Skip to content
Industry
This is research, not advice. We’re not SEBI-registered.

Gayatri Projects share price today

Gayatri Projects Ltd · NSE: GAYAPROJ · Construction - Civil/Turnkey · price as of the 4 November 2026 close, updated every trading day · results updated weekly

Gayatri Projects share price today: ₹21.36 at the NSE close on 4 November 2026, up 94.4% in a year. Gayatri Projects (NSE: GAYAPROJ) is worth ₹989 crore, trades at a P/E of 7.9 and has closed between ₹11.53 and ₹25.93 over the past 52 weeks. Latest change: operating margin up 6 points on a year earlier.

₹21.36Price +94.4% in a year
7.9×P/E lower than 54% of the last 7.1 years
₹229 CrRevenue (Jun 2026) +197.4% on a year ago
₹37.0 CrProfit (Jun 2026)
18.0%Operating margin +6.0 points on a year ago
5%ROCE FY26

Gayatri Projects Ltd's earnings have grown faster than its share price. Earnings per share grew +1,547.9% in a year while the price moved +94.4%.

The main question: profits are rising, but only 31% of the last 3 years' profit came in as cash from operations. The gap between reported profit and actual cash is the thing to watch.

The price has been rising for 69 weeks, and the P/E is lower than 54% of its own last 7.1 years. Over the last four quarters, results have been improving, and 31% of the last 3 years' profit came in as cash. What will decide it: whether the cash starts to follow the profit.

Left out of this page: Its two data sources disagree by up to 18% on reported income across 15 comparable periods, so nothing from the second source is shown here. That is why the quarterly PEG curve, the quarterly return curves, the yearly return-on-capital-used (ROIC) line, the total-debt and debt-to-equity series and the F-score and the return-on-capital-used (ROIC) reading are missing. When two sources disagree on a figure, we leave it out on purpose. The gap is a choice, not missing data. The quarterly history also starts where the main source starts: 5 earlier quarters from the second source are not added in front of it. Adding to a profit history needs a source that has been checked.

What is the Gayatri Projects share price today?

Gayatri Projects Ltd's share price was ₹21.36 at the close on 4 November 2026. It has been rising for 69 weeks. That is 17.8% above its average price over the last 200 trading days. In the last 52 weeks it traded between ₹12 and ₹26, and at that close it sat 68% of the way up from that low.

A share price tends to move through four phases: moving sideways (stage 1), rising (stage 2), stalling near a high (stage 3) and falling (stage 4). Today Gayatri Projects Ltd is in stage 2. The phase helps read everything below.

Over the past 13 weeks it has done better than the NIFTY 500, and it has stayed ahead for 10 weeks in a row.

1Y

Nov 2026: ₹21.4, 17.8% above its 200-day average. The price has been rising for 69 weeks.

  • Price ₹21.4
  • 50-day avg ₹21
  • 200-day avg ₹18
Nov 2026: ₹21.4, 17.8% above its 200-day average. The price has been rising for 69 weeks.
WeekPrice50-day avg200-day avg
3 Nov 2025₹11₹9₹8
10 Nov 2025₹12₹9₹8
17 Nov 2025₹12₹9₹8
24 Nov 2025₹12₹10₹8
1 Dec 2025₹12₹10₹8
8 Dec 2025₹12₹10₹8
5 Jan 2026₹12₹10₹9
12 Jan 2026₹12₹10₹9
19 Jan 2026₹12₹10₹9
27 Jan 2026₹12₹10₹9
2 Feb 2026₹12₹10₹9
9 Feb 2026₹13₹10₹9
16 Feb 2026₹13₹10₹9
23 Feb 2026₹13₹10₹9
2 Mar 2026₹13₹11₹9
9 Mar 2026₹13₹11₹9
16 Mar 2026₹13₹11₹9
23 Mar 2026₹14₹11₹9
30 Mar 2026₹14₹11₹9
10 Apr 2026₹16₹12₹9
17 Apr 2026₹20₹13₹10
24 Apr 2026₹19₹14₹10
30 Apr 2026₹18₹14₹10
8 May 2026₹19₹15₹11
15 May 2026₹18₹16₹11
22 May 2026₹17₹16₹11
29 May 2026₹19₹16₹12
4 Jun 2026₹21₹17₹12
5 Jun 2026₹21₹17₹12
9 Jun 2026₹21₹17₹12
10 Jun 2026₹22₹18₹12
12 Jun 2026₹22₹18₹13
17 Jun 2026₹25₹19₹13
19 Jun 2026₹24₹19₹13
24 Jun 2026₹23₹20₹13
25 Jun 2026₹22₹20₹14
1 Jul 2026₹22₹20₹14
3 Jul 2026₹22₹20₹14
10 Jul 2026₹21₹20₹14
17 Jul 2026₹22₹21₹15
24 Jul 2026₹21₹21₹15
31 Jul 2026₹20₹20₹15
7 Aug 2026₹20₹20₹15
14 Aug 2026₹21₹20₹16
21 Aug 2026₹22₹21₹16
28 Aug 2026₹22₹21₹16
4 Sep 2026₹22₹21₹17
11 Sep 2026₹26₹22₹17
18 Sep 2026₹25₹22₹17
25 Sep 2026₹23₹22₹18
28 Sep 2026₹22₹22₹18
1 Oct 2026₹22₹22₹18
9 Oct 2026₹21₹22₹18
16 Oct 2026₹21₹22₹18
23 Oct 2026₹19₹22₹18
30 Oct 2026₹19₹21₹18
4 Nov 2026₹21₹21₹18
Weekly closing price (₹) with its 50-day and 200-day averages. The strip under the chart shows the phase: tan sideways, green rising, yellow stalling near a high, orange falling. 1-year window.

3Y

Nov 2026: ₹21.4, 17.8% above its 200-day average. The price has been rising for 69 weeks.

  • Price ₹21.4
  • 50-day avg ₹21
  • 200-day avg ₹18
Nov 2026: ₹21.4, 17.8% above its 200-day average. The price has been rising for 69 weeks.
WeekPrice50-day avg200-day avg
3 Nov 2023₹6₹6₹8
12 Nov 2023₹7₹6₹8
17 Nov 2023₹6₹6₹8
24 Nov 2023₹7₹6₹8
1 Dec 2023₹8₹6₹8
8 Dec 2023₹7₹7₹8
15 Dec 2023₹8₹7₹8
22 Dec 2023₹10₹7₹8
26 Dec 2023₹10₹7₹8
1 Jan 2024₹10₹8₹8
8 Jan 2024₹9₹8₹8
15 Jan 2024₹9₹8₹8
23 Jan 2024₹8₹8₹8
2 Feb 2024₹7₹8₹8
9 Feb 2024₹8₹8₹8
16 Feb 2024₹7₹8₹8
23 Feb 2024₹8₹8₹8
2 Mar 2024₹10₹8₹8
11 Mar 2024₹9₹8₹8
18 Mar 2024₹9₹8₹8
26 Mar 2024₹8₹8₹8
1 Apr 2024₹8₹8₹8
8 Apr 2024₹8₹8₹8
15 Apr 2024₹7₹8₹8
22 Apr 2024₹7₹8₹8
3 May 2024₹6₹8₹8
10 May 2024₹6₹7₹8
18 May 2024₹7₹7₹8
24 May 2024₹8₹7₹8
3 Jun 2024₹8₹7₹8
10 Jun 2024₹7₹7₹8
18 Jun 2024₹7₹7₹8
24 Jun 2024₹7₹7₹8
5 Jul 2024₹7₹7₹8
12 Jul 2024₹8₹7₹8
19 Jul 2024₹7₹7₹8
26 Jul 2024₹8₹7₹8
31 Jul 2024₹9₹7₹8
5 Aug 2024₹9₹7₹8
12 Aug 2024₹8₹7₹8
19 Aug 2024₹8₹7₹8
26 Aug 2024₹8₹8₹8
2 Sep 2024₹9₹8₹8
9 Sep 2024₹9₹8₹8
16 Sep 2024₹10₹8₹8
23 Sep 2024₹10₹8₹8
4 Oct 2024₹11₹8₹8
14 Oct 2024₹10₹8₹8
21 Oct 2024₹10₹8₹8
28 Oct 2024₹9₹8₹8
4 Nov 2024₹9₹8₹8
14 Nov 2024₹7₹8₹8
22 Nov 2024₹7₹8₹8
29 Nov 2024₹8₹8₹8
6 Dec 2024₹8₹8₹8
13 Dec 2024₹9₹8₹8
20 Dec 2024₹9₹8₹8
27 Dec 2024₹9₹8₹8
3 Jan 2025₹8₹8₹8
10 Jan 2025₹8₹8₹8
17 Jan 2025₹8₹8₹8
24 Jan 2025₹8₹8₹8
1 Feb 2025₹8₹8₹8
7 Feb 2025₹8₹8₹8
14 Feb 2025₹7₹8₹8
21 Feb 2025₹6₹8₹8
28 Feb 2025₹6₹7₹8
7 Mar 2025₹7₹7₹8
13 Mar 2025₹7₹7₹8
21 Mar 2025₹7₹7₹8
28 Mar 2025₹6₹7₹8
4 Apr 2025₹7₹7₹8
11 Apr 2025₹6₹7₹8
17 Apr 2025₹7₹7₹8
22 Apr 2025₹8₹7₹8
28 Apr 2025₹7₹7₹8
5 May 2025₹7₹7₹8
12 May 2025₹7₹7₹8
19 May 2025₹7₹7₹8
26 May 2025₹7₹7₹7
6 Jun 2025₹9₹7₹8
13 Jun 2025₹9₹7₹8
20 Jun 2025₹9₹8₹8
27 Jun 2025₹9₹8₹8
4 Jul 2025₹9₹8₹8
11 Jul 2025₹8₹8₹8
18 Jul 2025₹9₹8₹8
25 Jul 2025₹9₹8₹8
1 Aug 2025₹9₹8₹8
8 Aug 2025₹8₹8₹8
14 Aug 2025₹8₹8₹8
22 Aug 2025₹9₹8₹8
29 Aug 2025₹8₹8₹8
5 Sep 2025₹8₹8₹8
12 Sep 2025₹10₹9₹8
15 Sep 2025₹11₹9₹8
22 Sep 2025₹11₹9₹8
29 Sep 2025₹11₹9₹8
6 Oct 2025₹11₹9₹8
13 Oct 2025₹11₹9₹8
20 Oct 2025₹11₹9₹8
27 Oct 2025₹11₹9₹8
3 Nov 2025₹11₹9₹8
10 Nov 2025₹12₹9₹8
17 Nov 2025₹12₹9₹8
24 Nov 2025₹12₹10₹8
1 Dec 2025₹12₹10₹8
8 Dec 2025₹12₹10₹8
5 Jan 2026₹12₹10₹9
12 Jan 2026₹12₹10₹9
19 Jan 2026₹12₹10₹9
27 Jan 2026₹12₹10₹9
2 Feb 2026₹12₹10₹9
9 Feb 2026₹13₹10₹9
16 Feb 2026₹13₹10₹9
23 Feb 2026₹13₹10₹9
2 Mar 2026₹13₹11₹9
9 Mar 2026₹13₹11₹9
16 Mar 2026₹13₹11₹9
23 Mar 2026₹14₹11₹9
30 Mar 2026₹14₹11₹9
10 Apr 2026₹16₹12₹9
17 Apr 2026₹20₹13₹10
24 Apr 2026₹19₹14₹10
30 Apr 2026₹18₹14₹10
8 May 2026₹19₹15₹11
15 May 2026₹18₹16₹11
22 May 2026₹17₹16₹11
29 May 2026₹19₹16₹12
4 Jun 2026₹21₹17₹12
5 Jun 2026₹21₹17₹12
9 Jun 2026₹21₹17₹12
10 Jun 2026₹22₹18₹12
12 Jun 2026₹22₹18₹13
17 Jun 2026₹25₹19₹13
19 Jun 2026₹24₹19₹13
24 Jun 2026₹23₹20₹13
25 Jun 2026₹22₹20₹14
1 Jul 2026₹22₹20₹14
3 Jul 2026₹22₹20₹14
10 Jul 2026₹21₹20₹14
17 Jul 2026₹22₹21₹15
24 Jul 2026₹21₹21₹15
31 Jul 2026₹20₹20₹15
7 Aug 2026₹20₹20₹15
14 Aug 2026₹21₹20₹16
21 Aug 2026₹22₹21₹16
28 Aug 2026₹22₹21₹16
4 Sep 2026₹22₹21₹17
11 Sep 2026₹26₹22₹17
18 Sep 2026₹25₹22₹17
25 Sep 2026₹23₹22₹18
28 Sep 2026₹22₹22₹18
1 Oct 2026₹22₹22₹18
9 Oct 2026₹21₹22₹18
16 Oct 2026₹21₹22₹18
23 Oct 2026₹19₹22₹18
30 Oct 2026₹19₹21₹18
4 Nov 2026₹21₹21₹18
Weekly closing price (₹) with its 50-day and 200-day averages. The strip under the chart shows the phase: tan sideways, green rising, yellow stalling near a high, orange falling. 3-year window.

5Y

Nov 2026: ₹21.4, 17.8% above its 200-day average. The price has been rising for 69 weeks.

  • Price ₹21.4
  • 50-day avg ₹21
  • 200-day avg ₹18
Nov 2026: ₹21.4, 17.8% above its 200-day average. The price has been rising for 69 weeks.
WeekPrice50-day avg200-day avg
29 Oct 2021₹43₹46₹41
12 Nov 2021₹40₹45₹41
26 Nov 2021₹31₹41₹40
10 Dec 2021₹34₹38₹39
24 Dec 2021₹30₹36₹39
7 Jan 2022₹30₹34₹38
21 Jan 2022₹28₹32₹37
4 Feb 2022₹27₹31₹36
18 Feb 2022₹28₹29₹35
4 Mar 2022₹22₹27₹34
17 Mar 2022₹23₹26₹33
1 Apr 2022₹24₹25₹32
13 Apr 2022₹25₹25₹32
29 Apr 2022₹21₹24₹31
13 May 2022₹18₹23₹30
27 May 2022₹18₹21₹29
10 Jun 2022₹17₹20₹27
24 Jun 2022₹19₹19₹26
8 Jul 2022₹15₹18₹25
22 Jul 2022₹15₹17₹24
5 Aug 2022₹13₹16₹23
19 Aug 2022₹14₹16₹23
2 Sep 2022₹13₹15₹22
16 Sep 2022₹12₹14₹21
30 Sep 2022₹9₹13₹20
14 Oct 2022₹13₹12₹19
28 Oct 2022₹12₹13₹19
11 Nov 2022₹12₹13₹18
25 Nov 2022₹9₹12₹17
9 Dec 2022₹9₹11₹17
23 Dec 2022₹8₹10₹16
6 Jan 2023₹9₹10₹15
20 Jan 2023₹8₹9₹15
3 Feb 2023₹7₹9₹14
17 Feb 2023₹7₹8₹13
3 Mar 2023₹8₹8₹13
17 Mar 2023₹6₹7₹12
31 Mar 2023₹5₹7₹12
11 Apr 2023₹7₹7₹11
24 Apr 2023₹6₹7₹11
8 May 2023₹5₹7₹11
22 May 2023₹5₹6₹11
9 Jun 2023₹6₹6₹11
23 Jun 2023₹6₹6₹10
7 Jul 2023₹6₹6₹10
20 Jul 2023₹8₹6₹10
31 Jul 2023₹7₹6₹9
14 Aug 2023₹7₹6₹9
1 Sep 2023₹6₹6₹9
15 Sep 2023₹7₹6₹9
29 Sep 2023₹6₹6₹9
13 Oct 2023₹6₹6₹9
27 Oct 2023₹6₹6₹8
12 Nov 2023₹7₹6₹8
24 Nov 2023₹7₹6₹8
8 Dec 2023₹7₹7₹8
22 Dec 2023₹10₹7₹8
1 Jan 2024₹10₹8₹8
15 Jan 2024₹9₹8₹8
2 Feb 2024₹7₹8₹8
16 Feb 2024₹7₹8₹8
2 Mar 2024₹10₹8₹8
18 Mar 2024₹9₹8₹8
1 Apr 2024₹8₹8₹8
15 Apr 2024₹7₹8₹8
3 May 2024₹6₹8₹8
18 May 2024₹7₹7₹8
3 Jun 2024₹8₹7₹8
18 Jun 2024₹7₹7₹8
5 Jul 2024₹7₹7₹8
19 Jul 2024₹7₹7₹8
31 Jul 2024₹9₹7₹8
12 Aug 2024₹8₹7₹8
26 Aug 2024₹8₹8₹8
9 Sep 2024₹9₹8₹8
23 Sep 2024₹10₹8₹8
14 Oct 2024₹10₹8₹8
28 Oct 2024₹9₹8₹8
14 Nov 2024₹7₹8₹8
29 Nov 2024₹8₹8₹8
13 Dec 2024₹9₹8₹8
27 Dec 2024₹9₹8₹8
10 Jan 2025₹8₹8₹8
24 Jan 2025₹8₹8₹8
7 Feb 2025₹8₹8₹8
21 Feb 2025₹6₹8₹8
7 Mar 2025₹7₹7₹8
21 Mar 2025₹7₹7₹8
4 Apr 2025₹7₹7₹8
17 Apr 2025₹7₹7₹8
28 Apr 2025₹7₹7₹8
12 May 2025₹7₹7₹8
26 May 2025₹7₹7₹7
13 Jun 2025₹9₹7₹8
27 Jun 2025₹9₹8₹8
11 Jul 2025₹8₹8₹8
25 Jul 2025₹9₹8₹8
8 Aug 2025₹8₹8₹8
22 Aug 2025₹9₹8₹8
5 Sep 2025₹8₹8₹8
15 Sep 2025₹11₹9₹8
29 Sep 2025₹11₹9₹8
13 Oct 2025₹11₹9₹8
27 Oct 2025₹11₹9₹8
10 Nov 2025₹12₹9₹8
24 Nov 2025₹12₹10₹8
8 Dec 2025₹12₹10₹8
12 Jan 2026₹12₹10₹9
27 Jan 2026₹12₹10₹9
9 Feb 2026₹13₹10₹9
23 Feb 2026₹13₹10₹9
9 Mar 2026₹13₹11₹9
23 Mar 2026₹14₹11₹9
10 Apr 2026₹16₹12₹9
24 Apr 2026₹19₹14₹10
8 May 2026₹19₹15₹11
22 May 2026₹17₹16₹11
4 Jun 2026₹21₹17₹12
9 Jun 2026₹21₹17₹12
12 Jun 2026₹22₹18₹13
19 Jun 2026₹24₹19₹13
25 Jun 2026₹22₹20₹14
3 Jul 2026₹22₹20₹14
17 Jul 2026₹22₹21₹15
31 Jul 2026₹20₹20₹15
14 Aug 2026₹21₹20₹16
28 Aug 2026₹22₹21₹16
11 Sep 2026₹26₹22₹17
25 Sep 2026₹23₹22₹18
1 Oct 2026₹22₹22₹18
16 Oct 2026₹21₹22₹18
30 Oct 2026₹19₹21₹18
4 Nov 2026₹21₹21₹18
Weekly closing price (₹) with its 50-day and 200-day averages. The strip under the chart shows the phase: tan sideways, green rising, yellow stalling near a high, orange falling. 5-year window.

10Y

Nov 2026: ₹21.4, 17.8% above its 200-day average. The price has been rising for 69 weeks.

  • Price ₹21.4
  • 50-day avg ₹21
  • 200-day avg ₹18
Nov 2026: ₹21.4, 17.8% above its 200-day average. The price has been rising for 69 weeks.
WeekPrice50-day avg200-day avg
30 Oct 2016₹131₹127₹117
18 Nov 2016₹119₹125₹118
9 Dec 2016₹120₹122₹118
30 Dec 2016₹128₹121₹118
20 Jan 2017₹123₹123₹119
10 Feb 2017₹142₹126₹121
3 Mar 2017₹130₹129₹122
24 Mar 2017₹130₹130₹123
13 Apr 2017₹150₹133₹125
5 May 2017₹152₹142₹129
26 May 2017₹149₹146₹132
16 Jun 2017₹155₹148₹135
7 Jul 2017₹169₹151₹137
28 Jul 2017₹160₹157₹141
18 Aug 2017₹155₹156₹143
8 Sep 2017₹169₹161₹146
29 Sep 2017₹170₹168₹150
19 Oct 2017₹180₹173₹154
10 Nov 2017₹187₹179₹158
1 Dec 2017₹204₹187₹164
22 Dec 2017₹210₹194₹169
12 Jan 2018₹209₹200₹174
2 Feb 2018₹206₹204₹179
23 Feb 2018₹213₹207₹183
16 Mar 2018₹200₹207₹186
6 Apr 2018₹212₹204₹188
27 Apr 2018₹204₹203₹190
18 May 2018₹200₹203₹191
8 Jun 2018₹181₹196₹191
29 Jun 2018₹163₹184₹188
20 Jul 2018₹190₹182₹187
10 Aug 2018₹206₹192₹189
31 Aug 2018₹209₹196₹191
21 Sep 2018₹198₹198₹192
12 Oct 2018₹180₹192₹191
2 Nov 2018₹184₹185₹189
22 Nov 2018₹176₹182₹188
14 Dec 2018₹165₹177₹185
4 Jan 2019₹178₹179₹185
25 Jan 2019₹167₹177₹184
15 Feb 2019₹156₹171₹181
8 Mar 2019₹167₹165₹178
29 Mar 2019₹162₹162₹175
18 Apr 2019₹175₹165₹174
10 May 2019₹158₹165₹173
31 May 2019₹184₹166₹172
21 Jun 2019₹158₹167₹172
12 Jul 2019₹147₹161₹170
2 Aug 2019₹136₹152₹166
23 Aug 2019₹109₹142₹161
13 Sep 2019₹120₹130₹155
4 Oct 2019₹112₹122₹149
27 Oct 2019₹128₹120₹145
15 Nov 2019₹98₹117₹141
6 Dec 2019₹72₹96₹131
27 Dec 2019₹79₹89₹125
17 Jan 2020₹80₹86₹119
7 Feb 2020₹40₹72₹110
28 Feb 2020₹22₹53₹99
20 Mar 2020₹11₹37₹88
9 Apr 2020₹10₹26₹79
30 Apr 2020₹14₹20₹71
22 May 2020₹13₹18₹63
12 Jun 2020₹19₹17₹57
3 Jul 2020₹16₹17₹51
24 Jul 2020₹16₹16₹46
14 Aug 2020₹16₹16₹42
4 Sep 2020₹16₹16₹39
25 Sep 2020₹17₹17₹36
16 Oct 2020₹23₹18₹34
6 Nov 2020₹23₹19₹32
27 Nov 2020₹32₹24₹31
18 Dec 2020₹37₹29₹32
8 Jan 2021₹46₹34₹33
29 Jan 2021₹44₹38₹34
19 Feb 2021₹41₹40₹36
12 Mar 2021₹37₹40₹36
1 Apr 2021₹31₹36₹36
23 Apr 2021₹27₹34₹35
14 May 2021₹29₹31₹34
4 Jun 2021₹35₹33₹34
25 Jun 2021₹32₹33₹34
16 Jul 2021₹40₹33₹34
6 Aug 2021₹44₹38₹35
27 Aug 2021₹49₹40₹36
17 Sep 2021₹54₹46₹38
8 Oct 2021₹52₹48₹40
29 Oct 2021₹43₹46₹41
18 Nov 2021₹33₹43₹40
10 Dec 2021₹34₹38₹39
31 Dec 2021₹30₹35₹38
21 Jan 2022₹28₹32₹37
11 Feb 2022₹26₹30₹36
4 Mar 2022₹22₹27₹34
25 Mar 2022₹22₹25₹33
13 Apr 2022₹25₹25₹32
6 May 2022₹20₹24₹30
27 May 2022₹18₹21₹29
17 Jun 2022₹17₹19₹27
8 Jul 2022₹15₹18₹25
29 Jul 2022₹15₹16₹24
19 Aug 2022₹14₹16₹23
9 Sep 2022₹12₹15₹22
30 Sep 2022₹9₹13₹20
21 Oct 2022₹13₹13₹19
11 Nov 2022₹12₹13₹18
2 Dec 2022₹9₹11₹17
23 Dec 2022₹8₹10₹16
13 Jan 2023₹8₹10₹15
3 Feb 2023₹7₹9₹14
24 Feb 2023₹6₹8₹13
17 Mar 2023₹6₹7₹12
6 Apr 2023₹6₹7₹11
24 Apr 2023₹6₹7₹11
15 May 2023₹5₹7₹11
9 Jun 2023₹6₹6₹11
30 Jun 2023₹6₹6₹10
20 Jul 2023₹8₹6₹10
7 Aug 2023₹7₹6₹9
1 Sep 2023₹6₹6₹9
22 Sep 2023₹6₹6₹9
13 Oct 2023₹6₹6₹9
3 Nov 2023₹6₹6₹8
24 Nov 2023₹7₹6₹8
15 Dec 2023₹8₹7₹8
1 Jan 2024₹10₹8₹8
23 Jan 2024₹8₹8₹8
16 Feb 2024₹7₹8₹8
11 Mar 2024₹9₹8₹8
1 Apr 2024₹8₹8₹8
22 Apr 2024₹7₹8₹8
18 May 2024₹7₹7₹8
10 Jun 2024₹7₹7₹8
5 Jul 2024₹7₹7₹8
26 Jul 2024₹8₹7₹8
12 Aug 2024₹8₹7₹8
2 Sep 2024₹9₹8₹8
23 Sep 2024₹10₹8₹8
21 Oct 2024₹10₹8₹8
14 Nov 2024₹7₹8₹8
6 Dec 2024₹8₹8₹8
27 Dec 2024₹9₹8₹8
17 Jan 2025₹8₹8₹8
7 Feb 2025₹8₹8₹8
28 Feb 2025₹6₹7₹8
21 Mar 2025₹7₹7₹8
11 Apr 2025₹6₹7₹8
28 Apr 2025₹7₹7₹8
19 May 2025₹7₹7₹8
13 Jun 2025₹9₹7₹8
4 Jul 2025₹9₹8₹8
25 Jul 2025₹9₹8₹8
14 Aug 2025₹8₹8₹8
5 Sep 2025₹8₹8₹8
22 Sep 2025₹11₹9₹8
13 Oct 2025₹11₹9₹8
3 Nov 2025₹11₹9₹8
24 Nov 2025₹12₹10₹8
5 Jan 2026₹12₹10₹9
27 Jan 2026₹12₹10₹9
16 Feb 2026₹13₹10₹9
9 Mar 2026₹13₹11₹9
30 Mar 2026₹14₹11₹9
24 Apr 2026₹19₹14₹10
15 May 2026₹18₹16₹11
4 Jun 2026₹21₹17₹12
10 Jun 2026₹22₹18₹12
19 Jun 2026₹24₹19₹13
1 Jul 2026₹22₹20₹14
17 Jul 2026₹22₹21₹15
7 Aug 2026₹20₹20₹15
28 Aug 2026₹22₹21₹16
18 Sep 2026₹25₹22₹17
1 Oct 2026₹22₹22₹18
23 Oct 2026₹19₹22₹18
4 Nov 2026₹21₹21₹18
Weekly closing price (₹) with its 50-day and 200-day averages. The strip under the chart shows the phase: tan sideways, green rising, yellow stalling near a high, orange falling. 10-year window.

Price stage: Rising from Nov 2025 to Oct 2026.

Price stage: Falling from Nov 2023 to Feb 2024; Sideways in Feb 2024; Sideways from Mar 2024 to May 2024; Falling from May 2024 to Aug 2024; Sideways from Aug 2024 to Oct 2024; Rising from Oct 2024 to Feb 2025; Falling from Feb 2025 to Jun 2025; Rising from Jul 2025 to Oct 2026.

Price stage: Rising from Oct 2021 to Nov 2021; Falling from Dec 2021 to Feb 2024; Sideways from Mar 2024 to May 2024; Falling from May 2024 to Aug 2024; Sideways from Aug 2024 to Sep 2024; Rising from Oct 2024 to Feb 2025; Falling from Feb 2025 to Jun 2025; Rising from Jul 2025 to Oct 2026.

Price stage: Rising from Oct 2016 to Jun 2018; Falling from Jun 2018 to Jan 2021; Rising from Jan 2021 to Apr 2021; Falling from Apr 2021 to Aug 2021; Rising from Aug 2021 to Nov 2021; Falling from Dec 2021 to Feb 2024; Sideways from Mar 2024 to Apr 2024; Falling from May 2024 to Sep 2024; Rising from Oct 2024 to Feb 2025; Falling from Feb 2025 to Jun 2025; Rising from Jul 2025 to Oct 2026.

Week by week since 2016: did it beat the NIFTY 500 over the past 13 weeks?

Ahead in 246 of 537 weeks

Week by week since 2016: did it beat the NIFTY 500 over the past 13 weeks?
Week13-week return vs NIFTY 500
6 May 2016no NIFTY 500 reading
13 May 2016no NIFTY 500 reading
20 May 2016no NIFTY 500 reading
27 May 2016no NIFTY 500 reading
3 Jun 2016no NIFTY 500 reading
10 Jun 2016no NIFTY 500 reading
17 Jun 2016no NIFTY 500 reading
24 Jun 2016no NIFTY 500 reading
1 Jul 2016no NIFTY 500 reading
8 Jul 2016no NIFTY 500 reading
15 Jul 2016no NIFTY 500 reading
22 Jul 2016no NIFTY 500 reading
29 Jul 2016no NIFTY 500 reading
5 Aug 2016+20.6%
12 Aug 2016+13.6%
19 Aug 2016+21.9%
26 Aug 2016+14.6%
2 Sep 2016+4.4%
9 Sep 2016+1.9%
16 Sep 2016−10.6%
23 Sep 2016+3.1%
30 Sep 2016−7.0%
7 Oct 2016+0.1%
14 Oct 2016+2.5%
21 Oct 2016+4.0%
30 Oct 2016+4.6%
4 Nov 2016−6.8%
11 Nov 2016−0.8%
18 Nov 2016−4.0%
25 Nov 2016−6.7%
2 Dec 2016+2.3%
9 Dec 2016+2.0%
16 Dec 2016+1.2%
23 Dec 2016+0.2%
30 Dec 2016+13.3%
6 Jan 2017+0.5%
13 Jan 2017+1.5%
20 Jan 2017−2.1%
27 Jan 2017−10.5%
3 Feb 2017+1.7%
10 Feb 2017+7.3%
17 Feb 2017−0.4%
23 Feb 2017+3.0%
3 Mar 2017−1.3%
10 Mar 2017−4.7%
17 Mar 2017+1.4%
24 Mar 2017−7.4%
31 Mar 2017−7.5%
7 Apr 2017−0.8%
13 Apr 2017+10.4%
21 Apr 2017+13.2%
28 Apr 2017+12.8%
5 May 2017+6.0%
12 May 2017−3.6%
19 May 2017+6.7%
26 May 2017+5.4%
2 Jun 2017+1.1%
9 Jun 2017+11.4%
16 Jun 2017+9.6%
23 Jun 2017+14.0%
30 Jun 2017+5.6%
7 Jul 2017+16.3%
14 Jul 2017+2.2%
21 Jul 2017+0.9%
28 Jul 2017+0.5%
4 Aug 2017+3.5%
11 Aug 2017−7.3%
18 Aug 2017−1.7%
24 Aug 2017+8.9%
1 Sep 2017+14.7%
8 Sep 2017+5.1%
15 Sep 2017+6.2%
22 Sep 2017+12.8%
29 Sep 2017+9.3%
6 Oct 2017+3.7%
13 Oct 2017+8.0%
19 Oct 2017+6.5%
27 Oct 2017+10.7%
3 Nov 2017+6.8%
10 Nov 2017+23.5%
17 Nov 2017+19.4%
24 Nov 2017+10.4%
1 Dec 2017+17.6%
8 Dec 2017+16.9%
15 Dec 2017+8.2%
22 Dec 2017+6.7%
29 Dec 2017+18.4%
5 Jan 2018+4.9%
12 Jan 2018+5.2%
19 Jan 2018+7.3%
25 Jan 2018+8.3%
2 Feb 2018+11.8%
9 Feb 2018+3.3%
16 Feb 2018+11.3%
23 Feb 2018+7.9%
1 Mar 2018+4.2%
9 Mar 2018−0.8%
16 Mar 2018+6.3%
23 Mar 2018−6.7%
28 Mar 2018−2.1%
6 Apr 2018+7.3%
13 Apr 2018+1.6%
20 Apr 2018+0.6%
27 Apr 2018−0.8%
4 May 2018−3.9%
11 May 2018+3.6%
18 May 2018−7.3%
25 May 2018−8.0%
1 Jun 2018−14.7%
8 Jun 2018−12.4%
15 Jun 2018−15.8%
22 Jun 2018−9.7%
29 Jun 2018−21.4%
6 Jul 2018−23.6%
13 Jul 2018−6.4%
20 Jul 2018−5.7%
27 Jul 2018−1.5%
3 Aug 2018−0.3%
10 Aug 2018−5.1%
17 Aug 2018−5.9%
24 Aug 2018−7.2%
31 Aug 2018+5.7%
7 Sep 2018+7.4%
14 Sep 2018+11.9%
21 Sep 2018+14.2%
28 Sep 2018+4.4%
5 Oct 2018+15.4%
12 Oct 2018+0.4%
19 Oct 2018−1.3%
26 Oct 2018−8.7%
2 Nov 2018−3.8%
9 Nov 2018−4.8%
16 Nov 2018−3.8%
22 Nov 2018−1.0%
30 Nov 2018−8.3%
7 Dec 2018−8.6%
14 Dec 2018−14.9%
21 Dec 2018−2.6%
28 Dec 2018+7.0%
4 Jan 2019−5.0%
11 Jan 2019−10.1%
18 Jan 2019−1.3%
25 Jan 2019−1.9%
1 Feb 2019−9.5%
8 Feb 2019−9.0%
15 Feb 2019−11.2%
22 Feb 2019−14.4%
1 Mar 2019−9.9%
8 Mar 2019−6.0%
15 Mar 2019−7.0%
22 Mar 2019−24.5%
29 Mar 2019−16.5%
5 Apr 2019−13.6%
12 Apr 2019−4.9%
18 Apr 2019−8.2%
26 Apr 2019−8.5%
3 May 2019−5.4%
10 May 2019−5.7%
17 May 2019−8.1%
24 May 2019+5.8%
31 May 2019+6.2%
7 Jun 2019+1.2%
14 Jun 2019+5.5%
21 Jun 2019+3.0%
28 Jun 2019−2.3%
5 Jul 2019−5.1%
12 Jul 2019−12.7%
19 Jul 2019−14.6%
26 Jul 2019−7.4%
2 Aug 2019−12.4%
9 Aug 2019−12.8%
16 Aug 2019−7.7%
23 Aug 2019−28.4%
30 Aug 2019−31.2%
6 Sep 2019−29.3%
13 Sep 2019−21.4%
20 Sep 2019−27.5%
27 Sep 2019−26.9%
4 Oct 2019−23.5%
11 Oct 2019−23.0%
18 Oct 2019−16.1%
27 Oct 2019−18.9%
1 Nov 2019−18.2%
8 Nov 2019−26.6%
15 Nov 2019−36.1%
22 Nov 2019−52.0%
29 Nov 2019−45.7%
6 Dec 2019−42.0%
13 Dec 2019−43.9%
20 Dec 2019−31.6%
27 Dec 2019−34.3%
3 Jan 2020−32.0%
10 Jan 2020−30.2%
17 Jan 2020−39.9%
24 Jan 2020−48.3%
1 Feb 2020−61.1%
7 Feb 2020−67.4%
14 Feb 2020−70.7%
20 Feb 2020−57.6%
28 Feb 2020−63.4%
6 Mar 2020−65.8%
13 Mar 2020−53.9%
20 Mar 2020−54.7%
27 Mar 2020−57.5%
3 Apr 2020−62.0%
9 Apr 2020−61.4%
17 Apr 2020−64.1%
24 Apr 2020−61.2%
30 Apr 2020−48.7%
8 May 2020−32.0%
15 May 2020−29.8%
22 May 2020−27.0%
29 May 2020−26.9%
5 Jun 2020−5.4%
12 Jun 2020+19.1%
19 Jun 2020+39.5%
26 Jun 2020+70.6%
3 Jul 2020+49.5%
10 Jul 2020+48.3%
17 Jul 2020+52.4%
24 Jul 2020+18.4%
31 Jul 2020−14.7%
7 Aug 2020−31.5%
14 Aug 2020−13.4%
21 Aug 2020+8.3%
28 Aug 2020+3.7%
4 Sep 2020−6.8%
11 Sep 2020−26.6%
18 Sep 2020−5.7%
25 Sep 2020−5.6%
1 Oct 2020+4.4%
9 Oct 2020−2.2%
16 Oct 2020+33.8%
23 Oct 2020+25.8%
30 Oct 2020+15.5%
6 Nov 2020+34.4%
14 Nov 2020+63.6%
20 Nov 2020+73.3%
27 Nov 2020+84.1%
4 Dec 2020+77.2%
11 Dec 2020+93.2%
18 Dec 2020+76.3%
24 Dec 2020+98.3%
1 Jan 2021+97.4%
8 Jan 2021+133.1%
15 Jan 2021+66.7%
22 Jan 2021+95.5%
29 Jan 2021+116.4%
5 Feb 2021+64.9%
12 Feb 2021+40.2%
19 Feb 2021+8.0%
26 Feb 2021+9.2%
5 Mar 2021+4.6%
12 Mar 2021−8.4%
19 Mar 2021−21.6%
26 Mar 2021−29.5%
1 Apr 2021−29.2%
9 Apr 2021−30.9%
16 Apr 2021−32.3%
23 Apr 2021−47.4%
30 Apr 2021−37.9%
7 May 2021−35.1%
14 May 2021−35.8%
21 May 2021−17.9%
28 May 2021−19.6%
4 Jun 2021−13.0%
11 Jun 2021−18.3%
18 Jun 2021−7.9%
25 Jun 2021−2.9%
2 Jul 2021−6.5%
9 Jul 2021−20.9%
16 Jul 2021+24.7%
23 Jul 2021+46.0%
30 Jul 2021+43.1%
6 Aug 2021+46.3%
13 Aug 2021+42.5%
20 Aug 2021+4.1%
27 Aug 2021+33.6%
3 Sep 2021+37.5%
9 Sep 2021+56.7%
17 Sep 2021+54.2%
24 Sep 2021+53.2%
1 Oct 2021+46.1%
8 Oct 2021+62.1%
14 Oct 2021+8.8%
22 Oct 2021−15.8%
29 Oct 2021−11.6%
4 Nov 2021−13.4%
12 Nov 2021−20.2%
18 Nov 2021−24.1%
26 Nov 2021−37.1%
3 Dec 2021−36.9%
10 Dec 2021−38.8%
17 Dec 2021−40.3%
24 Dec 2021−41.3%
31 Dec 2021−42.9%
7 Jan 2022−41.8%
14 Jan 2022−40.0%
21 Jan 2022−28.0%
28 Jan 2022−38.5%
4 Feb 2022−33.9%
11 Feb 2022−29.9%
18 Feb 2022−12.4%
25 Feb 2022−23.8%
4 Mar 2022−27.8%
11 Mar 2022−32.4%
17 Mar 2022−25.1%
25 Mar 2022−28.6%
1 Apr 2022−18.2%
8 Apr 2022−16.7%
13 Apr 2022−11.8%
22 Apr 2022−17.4%
29 Apr 2022−14.2%
6 May 2022−18.8%
13 May 2022−26.2%
20 May 2022−28.5%
27 May 2022−20.3%
3 Jun 2022−20.2%
10 Jun 2022−16.4%
17 Jun 2022−17.1%
24 Jun 2022−1.9%
1 Jul 2022−21.4%
8 Jul 2022−28.4%
15 Jul 2022−35.3%
22 Jul 2022−33.7%
29 Jul 2022−34.6%
5 Aug 2022−43.7%
12 Aug 2022−21.5%
19 Aug 2022−32.6%
26 Aug 2022−30.3%
2 Sep 2022−32.9%
9 Sep 2022−45.6%
16 Sep 2022−47.4%
23 Sep 2022−50.7%
30 Sep 2022−56.3%
7 Oct 2022−37.2%
14 Oct 2022−18.2%
21 Oct 2022−15.2%
28 Oct 2022−18.6%
4 Nov 2022−7.7%
11 Nov 2022−24.4%
18 Nov 2022−29.5%
25 Nov 2022−38.2%
2 Dec 2022−36.8%
9 Dec 2022−28.7%
16 Dec 2022−18.1%
23 Dec 2022−30.8%
30 Dec 2022−2.3%
6 Jan 2023−23.7%
13 Jan 2023−39.0%
20 Jan 2023−39.3%
27 Jan 2023−35.6%
3 Feb 2023−39.7%
10 Feb 2023−39.1%
17 Feb 2023−30.4%
24 Feb 2023−22.8%
3 Mar 2023−10.3%
10 Mar 2023−9.8%
17 Mar 2023−30.6%
24 Mar 2023−21.3%
31 Mar 2023−34.4%
6 Apr 2023−25.9%
11 Apr 2023−17.7%
17 Apr 2023−21.8%
24 Apr 2023−24.2%
2 May 2023−24.0%
8 May 2023−25.6%
15 May 2023−28.8%
22 May 2023−29.4%
2 Jun 2023−38.6%
9 Jun 2023−28.9%
16 Jun 2023−13.1%
23 Jun 2023−14.3%
30 Jun 2023−5.4%
7 Jul 2023−14.7%
14 Jul 2023−14.9%
20 Jul 2023+11.8%
24 Jul 2023+15.1%
31 Jul 2023+15.9%
7 Aug 2023+16.0%
14 Aug 2023+27.0%
21 Aug 2023+24.4%
1 Sep 2023+10.5%
8 Sep 2023+4.8%
15 Sep 2023+2.5%
22 Sep 2023−0.6%
29 Sep 2023+7.3%
6 Oct 2023+3.0%
13 Oct 2023−7.0%
20 Oct 2023−20.7%
27 Oct 2023−18.8%
3 Nov 2023−14.3%
12 Nov 2023−3.1%
17 Nov 2023−14.1%
24 Nov 2023−7.0%
1 Dec 2023+14.9%
8 Dec 2023+5.1%
15 Dec 2023+9.7%
22 Dec 2023+45.5%
26 Dec 2023+48.3%
1 Jan 2024+41.4%
8 Jan 2024+38.9%
15 Jan 2024+30.2%
23 Jan 2024+22.8%
2 Feb 2024+3.0%
9 Feb 2024−0.5%
16 Feb 2024+0.2%
23 Feb 2024+10.5%
2 Mar 2024+22.8%
11 Mar 2024+19.0%
18 Mar 2024+4.6%
26 Mar 2024−22.1%
1 Apr 2024−30.9%
8 Apr 2024−27.7%
15 Apr 2024−29.5%
22 Apr 2024−31.1%
3 May 2024−33.7%
10 May 2024−29.0%
18 May 2024−21.6%
24 May 2024+3.5%
3 Jun 2024−16.0%
10 Jun 2024−39.5%
18 Jun 2024−37.5%
24 Jun 2024−37.1%
5 Jul 2024−22.1%
12 Jul 2024−16.6%
19 Jul 2024−17.6%
26 Jul 2024−4.8%
31 Jul 2024+23.1%
5 Aug 2024+33.7%
12 Aug 2024+37.8%
19 Aug 2024+11.0%
26 Aug 2024−4.9%
2 Sep 2024+10.2%
9 Sep 2024+21.2%
16 Sep 2024+27.2%
23 Sep 2024+44.0%
4 Oct 2024+43.0%
14 Oct 2024+40.9%
21 Oct 2024+39.6%
28 Oct 2024+22.6%
4 Nov 2024+3.2%
14 Nov 2024−12.2%
22 Nov 2024−7.5%
29 Nov 2024+5.1%
6 Dec 2024−4.0%
13 Dec 2024+0.6%
20 Dec 2024+9.1%
27 Dec 2024−3.1%
3 Jan 2025−11.8%
10 Jan 2025−14.0%
17 Jan 2025−12.8%
24 Jan 2025−12.5%
1 Feb 2025−9.9%
7 Feb 2025−10.7%
14 Feb 2025−0.3%
21 Feb 2025−5.1%
28 Feb 2025−14.5%
7 Mar 2025+0.8%
13 Mar 2025−12.8%
21 Mar 2025−22.0%
28 Mar 2025−21.5%
4 Apr 2025−9.7%
11 Apr 2025−26.6%
17 Apr 2025−20.4%
22 Apr 2025−6.8%
28 Apr 2025−8.8%
5 May 2025−14.4%
12 May 2025−9.8%
19 May 2025−4.3%
26 May 2025+4.5%
6 Jun 2025+9.0%
13 Jun 2025+22.5%
20 Jun 2025+15.7%
27 Jun 2025+27.3%
4 Jul 2025+15.1%
11 Jul 2025+26.0%
18 Jul 2025+15.2%
25 Jul 2025+5.4%
1 Aug 2025+17.6%
8 Aug 2025+18.9%
14 Aug 2025+22.8%
22 Aug 2025+32.8%
29 Aug 2025+17.0%
5 Sep 2025+0.1%
12 Sep 2025+10.2%
15 Sep 2025+23.0%
22 Sep 2025+30.4%
29 Sep 2025+30.1%
6 Oct 2025+33.6%
13 Oct 2025+28.5%
20 Oct 2025+25.3%
27 Oct 2025+20.0%
3 Nov 2025+25.7%
10 Nov 2025+33.2%
17 Nov 2025+24.6%
24 Nov 2025+36.7%
1 Dec 2025+35.0%
8 Dec 2025+15.3%
5 Jan 2026+14.3%
12 Jan 2026+7.7%
19 Jan 2026+11.8%
27 Jan 2026+9.4%
2 Feb 2026+11.5%
9 Feb 2026+18.2%
16 Feb 2026+16.7%
23 Feb 2026+18.4%
2 Mar 2026+16.1%
9 Mar 2026+20.9%
16 Mar 2026+25.7%
23 Mar 2026+31.5%
30 Mar 2026+35.8%
10 Apr 2026+39.1%
17 Apr 2026+66.4%
24 Apr 2026+58.9%
30 Apr 2026+49.8%
8 May 2026+62.1%
15 May 2026+45.4%
22 May 2026+35.5%
29 May 2026+49.6%
4 Jun 2026+64.6%
5 Jun 2026+56.6%
9 Jun 2026+54.1%
10 Jun 2026+48.0%
12 Jun 2026+43.9%
17 Jun 2026+51.8%
19 Jun 2026+17.6%
24 Jun 2026+17.7%
25 Jun 2026+22.4%
1 Jul 2026+12.9%
3 Jul 2026+17.9%
10 Jul 2026+21.8%
17 Jul 2026+15.2%
24 Jul 2026−2.8%
31 Jul 2026−7.1%
7 Aug 2026−10.7%
14 Aug 2026−7.1%
21 Aug 2026−4.6%
28 Aug 2026−14.0%
4 Sep 2026−8.0%
11 Sep 2026+14.2%
18 Sep 2026+14.1%
25 Sep 2026+5.8%
28 Sep 2026+7.7%
1 Oct 2026+13.2%
9 Oct 2026+1.5%
16 Oct 2026+5.9%
23 Oct 2026+1.4%
30 Oct 2026+1.9%
4 Nov 2026+8.1%
Each bar is one week, from 2016 to now (537 weeks with a reading). Green means the stock's return over the previous 13 weeks beat the NIFTY 500; red means it trailed. The colour is strongest at a gap of 25 percentage points or more. A gap means there is no reading for that week.

Over the last 11 years the share price moved −79% while the NIFTY 500 moved +232%, so it is behind the index over that whole period. The chart above shows the 13-week comparison for every week.

This page treats a rise as over when the price closes below its 200-day average on two Fridays in a row.

What changed at Gayatri Projects this quarter?

One change stood out: operating margin up 6 points on a year earlier.

  1. Operating margin up 6 points on a year earlier

    18% in the June 2026 quarter, from 12%.

What are Gayatri Projects' latest quarterly results?

For April to June 2026 (the quarter ended 30 June 2026), Gayatri Projects reported revenue of ₹229 crore, up 197.4% from ₹77.0 crore a year earlier, and a profit of ₹37.0 crore, against a loss of ₹1.00 crore a year earlier.

Gayatri Projects results: April to June 2026 against a year earlier

Gayatri Projects results: April to June 2026 against a year earlier
MeasureApril to June 2026April to June 2025Change
Revenue₹229 crore₹77.0 crore+197.4%
Profit₹37.0 croreloss of ₹1.00 crore—
Earnings per share₹0.80₹−0.03—
Operating margin18.0%12.0%+6.0 points

The next results, for July to September 2026, are due by 14 November 2026: listed companies must publish quarterly results within 45 days of the quarter's end (60 days for the January to March quarter).

From the company's reported quarterly results (quarter ended 30 June 2026). Revenue and profit in ₹ crore.

What is the Gayatri Projects share price history?

Gayatri Projects closed at ₹21.36 on 4 November 2026, up 94.4% from ₹10.99 a year earlier (3 November 2025) and down 50.9% over five years. Its highest weekly close since May 2016 was ₹217.70 on 16 February 2018.

Gayatri Projects share price: then and now

Gayatri Projects share price: then and now
WhenCloseChange to 4 Nov 2026
1 week ago · 30 Oct 2026₹18.93+12.8%
1 month ago · 1 Oct 2026₹22.42−4.7%
6 months ago · 8 May 2026₹19.15+11.5%
1 year ago · 3 Nov 2025₹10.99+94.4%
3 years ago · 3 Nov 2023₹6.15+247.3%
5 years ago · 4 Nov 2021₹43.50−50.9%
10 years ago · 4 Nov 2016₹123.32−82.7%
Earliest weekly close in our records · 6 May 2016₹101.44−78.9%
Highest weekly close since May 2016 · 16 Feb 2018₹217.70−90.2%
Lowest weekly close since May 2016 · 22 May 2023₹5.00+327.2%
52-week high (weekly close) · 11 Sep 2026₹25.93−17.6%
52-week low (weekly close) · 10 Nov 2025₹11.53+85.3%

Weekly closing prices, adjusted for splits and bonuses so every price is on today’s share count. Each change is the move from that price to the 4 Nov 2026 close. A day's intraday high or low can go beyond these weekly closes.

550 weekly closes from 6 May 2016 to 4 November 2026.

What is the latest news on Gayatri Projects?

4 Nov 2026: Gayatri Projects closed at ₹21.36, up 12.8% on the week and down 4.7% on the month. Results for April to June 2026: Revenue up 197.4% on a year earlier.

What dividend does Gayatri Projects pay?

Gayatri Projects has paid no dividend on the NSE since 1 April 2021, the start of the period we checked.

No. Gayatri Projects Ltd paid out 0% of its profit as dividends in each of its last 13 reported years, so there is no payout history to show. That comes from the filed annual statements, not an estimate.

From the NSE corporate-actions record, read 5 November 2026.

Which stock lists is Gayatri Projects on?

Gayatri Projects is on one of our India lists: Penny stocks.

Is Gayatri Projects profitable?

Gayatri Projects Ltd earned ₹37.0 Cr of net profit in the Jun 2026 quarter. Full-year FY26 profit was ₹2,042 Cr. That is 16.2% of the quarter's revenue. The same quarter a year earlier lost ₹1.0 Cr. 7 of the last 12 reported quarters were loss-making.

Net profit is what is left after every cost, interest and tax. Earnings per share, dividends and book value all grow from it.

For the full year, FY26 profit was ₹2,042 Cr (+1,546.8% on the year before).

FY26 profit ₹2,042 Cr (+1,546.8% on the year before)

  • Net profit ₹2,042
FY26 profit ₹2,042 Cr (+1,546.8% on the year before)
QuarterNet profit
FY16−₹27
FY17₹0
FY18−₹20
FY19₹160
FY20−₹58
FY21₹43
FY22−₹958
FY23−₹1,504
FY24₹41
FY25₹124
FY26₹2,042

Growth on a year earlier

  • Growth on a year earlier 1,546.8%
Growth on a year earlier
QuarterGrowth on a year earlier
FY16–
FY17–
FY18–
FY19–
FY20−136.3%
FY21–
FY22−2,327.9%
FY23–
FY24–
FY25202.4%
FY261,546.8%
Top: net profit each year, ₹ Cr. Below: growth on the year before, %. 11-year window. A grey bar is lower than the year before.

Jun 2026: ₹37.0 Cr

  • Net profit (quarterly) ₹37.0
Jun 2026: ₹37.0 Cr
QuarterNet profit (quarterly)
Sep 2023₹4
Dec 2023−₹12
Mar 2024₹88
Jun 2024−₹13
Sep 2024−₹20
Dec 2024−₹2
Mar 2025₹159
Jun 2025−₹1
Sep 2025−₹3
Dec 2025₹2,157
Mar 2026−₹111
Jun 2026₹37

Growth on a year earlier

  • Growth on a year earlier −169.8%
Growth on a year earlier
QuarterGrowth on a year earlier
Sep 2023–
Dec 2023–
Mar 2024–
Jun 2024–
Sep 2024−600%
Dec 2024–
Mar 202580.7%
Jun 2025–
Sep 2025–
Dec 2025–
Mar 2026−169.8%
Jun 2026–
Top: net profit each quarter, ₹ Cr. Below: growth on the same quarter a year earlier, %. Last 12 quarters. A grey bar is lower than the quarter before.

How much revenue does Gayatri Projects make, and is it growing?

Gayatri Projects Ltd reported ₹229 Cr of revenue in the Jun 2026 quarter, +197.4% on the same quarter a year earlier. That is the 3rd quarter in a row with growth on the year before. Over 10 years it has grown −6.9% a year on average. The last full year, FY26, came in at ₹847 Cr.

Revenue is everything the company billed its customers in the period.

The last four reported quarters add to ₹999 Cr.

FY26 revenue was ₹847 Cr, +88.2% on the year before.

FY26 revenue ₹847 Cr (+88.2% on the year before), −6.9% a year over 10 years

  • Revenue ₹847
FY26 revenue ₹847 Cr (+88.2% on the year before), −6.9% a year over 10 years
QuarterRevenue
FY16₹1,726
FY17₹2,115
FY18₹2,912
FY19₹3,463
FY20₹3,439
FY21₹3,901
FY22₹3,102
FY23₹1,017
FY24₹680
FY25₹450
FY26₹847

Growth on a year earlier

  • Growth on a year earlier 88.2%
Growth on a year earlier
QuarterGrowth on a year earlier
FY1615%
FY1722.5%
FY1837.7%
FY1918.9%
FY20−0.7%
FY2113.4%
FY22−20.5%
FY23−67.2%
FY24−33.1%
FY25−33.8%
FY2688.2%
Top: revenue each year, ₹ Cr. Below: growth on the year before, %. 11-year window. A grey bar is lower than the year before.

Jun 2026: ₹229 Cr (+197.4% on a year earlier), the 3rd quarter in a row of growth

  • Revenue (quarterly) ₹229
Jun 2026: ₹229 Cr (+197.4% on a year earlier), the 3rd quarter in a row of growth
QuarterRevenue (quarterly)
Sep 2023₹200
Dec 2023₹130
Mar 2024₹164
Jun 2024₹119
Sep 2024₹103
Dec 2024₹91
Mar 2025₹137
Jun 2025₹77
Sep 2025₹73
Dec 2025₹506
Mar 2026₹191
Jun 2026₹229

Growth on a year earlier

  • Growth on a year earlier 197.4%
Growth on a year earlier
QuarterGrowth on a year earlier
Sep 2023–
Dec 2023−44.2%
Mar 2024−11.8%
Jun 2024−35.7%
Sep 2024−48.5%
Dec 2024−30%
Mar 2025−16.5%
Jun 2025−35.3%
Sep 2025−29.1%
Dec 2025456%
Mar 202639.4%
Jun 2026197.4%
Top: revenue each quarter, ₹ Cr. Below: growth on the same quarter a year earlier, %. Last 12 quarters. A grey bar is lower than the quarter before.

Recent pace: the last four quarters grew +165.9% on average, against −6.9% a year over the longer run, so this year is growing faster than its own long-run rate.

Is growth speeding up? Revenue over the last 12 months grew +144.9%, against +27.7% a year over the last 8 quarters (accelerating); profit over the last 12 months grew +1,429.4%, against +457.2% a year (accelerating).

How much of every ₹100 of sales does Gayatri Projects keep?

Gayatri Projects Ltd's operating margin was 18.0% in the Jun 2026 quarter, 6.0 percentage points higher than the same quarter a year ago. Across 13 years it has been between −72.0% and 28.0%. The latest quarter is within that range.

Operating margin is what is left from every ₹100 of sales after the costs of running the business, before interest and tax. It shows pricing power and cost control.

Why the margin moved: operating margin changed +5.7 percentage points on the year while gross margin changed −2.5 points. So the gain came mostly from costs below the gross margin, such as staff and overheads, measured against sales.

FY26: 0.0%, within a range of −72.0% to 28.0% over 13 years

  • Operating margin 0.0%
FY26: 0.0%, within a range of −72.0% to 28.0% over 13 years
QuarterOperating margin
FY1425%
FY1523%
FY1612%
FY1715%
FY1815%
FY1915%
FY2010%
FY2111%
FY22−13%
FY23−72%
FY2428%
FY250.6%
FY260%

Change on the year before (points)

  • Change on the year before (points) −0.6 pts
Change on the year before (points)
QuarterChange on the year before (points)
FY14–
FY15−2.0 pts
FY16−11.0 pts
FY17+3.0 pts
FY180.0 pts
FY190.0 pts
FY20−5.0 pts
FY21+1.0 pts
FY22−24.0 pts
FY23−59.0 pts
FY24+100.0 pts
FY25−27.4 pts
FY26−0.6 pts
Operating margin each year, % (top). Below: change on the year before, in percentage points. 13-year window.

Jun 2026: operating margin 18.0% (+6.0 points on a year earlier)

  • Operating margin 18.0%
Jun 2026: operating margin 18.0% (+6.0 points on a year earlier)
QuarterOperating margin
Sep 20234.1%
Dec 202314%
Mar 2024−28%
Jun 2024−3.5%
Sep 202421%
Dec 20249%
Mar 2025−19%
Jun 202512%
Sep 20250.6%
Dec 2025−6%
Mar 20269%
Jun 202618%

Change on a year earlier (points)

  • Change on a year earlier (points) +6.0 pts
Change on a year earlier (points)
QuarterChange on a year earlier (points)
Sep 2023–
Dec 2023+114.0 pts
Mar 2024+18.0 pts
Jun 2024−11.5 pts
Sep 2024+16.9 pts
Dec 2024−5.0 pts
Mar 2025+9.0 pts
Jun 2025+15.5 pts
Sep 2025−20.4 pts
Dec 2025−15.0 pts
Mar 2026+28.0 pts
Jun 2026+6.0 pts
Top: quarterly operating margin, %. Below: change on the same quarter a year earlier, in percentage points. Last 12 quarters. Operating profit as a share of revenue, each quarter.

Is Gayatri Projects' profit turning into cash?

Over the last 3 years, 31% of Gayatri Projects Ltd's reported profit came in as cash from its operations, a gap worth watching. In FY26 it brought in ₹490 Cr of operating cash against ₹2,042 Cr of profit. After −₹80.0 Cr of spending on assets, ₹570 Cr was left over as free cash.

The profit and loss account shows what was earned. The cash-flow statement shows the cash that actually came in. Comparing operating cash flow with profit is one of the best checks that a profit is real.

Cash-flow figures here are yearly, because quarterly cash statements are not published, so this section changes once a year.

FY26: operating cash ₹490 Cr against profit ₹2,042 Cr; 31% of 3 years' profit came in as cash

  • Operating cash ₹490
  • Net profit ₹2,042
  • Free cash ₹570
FY26: operating cash ₹490 Cr against profit ₹2,042 Cr; 31% of 3 years' profit came in as cash
QuarterOperating cashNet profitFree cash
FY16₹470−₹27₹810
FY17₹234₹0–
FY18₹213−₹20₹157
FY19₹516₹160₹429
FY20₹361−₹58₹243
FY21₹228₹43₹196
FY22−₹695−₹958−₹707
FY23−₹863−₹1,504−₹844
FY24−₹110₹41−₹110
FY25₹305₹124₹302
FY26₹490₹2,042₹570
Operating cash flow and net profit each year, ₹ Cr. The line is free cash flow: operating cash minus spending on assets. 11-year window, yearly figures. FY17 was an acquisition year, so its point is cut off at the edge.

FY26: operating cash was 24% of profit (31% over three years)

  • Operating cash as % of profit 24%
  • Break-even line 100%
FY26: operating cash was 24% of profit (31% over three years)
QuarterOperating cash as % of profitBreak-even line
FY16–100%
FY17–100%
FY18–100%
FY19300%100%
FY20–100%
FY21300%100%
FY22–100%
FY23–100%
FY24−268%100%
FY25246%100%
FY2624%100%
Operating cash as a share of net profit, each year, % (line). The flat line marks 100%, meaning all of the profit came in as cash; unusual years are drawn at the edge.

Why: the cash figure is clear, but the day counts behind it are not in our data, so we show it without guessing the reason.

What to look at next: it has been selling more assets than it buys. The next section shows those figures.

Where does Gayatri Projects' cash go?

Gayatri Projects Ltd's customer, stock and supplier day counts come out in the thousands of days on sales this small (₹847 Cr in FY26), so no cash-cycle chart is drawn and this section looks at its spending on assets instead. Over the last 3 years it sold more assets than it bought, by ₹77.0 Cr.

Working capital is the cash tied up between paying suppliers and getting paid. Debtor days: how long customers take to pay. Inventory days: how long stock sits. The cash cycle: the whole loop, in days of sales.

Over the last 3 years, money from selling assets was ₹77.0 Cr more than it spent on new ones. Work still in progress is ₹6.0 Cr (FY26).

FY26: asset sales brought in ₹80.0 Cr more than it spent on new assets

  • Capex −₹80.0
  • Work-in-progress ₹6
FY26: asset sales brought in ₹80.0 Cr more than it spent on new assets
QuarterCapexWork-in-progress
FY16−₹340₹1,310
FY17−₹1,970₹30
FY18₹56₹6
FY19₹87₹7
FY20₹118₹17
FY21₹32₹29
FY22₹12₹9
FY23−₹19₹9
FY24₹0₹9
FY25₹3₹12
FY26−₹80₹6
Capital spending each year, ₹ Cr, with work in progress, ₹ Cr, as the line. Quarterly capital-spending figures are not available for India, so this is yearly.

In short: assets are being sold, not built, so this cash is not going into new capacity.

What is Gayatri Projects' P/E ratio, and how does it compare with its own history?

Gayatri Projects Ltd's P/E is 7.9×, in the middle of its own history: higher than 46% of past readings. Its usual P/E (the middle reading) is 8.4×, over 7.1 years of weekly prices. This compares the share price with the company’s own past. It does not say what the business is worth.

P/E is the share price divided by a year's profit per share: how many rupees the market pays for each rupee of yearly profit.

P/E 7.9× against a usual 8.4×: in the middle of its own history: higher than 46% of past readings

  • P/E 7.00×
  • Median 8.40×
P/E 7.9× against a usual 8.4×: in the middle of its own history: higher than 46% of past readings
WeekP/EMedian
6 Sep 201912.9×8.40×
13 Sep 201914.0×8.40×
20 Sep 201912.7×8.40×
27 Sep 201912.5×8.40×
4 Oct 201913.1×8.40×
11 Oct 201912.7×8.40×
18 Oct 201914.2×8.40×
27 Oct 201915.0×8.40×
1 Nov 201914.5×8.40×
8 Nov 201913.1×8.40×
15 Nov 201912.3×8.40×
22 Nov 20197.90×8.40×
29 Nov 20198.80×8.40×
6 Dec 20199.10×8.40×
13 Dec 201910.1×8.40×
20 Dec 201910.1×8.40×
27 Dec 20199.80×8.40×
3 Jan 202010.5×8.40×
10 Jan 202010.7×8.40×
17 Jan 202010.0×8.40×
24 Jan 20208.80×8.40×
1 Feb 20206.50×8.40×
7 Feb 20205.00×8.40×
14 Feb 20205.40×8.40×
20 Feb 20204.40×8.40×
28 Feb 20203.80×8.40×
6 Mar 20203.00×8.40×
13 Mar 20202.40×8.40×
20 Mar 20201.90×8.40×
27 Mar 20201.50×8.40×
3 Apr 20201.60×8.40×
9 Apr 20201.70×8.40×
17 Apr 20201.60×8.40×
24 Apr 20202.10×8.40×
30 Apr 20202.50×8.40×
8 May 20203.20×8.40×
15 May 20202.50×8.40×
22 May 20202.30×8.40×
29 May 20202.40×8.40×
5 Jun 20202.70×8.40×
12 Jun 20203.20×8.40×
19 Jun 20203.10×8.40×
26 Jun 20203.00×8.40×
18 Jun 202114.1×8.40×
25 Jun 202113.8×8.40×
2 Jul 202113.9×8.40×
9 Jul 202112.8×8.40×
16 Jul 202117.2×8.40×
23 Jul 202118.3×8.40×
30 Jul 202118.3×8.40×
6 Aug 202118.3×8.40×
13 Aug 202110.4×8.40×
20 Aug 20219.30×8.40×
27 Aug 202111.4×8.40×
3 Sep 202112.1×8.40×
9 Sep 202113.1×8.40×
17 Sep 202112.7×8.40×
24 Sep 202112.3×8.40×
1 Oct 202111.8×8.40×
8 Oct 202112.2×8.40×
14 Oct 202111.6×8.40×
22 Oct 20219.70×8.40×
29 Oct 202110.1×8.40×
4 Nov 202110.2×8.40×
12 Nov 20219.30×8.40×
5 Jan 20261.50×8.40×
12 Jan 20261.50×8.40×
19 Jan 20261.50×8.40×
27 Jan 20261.50×8.40×
2 Feb 20261.50×8.40×
9 Feb 20261.50×8.40×
16 Feb 20261.20×8.40×
23 Feb 20261.20×8.40×
2 Mar 20261.20×8.40×
9 Mar 20261.20×8.40×
16 Mar 20261.20×8.40×
23 Mar 20261.30×8.40×
30 Mar 20261.30×8.40×
10 Apr 20261.50×8.40×
17 Apr 20261.80×8.40×
24 Apr 20264.30×8.40×
29 Apr 20261.60×8.40×
30 Apr 20264.00×8.40×
8 May 20264.20×8.40×
15 May 202612.8×8.40×
22 May 202612.0×8.40×
29 May 202613.2×8.40×
4 Jun 20264.40×8.40×
5 Jun 202614.7×8.40×
9 Jun 20264.50×8.40×
10 Jun 20264.60×8.40×
12 Jun 202615.6×8.40×
17 Jun 20265.30×8.40×
19 Jun 202616.5×8.40×
24 Jun 20264.80×8.40×
25 Jun 202616.1×8.40×
1 Jul 20264.70×8.40×
3 Jul 202615.7×8.40×
10 Jul 202614.9×8.40×
17 Jul 202615.7×8.40×
24 Jul 202614.9×8.40×
31 Jul 202614.1×8.40×
7 Aug 202614.2×8.40×
14 Aug 20267.90×8.40×
21 Aug 20268.10×8.40×
28 Aug 20268.20×8.40×
4 Sep 20268.20×8.40×
11 Sep 20269.60×8.40×
18 Sep 20269.20×8.40×
25 Sep 20268.50×8.40×
28 Sep 20264.60×8.40×
1 Oct 20268.30×8.40×
9 Oct 20267.80×8.40×
16 Oct 20268.00×8.40×
23 Oct 20266.90×8.40×
30 Oct 20267.00×8.40×

Earnings per share, 12 months

  • Earnings per share, 12 months ₹3
Earnings per share, 12 months
WeekEarnings per share, 12 months
6 Sep 2019–
13 Sep 2019–
20 Sep 2019–
27 Sep 2019₹9
4 Oct 2019₹9
11 Oct 2019₹9
18 Oct 2019₹9
27 Oct 2019₹9
1 Nov 2019₹9
8 Nov 2019₹9
15 Nov 2019₹9
22 Nov 2019₹9
29 Nov 2019₹9
6 Dec 2019₹9
13 Dec 2019₹9
20 Dec 2019₹9
27 Dec 2019₹8
3 Jan 2020₹8
10 Jan 2020₹8
17 Jan 2020₹8
24 Jan 2020₹8
1 Feb 2020₹8
7 Feb 2020₹8
14 Feb 2020₹8
20 Feb 2020₹8
28 Feb 2020₹8
6 Mar 2020₹8
13 Mar 2020₹8
20 Mar 2020₹8
27 Mar 2020₹6
3 Apr 2020₹6
9 Apr 2020₹6
17 Apr 2020₹6
24 Apr 2020₹6
30 Apr 2020₹6
8 May 2020₹6
15 May 2020₹6
22 May 2020₹6
29 May 2020₹6
5 Jun 2020₹6
12 Jun 2020₹6
19 Jun 2020₹6
26 Jun 2020₹6
18 Jun 2021₹6
25 Jun 2021₹2
2 Jul 2021₹2
9 Jul 2021₹2
16 Jul 2021₹2
23 Jul 2021₹2
30 Jul 2021₹2
6 Aug 2021₹2
13 Aug 2021₹2
20 Aug 2021₹2
27 Aug 2021₹2
3 Sep 2021₹2
9 Sep 2021₹2
17 Sep 2021₹2
24 Sep 2021₹4
1 Oct 2021₹4
8 Oct 2021₹4
14 Oct 2021₹4
22 Oct 2021₹4
29 Oct 2021₹4
4 Nov 2021₹4
12 Nov 2021₹4
5 Jan 2026₹4
12 Jan 2026₹4
19 Jan 2026₹4
27 Jan 2026₹4
2 Feb 2026₹4
9 Feb 2026₹4
16 Feb 2026₹4
23 Feb 2026₹4
2 Mar 2026₹4
9 Mar 2026₹4
16 Mar 2026₹4
23 Mar 2026₹4
30 Mar 2026₹11
10 Apr 2026₹11
17 Apr 2026₹11
24 Apr 2026₹11
29 Apr 2026₹11
30 Apr 2026₹11
8 May 2026₹11
15 May 2026₹11
22 May 2026₹11
29 May 2026₹11
4 Jun 2026₹11
5 Jun 2026₹11
9 Jun 2026₹11
10 Jun 2026₹11
12 Jun 2026₹11
17 Jun 2026₹11
19 Jun 2026₹11
24 Jun 2026₹11
25 Jun 2026₹1
1 Jul 2026₹1
3 Jul 2026₹1
10 Jul 2026₹1
17 Jul 2026₹1
24 Jul 2026₹1
31 Jul 2026₹1
7 Aug 2026₹1
14 Aug 2026₹1
21 Aug 2026₹1
28 Aug 2026₹1
4 Sep 2026₹1
11 Sep 2026₹1
18 Sep 2026₹1
25 Sep 2026₹1
28 Sep 2026₹5
1 Oct 2026₹5
9 Oct 2026₹5
16 Oct 2026₹5
23 Oct 2026₹5
30 Oct 2026₹3
Top: P/E each week. Below: earnings per share, trailing twelve months, leaving out one-off items, a step line that moves once a quarter; 7.1 years of history; short peaks above 18× are drawn at the top edge.
7.9×P/E · lower than 54% of its last 7.1 years

Why the multiple is where it is: over the past year earnings per share moved +1,547.9% while the price moved +94.4%. Earnings did better than the price, which pulled the multiple down within its own range.

Where the price move came from: over 5 years the price moved −13.3% a year; about −8.7% a year came from earnings growth and about −4.6 percentage points from the multiple (the market paying less). The split is approximate (price return minus earnings growth). It shows how much of the move came from the market paying a different multiple.

In short: the multiple is about average against its own past, so the earnings trend underneath matters more than the multiple.

A quarterly PEG curve, which only the second data source has, is not shown on this page: its two data sources disagree by up to 18% on reported income across 15 comparable periods. When two sources disagree on a figure, we leave it out on purpose. The gap is a choice, not missing data.

Is the Gayatri Projects business getting better or worse?

Gayatri Projects Ltd's business trend cannot be read yet. There are fewer than eight usable quarters of growth figures, so there is not enough history to read the trend. This is based on 8 quarters of 2 measures, with some gaps.

Every business is somewhere on a path of getting better or worse, and this section names where. The last 12 quarters of growth in revenue, profit and earnings per share, plus the return the business earns on its capital, are read as lines. Getting worse: the lines are falling. Turning around: a low point has just formed and the last few quarters are rising from it. Getting better: the rise from the low has lasted. Growing steadily: steady growth with healthy returns. Slowing from a peak: still high, but slowing. When the lines disagree the result is mixed; too little history means no reading. CAGR (compound annual growth rate) is the steady yearly rate that would turn the starting value into the latest one. It is the fairest way to compare growth over different periods. If the 1-year figure is much bigger than the 10-year one, recent growth is running faster than the long-run trend. A dash means there is no figure for that period, or the starting year was a loss, where a growth rate means nothing.

Growth year by year: revenue +88.2% in FY26, profit +1,546.8%

  • Revenue growth 88.2%
Growth year by year: revenue +88.2% in FY26, profit +1,546.8%
QuarterRevenue growth
FY1615%
FY1722.5%
FY1837.7%
FY1918.9%
FY20−0.7%
FY2113.4%
FY22−20.5%
FY23−67.2%
FY24−33.1%
FY25−33.8%
FY2688.2%

Profit growth, EPS growth

  • Profit growth 300%
  • EPS growth 300%
Profit growth, EPS growth
QuarterProfit growthEPS growth
FY16––
FY17––
FY18––
FY19––
FY20−136.3%−136.3%
FY21––
FY22−300%−300%
FY23––
FY24––
FY25202.4%199.5%
FY26300%300%
Growth on the year before, each year, %. Top: revenue. Below: net profit and earnings per share, on their own scale because profit growth swings much more. Zero line drawn. Turnaround-year jumps are drawn at the edge (▲).

Three growth lines over twelve quarters: revenue accelerating, profit accelerating

  • Revenue 144.9%
Three growth lines over twelve quarters: revenue accelerating, profit accelerating
QuarterRevenue
Sep 2023–
Dec 2023–
Mar 2024–
Jun 2024–
Sep 2024−35.8%
Dec 2024−32%
Mar 2025−33.7%
Jun 2025−33.4%
Sep 2025−26.7%
Dec 202566.2%
Mar 202688.2%
Jun 2026144.9%

Profit, EPS

  • Profit 300%
  • EPS 300%
Profit, EPS
QuarterProfitEPS
Sep 2023––
Dec 2023––
Mar 2024––
Jun 2024––
Sep 2024––
Dec 2024––
Mar 2025195.2%197.7%
Jun 2025103%103.6%
Sep 2025255.8%259.5%
Dec 2025300%300%
Mar 2026300%300%
Jun 2026300%300%
Growth on a year earlier, % at each quarter end. Top: revenue. Below: profit and earnings per share, on their own scale because they swing much more. Each is measured over the last 12 months. Extreme jumps from a tiny base are drawn at the edge (▲). A gap means there is no reading for that quarter.

ROCE: the return line, yearly figures

  • ROCE 5%
ROCE: the return line, yearly figures
QuarterROCE
FY23−30%
FY248%
FY258%
FY265%
Yearly figures: the quarterly balance-sheet figures this line needs are not available for this stock, so it changes once a year and counts for less in the reading.
FlatRevenue growth · latest +144.9%, range −35.8% to +144.9%
Stuck lowROCE · latest 5.0%, range −30.0% to 8.0%

Why it matters: with too little history, we say so rather than guess a direction.

The return figures here are yearly, not quarterly. They show level and direction only; they can support the growth lines but never decide the reading alone.

There are fewer than eight usable quarters, so this page does not guess a direction from so little history.

Compound annual growth rate (%)

Compound annual growth rate over each period, %. Revenue, profit and EPS come from yearly figures; the share price row is price growth over the same periods. A dash means no figure for that period, or the starting year was a loss.

Compound annual growth rate (%)
Measure1yr3yr5yr10yr
Revenue+88.2%−5.9%−26.3%−6.9%
Profit+1,546.8%—+116.4%—
EPS+1,547.9%—+116.4%—
Share price+94.4%+51.4%−13.3%−16.1%
+197.4%Revenue growth (Jun 2026) · latest quarter against a year ago
−6.9%Revenue, 10 years · yearly growth over the long run

How much does Gayatri Projects earn on its capital?

Gayatri Projects Ltd earned a ROCE of 5% in FY26. That is up from a low of −30% in FY23. We cannot compare its return on capital used with its cost of capital from the data we have. It comes from a 241.1% net margin and 0.40× asset turnover (sales divided by assets).

Return on capital employed (ROCE) is the profit the whole business earns on all the money in it, from shareholders and lenders together. It is the best single test of whether growth adds value or just size.

Why the return is what it is (FY26): a 241.1% net margin × 0.40× asset turnover × 3.49× leverage (assets divided by equity) ≈ 336.6% on equity. The margin does most of the work; borrowing is a big part of it.

FY26: ROCE 5%, the climb back from FY23's −30%

  • ROCE 5%
  • Cost of capital 12%
FY26: ROCE 5%, the climb back from FY23's −30%
QuarterROCECost of capital
FY143%12%
FY153%12%
FY164%12%
FY178%12%
FY1813%12%
FY1914%12%
FY209%12%
FY2112%12%
FY22−17%12%
FY23−30%12%
FY248%12%
FY258%12%
FY265%12%
Return on capital employed each year, % (line). 13-year window, low years included. The flat line is the 12.0% cost of capital used on this page.

The quarterly return lines and the return-on-capital-used (ROIC) line, which only the second data source has, are not shown on this page: its two data sources disagree by up to 18% on reported income across 15 comparable periods. When two sources disagree on a figure, we leave it out on purpose. The gap is a choice, not missing data.

Does Gayatri Projects have too much debt?

Gayatri Projects Ltd had ₹311 Cr of borrowings against ₹606 Cr of equity in FY26, so its debt is 0.51× its equity. Its operating profit is 0 times its interest bill. Over 5 years borrowings went from ₹2,123 Cr to ₹311 Cr. Over the last 3 of those years it sold more assets than it bought, by ₹77.0 Cr.

Debt-to-equity shows how much of the business is paid for with borrowed money. Interest cover shows how many times operating profit pays the interest bill. Low debt and high cover are the safe combination.

The spending on assets is being paid for from cash, not new debt.

FY26: borrowings ₹311 Cr, 0.51× equity, debt falling while the business grows

  • Borrowings ₹311
FY26: borrowings ₹311 Cr, 0.51× equity, debt falling while the business grows
QuarterBorrowings
FY14₹9,429
FY15₹4,264
FY16₹3,825
FY17₹2,199
FY18₹2,312
FY19₹2,220
FY20₹2,041
FY21₹2,123
FY22₹2,748
FY23₹3,791
FY24₹3,675
FY25₹3,628
FY26₹311

Debt-to-equity

  • Debt-to-equity 0.51×
Debt-to-equity
QuarterDebt-to-equity
FY1414.8×
FY155.83×
FY166.97×
FY174.30×
FY182.29×
FY191.89×
FY202.24×
FY212.23×
FY22−549.6×
FY23−2.37×
FY24−2.36×
FY25−2.52×
FY260.51×
Top: borrowings each year, ₹ Cr. Below: debt-to-equity, ×. 13-year window. Quarterly balance-sheet figures are not available for India, so this is yearly.

The total-debt and debt-to-equity series, which only the second data source has, are not shown on this page: its two data sources disagree by up to 18% on reported income across 15 comparable periods. When two sources disagree on a figure, we leave it out on purpose. The gap is a choice, not missing data.

What is the Gayatri Projects shareholding pattern?

Promoters raised their stake in Gayatri Projects Ltd by 19.6 percentage points over 8 quarters, the biggest change among its owners. Promoters now own 23.6% of the company. Foreign institutions moved +14.0 points over the same period, to 17.9%. This uses the four owner groups that companies report every quarter; nothing is guessed between filings.

Who owns the company each quarter: promoters (the founders or controlling owners), foreign institutions, domestic institutions such as mutual funds, and the public. When people close to the business steadily raise their stake, that is worth noticing; a quiet list is also an answer.

Over the last two years: Promoters: +19.6 points over 8 quarters, to 23.6%; Foreign institutions: +14.0 points over 8 quarters, to 17.9%; Domestic institutions: −0.4 points over 8 quarters, to 0.7%.

Why the owners changed: promoters drove it (+19.6 points), together with foreign institutions (+14.0 points). They raised their stake step by step.

Year ends: foreign institutions −2.0 points from Mar 2024 to Mar 2026

  • Promoters 3.94%
  • Foreign inst. 1.91%
  • Domestic inst. 2.75%
  • Public 91.41%
Year ends: foreign institutions −2.0 points from Mar 2024 to Mar 2026
QuarterPromotersForeign inst.Domestic inst.Public
Mar 20243.94%3.92%1.07%91.07%
Mar 20253.94%1.91%2.75%91.39%
Mar 20263.94%1.91%2.75%91.41%
Shareholding at each year end (March quarter), % of the company. 3 year ends on file.

Promoters raised their stake by 19.6 points over 8 quarters

  • Promoters 23.56%
  • Foreign inst. 17.95%
  • Domestic inst. 0.72%
  • Public 57.78%
Promoters raised their stake by 19.6 points over 8 quarters
QuarterPromotersForeign inst.Domestic inst.Public
Dec 20233.94%3.92%1.07%91.07%
Mar 20243.94%3.92%1.07%91.07%
Jun 20243.94%3.92%1.07%91.08%
Sep 20243.94%3.92%1.07%91.06%
Dec 20243.94%3.92%1.07%91.08%
Mar 20253.94%1.91%2.75%91.39%
Jun 20253.94%1.91%2.75%91.39%
Sep 20253.94%1.91%2.75%91.39%
Dec 20253.94%1.91%2.75%91.4%
Mar 20263.94%1.91%2.75%91.41%
Apr 202623.13%18%1.11%57.76%
Jun 202623.56%17.99%0.68%57.76%
Sep 202623.56%17.95%0.72%57.78%
Shareholding by owner group, % of the company, each quarter, last 13 quarters.

How far is Gayatri Projects from balance-sheet trouble?

For Gayatri Projects Ltd, the Z-score is not available, so we say so rather than guess one. It estimates how far the balance sheet is from trouble; it is not a forecast of failure. The debt, cash-flow and return sections show the balance-sheet figures we do have, each with its own date.

The Z-score estimates how far a company is from balance-sheet trouble. Above about 3 is safe; below about 1.8 is the danger zone. It was built for manufacturers, so it is not used for banks and lenders.

How does Gayatri Projects rank in its industry?

48.9 out of 100, rank 7 of 15 in Construction - Civil/Turnkey, with 56% of the evidence available.

Gayatri Projects Ltd scores 48.9 out of 100 against the 15 companies it is compared with in Construction - Civil/Turnkey, ranking 7. Some evidence is missing, so the score is pulled toward the middle on purpose.

The four parts add up to the total exactly: 19.3 + 6.3 + 11.8 + 11.5 = 48.9. This is the same number shown on the industry page; it is worked out once for the whole group and read here.

What would change it: The score would fall if profit growth turns negative or margins stop improving while the share price lags its sector.

Which companies is Gayatri Projects compared with?

Gayatri Projects ranks 7 of 15 Construction - Civil/Turnkey companies on the 4-Factor Sector Score, with 48.9 out of 100.

  1. 1SRM Contractors LtdSRM · basing · Evidence leans up · 79% evidence64.4out of 100GrowthCapitalValuationRelative
    How the score adds upGrowth & earnings 27.9/35 · Revenue 75.5% · Profit 87.3% · Operating margin change 5 points · 88% evidenceCapital efficiency 20.8/25 · ROCE 37.1% · Operating margin 19% · 100% evidenceValuation 11.3/20 · P/E 7.9× · PEG — · 15% evidenceRelative strength 4.4/20 · Lead over its industry -17.3% · Lead over NIFTY 500 -10.3% · 1 year -28.9% · 100% evidence · 0 of 12 weeks aheadExact sum: 27.9 + 20.8 + 11.3 + 4.4 = 64.4 · What this means: Earnings are strong; relative strength in its sector is -17.3% and the one-year return is -28.9%.
  2. 2Sathlokhar Synergys E&C Global LtdSSEGL · breaking out · Evidence leans up · 60% evidence62.9out of 100GrowthCapitalValuationRelative
    How the score adds upGrowth & earnings 23.9/35 · Revenue 100% · Profit 100% · Operating margin change 2 points · 95% evidenceCapital efficiency 18.6/25 · ROCE 36.3% · Operating margin 15% · 76% evidenceValuation 10.9/20 · P/E 8.4× · PEG — · 15% evidenceRelative strength 9.5/20 · Lead over its industry — · Lead over NIFTY 500 -3% · 1 year -35.9% · 25% evidence · 10 of 12 weeks aheadExact sum: 23.9 + 18.6 + 10.9 + 9.5 = 62.9 · What this means: The evidence is balanced: no factor stands out, so another reported quarter is needed before the picture is clearer.
  3. 3Univastu India LtdUNIVASTU · Too little evidence to rank firmly · 58% evidence62.7out of 100GrowthCapitalValuationRelative
    How the score adds upGrowth & earnings 29.4/43.75 · Revenue 100% · Profit 82.3% · Operating margin change -11 points · 83% evidenceCapital efficiency 22.2/31.25 · ROCE 30% · Operating margin 14% · 76% evidenceValuation 11.1/25 · P/E 16.4× · PEG — · 50% evidenceRelative strength: no reading this week · its 20 points are shared across the other threeExact sum: 29.4 + 22.2 + 11.1 = 62.7 (no relative-strength reading this week; its 20 points are shared across the other three) · What this means: Some evidence is missing, so the score is pulled toward the middle on purpose.
  4. 4Ceigall India LtdCEIGALL · breaking out · Evidence leans up · 71% evidence62.3out of 100GrowthCapitalValuationRelative
    How the score adds upGrowth & earnings 19.5/35 · Revenue 20.3% · Profit 23.5% · Operating margin change 2 points · 83% evidenceCapital efficiency 14.1/25 · ROCE 17% · Operating margin 15% · 76% evidenceValuation 10.0/20 · P/E 21.1× · PEG — · 15% evidenceRelative strength 18.7/20 · Lead over its industry 20.3% · Lead over NIFTY 500 29% · 1 year 55.1% · 100% evidence · 6 of 12 weeks aheadExact sum: 19.5 + 14.1 + 10 + 18.7 = 62.3 · What this means: The evidence is balanced: no factor stands out, so another reported quarter is needed before the picture is clearer.
  5. 5Interise TrustINTERISE · Too little evidence to rank firmly · 51% evidence51.3out of 100GrowthCapitalValuationRelative
    How the score adds upGrowth & earnings 25.9/43.75 · Revenue 6% · Profit 64.1% · Operating margin change 4 points · 83% evidenceCapital efficiency 12.4/31.25 · ROCE 9.7% · Operating margin 94% · 76% evidenceValuation 13.0/25 · P/E 13.6× · PEG — · 15% evidenceRelative strength: no reading this week · its 20 points are shared across the other threeExact sum: 25.9 + 12.4 + 13 = 51.3 (no relative-strength reading this week; its 20 points are shared across the other three) · What this means: Some evidence is missing, so the score is pulled toward the middle on purpose.
  6. 6GHV Infra Projects Ltdquiet · Evidence leans down · 87% evidence48.9out of 100GrowthCapitalValuationRelative
    How the score adds upGrowth & earnings 16.2/35 · Revenue 92.6% · Profit 66.7% · Operating margin change 0 points · 95% evidenceCapital efficiency 16.4/25 · ROCE 46% · Operating margin 12% · 95% evidenceValuation 11.1/20 · P/E 34.2× · PEG — · 50% evidenceRelative strength 5.2/20 · Lead over its industry -14.9% · Lead over NIFTY 500 -7.6% · 1 year -27.9% · 100% evidence · 10 of 12 weeks aheadExact sum: 16.2 + 16.4 + 11.1 + 5.2 = 48.9 · What this means: The evidence is balanced: no factor stands out, so another reported quarter is needed before the picture is clearer.
  7. 7Gayatri Projects Ltd this pageGAYAPROJ · losing its lead · Too little evidence to rank firmly · 56% evidence48.9out of 100GrowthCapitalValuationRelative
    How the score adds upGrowth & earnings 19.3/35 · Revenue 100% · Profit 100% · Operating margin change 6 points · 62% evidenceCapital efficiency 6.3/25 · ROCE 4.8% · Operating margin 18% · 76% evidenceValuation 11.8/20 · P/E 7× · PEG — · 50% evidenceRelative strength 11.5/20 · Lead over its industry — · Lead over NIFTY 500 15.1% · 1 year 72.2% · 25% evidence · 7 of 12 weeks aheadExact sum: 19.3 + 6.3 + 11.8 + 11.5 = 48.9 · What this means: Some evidence is missing, so the score is pulled toward the middle on purpose.
  8. 8Denta Water & Infra Solutions LtdDENTA · quiet · Evidence leans down · 64% evidence42.1out of 100GrowthCapitalValuationRelative
    How the score adds upGrowth & earnings 8.4/35 · Revenue 10% · Profit -10.2% · Operating margin change -11 points · 88% evidenceCapital efficiency 15.3/25 · ROCE 18.4% · Operating margin 22% · 100% evidenceValuation 10.6/20 · P/E 11.1× · PEG — · 15% evidenceRelative strength 7.8/20 · Lead over its industry — · Lead over NIFTY 500 -20.2% · 1 year -44.9% · 25% evidence · 4 of 12 weeks aheadExact sum: 8.4 + 15.3 + 10.6 + 7.8 = 42.1 · What this means: The evidence is balanced: no factor stands out, so another reported quarter is needed before the picture is clearer.
  9. 9B.L.Kashyap & Sons LtdBLKASHYAP · turning · Evidence leans down · 64% evidence42.0out of 100GrowthCapitalValuationRelative
    How the score adds upGrowth & earnings 12.2/35 · Revenue 21.9% · Profit -80% · Operating margin change 0 points · 88% evidenceCapital efficiency 9.2/25 · ROCE 12.6% · Operating margin 8% · 100% evidenceValuation 9.6/20 · P/E 31.9× · PEG — · 15% evidenceRelative strength 11.0/20 · Lead over its industry — · Lead over NIFTY 500 3.9% · 1 year -11.6% · 25% evidence · 3 of 12 weeks aheadExact sum: 12.2 + 9.2 + 9.6 + 11 = 42 · What this means: The evidence is balanced: no factor stands out, so another reported quarter is needed before the picture is clearer.
  10. 10IL&FS Engineering & Construction Co LtdIL&FSENGG · Too little evidence to rank firmly · 56% evidence38.9out of 100GrowthCapitalValuationRelative
    How the score adds upGrowth & earnings 15.7/35 · Revenue -33.5% · Profit 100% · Operating margin change 40.3 points · 65% evidenceCapital efficiency 1.8/25 · ROCE 0.8% · Operating margin -24.9% · 100% evidenceValuation 8.9/20 · P/E 37.6× · PEG — · 15% evidenceRelative strength 12.5/20 · Lead over its industry — · Lead over NIFTY 500 32.5% · 1 year — · 25% evidenceExact sum: 15.7 + 1.8 + 8.9 + 12.5 = 38.9 · What this means: Some evidence is missing, so the score is pulled toward the middle on purpose.
  11. 11Afcons Infrastructure LtdAFCONS · quiet · Most evidence points down · 74% evidence32.3out of 100GrowthCapitalValuationRelative
  12. 12A B Infrabuild LtdABINFRA · breaking out · Most evidence points down · 96% evidence29.7out of 100GrowthCapitalValuationRelative
  13. 13Brahmaputra Infrastructure LtdToo little evidence to rank firmly · 47% evidence63.1out of 100GrowthCapitalValuationRelative
  14. 14Effwa Infra & Research LtdEFFWA · quiet · Too little evidence to rank firmly · 47% evidence54.6out of 100GrowthCapitalValuationRelative
  15. 15HRS Aluglaze LtdToo little evidence to rank firmly · 26% evidence52.2out of 100GrowthCapitalValuationRelative

Missing figures are not scored as bad. They lower the confidence and pull the final score toward the middle. Relative strength counts only when the company has a reading for this week; with no reading, that factor is left out and its 20 points are shared across the other three in proportion. PEG is not shown when the ratio cannot mean anything: the company must be making a profit, its price-to-earnings must be positive, and its three-year earnings growth must fall between 5% and 60%. Dividing a price multiple by a loss, or by growth measured off a tiny base, produces a number that looks precise and tells you nothing. Under relative strength, one mark per week shows the last 12 weeks: a mark is filled where the company led NIFTY 500 by 5% or more over the 13 weeks ending that week, which is the same test used everywhere on this site. Price stage places the company on the same six-step path the industry is placed on (basing, turning, breaking out, leader, fading, asleep), read from how many weeks running it has led NIFTY 500 and whether that lead is growing or shrinking. It describes where the share price stands, not the direction of earnings, and it is not a recommendation; it is left blank for a company whose weekly history is too short or too stale to read.

The figures in this ranking come from the industry comparison: results through the Sep 2026 quarter, and the P/E at that quarter's end. The sections above use the latest weekly price, so a P/E or return there can differ a little from the one here. The stage words in this ranking (such as losing its lead or breaking out) describe the lead over the index, not the price phase in the price section.

Related companies: Construction - Civil/Turnkey, all 15 compared on one page.

Which companies are close to Gayatri Projects in size?

Gayatri Projects is the 8th largest of 15 Construction - Civil/Turnkey companies on Sector Alpha by market value (scores of 30 October 2026). Just above it: B.L.Kashyap & Sons, SRM Contractors and Sathlokhar Synergys E&C Global. Just below it: Effwa Infra & Research, A B Infrabuild and Denta Water & Infra Solutions.

Construction - Civil/Turnkey companies close in size

  1. B.L.Kashyap & Sons Ltd ₹1,175 crore
  2. SRM Contractors Ltd ₹932 crore
  3. Sathlokhar Synergys E&C Global Ltd ₹929 crore
  4. Gayatri Projects Ltd ₹880 crore
  5. Effwa Infra & Research Ltd ₹784 crore
  6. A B Infrabuild Ltd ₹777 crore
  7. Denta Water & Infra Solutions Ltd ₹592 crore

All 15 Construction - Civil/Turnkey companies, largest first

Companies close in size in other industries

  1. Sejal Glass Ltd ₹882 crore · Glass & Glass Products
  2. Sunshield Chemicals Ltd ₹882 crore · Speciality Chemicals
  3. Gayatri Projects Ltd ₹880 crore
  4. Kalyani Cast-Tech Ltd ₹878 crore · Castings - Steel/Alloy
  5. Finkurve Financial Services Ltd ₹876 crore · Finance & Investments - Others

What else do people ask about Gayatri Projects?

What is Gayatri Projects's share price today?

Gayatri Projects Ltd's share price is ₹21.36, +94.4% over the past year. The whole company is worth ₹989 Cr on the market.

In the last 52 weeks it traded between ₹12 to ₹26; today it is 68% of the way up from the low, 17.8% above its 200-day average (as of 4 November 2026).

What were Gayatri Projects's latest quarterly results?

Gayatri Projects Ltd reported revenue of ₹229 Cr and net profit of ₹37.0 Cr for the Jun 2026 quarter. Earnings per share were ₹0.80. The operating margin was 18.0%, 6.0 percentage points higher than a year earlier (as of 4 November 2026).

What is Gayatri Projects's market cap?

Gayatri Projects Ltd's market capitalisation is ₹989 Cr at a share price of ₹21.36. Market cap is the share price times the number of shares, so it changes whenever the price moves (as of 4 November 2026).

How is Gayatri Projects performing?

Gayatri Projects Ltd's share price has been rising for 69 weeks. Over the past 13 weeks it has done better than the NIFTY 500, for 10 weeks running. This describes what the data did, not a rating (as of 4 November 2026).

Will Gayatri Projects's share price go up?

This page does not forecast Gayatri Projects Ltd's share price. What it shows instead: the share price is ₹21.36, and it has been rising for 69 weeks. Its P/E of 7.9× is higher than 46% of its own last 7 years (as of 4 November 2026).

Who owns Gayatri Projects?

Promoters own 23.6% of Gayatri Projects Ltd, foreign institutions 17.9%, domestic institutions 0.7% and the public 57.8% (latest quarter). The biggest change over the last two years: Promoters raised their stake by 19.6 percentage points over 8 quarters (as of 4 November 2026).

What is Gayatri Projects's capex?

Gayatri Projects Ltd sold more long-term assets (plants, machines and the like) than it bought over the last 3 years, by ₹77.0 Cr, worked out from the change in fixed assets plus depreciation. Depreciation over the same years was ₹121 Cr (as of 4 November 2026).

Where is Gayatri Projects in its business cycle?

Gayatri Projects Ltd's FY26 operating margin was 0.0%, against a 13-year range of −72.0% to 28.0%: the middle of its own range, neither a peak nor a low. The latest quarter was 18.0%.

Comparing margins with a company's own long history is a good way to see where it is in its cycle (as of 4 November 2026).

What could break the Gayatri Projects story?

The main question: profits are rising, but only 31% of the last 3 years' profit came in as cash from operations. The gap between reported profit and actual cash is the thing to watch.

On price, this page treats a rise as over when the share price closes below its 200-day average on two Fridays in a row (as of 4 November 2026).

Is Gayatri Projects a stock worth studying right now?

What the numbers show: Gayatri Projects Ltd's earnings have grown faster than its share price. Earnings per share grew +1,547.9% in a year while the price moved +94.4%. The main open question: whether the cash starts to follow the profit.

Every number on this page is worked out by code from the published figures, with no forecasts and no price opinions (as of 4 November 2026).

Where do these numbers come from?

Sector Alpha, written by code from the published numbers. Data as of 4 November 2026.

Every chart on this page is drawn by code from the published figures, with no forecasts and no price opinions.

See the plain-text version of this page.

More lists

Every Sector Alpha list, grouped

X · Instagram · YouTube · About · Newsletter · Newsletter archive
This is research, not advice. We’re not SEBI-registered.