about management, upcoming events and risks.
  3. 3Larsen & Toubro LtdLT · turning · Evidence leans up · 82% evidence61.3out of 100GrowthCapitalValuationRelative
    How the score adds upGrowth & earnings 19.4/35 · Revenue 11.2% · Profit 9.3% · Operating margin change -2 points · 95% evidenceCapital efficiency 15.5/25 · ROCE 14.6% · Operating margin 11% · 76% evidenceValuation 9.1/20 · P/E 28.2× · PEG — · 50% evidenceRelative strength 17.3/20 · Lead over its industry 14.1% · Lead over NIFTY 500 3% · 1 year -3.9% · 100% evidence · 2 of 12 weeks aheadExact sum: 19.4 + 15.5 + 9.1 + 17.3 = 61.3 · What this means: The evidence is balanced: no factor stands out, so another reported quarter is needed before the picture is clearer.
  4. 4Patel Engineering Ltd this pagePATELENG · basing · Evidence leans up · 96% evidence55.6out of 100GrowthCapitalValuationRelative
    How the score adds upGrowth & earnings 15.4/35 · Revenue -1.4% · Profit 4.7% · Operating margin change 1 points · 88% evidenceCapital efficiency 15.6/25 · ROCE 13.3% · Operating margin 14% · 100% evidenceValuation 15.1/20 · P/E 5.8× · PEG 1.52 · 100% evidenceRelative strength 9.5/20 · Lead over its industry -4.9% · Lead over NIFTY 500 -14.5% · 1 year -36.1% · 100% evidence · 0 of 12 weeks aheadExact sum: 15.4 + 15.6 + 15.1 + 9.5 = 55.6 · What this means: The valuation scores well, but earnings are not improving yet, so the business does not back up the low multiple so far.
  5. 5SPML Infra LtdSPMLINFRA · quiet · Evidence leans up · 74% evidence53.2out of 100GrowthCapitalValuationRelative
    How the score adds upGrowth & earnings 26.2/35 · Revenue 37.8% · Profit 80.8% · Operating margin change 4.4 points · 88% evidenceCapital efficiency 4.1/25 · ROCE 6.5% · Operating margin 9% · 100% evidenceValuation 14.5/20 · P/E 12.7× · PEG 0.69 · 65% evidenceRelative strength 8.4/20 · Lead over its industry — · Lead over NIFTY 500 -26.9% · 1 year -44.4% · 25% evidence · 0 of 12 weeks aheadExact sum: 26.2 + 4.1 + 14.5 + 8.4 = 53.2 · What this means: The evidence is balanced: no factor stands out, so another reported quarter is needed before the picture is clearer.
  6. 6NBCC (India) LtdNBCC · quiet · Evidence leans up · 78% evidence50.6out of 100GrowthCapitalValuationRelative
    How the score adds upGrowth & earnings 19.2/35 · Revenue 3.8% · Profit 30.9% · Operating margin change 2.4 points · 83% evidenceCapital efficiency 17.8/25 · ROCE 29.3% · Operating margin 7% · 76% evidenceValuation 10.7/20 · P/E 27.5× · PEG — · 50% evidenceRelative strength 2.9/20 · Lead over its industry -14.9% · Lead over NIFTY 500 -23.7% · 1 year -40.7% · 100% evidence · 0 of 12 weeks aheadExact sum: 19.2 + 17.8 + 10.7 + 2.9 = 50.6 · What this means: The evidence is balanced: no factor stands out, so another reported quarter is needed before the picture is clearer.
  7. 7Hazoor Multi Projects LtdHAZOOR · Too little evidence to rank firmly · 59% evidence47.3out of 100GrowthCapitalValuationRelative
    How the score adds upGrowth & earnings 15.9/43.75 · Revenue -30.5% · Profit -34.1% · Operating margin change 70.1 points · 88% evidenceCapital efficiency 18.3/31.25 · ROCE 12% · Operating margin 84.5% · 100% evidenceValuation 13.1/25 · P/E 16.6× · PEG — · 15% evidenceRelative strength: no reading this week · its 20 points are shared across the other threeExact sum: 15.9 + 18.3 + 13.1 = 47.3 (no relative-strength reading this week; its 20 points are shared across the other three) · What this means: Some evidence is missing, so the score is pulled toward the middle on purpose.
  8. 8Ramky Infrastructure LtdRAMKY · basing · Evidence leans down · 63% evidence46.9out of 100GrowthCapitalValuationRelative
    How the score adds upGrowth & earnings 13.9/35 · Revenue 4.6% · Profit 17.8% · Operating margin change -14 points · 83% evidenceCapital efficiency 11.6/25 · ROCE 13.5% · Operating margin 6% · 76% evidenceValuation 13.2/20 · P/E 11.4× · PEG — · 50% evidenceRelative strength 8.2/20 · Lead over its industry — · Lead over NIFTY 500 -27.3% · 1 year -51.7% · 25% evidence · 0 of 12 weeks aheadExact sum: 13.9 + 11.6 + 13.2 + 8.2 = 46.9 · What this means: The valuation scores well, but earnings are not improving yet, so the business does not back up the low multiple so far.
  9. 9Simplex Infrastructures LtdSIMPLEXINF · turning · Evidence leans down · 71% evidence44.7out of 100GrowthCapitalValuationRelative
    How the score adds upGrowth & earnings 21.4/35 · Revenue 4.6% · Profit 80.8% · Operating margin change 3.9 points · 88% evidenceCapital efficiency 5.4/25 · ROCE 2.4% · Operating margin 7% · 100% evidenceValuation 5.9/20 · P/E 44.4× · PEG — · 50% evidenceRelative strength 12.0/20 · Lead over its industry — · Lead over NIFTY 500 11.1% · 1 year -6.4% · 25% evidence · 7 of 12 weeks aheadExact sum: 21.4 + 5.4 + 5.9 + 12 = 44.7 · What this means: The evidence is balanced: no factor stands out, so another reported quarter is needed before the picture is clearer.
  10. 10PNC Infratech LtdPNCINFRA · quiet · Evidence leans down · 100% evidence44.6out of 100GrowthCapitalValuationRelative
    How the score adds upGrowth & earnings 14.7/35 · Revenue 1.8% · Profit -21.3% · Operating margin change -1 points · 100% evidenceCapital efficiency 9.9/25 · ROCE 8% · Operating margin 21% · 100% evidenceValuation 20.0/20 · P/E 5.1× · PEG 0.17 · 100% evidenceRelative strength 0.0/20 · Lead over its industry -31% · Lead over NIFTY 500 -38.1% · 1 year -55.8% · 100% evidence · 0 of 12 weeks aheadExact sum: 14.7 + 9.9 + 20 + 0 = 44.6 · What this means: The valuation scores well, but earnings are not improving yet, so the business does not back up the low multiple so far.
  11. 11Likhitha Infrastructure LtdLIKHITHA · basing · Evidence leans down · 96% evidence43.0out of 100GrowthCapitalValuationRelative
  12. 12IRB Infrastructure Developers LtdIRB · basing · Evidence leans down · 82% evidence41.4out of 100GrowthCapitalValuationRelative
  13. 13H.G. Infra Engineering LtdHGINFRA · quiet · Evidence leans down · 85% evidence40.6out of 100GrowthCapitalValuationRelative
  14. 14Hindustan Construction Company LtdHCC · quiet · Evidence leans down · 79% evidence40.5out of 100GrowthCapitalValuationRelative
  15. 15KNR Constructions LtdKNRCON · quiet · Evidence leans down · 78% evidence38.0out of 100GrowthCapitalValuationRelative
  16. 16Rail Vikas Nigam LtdRVNL · quiet · Evidence leans down · 74% evidence36.4out of 100GrowthCapitalValuationRelative
  17. 17Vishnu Prakash R Punglia LtdVPRPL · Too little evidence to rank firmly · 59% evidence23.0out of 100GrowthCapitalValuationRelative
  18. 18Giriraj Civil Developers LtdGIRIRAJ · Too little evidence to rank firmly · 32% evidence55.9out of 100GrowthCapitalValuationRelative

Missing figures are not scored as bad. They lower the confidence and pull the final score toward the middle. Relative strength counts only when the company has a reading for this week; with no reading, that factor is left out and its 20 points are shared across the other three in proportion. PEG is not shown when the ratio cannot mean anything: the company must be making a profit, its price-to-earnings must be positive, and its three-year earnings growth must fall between 5% and 60%. Dividing a price multiple by a loss, or by growth measured off a tiny base, produces a number that looks precise and tells you nothing. Under relative strength, one mark per week shows the last 12 weeks: a mark is filled where the company led NIFTY 500 by 5% or more over the 13 weeks ending that week, which is the same test used everywhere on this site. Price stage places the company on the same six-step path the industry is placed on (basing, turning, breaking out, leader, fading, asleep), read from how many weeks running it has led NIFTY 500 and whether that lead is growing or shrinking. It describes where the share price stands, not the direction of earnings, and it is not a recommendation; it is left blank for a company whose weekly history is too short or too stale to read.

The figures in this ranking come from the industry comparison: results through the Sep 2026 quarter, and the P/E at that quarter's end. The sections above use the latest weekly price, so a P/E or return there can differ a little from the one here. The stage words in this ranking (such as losing its lead or breaking out) describe the lead over the index, not the price phase in the price section.

Related companies: Infra - Construction & Contracting, all 18 compared on one page.

Which companies are close to Patel Engineering in size?

Patel Engineering is the 10th largest of 18 Infra - Construction & Contracting companies on Sector Alpha by market value (scores of 30 October 2026). Just above it: PNC Infratech, KNR Constructions and H.G. Infra Engineering. Just below it: Ramky Infrastructure, Simplex Infrastructures and SPML Infra.

Infra - Construction & Contracting companies close in size

  1. PNC Infratech Ltd ₹3,179 crore
  2. KNR Constructions Ltd ₹2,772 crore
  3. H.G. Infra Engineering Ltd ₹2,621 crore
  4. Patel Engineering Ltd ₹2,286 crore
  5. Ramky Infrastructure Ltd ₹2,125 crore
  6. Simplex Infrastructures Ltd ₹2,006 crore
  7. SPML Infra Ltd ₹1,084 crore

All 18 Infra - Construction & Contracting companies, largest first

Companies close in size in other industries

  1. NOCIL Ltd ₹2,290 crore · Petrochem - Polymers
  2. Dredging Corporation of India Ltd ₹2,288 crore · Shipping
  3. Patel Engineering Ltd ₹2,286 crore
  4. Knack Packaging Ltd ₹2,276 crore · Packaging - FMCG/Consumers
  5. Mahamaya Steel Industries Ltd ₹2,276 crore · Steel - Rolling

What else do people ask about Patel Engineering?

What is Patel Engineering's share price today?

Patel Engineering Ltd's share price is ₹25.26, −26.2% over the past year. The whole company is worth ₹2,511 Cr on the market.

In the last 52 weeks it traded between ₹22 to ₹35; today it is 23% of the way up from the low, 11.8% below its 200-day average (as of 4 November 2026).

What were Patel Engineering's latest quarterly results?

Patel Engineering Ltd reported revenue of ₹1,281 Cr and net profit of ₹98.0 Cr for the Jun 2026 quarter. Revenue rose 3.9% and profit rose 21.0% compared with a year earlier. Earnings per share were ₹0.98.

The operating margin was 14.0%, 1.0 percentage points higher than a year earlier (as of 4 November 2026).

What is Patel Engineering's market cap?

Patel Engineering Ltd's market capitalisation is ₹2,511 Cr at a share price of ₹25.26. Market cap is the share price times the number of shares, so it changes whenever the price moves (as of 4 November 2026).

How is Patel Engineering performing?

Patel Engineering Ltd's share price has been falling for 108 weeks. In its latest quarter, revenue rose 3.9% and profit rose 21.0% compared with a year earlier. Over the past 13 weeks it has done worse than the NIFTY 500, for 12 weeks running (as of 4 November 2026).

Will Patel Engineering's share price go up?

This page does not forecast Patel Engineering Ltd's share price. What it shows instead: the share price is ₹25.26, and it has been falling for 108 weeks. Its P/E of 6.4× is higher than 11% of its own last 8 years (as of 4 November 2026).

Who owns Patel Engineering?

Promoters own 31.5% of Patel Engineering Ltd, foreign institutions 3.0%, domestic institutions 3.9% and the public 57.9% (latest quarter). The biggest change over the last two years: Promoters cut their stake by 4.6 percentage points over 8 quarters (as of 4 November 2026).

Does Patel Engineering have too much debt?

No, Patel Engineering Ltd has little debt: its debt is 0.27× its equity, and its operating profit is 2 times its interest bill. FY26 borrowings were ₹1,216 Cr against equity of ₹4,440 Cr.

So the returns on this page come from the business, not borrowed money (as of 4 November 2026).

Where is Patel Engineering in its business cycle?

Patel Engineering Ltd's FY26 operating margin was 13.0%, against a 13-year range of 7.0% to 23.0%: the middle of its own range, neither a peak nor a low. The latest quarter was 14.0%.

Comparing margins with a company's own long history is a good way to see where it is in its cycle (as of 4 November 2026).

What could break the Patel Engineering story?

The main question: yearly earnings per share moved +8.4% while the share price moved −26.2%. On price, this page treats a rise as over when the share price closes below its 200-day average on two Fridays in a row (as of 4 November 2026).

Is Patel Engineering a stock worth studying right now?

What the numbers show: Patel Engineering Ltd's earnings have grown faster than its share price. Earnings per share grew +8.4% in a year while the price moved −26.2%. The main open question: whether the price catches up with earnings that have already grown.

Every number on this page is worked out by code from the published figures, with no forecasts and no price opinions (as of 4 November 2026).

Is there a Patel Engineering share price forecast for 2026?

What management itself guided: New order inflow ₹8,000-10,000 crore annually for the next 4-5 years, approximately ₹50,000 crore over 5 years.

Where do these numbers come from?

Sector Alpha, written by code from the published numbers. Data as of 4 November 2026.

Every chart on this page is drawn by code from the published figures, with no forecasts and no price opinions.

See the plain-text version of this page.

More lists

Every Sector Alpha list, grouped

X · Instagram · YouTube · About · Newsletter · Newsletter archive
This is research, not advice. We’re not SEBI-registered.