Skip to content
Industry
This is research, not advice. We’re not SEBI-registered.

J Kumar Infraprojects share price today

J Kumar Infraprojects Ltd · NSE: JKIL · EPC · price as of the 4 November 2026 close, updated every trading day · results updated weekly · research updated 7 August 2026

J Kumar Infraprojects share price today: ₹421.00 at the NSE close on 4 November 2026, down 32.1% in a year. J Kumar Infraprojects (NSE: JKIL) is worth ₹3,182 crore, trades at a P/E of 8.2 and has closed between ₹405.65 and ₹619.60 over the past 52 weeks.

Getting worseBusiness trend from the last 12 quarters
₹421.00Price −32.1% in a year
8.2×P/E lower than 92% of the last 9.1 years
₹1,511 CrRevenue (Jun 2026) +1.8% on a year ago
₹97.0 CrProfit (Jun 2026) −5.8% on a year ago
14.0%Operating margin −1.0 points on a year ago
18%ROCE FY26
13.2%ROIC against a 12.0% cost of capital: +1.2 points

J Kumar Infraprojects Ltd's P/E is near the low end of its own history, higher than only 8% of past readings, and its quarterly results are still getting worse.

The main question: yearly earnings per share moved −1.2% while the share price moved −32.1%.

The price has been falling for 61 weeks, and the P/E is lower than 92% of its own last 9.1 years. Over the last four quarters, results have been deteriorating, with profit −5.8% on a year earlier, and 166% of the last 3 years' profit came in as cash. What will decide it: whether the price catches up with earnings that have already grown.

What is the J Kumar Infraprojects share price today?

J Kumar Infraprojects Ltd's share price was ₹421.00 at the close on 4 November 2026. It has been falling for 61 weeks. That is 16.6% below its average price over the last 200 trading days. In the last 52 weeks it traded between ₹406 and ₹620, and at that close it sat 7% of the way up from that low.

A share price tends to move through four phases: moving sideways (stage 1), rising (stage 2), stalling near a high (stage 3) and falling (stage 4). Today J Kumar Infraprojects Ltd is in stage 4. The phase helps read everything below.

Over the past 13 weeks it has done worse than the NIFTY 500, and it has been behind for 11 weeks running.

1Y

Nov 2026: ₹421, 16.6% below its 200-day average. The price has been falling for 61 weeks.

  • Price ₹421
  • 50-day avg ₹455
  • 200-day avg ₹505
Nov 2026: ₹421, 16.6% below its 200-day average. The price has been falling for 61 weeks.
WeekPrice50-day avg200-day avg
31 Oct 2025₹659₹644₹678
7 Nov 2025₹620₹644₹677
14 Nov 2025₹615₹638₹674
21 Nov 2025₹605₹634₹671
28 Nov 2025₹586₹626₹667
5 Dec 2025₹563₹615₹662
12 Dec 2025₹564₹604₹657
19 Dec 2025₹558₹595₹652
26 Dec 2025₹577₹594₹649
2 Jan 2026₹602₹592₹646
9 Jan 2026₹575₹592₹643
16 Jan 2026₹559₹587₹640
23 Jan 2026₹558₹582₹636
1 Feb 2026₹567₹579₹633
6 Feb 2026₹571₹577₹630
13 Feb 2026₹556₹576₹627
20 Feb 2026₹546₹571₹623
27 Feb 2026₹529₹566₹619
6 Mar 2026₹472₹554₹614
13 Mar 2026₹494₹544₹608
20 Mar 2026₹488₹535₹603
27 Mar 2026₹447₹524₹597
17 Apr 2026₹519₹505₹583
24 Apr 2026₹515₹507₹580
30 Apr 2026₹520₹508₹577
8 May 2026₹512₹509₹574
15 May 2026₹494₹507₹570
22 May 2026₹487₹503₹566
29 May 2026₹503₹503₹564
4 Jun 2026₹492₹502₹561
5 Jun 2026₹483₹501₹560
10 Jun 2026₹469₹498₹558
12 Jun 2026₹459₹495₹556
17 Jun 2026₹493₹494₹554
19 Jun 2026₹500₹495₹553
24 Jun 2026₹504₹496₹551
25 Jun 2026₹504₹496₹551
1 Jul 2026₹490₹496₹549
3 Jul 2026₹494₹495₹548
10 Jul 2026₹501₹496₹545
17 Jul 2026₹499₹496₹543
24 Jul 2026₹486₹495₹541
31 Jul 2026₹482₹493₹538
7 Aug 2026₹499₹493₹536
14 Aug 2026₹498₹494₹534
21 Aug 2026₹506₹496₹532
28 Aug 2026₹500₹497₹531
4 Sep 2026₹487₹495₹529
11 Sep 2026₹476₹493₹526
18 Sep 2026₹487₹491₹525
25 Sep 2026₹474₹489₹522
1 Oct 2026₹462₹484₹520
9 Oct 2026₹431₹476₹516
16 Oct 2026₹442₹470₹512
23 Oct 2026₹421₹465₹509
30 Oct 2026₹406₹455₹505
4 Nov 2026₹421₹455₹505
Weekly closing price (₹) with its 50-day and 200-day averages. The strip under the chart shows the phase: tan sideways, green rising, yellow stalling near a high, orange falling. 1-year window.

3Y

Nov 2026: ₹421, 16.6% below its 200-day average. The price has been falling for 61 weeks.

  • Price ₹421
  • 50-day avg ₹455
  • 200-day avg ₹505
Nov 2026: ₹421, 16.6% below its 200-day average. The price has been falling for 61 weeks.
WeekPrice50-day avg200-day avg
3 Nov 2023₹424₹411₹344
12 Nov 2023₹431₹415₹348
17 Nov 2023₹429₹417₹352
24 Nov 2023₹416₹419₹355
1 Dec 2023₹427₹420₹358
8 Dec 2023₹441₹422₹362
15 Dec 2023₹486₹428₹366
22 Dec 2023₹495₹439₹372
29 Dec 2023₹577₹462₹381
5 Jan 2024₹574₹484₹391
12 Jan 2024₹578₹501₹400
20 Jan 2024₹579₹518₹411
25 Jan 2024₹602₹526₹416
2 Feb 2024₹664₹548₹427
9 Feb 2024₹645₹569₹439
16 Feb 2024₹642₹580₹448
23 Feb 2024₹678₹594₹458
2 Mar 2024₹649₹609₹470
7 Mar 2024₹642₹614₹477
15 Mar 2024₹597₹611₹483
22 Mar 2024₹624₹609₹489
28 Mar 2024₹631₹612₹493
5 Apr 2024₹626₹617₹500
12 Apr 2024₹622₹619₹505
19 Apr 2024₹622₹618₹509
26 Apr 2024₹648₹623₹516
3 May 2024₹678₹631₹522
10 May 2024₹620₹632₹528
18 May 2024₹633₹631₹534
24 May 2024₹667₹636₹539
31 May 2024₹756₹645₹546
7 Jun 2024₹797₹664₹556
14 Jun 2024₹821₹690₹568
21 Jun 2024₹877₹718₹580
28 Jun 2024₹831₹741₹593
5 Jul 2024₹903₹769₹608
12 Jul 2024₹860₹786₹620
19 Jul 2024₹814₹794₹629
26 Jul 2024₹846₹801₹639
2 Aug 2024₹843₹809₹649
9 Aug 2024₹829₹809₹657
16 Aug 2024₹858₹815₹664
23 Aug 2024₹852₹823₹674
30 Aug 2024₹851₹827₹682
6 Sep 2024₹789₹821₹688
13 Sep 2024₹773₹812₹692
20 Sep 2024₹760₹802₹695
27 Sep 2024₹778₹798₹699
4 Oct 2024₹749₹794₹702
11 Oct 2024₹736₹783₹703
18 Oct 2024₹738₹775₹705
25 Oct 2024₹697₹765₹706
1 Nov 2024₹793₹765₹709
8 Nov 2024₹752₹763₹711
14 Nov 2024₹700₹755₹711
22 Nov 2024₹688₹745₹710
29 Nov 2024₹754₹746₹712
6 Dec 2024₹785₹751₹715
13 Dec 2024₹762₹756₹718
20 Dec 2024₹752₹758₹721
27 Dec 2024₹761₹758₹722
3 Jan 2025₹768₹759₹724
10 Jan 2025₹738₹757₹725
17 Jan 2025₹713₹749₹724
24 Jan 2025₹703₹742₹724
1 Feb 2025₹725₹736₹723
7 Feb 2025₹762₹737₹724
14 Feb 2025₹692₹733₹724
21 Feb 2025₹677₹723₹721
28 Feb 2025₹673₹715₹719
7 Mar 2025₹679₹704₹716
13 Mar 2025₹670₹699₹714
21 Mar 2025₹678₹693₹712
28 Mar 2025₹634₹687₹709
4 Apr 2025₹679₹687₹709
11 Apr 2025₹693₹686₹707
17 Apr 2025₹691₹688₹707
25 Apr 2025₹656₹687₹706
2 May 2025₹631₹681₹704
9 May 2025₹631₹675₹701
16 May 2025₹694₹677₹700
23 May 2025₹726₹683₹701
30 May 2025₹708₹689₹702
6 Jun 2025₹725₹695₹703
13 Jun 2025₹735₹704₹705
20 Jun 2025₹715₹706₹705
27 Jun 2025₹725₹710₹706
4 Jul 2025₹720₹711₹707
11 Jul 2025₹710₹712₹707
18 Jul 2025₹733₹716₹708
25 Jul 2025₹724₹719₹710
1 Aug 2025₹698₹716₹709
8 Aug 2025₹691₹713₹709
14 Aug 2025₹670₹706₹707
22 Aug 2025₹650₹698₹705
29 Aug 2025₹618₹688₹702
5 Sep 2025₹629₹678₹699
12 Sep 2025₹628₹669₹695
19 Sep 2025₹652₹665₹693
26 Sep 2025₹625₹658₹690
3 Oct 2025₹644₹656₹688
10 Oct 2025₹636₹653₹686
17 Oct 2025₹622₹647₹682
24 Oct 2025₹630₹645₹680
31 Oct 2025₹659₹644₹678
7 Nov 2025₹620₹644₹677
14 Nov 2025₹615₹638₹674
21 Nov 2025₹605₹634₹671
28 Nov 2025₹586₹626₹667
5 Dec 2025₹563₹615₹662
12 Dec 2025₹564₹604₹657
19 Dec 2025₹558₹595₹652
26 Dec 2025₹577₹594₹649
2 Jan 2026₹602₹592₹646
9 Jan 2026₹575₹592₹643
16 Jan 2026₹559₹587₹640
23 Jan 2026₹558₹582₹636
1 Feb 2026₹567₹579₹633
6 Feb 2026₹571₹577₹630
13 Feb 2026₹556₹576₹627
20 Feb 2026₹546₹571₹623
27 Feb 2026₹529₹566₹619
6 Mar 2026₹472₹554₹614
13 Mar 2026₹494₹544₹608
20 Mar 2026₹488₹535₹603
27 Mar 2026₹447₹524₹597
17 Apr 2026₹519₹505₹583
24 Apr 2026₹515₹507₹580
30 Apr 2026₹520₹508₹577
8 May 2026₹512₹509₹574
15 May 2026₹494₹507₹570
22 May 2026₹487₹503₹566
29 May 2026₹503₹503₹564
4 Jun 2026₹492₹502₹561
5 Jun 2026₹483₹501₹560
10 Jun 2026₹469₹498₹558
12 Jun 2026₹459₹495₹556
17 Jun 2026₹493₹494₹554
19 Jun 2026₹500₹495₹553
24 Jun 2026₹504₹496₹551
25 Jun 2026₹504₹496₹551
1 Jul 2026₹490₹496₹549
3 Jul 2026₹494₹495₹548
10 Jul 2026₹501₹496₹545
17 Jul 2026₹499₹496₹543
24 Jul 2026₹486₹495₹541
31 Jul 2026₹482₹493₹538
7 Aug 2026₹499₹493₹536
14 Aug 2026₹498₹494₹534
21 Aug 2026₹506₹496₹532
28 Aug 2026₹500₹497₹531
4 Sep 2026₹487₹495₹529
11 Sep 2026₹476₹493₹526
18 Sep 2026₹487₹491₹525
25 Sep 2026₹474₹489₹522
1 Oct 2026₹462₹484₹520
9 Oct 2026₹431₹476₹516
16 Oct 2026₹442₹470₹512
23 Oct 2026₹421₹465₹509
30 Oct 2026₹406₹455₹505
4 Nov 2026₹421₹455₹505
Weekly closing price (₹) with its 50-day and 200-day averages. The strip under the chart shows the phase: tan sideways, green rising, yellow stalling near a high, orange falling. 3-year window.

5Y

Nov 2026: ₹421, 16.6% below its 200-day average. The price has been falling for 61 weeks.

  • Price ₹421
  • 50-day avg ₹455
  • 200-day avg ₹505
Nov 2026: ₹421, 16.6% below its 200-day average. The price has been falling for 61 weeks.
WeekPrice50-day avg200-day avg
29 Oct 2021₹151₹182₹179
12 Nov 2021₹179₹180₹179
26 Nov 2021₹170₹178₹178
10 Dec 2021₹172₹175₹177
24 Dec 2021₹164₹172₹176
7 Jan 2022₹165₹169₹175
21 Jan 2022₹174₹170₹175
4 Feb 2022₹178₹170₹174
18 Feb 2022₹174₹172₹174
4 Mar 2022₹162₹169₹173
17 Mar 2022₹168₹168₹173
1 Apr 2022₹172₹168₹172
13 Apr 2022₹199₹174₹174
29 Apr 2022₹215₹186₹177
13 May 2022₹219₹199₹181
27 May 2022₹233₹209₹186
10 Jun 2022₹292₹226₹193
24 Jun 2022₹291₹243₹201
8 Jul 2022₹306₹259₹210
22 Jul 2022₹333₹277₹220
5 Aug 2022₹308₹295₹230
19 Aug 2022₹309₹300₹237
2 Sep 2022₹290₹300₹242
16 Sep 2022₹292₹298₹247
30 Sep 2022₹301₹294₹251
14 Oct 2022₹256₹290₹253
28 Oct 2022₹257₹273₹252
11 Nov 2022₹273₹271₹253
25 Nov 2022₹276₹274₹256
9 Dec 2022₹274₹275₹258
23 Dec 2022₹248₹276₹260
6 Jan 2023₹275₹275₹261
20 Jan 2023₹273₹275₹262
3 Feb 2023₹259₹273₹263
17 Feb 2023₹256₹270₹263
3 Mar 2023₹258₹265₹262
17 Mar 2023₹243₹262₹261
31 Mar 2023₹254₹256₹260
13 Apr 2023₹254₹255₹259
28 Apr 2023₹273₹259₹260
12 May 2023₹267₹263₹261
26 May 2023₹263₹264₹262
9 Jun 2023₹286₹267₹263
23 Jun 2023₹297₹279₹267
7 Jul 2023₹304₹287₹270
21 Jul 2023₹338₹298₹275
4 Aug 2023₹370₹317₹282
18 Aug 2023₹394₹341₹292
1 Sep 2023₹420₹363₹303
15 Sep 2023₹408₹379₹313
29 Sep 2023₹432₹390₹322
13 Oct 2023₹429₹402₹331
27 Oct 2023₹414₹411₹340
12 Nov 2023₹431₹415₹348
24 Nov 2023₹416₹419₹355
8 Dec 2023₹441₹422₹362
22 Dec 2023₹495₹439₹372
5 Jan 2024₹574₹484₹391
20 Jan 2024₹579₹518₹411
2 Feb 2024₹664₹548₹427
16 Feb 2024₹642₹580₹448
2 Mar 2024₹649₹609₹470
15 Mar 2024₹597₹611₹483
28 Mar 2024₹631₹612₹493
12 Apr 2024₹622₹619₹505
26 Apr 2024₹648₹623₹516
10 May 2024₹620₹632₹528
24 May 2024₹667₹636₹539
7 Jun 2024₹797₹664₹556
21 Jun 2024₹877₹718₹580
5 Jul 2024₹903₹769₹608
19 Jul 2024₹814₹794₹629
2 Aug 2024₹843₹809₹649
16 Aug 2024₹858₹815₹664
30 Aug 2024₹851₹827₹682
13 Sep 2024₹773₹812₹692
27 Sep 2024₹778₹798₹699
11 Oct 2024₹736₹783₹703
25 Oct 2024₹697₹765₹706
8 Nov 2024₹752₹763₹711
22 Nov 2024₹688₹745₹710
6 Dec 2024₹785₹751₹715
20 Dec 2024₹752₹758₹721
3 Jan 2025₹768₹759₹724
17 Jan 2025₹713₹749₹724
1 Feb 2025₹725₹736₹723
14 Feb 2025₹692₹733₹724
28 Feb 2025₹673₹715₹719
13 Mar 2025₹670₹699₹714
28 Mar 2025₹634₹687₹709
11 Apr 2025₹693₹686₹707
25 Apr 2025₹656₹687₹706
9 May 2025₹631₹675₹701
23 May 2025₹726₹683₹701
6 Jun 2025₹725₹695₹703
20 Jun 2025₹715₹706₹705
4 Jul 2025₹720₹711₹707
18 Jul 2025₹733₹716₹708
1 Aug 2025₹698₹716₹709
14 Aug 2025₹670₹706₹707
29 Aug 2025₹618₹688₹702
12 Sep 2025₹628₹669₹695
26 Sep 2025₹625₹658₹690
10 Oct 2025₹636₹653₹686
24 Oct 2025₹630₹645₹680
7 Nov 2025₹620₹644₹677
21 Nov 2025₹605₹634₹671
5 Dec 2025₹563₹615₹662
19 Dec 2025₹558₹595₹652
2 Jan 2026₹602₹592₹646
16 Jan 2026₹559₹587₹640
1 Feb 2026₹567₹579₹633
13 Feb 2026₹556₹576₹627
27 Feb 2026₹529₹566₹619
13 Mar 2026₹494₹544₹608
27 Mar 2026₹447₹524₹597
24 Apr 2026₹515₹507₹580
8 May 2026₹512₹509₹574
22 May 2026₹487₹503₹566
4 Jun 2026₹492₹502₹561
10 Jun 2026₹469₹498₹558
17 Jun 2026₹493₹494₹554
24 Jun 2026₹504₹496₹551
1 Jul 2026₹490₹496₹549
10 Jul 2026₹501₹496₹545
24 Jul 2026₹486₹495₹541
7 Aug 2026₹499₹493₹536
21 Aug 2026₹506₹496₹532
4 Sep 2026₹487₹495₹529
18 Sep 2026₹487₹491₹525
1 Oct 2026₹462₹484₹520
16 Oct 2026₹442₹470₹512
30 Oct 2026₹406₹455₹505
4 Nov 2026₹421₹455₹505
Weekly closing price (₹) with its 50-day and 200-day averages. The strip under the chart shows the phase: tan sideways, green rising, yellow stalling near a high, orange falling. 5-year window.

10Y

Nov 2026: ₹421, 16.6% below its 200-day average. The price has been falling for 61 weeks.

  • Price ₹421
  • 50-day avg ₹455
  • 200-day avg ₹505
Nov 2026: ₹421, 16.6% below its 200-day average. The price has been falling for 61 weeks.
WeekPrice50-day avg200-day avg
30 Oct 2016₹216₹200₹236
18 Nov 2016₹183₹197₹231
9 Dec 2016₹193₹192₹225
30 Dec 2016₹204₹198₹222
20 Jan 2017₹232₹212₹223
10 Feb 2017₹230₹220₹224
3 Mar 2017₹229₹222₹224
24 Mar 2017₹271₹235₹228
13 Apr 2017₹256₹245₹231
5 May 2017₹284₹258₹237
26 May 2017₹306₹278₹246
16 Jun 2017₹297₹286₹253
7 Jul 2017₹302₹290₹258
28 Jul 2017₹296₹293₹264
18 Aug 2017₹209₹277₹263
8 Sep 2017₹210₹243₹254
29 Sep 2017₹204₹230₹249
19 Oct 2017₹230₹227₹245
10 Nov 2017₹251₹240₹247
1 Dec 2017₹285₹259₹252
22 Dec 2017₹320₹281₹259
12 Jan 2018₹348₹299₹267
2 Feb 2018₹294₹310₹275
23 Feb 2018₹334₹317₹281
16 Mar 2018₹302₹311₹284
6 Apr 2018₹292₹302₹285
27 Apr 2018₹291₹296₹285
18 May 2018₹251₹286₹284
8 Jun 2018₹277₹276₹281
29 Jun 2018₹228₹262₹276
20 Jul 2018₹217₹245₹269
10 Aug 2018₹228₹232₹262
31 Aug 2018₹259₹234₹258
21 Sep 2018₹239₹239₹257
12 Oct 2018₹136₹206₹245
2 Nov 2018₹136₹172₹230
22 Nov 2018₹140₹161₹219
14 Dec 2018₹119₹145₹207
4 Jan 2019₹129₹140₹197
25 Jan 2019₹115₹132₹187
15 Feb 2019₹115₹125₹177
8 Mar 2019₹167₹132₹172
29 Mar 2019₹161₹146₹171
18 Apr 2019₹135₹147₹168
10 May 2019₹128₹139₹163
31 May 2019₹157₹144₹161
21 Jun 2019₹153₹149₹161
12 Jul 2019₹143₹151₹160
2 Aug 2019₹122₹143₹156
23 Aug 2019₹121₹137₹153
13 Sep 2019₹132₹131₹149
4 Oct 2019₹131₹132₹147
27 Oct 2019₹154₹139₹147
15 Nov 2019₹160₹146₹148
6 Dec 2019₹135₹150₹149
27 Dec 2019₹136₹145₹148
17 Jan 2020₹153₹147₹148
7 Feb 2020₹148₹149₹149
28 Feb 2020₹126₹145₹148
20 Mar 2020₹83₹126₹142
9 Apr 2020₹82₹107₹134
30 Apr 2020₹80₹97₹128
22 May 2020₹78₹88₹121
12 Jun 2020₹88₹88₹116
3 Jul 2020₹99₹91₹113
24 Jul 2020₹89₹93₹111
14 Aug 2020₹101₹94₹109
4 Sep 2020₹112₹103₹109
25 Sep 2020₹104₹105₹109
16 Oct 2020₹108₹106₹109
6 Nov 2020₹106₹106₹108
27 Nov 2020₹119₹110₹109
18 Dec 2020₹132₹120₹113
8 Jan 2021₹145₹127₹115
29 Jan 2021₹146₹135₹119
19 Feb 2021₹204₹158₹128
12 Mar 2021₹197₹174₹137
1 Apr 2021₹194₹183₹144
23 Apr 2021₹182₹182₹149
14 May 2021₹178₹181₹153
4 Jun 2021₹181₹182₹157
25 Jun 2021₹188₹185₹161
16 Jul 2021₹219₹192₹167
6 Aug 2021₹208₹202₹173
27 Aug 2021₹194₹203₹177
17 Sep 2021₹194₹202₹180
8 Oct 2021₹184₹195₹181
29 Oct 2021₹151₹182₹179
18 Nov 2021₹174₹180₹179
10 Dec 2021₹172₹175₹177
31 Dec 2021₹162₹170₹175
21 Jan 2022₹174₹170₹175
11 Feb 2022₹175₹172₹174
4 Mar 2022₹162₹169₹173
25 Mar 2022₹168₹168₹173
13 Apr 2022₹199₹174₹174
6 May 2022₹227₹193₹179
27 May 2022₹233₹209₹186
17 Jun 2022₹275₹236₹197
8 Jul 2022₹306₹259₹210
29 Jul 2022₹336₹288₹225
19 Aug 2022₹309₹300₹237
9 Sep 2022₹301₹299₹245
30 Sep 2022₹301₹294₹251
21 Oct 2022₹218₹279₹252
11 Nov 2022₹273₹271₹253
2 Dec 2022₹280₹275₹257
23 Dec 2022₹248₹276₹260
13 Jan 2023₹273₹275₹262
3 Feb 2023₹259₹273₹263
24 Feb 2023₹260₹268₹263
17 Mar 2023₹243₹262₹261
6 Apr 2023₹254₹256₹260
28 Apr 2023₹273₹259₹260
19 May 2023₹268₹264₹262
9 Jun 2023₹286₹267₹263
30 Jun 2023₹301₹282₹268
21 Jul 2023₹338₹298₹275
11 Aug 2023₹400₹331₹288
1 Sep 2023₹420₹363₹303
22 Sep 2023₹403₹382₹317
13 Oct 2023₹429₹402₹331
3 Nov 2023₹424₹411₹344
24 Nov 2023₹416₹419₹355
15 Dec 2023₹486₹428₹366
5 Jan 2024₹574₹484₹391
25 Jan 2024₹602₹526₹416
16 Feb 2024₹642₹580₹448
7 Mar 2024₹642₹614₹477
28 Mar 2024₹631₹612₹493
19 Apr 2024₹622₹618₹509
10 May 2024₹620₹632₹528
31 May 2024₹756₹645₹546
21 Jun 2024₹877₹718₹580
12 Jul 2024₹860₹786₹620
2 Aug 2024₹843₹809₹649
23 Aug 2024₹852₹823₹674
13 Sep 2024₹773₹812₹692
4 Oct 2024₹749₹794₹702
25 Oct 2024₹697₹765₹706
14 Nov 2024₹700₹755₹711
6 Dec 2024₹785₹751₹715
27 Dec 2024₹761₹758₹722
17 Jan 2025₹713₹749₹724
7 Feb 2025₹762₹737₹724
28 Feb 2025₹673₹715₹719
21 Mar 2025₹678₹693₹712
11 Apr 2025₹693₹686₹707
2 May 2025₹631₹681₹704
23 May 2025₹726₹683₹701
13 Jun 2025₹735₹704₹705
4 Jul 2025₹720₹711₹707
25 Jul 2025₹724₹719₹710
14 Aug 2025₹670₹706₹707
5 Sep 2025₹629₹678₹699
26 Sep 2025₹625₹658₹690
17 Oct 2025₹622₹647₹682
7 Nov 2025₹620₹644₹677
28 Nov 2025₹586₹626₹667
19 Dec 2025₹558₹595₹652
9 Jan 2026₹575₹592₹643
1 Feb 2026₹567₹579₹633
20 Feb 2026₹546₹571₹623
13 Mar 2026₹494₹544₹608
17 Apr 2026₹519₹505₹583
8 May 2026₹512₹509₹574
29 May 2026₹503₹503₹564
10 Jun 2026₹469₹498₹558
19 Jun 2026₹500₹495₹553
1 Jul 2026₹490₹496₹549
17 Jul 2026₹499₹496₹543
7 Aug 2026₹499₹493₹536
28 Aug 2026₹500₹497₹531
18 Sep 2026₹487₹491₹525
9 Oct 2026₹431₹476₹516
30 Oct 2026₹406₹455₹505
4 Nov 2026₹421₹455₹505
Weekly closing price (₹) with its 50-day and 200-day averages. The strip under the chart shows the phase: tan sideways, green rising, yellow stalling near a high, orange falling. 10-year window.

Price stage: Falling from Oct 2025 to Oct 2026.

Price stage: Rising from Nov 2023 to Feb 2025; Falling from Mar 2025 to Jun 2025; Sideways from Jun 2025 to Jul 2025; Rising in Aug 2025; Falling from Sep 2025 to Oct 2026.

Price stage: Falling from Oct 2021 to Apr 2022; Rising from May 2022 to Mar 2023; Falling from Mar 2023 to Jun 2023; Rising from Jun 2023 to Feb 2025; Falling from Mar 2025 to Jun 2025; Sideways from Jun 2025 to Jul 2025; Rising in Aug 2025; Falling from Sep 2025 to Oct 2026.

Price stage: Falling from Oct 2016 to Mar 2017; Rising from Mar 2017 to Aug 2017; Falling from Sep 2017 to Dec 2017; Rising from Dec 2017 to May 2018; Falling from Jun 2018 to Nov 2020; Rising from Dec 2020 to Nov 2021; Falling from Dec 2021 to May 2022; Rising from May 2022 to Mar 2023; Falling from Apr 2023 to Jun 2023; Rising from Jun 2023 to Feb 2025; Falling from Mar 2025 to Oct 2026.

Week by week since 2016: did it beat the NIFTY 500 over the past 13 weeks?

Ahead in 240 of 547 weeks

Week by week since 2016: did it beat the NIFTY 500 over the past 13 weeks?
Week13-week return vs NIFTY 500
11 Mar 2016no NIFTY 500 reading
18 Mar 2016no NIFTY 500 reading
23 Mar 2016no NIFTY 500 reading
1 Apr 2016no NIFTY 500 reading
8 Apr 2016no NIFTY 500 reading
13 Apr 2016no NIFTY 500 reading
22 Apr 2016no NIFTY 500 reading
29 Apr 2016no NIFTY 500 reading
6 May 2016no NIFTY 500 reading
13 May 2016no NIFTY 500 reading
20 May 2016no NIFTY 500 reading
27 May 2016no NIFTY 500 reading
3 Jun 2016no NIFTY 500 reading
10 Jun 2016−34.9%
17 Jun 2016−28.4%
24 Jun 2016−30.4%
1 Jul 2016−29.2%
8 Jul 2016−11.2%
15 Jul 2016−28.6%
22 Jul 2016−31.0%
29 Jul 2016−18.9%
5 Aug 2016−31.2%
12 Aug 2016−53.5%
19 Aug 2016−52.5%
26 Aug 2016−40.1%
2 Sep 2016−42.7%
9 Sep 2016−40.9%
16 Sep 2016−31.2%
23 Sep 2016−19.6%
30 Sep 2016−24.2%
7 Oct 2016−10.3%
14 Oct 2016−9.2%
21 Oct 2016−4.2%
30 Oct 2016−1.2%
4 Nov 2016−1.6%
11 Nov 2016+38.7%
18 Nov 2016+39.0%
25 Nov 2016+22.3%
2 Dec 2016+22.3%
9 Dec 2016+25.6%
16 Dec 2016+23.5%
23 Dec 2016+12.9%
30 Dec 2016+19.4%
6 Jan 2017+8.6%
13 Jan 2017+18.3%
20 Jan 2017+6.5%
27 Jan 2017+3.2%
3 Feb 2017+15.2%
10 Feb 2017+13.7%
17 Feb 2017+9.6%
23 Feb 2017+7.1%
3 Mar 2017+11.8%
10 Mar 2017+13.9%
17 Mar 2017+9.3%
24 Mar 2017+21.5%
31 Mar 2017+11.4%
7 Apr 2017−4.0%
13 Apr 2017−3.6%
21 Apr 2017+4.8%
28 Apr 2017+14.0%
5 May 2017+15.0%
12 May 2017+19.6%
19 May 2017+33.1%
26 May 2017+29.1%
2 Jun 2017+18.5%
9 Jun 2017+17.5%
16 Jun 2017+9.1%
23 Jun 2017+1.7%
30 Jun 2017+10.9%
7 Jul 2017+16.2%
14 Jul 2017+10.0%
21 Jul 2017+1.7%
28 Jul 2017−2.8%
4 Aug 2017−3.4%
11 Aug 2017−27.5%
18 Aug 2017−38.1%
24 Aug 2017−39.6%
1 Sep 2017−37.4%
8 Sep 2017−36.1%
15 Sep 2017−33.9%
22 Sep 2017−26.6%
29 Sep 2017−34.4%
6 Oct 2017−30.5%
13 Oct 2017−30.5%
19 Oct 2017−24.6%
27 Oct 2017−17.3%
3 Nov 2017−16.6%
10 Nov 2017+6.6%
17 Nov 2017+19.3%
24 Nov 2017+45.5%
1 Dec 2017+44.7%
8 Dec 2017+52.6%
15 Dec 2017+39.3%
22 Dec 2017+35.4%
29 Dec 2017+38.4%
5 Jan 2018+36.9%
12 Jan 2018+49.7%
19 Jan 2018+30.8%
25 Jan 2018+20.7%
2 Feb 2018+14.9%
9 Feb 2018+21.9%
16 Feb 2018+24.8%
23 Feb 2018+11.7%
1 Mar 2018+12.2%
9 Mar 2018−13.1%
16 Mar 2018+2.5%
23 Mar 2018−6.0%
28 Mar 2018−4.6%
6 Apr 2018−4.0%
13 Apr 2018−14.6%
20 Apr 2018−6.1%
27 Apr 2018−8.6%
4 May 2018−6.3%
11 May 2018−11.5%
18 May 2018−22.5%
25 May 2018−22.2%
1 Jun 2018−19.0%
8 Jun 2018−5.3%
15 Jun 2018−17.3%
22 Jun 2018−16.7%
29 Jun 2018−18.4%
6 Jul 2018−21.0%
13 Jul 2018−21.5%
20 Jul 2018−24.9%
27 Jul 2018−30.7%
3 Aug 2018−29.4%
10 Aug 2018−22.8%
17 Aug 2018−21.0%
24 Aug 2018−19.9%
31 Aug 2018−9.3%
7 Sep 2018−9.3%
14 Sep 2018−7.3%
21 Sep 2018−3.5%
28 Sep 2018−9.5%
5 Oct 2018−36.2%
12 Oct 2018−33.2%
19 Oct 2018−29.8%
26 Oct 2018−32.7%
2 Nov 2018−26.6%
9 Nov 2018−22.6%
16 Nov 2018−25.3%
22 Nov 2018−28.8%
30 Nov 2018−40.1%
7 Dec 2018−46.2%
14 Dec 2018−49.1%
21 Dec 2018−40.7%
28 Dec 2018−35.3%
4 Jan 2019−8.7%
11 Jan 2019−10.9%
18 Jan 2019−11.8%
25 Jan 2019−5.9%
1 Feb 2019−23.6%
8 Feb 2019−20.7%
15 Feb 2019−19.5%
22 Feb 2019−6.9%
1 Mar 2019+4.1%
8 Mar 2019+31.4%
15 Mar 2019+42.7%
22 Mar 2019+10.6%
29 Mar 2019+15.2%
5 Apr 2019+14.2%
12 Apr 2019+4.8%
18 Apr 2019+2.4%
26 Apr 2019−0.7%
3 May 2019+21.8%
10 May 2019−0.4%
17 May 2019+9.8%
24 May 2019+14.0%
31 May 2019+1.8%
7 Jun 2019−5.5%
14 Jun 2019−10.6%
21 Jun 2019−4.2%
28 Jun 2019−0.7%
5 Jul 2019+1.8%
12 Jul 2019+3.1%
19 Jul 2019+5.1%
26 Jul 2019+13.6%
2 Aug 2019−2.9%
9 Aug 2019+3.4%
16 Aug 2019+8.1%
23 Aug 2019−15.8%
30 Aug 2019−14.4%
6 Sep 2019−17.8%
13 Sep 2019−7.9%
20 Sep 2019−10.3%
27 Sep 2019−11.8%
4 Oct 2019−12.3%
11 Oct 2019+1.1%
18 Oct 2019+15.0%
27 Oct 2019+7.5%
1 Nov 2019+18.3%
8 Nov 2019+14.7%
15 Nov 2019+7.7%
22 Nov 2019+31.0%
29 Nov 2019+24.9%
6 Dec 2019+4.1%
13 Dec 2019−3.4%
20 Dec 2019−1.9%
27 Dec 2019−5.4%
3 Jan 2020+10.6%
10 Jan 2020+2.5%
17 Jan 2020−9.2%
24 Jan 2020−1.9%
1 Feb 2020−9.0%
7 Feb 2020−10.7%
14 Feb 2020−10.4%
20 Feb 2020−16.8%
28 Feb 2020−15.8%
6 Mar 2020−1.8%
13 Mar 2020−3.3%
20 Mar 2020−7.5%
27 Mar 2020−9.3%
3 Apr 2020−24.5%
9 Apr 2020−20.7%
17 Apr 2020−19.6%
24 Apr 2020−28.5%
30 Apr 2020−21.4%
8 May 2020−26.3%
15 May 2020−18.0%
22 May 2020−22.7%
29 May 2020−24.8%
5 Jun 2020−16.9%
12 Jun 2020−24.4%
19 Jun 2020−10.8%
26 Jun 2020−6.0%
3 Jul 2020+10.4%
10 Jul 2020+2.0%
17 Jul 2020−10.4%
24 Jul 2020−0.1%
31 Jul 2020+0.5%
7 Aug 2020+6.2%
14 Aug 2020−4.8%
21 Aug 2020+20.5%
28 Aug 2020+32.9%
4 Sep 2020+7.0%
11 Sep 2020+4.6%
18 Sep 2020+7.2%
25 Sep 2020−1.5%
1 Oct 2020−1.6%
9 Oct 2020−1.7%
16 Oct 2020+6.7%
23 Oct 2020+14.0%
30 Oct 2020−0.2%
6 Nov 2020+0.9%
14 Nov 2020−4.7%
20 Nov 2020−6.4%
27 Nov 2020−15.0%
4 Dec 2020+4.1%
11 Dec 2020+7.0%
18 Dec 2020−2.5%
24 Dec 2020+0.7%
1 Jan 2021+2.9%
8 Jan 2021+10.0%
15 Jan 2021+12.3%
22 Jan 2021+16.0%
29 Jan 2021+17.7%
5 Feb 2021+39.2%
12 Feb 2021+54.2%
19 Feb 2021+53.9%
26 Feb 2021+42.6%
5 Mar 2021+23.8%
12 Mar 2021+36.6%
19 Mar 2021+34.2%
26 Mar 2021+52.7%
1 Apr 2021+38.9%
9 Apr 2021+26.4%
16 Apr 2021+21.7%
23 Apr 2021+16.7%
30 Apr 2021+23.0%
7 May 2021+2.3%
14 May 2021−7.6%
21 May 2021−12.5%
28 May 2021−11.0%
4 Jun 2021−10.9%
11 Jun 2021−9.5%
18 Jun 2021−9.5%
25 Jun 2021−17.8%
2 Jul 2021−13.3%
9 Jul 2021−6.7%
16 Jul 2021+10.5%
23 Jul 2021+10.8%
30 Jul 2021+8.0%
6 Aug 2021+9.0%
13 Aug 2021+8.7%
20 Aug 2021+1.7%
27 Aug 2021+0.3%
3 Sep 2021+3.7%
9 Sep 2021−11.3%
17 Sep 2021−9.3%
24 Sep 2021−12.7%
1 Oct 2021−11.9%
8 Oct 2021−19.9%
14 Oct 2021−34.7%
22 Oct 2021−38.9%
29 Oct 2021−41.1%
4 Nov 2021−31.4%
12 Nov 2021−25.0%
18 Nov 2021−22.4%
26 Nov 2021−14.0%
3 Dec 2021−20.4%
10 Dec 2021−12.4%
17 Dec 2021−14.0%
24 Dec 2021−10.9%
31 Dec 2021−14.2%
7 Jan 2022−10.7%
14 Jan 2022−0.5%
21 Jan 2022+10.9%
28 Jan 2022+11.4%
4 Feb 2022+9.5%
11 Feb 2022+2.3%
18 Feb 2022+3.6%
25 Feb 2022−1.4%
4 Mar 2022+3.7%
11 Mar 2022+2.1%
17 Mar 2022+3.1%
25 Mar 2022+2.3%
1 Apr 2022+6.5%
8 Apr 2022+18.2%
13 Apr 2022+18.4%
22 Apr 2022+20.5%
29 Apr 2022+33.8%
6 May 2022+35.8%
13 May 2022+30.9%
20 May 2022+38.5%
27 May 2022+45.3%
3 Jun 2022+58.3%
10 Jun 2022+79.6%
17 Jun 2022+75.0%
24 Jun 2022+82.9%
1 Jul 2022+80.0%
8 Jul 2022+71.3%
15 Jul 2022+58.9%
22 Jul 2022+63.0%
29 Jul 2022+52.8%
5 Aug 2022+26.8%
12 Aug 2022+31.1%
19 Aug 2022+22.7%
26 Aug 2022+22.5%
2 Sep 2022+3.4%
9 Sep 2022−13.7%
16 Sep 2022−11.7%
23 Sep 2022−11.4%
30 Sep 2022−5.9%
7 Oct 2022−12.7%
14 Oct 2022−23.2%
21 Oct 2022−40.8%
28 Oct 2022−27.5%
4 Nov 2022−16.1%
11 Nov 2022−13.8%
18 Nov 2022−11.0%
25 Nov 2022−13.8%
2 Dec 2022−7.2%
9 Dec 2022−11.2%
16 Dec 2022−3.8%
23 Dec 2022−18.1%
30 Dec 2022−12.4%
6 Jan 2023−8.8%
13 Jan 2023+4.0%
20 Jan 2023+25.2%
27 Jan 2023+8.3%
3 Feb 2023−0.9%
10 Feb 2023+1.7%
17 Feb 2023−4.2%
24 Feb 2023+2.3%
3 Mar 2023−1.9%
10 Mar 2023+5.5%
17 Mar 2023−7.7%
24 Mar 2023+3.8%
31 Mar 2023−2.1%
6 Apr 2023−5.3%
13 Apr 2023−3.0%
21 Apr 2023−1.4%
28 Apr 2023−1.1%
5 May 2023+5.4%
12 May 2023−2.5%
19 May 2023−0.7%
26 May 2023−6.6%
2 Jun 2023−5.4%
9 Jun 2023−2.5%
16 Jun 2023+17.6%
23 Jun 2023+10.4%
30 Jun 2023+5.4%
7 Jul 2023+8.0%
14 Jul 2023+9.2%
21 Jul 2023+13.5%
28 Jul 2023+14.9%
4 Aug 2023+22.3%
11 Aug 2023+40.7%
18 Aug 2023+37.5%
25 Aug 2023+45.0%
1 Sep 2023+51.9%
8 Sep 2023+35.4%
15 Sep 2023+22.1%
22 Sep 2023+29.3%
29 Sep 2023+40.6%
6 Oct 2023+38.1%
13 Oct 2023+34.7%
20 Oct 2023+34.3%
27 Oct 2023+22.0%
3 Nov 2023+13.0%
12 Nov 2023+3.1%
17 Nov 2023+4.9%
24 Nov 2023−1.7%
1 Dec 2023−6.5%
8 Dec 2023−0.3%
15 Dec 2023+11.4%
22 Dec 2023+11.4%
29 Dec 2023+20.4%
5 Jan 2024+20.2%
12 Jan 2024+22.3%
20 Jan 2024+12.8%
25 Jan 2024+27.0%
2 Feb 2024+40.1%
9 Feb 2024+36.8%
16 Feb 2024+35.7%
23 Feb 2024+51.1%
2 Mar 2024+47.0%
7 Mar 2024+40.8%
15 Mar 2024+18.4%
22 Mar 2024+22.1%
28 Mar 2024+2.9%
5 Apr 2024+1.9%
12 Apr 2024+2.8%
19 Apr 2024+0.9%
26 Apr 2024+1.6%
3 May 2024−0.9%
10 May 2024−8.0%
18 May 2024−6.9%
24 May 2024−7.9%
31 May 2024+9.2%
7 Jun 2024+12.3%
14 Jun 2024+24.3%
21 Jun 2024+28.9%
28 Jun 2024+20.7%
5 Jul 2024+34.5%
12 Jul 2024+24.8%
19 Jul 2024+20.3%
26 Jul 2024+18.4%
2 Aug 2024+13.9%
9 Aug 2024+24.4%
16 Aug 2024+25.5%
23 Aug 2024+16.7%
30 Aug 2024−0.2%
6 Sep 2024−8.1%
13 Sep 2024−13.4%
20 Sep 2024−22.0%
27 Sep 2024−12.6%
4 Oct 2024−19.8%
11 Oct 2024−16.5%
18 Oct 2024−9.0%
25 Oct 2024−14.3%
1 Nov 2024−6.7%
8 Nov 2024−6.0%
14 Nov 2024−12.6%
22 Nov 2024−15.4%
29 Nov 2024−8.6%
6 Dec 2024+0.2%
13 Dec 2024+2.7%
20 Dec 2024+7.0%
27 Dec 2024+5.7%
3 Jan 2025+8.3%
10 Jan 2025+9.2%
17 Jan 2025+2.9%
24 Jan 2025+7.5%
1 Feb 2025−3.2%
7 Feb 2025+5.9%
14 Feb 2025+4.7%
21 Feb 2025+8.5%
28 Feb 2025+1.5%
7 Mar 2025−0.3%
13 Mar 2025−3.1%
21 Mar 2025−4.9%
28 Mar 2025−11.7%
4 Apr 2025−3.2%
11 Apr 2025−5.4%
17 Apr 2025−7.1%
25 Apr 2025−10.4%
2 May 2025−14.3%
9 May 2025−24.9%
16 May 2025−9.4%
23 May 2025−4.4%
30 May 2025−7.4%
6 Jun 2025−8.4%
13 Jun 2025−0.1%
20 Jun 2025−4.0%
27 Jun 2025+3.5%
4 Jul 2025−9.7%
11 Jul 2025−7.2%
18 Jul 2025+0.8%
25 Jul 2025+5.7%
1 Aug 2025+7.9%
8 Aug 2025+8.7%
14 Aug 2025−5.3%
22 Aug 2025−10.5%
29 Aug 2025−13.0%
5 Sep 2025−12.1%
12 Sep 2025−16.9%
19 Sep 2025−8.2%
26 Sep 2025−11.2%
3 Oct 2025−8.6%
10 Oct 2025−10.0%
17 Oct 2025−16.6%
24 Oct 2025−17.0%
31 Oct 2025−10.0%
7 Nov 2025−15.4%
14 Nov 2025−11.5%
21 Nov 2025−12.0%
28 Nov 2025−8.9%
5 Dec 2025−11.8%
12 Dec 2025−10.3%
19 Dec 2025−17.4%
26 Dec 2025−11.8%
2 Jan 2026−10.4%
9 Jan 2026−10.0%
16 Jan 2026−6.3%
23 Jan 2026−7.8%
1 Feb 2026−13.0%
6 Feb 2026−7.6%
13 Feb 2026−8.5%
20 Feb 2026−7.4%
27 Feb 2026−4.3%
6 Mar 2026−12.3%
13 Mar 2026−5.7%
20 Mar 2026−2.5%
27 Mar 2026−10.2%
17 Apr 2026−9.5%
24 Apr 2026−7.8%
30 Apr 2026−8.2%
8 May 2026−5.9%
15 May 2026−9.0%
22 May 2026−10.0%
29 May 2026−5.4%
4 Jun 2026−6.0%
5 Jun 2026−8.8%
10 Jun 2026−1.2%
12 Jun 2026−10.2%
17 Jun 2026−6.9%
19 Jun 2026+1.5%
24 Jun 2026−3.4%
25 Jun 2026−3.3%
1 Jul 2026−6.4%
3 Jul 2026−6.9%
10 Jul 2026−2.2%
17 Jul 2026−0.5%
24 Jul 2026−4.5%
31 Jul 2026−6.4%
7 Aug 2026−2.3%
14 Aug 2026+1.7%
21 Aug 2026+6.2%
28 Aug 2026−0.1%
4 Sep 2026−3.0%
11 Sep 2026−4.5%
18 Sep 2026−2.2%
25 Sep 2026−0.4%
1 Oct 2026−0.3%
9 Oct 2026−7.5%
16 Oct 2026−6.9%
23 Oct 2026−6.8%
30 Oct 2026−9.2%
4 Nov 2026−8.0%
Each bar is one week, from 2016 to now (547 weeks with a reading). Green means the stock's return over the previous 13 weeks beat the NIFTY 500; red means it trailed. The colour is strongest at a gap of 25 percentage points or more. A gap means there is no reading for that week.

Over the last 11 years the share price moved +33% while the NIFTY 500 moved +251%, so it is behind the index over that whole period. It was last ahead over 13 weeks in the week of 21 August 2026. The chart above shows the 13-week comparison for every week.

This page treats a rise as over when the price closes below its 200-day average on two Fridays in a row.

What are J Kumar Infraprojects' latest quarterly results?

For April to June 2026 (the quarter ended 30 June 2026), J Kumar Infraprojects reported revenue of ₹1,511 crore, up 1.8% from ₹1,484 crore a year earlier, and a profit of ₹97.0 crore, down 5.8% from ₹103 crore.

J Kumar Infraprojects results: April to June 2026 against a year earlier

J Kumar Infraprojects results: April to June 2026 against a year earlier
MeasureApril to June 2026April to June 2025Change
Revenue₹1,511 crore₹1,484 crore+1.8%
Profit₹97.0 crore₹103 crore−5.8%
Earnings per share₹12.89₹13.66−5.6%
Operating margin14.0%15.0%−1.0 points

The next results, for July to September 2026, are due by 14 November 2026: listed companies must publish quarterly results within 45 days of the quarter's end (60 days for the January to March quarter).

J Kumar Infraprojects' management discussed these results on a call held on 7 August 2026; what it said is further down this page.

From the company's reported quarterly results (quarter ended 30 June 2026). Revenue and profit in ₹ crore.

What is the J Kumar Infraprojects share price history?

J Kumar Infraprojects closed at ₹421.00 on 4 November 2026, down 32.1% from ₹619.60 a year earlier (7 November 2025) and up 151.0% over five years. Its highest weekly close since March 2016 was ₹903.30 on 5 July 2024.

J Kumar Infraprojects share price: then and now

J Kumar Infraprojects share price: then and now
WhenCloseChange to 4 Nov 2026
1 week ago · 30 Oct 2026₹405.65+3.8%
1 month ago · 1 Oct 2026₹461.85−8.8%
6 months ago · 8 May 2026₹511.65−17.7%
1 year ago · 7 Nov 2025₹619.60−32.1%
3 years ago · 3 Nov 2023₹424.15−0.7%
5 years ago · 4 Nov 2021₹167.70+151.0%
10 years ago · 4 Nov 2016₹189.90+121.7%
Earliest weekly close in our records · 11 Mar 2016₹317.10+32.8%
Highest weekly close since March 2016 · 5 Jul 2024₹903.30−53.4%
Lowest weekly close since March 2016 · 8 May 2020₹74.10+468.2%
52-week high (weekly close) · 7 Nov 2025₹619.60−32.1%
52-week low (weekly close) · 30 Oct 2026₹405.65+3.8%

Weekly closing prices. Each change is the move from that price to the 4 Nov 2026 close. A day's intraday high or low can go beyond these weekly closes.

560 weekly closes from 11 March 2016 to 4 November 2026.

What is the latest news on J Kumar Infraprojects?

4 Nov 2026: J Kumar Infraprojects closed at ₹421.00, up 3.8% on the week and down 8.8% on the month. 15 Sep 2026: ex-date for a dividend of ₹4 a share.

Earlier

  • 7 Aug 2026: J Kumar Infraprojects held its results call for April to June 2026. Management guided: FY27 revenue growth of 15%, near ₹6,500 crore.
  • Results for April to June 2026: Revenue up 1.8% and profit down 5.8% on a year earlier.

What dividend does J Kumar Infraprojects pay?

J Kumar Infraprojects paid ₹4 a share in regular dividends in the 12 months to 5 November 2026 (1 payment), a yield of 0.95% at the ₹421.00 close on 4 November 2026. The last was a dividend of ₹4 a share, ex-date 15 September 2026.

J Kumar Infraprojects dividends since 1 April 2021

J Kumar Infraprojects dividends since 1 April 2021
Ex-dateDividend per shareType
15 Sep 2026Dividend₹4Dividend
16 Sep 2025Dividend₹4Dividend
17 Sep 2024Dividend₹4Dividend
14 Sep 2023Dividend₹3.50Dividend
8 Sep 2022Dividend₹3Dividend
13 Sep 2021Dividend₹1Dividend

Amounts as the company declared them on the NSE. A dividend goes to whoever owns the shares before the ex-date. The record date is the same day as the ex-date for every payment here.

5 of 5Of the last 5 financial years, years with an NSE dividend record

Yes. J Kumar Infraprojects Ltd paid out 8% of its profit as dividends in FY26, and it paid a dividend in each of its last 6 reported years.

From the NSE corporate-actions record, read 5 November 2026.

What did J Kumar Infraprojects management say on the latest results call?

On the call for April to June 2026, held on 7 August 2026, J Kumar Infraprojects' management guided: FY27 revenue growth of 15%, near ₹6,500 crore.

“Our company's philosophy is that unless we make margins, we do not want growth. We do not want to become a hollow company with no margins, doing only top-line work and presenting a rosy picture to everyone.”Kamal Gupta, on the call for April to June 2026

What management guided

  • FY27 order inflow of ₹8,000-10,000 crore; DMRC L1 conversion expected in Q2; addressable bid opportunities of ₹50,000 crore-₹1 lakh crore over 9-12 months.
  • FY27 operating margin of 14-15%; longer-term path toward 15-16% through a 0.5-1 percentage-point improvement, with timing unspecified.
  • FY28 revenue goal of ₹7,500 crore with similar operating margin.
  • Chennai State package handover by March 2027; four NHAI packages by December 2028; GMLR internal completion goal June 2029 with late-2029 maximum; VCCR on track within 1-2 months.

Management’s own plans and goals, from our notes of the call. A plan is not a result.

Source: the call transcript.

From the call for April to June 2026, 7 August 2026.

What to watch in J Kumar Infraprojects' next results?

When J Kumar Infraprojects reports July to September 2026, these are the 4 checks that show whether the story is still on course. First: Next-quarter revenue should improve, with Vadwan and other new projects building toward the H2 contribution management described.

J Kumar Infraprojects: what to watch next quarter
What to check (from the call)
Next-quarter revenue should improve, with Vadwan and other new projects building toward the H2 contribution management described.
GMLR's first TBM launch and initial drilling should validate the restart narrative; track tunneling progress and second-machine readiness.
VCCR should move fully on track after completed GAD and land acquisition; check mobilisation and early execution.
Vizag land transaction should complete in the indicated quarter range; check cash receipt and realized gain.

Which stock lists is J Kumar Infraprojects on?

J Kumar Infraprojects is on one of our India lists: 52 week high & low.

Is J Kumar Infraprojects profitable?

J Kumar Infraprojects Ltd earned ₹97.0 Cr of net profit in the Jun 2026 quarter, −5.8% on the same quarter a year earlier. Full-year FY26 profit was ₹387 Cr. Over 10 years profit has grown 15.0% a year on average. That is 6.4% of the quarter's revenue. The same quarter a year earlier earned ₹103 Cr.

Net profit is what is left after every cost, interest and tax. Earnings per share, dividends and book value all grow from it.

For the full year, FY26 profit was ₹387 Cr (−1.0% on the year before).

FY26 profit ₹387 Cr (−1.0% on the year before), 15.0% a year over 10 years

  • Net profit ₹387
FY26 profit ₹387 Cr (−1.0% on the year before), 15.0% a year over 10 years
QuarterNet profit
FY16₹96
FY17₹106
FY23₹274
FY24₹331
FY25₹391
FY26₹387

Growth on a year earlier

  • Growth on a year earlier −1%
Growth on a year earlier
QuarterGrowth on a year earlier
FY16–
FY1710.4%
FY23158.5%
FY2420.8%
FY2518.1%
FY26−1%
Top: net profit each year, ₹ Cr. Below: growth on the year before, %. 6-year window. A grey bar is lower than the year before.

Jun 2026: ₹97.0 Cr (−5.8% on a year earlier)

  • Net profit (quarterly) ₹97.0
Jun 2026: ₹97.0 Cr (−5.8% on a year earlier)
QuarterNet profit (quarterly)
Sep 2023₹73
Dec 2023₹83
Mar 2024₹102
Jun 2024₹87
Sep 2024₹90
Dec 2024₹100
Mar 2025₹114
Jun 2025₹103
Sep 2025₹91
Dec 2025₹83
Mar 2026₹110
Jun 2026₹97

Growth on a year earlier

  • Growth on a year earlier −5.8%
Growth on a year earlier
QuarterGrowth on a year earlier
Sep 20237.4%
Dec 202316.9%
Mar 202437.8%
Jun 202419.2%
Sep 202423.3%
Dec 202420.5%
Mar 202511.8%
Jun 202518.4%
Sep 20251.1%
Dec 2025−17%
Mar 2026−3.5%
Jun 2026−5.8%
Top: net profit each quarter, ₹ Cr. Below: growth on the same quarter a year earlier, %. Last 12 quarters. A grey bar is lower than the quarter before.

Why profit moved: revenue changed +1.8% on a year earlier and the margin moved −1.0 percentage points. Sales did the work, and the margin was about flat.

On average over the last four quarters, profit changed −6.3% and revenue −2.3%. Profit is growing slower than sales: rising costs are taking part of the growth.

How much revenue does J Kumar Infraprojects make, and is it growing?

J Kumar Infraprojects Ltd reported ₹1,511 Cr of revenue in the Jun 2026 quarter, +1.8% on the same quarter a year earlier. Over 10 years it has grown 14.3% a year on average. The last full year, FY26, came in at ₹5,723 Cr. The last four reported quarters add to ₹5,750 Cr.

Revenue is everything the company billed its customers in the period.

FY26 revenue was ₹5,723 Cr, +0.5% on the year before.

FY26 revenue ₹5,723 Cr (+0.5% on the year before), 14.3% a year over 10 years

  • Revenue ₹5,723
FY26 revenue ₹5,723 Cr (+0.5% on the year before), 14.3% a year over 10 years
QuarterRevenue
FY16₹1,508
FY17₹1,573
FY23₹4,203
FY24₹4,879
FY25₹5,693
FY26₹5,723

Growth on a year earlier

  • Growth on a year earlier 0.5%
Growth on a year earlier
QuarterGrowth on a year earlier
FY16–
FY174.3%
FY23167.2%
FY2416.1%
FY2516.7%
FY260.5%
Top: revenue each year, ₹ Cr. Below: growth on the year before, %. 6-year window. A grey bar is lower than the year before.

Jun 2026: ₹1,511 Cr (+1.8% on a year earlier)

  • Revenue (quarterly) ₹1,511
Jun 2026: ₹1,511 Cr (+1.8% on a year earlier)
QuarterRevenue (quarterly)
Sep 2023₹1,104
Dec 2023₹1,219
Mar 2024₹1,425
Jun 2024₹1,282
Sep 2024₹1,292
Dec 2024₹1,487
Mar 2025₹1,633
Jun 2025₹1,484
Sep 2025₹1,343
Dec 2025₹1,311
Mar 2026₹1,585
Jun 2026₹1,511

Growth on a year earlier

  • Growth on a year earlier 1.8%
Growth on a year earlier
QuarterGrowth on a year earlier
Sep 20239%
Dec 202314.8%
Mar 202425.7%
Jun 202413.4%
Sep 202417%
Dec 202422%
Mar 202514.6%
Jun 202515.8%
Sep 20253.9%
Dec 2025−11.8%
Mar 2026−2.9%
Jun 20261.8%
Top: revenue each quarter, ₹ Cr. Below: growth on the same quarter a year earlier, %. Last 12 quarters. A grey bar is lower than the quarter before.

Recent pace: the last four quarters grew −2.3% on average, against 14.3% a year over the longer run, so this year is growing slower than its own long-run rate.

Is growth speeding up? Revenue over the last 12 months grew −2.5%, against +6.9% a year over the last 8 quarters (rolling over); profit over the last 12 months grew −6.4%, against +5.1% a year (rolling over).

How much of every ₹100 of sales does J Kumar Infraprojects keep?

J Kumar Infraprojects Ltd's operating margin was 14.0% in the Jun 2026 quarter, 1.0 percentage points lower than the same quarter a year ago. Across 6 years it has been between 14.0% and 16.0%. The latest quarter is within that range.

Operating margin is what is left from every ₹100 of sales after the costs of running the business, before interest and tax. It shows pricing power and cost control.

Why the margin moved: operating margin changed −0.4 percentage points on the year while gross margin changed −0.1 points. So the drop came mostly from costs below the gross margin, such as staff and overheads, measured against sales.

FY26: 14.0%, within a range of 14.0% to 16.0% over 6 years

  • Operating margin 14.0%
FY26: 14.0%, within a range of 14.0% to 16.0% over 6 years
QuarterOperating margin
FY1616%
FY1716%
FY2314%
FY2414%
FY2515%
FY2614%

Change on the year before (points)

  • Change on the year before (points) −1.0 pts
Change on the year before (points)
QuarterChange on the year before (points)
FY16–
FY170.0 pts
FY23−2.0 pts
FY240.0 pts
FY25+1.0 pts
FY26−1.0 pts
Operating margin each year, % (top). Below: change on the year before, in percentage points. 6-year window.

Jun 2026: operating margin 14.0% (−1.0 points on a year earlier)

  • Operating margin 14.0%
Jun 2026: operating margin 14.0% (−1.0 points on a year earlier)
QuarterOperating margin
Sep 202314%
Dec 202315%
Mar 202414%
Jun 202414%
Sep 202415%
Dec 202415%
Mar 202514%
Jun 202515%
Sep 202514%
Dec 202514%
Mar 202614%
Jun 202614%

Change on a year earlier (points)

  • Change on a year earlier (points) −1.0 pts
Change on a year earlier (points)
QuarterChange on a year earlier (points)
Sep 2023–
Dec 2023–
Mar 20240.0 pts
Jun 20240.0 pts
Sep 2024+1.0 pts
Dec 20240.0 pts
Mar 20250.0 pts
Jun 2025+1.0 pts
Sep 2025−1.0 pts
Dec 2025−1.0 pts
Mar 20260.0 pts
Jun 2026−1.0 pts
Top: quarterly operating margin, %. Below: change on the same quarter a year earlier, in percentage points. Last 12 quarters. Operating profit as a share of revenue, each quarter.

Is J Kumar Infraprojects' profit turning into cash?

Over the last 3 years, 166% of J Kumar Infraprojects Ltd's reported profit came in as cash from its operations, so the profit is backed by cash. In FY26 it brought in ₹1,128 Cr of operating cash against ₹387 Cr of profit. After ₹479 Cr of spending on assets, ₹649 Cr was left over as free cash.

The profit and loss account shows what was earned. The cash-flow statement shows the cash that actually came in. Comparing operating cash flow with profit is one of the best checks that a profit is real.

Cash-flow figures here are yearly, because quarterly cash statements are not published, so this section changes once a year.

FY26: operating cash ₹1,128 Cr against profit ₹387 Cr; 166% of 3 years' profit came in as cash

  • Operating cash ₹1,128
  • Net profit ₹387
  • Free cash ₹649
FY26: operating cash ₹1,128 Cr against profit ₹387 Cr; 166% of 3 years' profit came in as cash
QuarterOperating cashNet profitFree cash
FY16₹75₹96–
FY17₹268₹106₹128
FY23₹220₹274–
FY24₹339₹331₹121
FY25₹376₹391₹7
FY26₹1,128₹387₹649
Operating cash flow and net profit each year, ₹ Cr. The line is free cash flow: operating cash minus spending on assets. 6-year window, yearly figures.

FY26: operating cash was 291% of profit (166% over three years)

  • Operating cash as % of profit 291%
  • Break-even line 100%
FY26: operating cash was 291% of profit (166% over three years)
QuarterOperating cash as % of profitBreak-even line
FY1678%100%
FY17253%100%
FY2380%100%
FY24102%100%
FY2596%100%
FY26291%100%
Operating cash as a share of net profit, each year, % (line). The flat line marks 100%, meaning all of the profit came in as cash.

Why 166% of profit came in as cash: the cash cycle got 182 days shorter between FY16 and FY26, so cash that used to wait in the business now arrives sooner.

What to look at next: the bigger use of cash is spending on new assets, at 2.0× depreciation over three years. The next section checks what that spending is building.

Where does J Kumar Infraprojects' cash go?

J Kumar Infraprojects Ltd's cash cycle, the days between paying suppliers and getting paid by customers, was 44 days in FY26, down from 226 days in FY16. It spent ₹1,066 Cr on assets over the last 3 years. Customers take 95 days to pay, and stock sits for 32 days on average.

Working capital is the cash tied up between paying suppliers and getting paid. Debtor days: how long customers take to pay. Inventory days: how long stock sits. The cash cycle: the whole loop, in days of sales.

At FY26 sales of ₹5,723 Cr, each day of that cycle ties up about ₹15.7 Cr, so roughly ₹690 Cr is tied up in the business at any time.

FY26: customers took 95 days to pay and stock sat for 32 days, about 1.1 months of sales sitting as stock, for a full cycle of 44 days, shorter than FY16's 226.

The full loop: cash goes out to suppliers and production on day 0. Stock sits for 32 days. Customers pay about 95 days after that. Suppliers are paid at 83 days. Together that makes the 44-day cycle.

FY26: a 44-day cash cycle, −182 days compared with FY16

  • Cash cycle 44d
  • Inventory days 32d
  • Debtor days 95d
  • Payable days 83d
FY26: a 44-day cash cycle, −182 days compared with FY16
QuarterCash cycleInventory daysDebtor daysPayable days
FY16226d233d52d59d
FY17300d250d118d68d
FY2368d51d99d83d
FY2477d55d89d68d
FY2563d49d96d82d
FY2644d32d95d83d
Debtor days, inventory days, payable days and the full cash cycle, each year. 6-year window.

Spending on assets: ₹1,066 Cr over the last 3 years, against ₹533 Cr of depreciation (the yearly wear and tear on existing assets). So it is building well beyond replacing what wears out. Work still in progress is ₹295 Cr (FY26): assets paid for that are not earning yet.

FY26: capex ₹479 Cr, work in progress ₹295 Cr, a build-out

  • Capex ₹479
  • Work-in-progress ₹295
FY26: capex ₹479 Cr, work in progress ₹295 Cr, a build-out
QuarterCapexWork-in-progress
FY17₹140₹71
FY24₹218₹111
FY25₹369₹98
FY26₹479₹295
Capital spending each year, ₹ Cr, with work in progress, ₹ Cr, as the line. Quarterly capital-spending figures are not available for India, so this is yearly.

In short: the cash is going into new capacity, not getting stuck in the daily cycle. The question is whether the new capacity earns.

What is J Kumar Infraprojects' P/E ratio, and how does it compare with its own history?

J Kumar Infraprojects Ltd's P/E is 8.2×, near the low end of its own history: it has been lower only 8% of the time. Its usual P/E (the middle reading) is 13.5×, over 9.1 years of weekly prices. This compares the share price with the company’s own past. It does not say what the business is worth.

P/E is the share price divided by a year's profit per share: how many rupees the market pays for each rupee of yearly profit.

The P/E here, and its history, use a profit figure that can leave out one-off items, so it can differ from a P/E worked out on the quarterly results. Those results' earnings per share for the four quarters to Jun 2026 add up to ₹50.32.

P/E 8.2× against a usual 13.5×: near the low end of its own history: it has been lower only 8% of the time

  • P/E 7.90×
  • Median 13.5×
P/E 8.2× against a usual 13.5×: near the low end of its own history: it has been lower only 8% of the time
WeekP/EMedian
6 Oct 201715.7×13.5×
19 Oct 201716.6×13.5×
3 Nov 201718.3×13.5×
17 Nov 201719.0×13.5×
1 Dec 201720.6×13.5×
15 Dec 201722.2×13.5×
29 Dec 201721.6×13.5×
12 Jan 201825.1×13.5×
25 Jan 201823.6×13.5×
9 Feb 201822.8×13.5×
23 Feb 201824.1×13.5×
9 Mar 201820.5×13.5×
23 Mar 201820.4×13.5×
6 Apr 201821.0×13.5×
20 Apr 201820.5×13.5×
4 May 201820.3×13.5×
18 May 201818.1×13.5×
1 Jun 201819.3×13.5×
15 Jun 201818.8×13.5×
29 Jun 201816.4×13.5×
13 Jul 201816.0×13.5×
27 Jul 201815.0×13.5×
10 Aug 201816.4×13.5×
24 Aug 201816.4×13.5×
7 Sep 201818.7×13.5×
21 Sep 201817.2×13.5×
5 Oct 20189.70×13.5×
19 Oct 20189.50×13.5×
2 Nov 20189.80×13.5×
16 Nov 201810.4×13.5×
30 Nov 20189.80×13.5×
14 Dec 20188.60×13.5×
28 Dec 20189.60×13.5×
11 Jan 20199.20×13.5×
25 Jan 20198.30×13.5×
8 Feb 20199.00×13.5×
22 Feb 20199.30×13.5×
8 Mar 201912.0×13.5×
22 Mar 201911.2×13.5×
5 Apr 201911.1×13.5×
18 Apr 20199.80×13.5×
3 May 20199.60×13.5×
17 May 20199.80×13.5×
31 May 201911.3×13.5×
14 Jun 201911.2×13.5×
28 Jun 201911.6×13.5×
12 Jul 201910.3×13.5×
26 Jul 20199.60×13.5×
9 Aug 20199.30×13.5×
23 Aug 20198.80×13.5×
6 Sep 20198.80×13.5×
20 Sep 20199.50×13.5×
4 Oct 20199.40×13.5×
18 Oct 201911.5×13.5×
1 Nov 201911.2×13.5×
15 Nov 201911.5×13.5×
29 Nov 201911.5×13.5×
13 Dec 201910.2×13.5×
27 Dec 20199.80×13.5×
10 Jan 202011.3×13.5×
24 Jan 202011.2×13.5×
7 Feb 202010.7×13.5×
20 Feb 202010.0×13.5×
6 Mar 20208.50×13.5×
20 Mar 20206.00×13.5×
3 Apr 20205.40×13.5×
17 Apr 20206.20×13.5×
30 Apr 20205.70×13.5×
15 May 20206.00×13.5×
29 May 20205.80×13.5×
12 Jun 20206.40×13.5×
26 Jun 20207.00×13.5×
10 Jul 20207.10×13.5×
24 Jul 20206.40×13.5×
7 Aug 20206.80×13.5×
21 Aug 20208.20×13.5×
4 Sep 20208.10×13.5×
18 Sep 20208.00×13.5×
1 Oct 20207.80×13.5×
16 Oct 20207.80×13.5×
30 Oct 20207.40×13.5×
14 Nov 20207.90×13.5×
27 Nov 20208.60×13.5×
11 Dec 20209.80×13.5×
24 Dec 20209.30×13.5×
8 Jan 202110.4×13.5×
22 Jan 202110.5×13.5×
5 Feb 202112.2×13.5×
19 Feb 202114.7×13.5×
5 Mar 202113.8×13.5×
19 Mar 202113.6×13.5×
1 Apr 202114.0×13.5×
16 Apr 202112.9×13.5×
30 Apr 202113.2×13.5×
14 May 202112.8×13.5×
28 May 202112.8×13.5×
11 Jun 202114.2×13.5×
25 Jun 202113.6×13.5×
9 Jul 202114.0×13.5×
23 Jul 202115.7×13.5×
6 Aug 202115.0×13.5×
20 Aug 202114.9×13.5×
3 Sep 202114.9×13.5×
17 Sep 202114.0×13.5×
1 Oct 202113.3×13.5×
14 Oct 202112.7×13.5×
29 Oct 202110.9×13.5×
12 Nov 202112.9×13.5×
26 Nov 202112.3×13.5×
10 Dec 202112.4×13.5×
24 Dec 202111.8×13.5×
7 Jan 202211.9×13.5×
21 Jan 202212.5×13.5×
4 Feb 202212.8×13.5×
18 Feb 202212.6×13.5×
4 Mar 202211.7×13.5×
17 Mar 202212.1×13.5×
1 Apr 202212.4×13.5×
13 Apr 202214.4×13.5×
29 Apr 202215.5×13.5×
13 May 202215.8×13.5×
27 May 202216.8×13.5×
10 Jun 202221.0×13.5×
24 Jun 202220.9×13.5×
8 Jul 202222.1×13.5×
22 Jul 202224.0×13.5×
5 Aug 202222.2×13.5×
19 Aug 202222.3×13.5×
2 Sep 202220.9×13.5×
16 Sep 202221.0×13.5×
30 Sep 202221.7×13.5×
14 Oct 202218.4×13.5×
28 Oct 202218.6×13.5×
11 Nov 202219.7×13.5×
25 Nov 202219.9×13.5×
9 Dec 202219.7×13.5×
23 Dec 202217.9×13.5×
6 Jan 202319.9×13.5×
20 Jan 202319.7×13.5×
3 Feb 202318.6×13.5×
17 Feb 202318.4×13.5×
3 Mar 202318.6×13.5×
17 Mar 202317.5×13.5×
31 Mar 202318.3×13.5×
13 Apr 202318.3×13.5×
28 Apr 202319.6×13.5×
12 May 202319.2×13.5×
26 May 202318.9×13.5×
9 Jun 202320.6×13.5×
23 Jun 202321.4×13.5×
7 Jul 202321.9×13.5×
21 Jul 202324.3×13.5×
4 Aug 202326.7×13.5×
18 Aug 202328.4×13.5×
1 Sep 202330.3×13.5×
15 Sep 202329.4×13.5×
29 Sep 202331.2×13.5×
13 Oct 202330.9×13.5×
27 Oct 202329.9×13.5×
12 Nov 202331.1×13.5×
24 Nov 202330.0×13.5×
8 Dec 202331.8×13.5×
22 Dec 202335.6×13.5×
5 Jan 202440.5×13.5×
20 Jan 202440.5×13.5×
2 Feb 202440.5×13.5×
16 Feb 202440.5×13.5×
2 Mar 202440.5×13.5×
15 Mar 202440.5×13.5×
28 Mar 202440.5×13.5×
12 Apr 202440.5×13.5×
26 Apr 202440.5×13.5×
10 May 202440.5×13.5×
24 May 202440.5×13.5×
7 Jun 202418.2×13.5×
21 Jun 202420.1×13.5×
5 Jul 202420.7×13.5×
19 Jul 202418.6×13.5×
2 Aug 202419.3×13.5×
16 Aug 202418.8×13.5×
30 Aug 202418.7×13.5×
13 Sep 202417.0×13.5×
27 Sep 202417.1×13.5×
11 Oct 202416.1×13.5×
25 Oct 202415.3×13.5×
8 Nov 202415.7×13.5×
22 Nov 202414.4×13.5×
6 Dec 202416.4×13.5×
20 Dec 202415.7×13.5×
3 Jan 202516.1×13.5×
17 Jan 202514.9×13.5×
1 Feb 202515.2×13.5×
14 Feb 202513.8×13.5×
28 Feb 202513.4×13.5×
13 Mar 202513.4×13.5×
28 Mar 202512.7×13.5×
11 Apr 202513.8×13.5×
25 Apr 202513.1×13.5×
9 May 202512.6×13.5×
23 May 202514.0×13.5×
6 Jun 202514.0×13.5×
20 Jun 202513.8×13.5×
4 Jul 202513.9×13.5×
18 Jul 202514.2×13.5×
1 Aug 202512.9×13.5×
14 Aug 202512.4×13.5×
29 Aug 202511.5×13.5×
12 Sep 202511.7×13.5×
26 Sep 202511.6×13.5×
10 Oct 202511.8×13.5×
24 Oct 202511.7×13.5×
7 Nov 202511.5×13.5×
21 Nov 202511.2×13.5×
5 Dec 202510.4×13.5×
19 Dec 202510.3×13.5×
2 Jan 202611.2×13.5×
16 Jan 202610.3×13.5×
1 Feb 202610.5×13.5×
13 Feb 202610.5×13.5×
27 Feb 202610.0×13.5×
13 Mar 20269.30×13.5×
27 Mar 20268.40×13.5×
10 Apr 20268.90×13.5×
24 Apr 20269.70×13.5×
8 May 20269.70×13.5×
22 May 20269.30×13.5×
4 Jun 20269.40×13.5×
10 Jun 20269.00×13.5×
17 Jun 20269.40×13.5×
24 Jun 20269.70×13.5×
1 Jul 20269.40×13.5×
10 Jul 20269.60×13.5×
24 Jul 20269.30×13.5×
7 Aug 20269.70×13.5×
21 Aug 20269.80×13.5×
4 Sep 20269.50×13.5×
18 Sep 20269.50×13.5×
1 Oct 20269.00×13.5×
16 Oct 20268.60×13.5×
30 Oct 20267.90×13.5×

Earnings per share, 12 months

  • Earnings per share, 12 months ₹51
Earnings per share, 12 months
WeekEarnings per share, 12 months
6 Oct 2017–
19 Oct 2017–
3 Nov 2017–
17 Nov 2017–
1 Dec 2017–
15 Dec 2017–
29 Dec 2017₹14
12 Jan 2018₹14
25 Jan 2018₹14
9 Feb 2018₹14
23 Feb 2018₹14
9 Mar 2018₹14
23 Mar 2018₹14
6 Apr 2018₹14
20 Apr 2018₹14
4 May 2018₹14
18 May 2018₹14
1 Jun 2018₹14
15 Jun 2018₹14
29 Jun 2018₹14
13 Jul 2018₹14
27 Jul 2018₹14
10 Aug 2018₹14
24 Aug 2018₹14
7 Sep 2018₹14
21 Sep 2018₹14
5 Oct 2018₹14
19 Oct 2018₹14
2 Nov 2018₹14
16 Nov 2018₹14
30 Nov 2018₹14
14 Dec 2018₹14
28 Dec 2018₹14
11 Jan 2019₹14
25 Jan 2019₹14
8 Feb 2019₹14
22 Feb 2019₹14
8 Mar 2019₹14
22 Mar 2019₹14
5 Apr 2019₹14
18 Apr 2019₹14
3 May 2019₹14
17 May 2019₹14
31 May 2019₹14
14 Jun 2019₹14
28 Jun 2019₹14
12 Jul 2019₹14
26 Jul 2019₹14
9 Aug 2019₹14
23 Aug 2019₹14
6 Sep 2019₹14
20 Sep 2019₹14
4 Oct 2019₹14
18 Oct 2019₹14
1 Nov 2019₹14
15 Nov 2019₹14
29 Nov 2019₹14
13 Dec 2019₹14
27 Dec 2019₹14
10 Jan 2020₹14
24 Jan 2020₹14
7 Feb 2020₹14
20 Feb 2020₹14
6 Mar 2020₹14
20 Mar 2020₹14
3 Apr 2020₹14
17 Apr 2020₹14
30 Apr 2020₹14
15 May 2020₹14
29 May 2020₹14
12 Jun 2020₹14
26 Jun 2020₹14
10 Jul 2020₹14
24 Jul 2020₹14
7 Aug 2020₹14
21 Aug 2020₹14
4 Sep 2020₹14
18 Sep 2020₹14
1 Oct 2020₹14
16 Oct 2020₹14
30 Oct 2020₹14
14 Nov 2020₹14
27 Nov 2020₹14
11 Dec 2020₹14
24 Dec 2020₹14
8 Jan 2021₹14
22 Jan 2021₹14
5 Feb 2021₹14
19 Feb 2021₹14
5 Mar 2021₹14
19 Mar 2021₹14
1 Apr 2021₹14
16 Apr 2021₹14
30 Apr 2021₹14
14 May 2021₹14
28 May 2021₹14
11 Jun 2021₹14
25 Jun 2021₹14
9 Jul 2021₹14
23 Jul 2021₹14
6 Aug 2021₹14
20 Aug 2021₹14
3 Sep 2021₹14
17 Sep 2021₹14
1 Oct 2021₹14
14 Oct 2021₹14
29 Oct 2021₹14
12 Nov 2021₹14
26 Nov 2021₹14
10 Dec 2021₹14
24 Dec 2021₹14
7 Jan 2022₹14
21 Jan 2022₹14
4 Feb 2022₹14
18 Feb 2022₹14
4 Mar 2022₹14
17 Mar 2022₹14
1 Apr 2022₹14
13 Apr 2022₹14
29 Apr 2022₹14
13 May 2022₹14
27 May 2022₹14
10 Jun 2022₹14
24 Jun 2022₹14
8 Jul 2022₹14
22 Jul 2022₹14
5 Aug 2022₹14
19 Aug 2022₹14
2 Sep 2022₹14
16 Sep 2022₹14
30 Sep 2022₹14
14 Oct 2022₹14
28 Oct 2022₹14
11 Nov 2022₹14
25 Nov 2022₹14
9 Dec 2022₹14
23 Dec 2022₹14
6 Jan 2023₹14
20 Jan 2023₹14
3 Feb 2023₹14
17 Feb 2023₹14
3 Mar 2023₹14
17 Mar 2023₹14
31 Mar 2023₹14
13 Apr 2023₹14
28 Apr 2023₹14
12 May 2023₹14
26 May 2023₹14
9 Jun 2023₹14
23 Jun 2023₹14
7 Jul 2023₹14
21 Jul 2023₹14
4 Aug 2023₹14
18 Aug 2023₹14
1 Sep 2023₹14
15 Sep 2023₹14
29 Sep 2023₹14
13 Oct 2023₹14
27 Oct 2023₹14
12 Nov 2023₹14
24 Nov 2023₹14
8 Dec 2023₹14
22 Dec 2023₹14
5 Jan 2024₹14
20 Jan 2024₹14
2 Feb 2024₹14
16 Feb 2024₹14
2 Mar 2024₹14
15 Mar 2024₹14
28 Mar 2024₹14
12 Apr 2024₹14
26 Apr 2024₹14
10 May 2024₹14
24 May 2024₹14
7 Jun 2024₹14
21 Jun 2024₹44
5 Jul 2024₹44
19 Jul 2024₹44
2 Aug 2024₹44
16 Aug 2024₹44
30 Aug 2024₹44
13 Sep 2024₹44
27 Sep 2024₹46
11 Oct 2024₹46
25 Oct 2024₹46
8 Nov 2024₹46
22 Nov 2024₹46
6 Dec 2024₹46
20 Dec 2024₹46
3 Jan 2025₹48
17 Jan 2025₹48
1 Feb 2025₹48
14 Feb 2025₹48
28 Feb 2025₹48
13 Mar 2025₹48
28 Mar 2025₹50
11 Apr 2025₹50
25 Apr 2025₹50
9 May 2025₹50
23 May 2025₹50
6 Jun 2025₹50
20 Jun 2025₹52
4 Jul 2025₹52
18 Jul 2025₹52
1 Aug 2025₹52
14 Aug 2025₹52
29 Aug 2025₹52
12 Sep 2025₹52
26 Sep 2025₹54
10 Oct 2025₹54
24 Oct 2025₹54
7 Nov 2025₹54
21 Nov 2025₹54
5 Dec 2025₹54
19 Dec 2025₹54
2 Jan 2026₹54
16 Jan 2026₹54
1 Feb 2026₹54
13 Feb 2026₹54
27 Feb 2026₹54
13 Mar 2026₹54
27 Mar 2026₹53
10 Apr 2026₹53
24 Apr 2026₹53
8 May 2026₹53
22 May 2026₹53
4 Jun 2026₹53
10 Jun 2026₹53
17 Jun 2026₹53
24 Jun 2026₹52
1 Jul 2026₹52
10 Jul 2026₹52
24 Jul 2026₹52
7 Aug 2026₹52
21 Aug 2026₹52
4 Sep 2026₹52
18 Sep 2026₹52
1 Oct 2026₹52
16 Oct 2026₹52
30 Oct 2026₹51
Top: P/E each week. Below: earnings per share, trailing twelve months, leaving out one-off items, a step line that moves once a quarter; 9.1 years of history; short peaks above 41× are drawn at the top edge.

PEG 0.67: below 1.0, so the P/E is smaller than the earnings growth rate

  • PEG 0.67×
  • PEG = 1.0 1.00×
PEG 0.67: below 1.0, so the P/E is smaller than the earnings growth rate
QuarterPEGPEG = 1.0
Q1 FY220.67×1.00×
Q2 FY220.67×1.00×
Q3 FY220.67×1.00×
Q4 FY220.67×1.00×
Q1 FY230.67×1.00×
Q2 FY230.67×1.00×
Q3 FY230.67×1.00×
Q4 FY230.67×1.00×
Q1 FY240.67×1.00×
Q2 FY240.67×1.00×
Q3 FY240.67×1.00×
Q4 FY240.67×1.00×
Q1 FY250.67×1.00×
Q2 FY250.67×1.00×
Q3 FY250.67×1.00×
Q4 FY250.67×1.00×
Q1 FY260.67×1.00×
Q2 FY260.67×1.00×
Q3 FY260.67×1.00×
Q4 FY260.67×1.00×
Q1 FY270.67×1.00×
PEG each quarter: the P/E divided by the yearly growth rate of earnings. The flat line marks 1.0. Below it the P/E is smaller than the growth rate; above it the P/E is bigger. Last 21 quarters.
8.2×P/E · lower than 92% of its last 9.1 years
0.52PEG · today, derived from 3-year earnings growth

Why the multiple is where it is: over the past year earnings per share moved −1.2% while the price moved −32.1%. Earnings did better than the price, which pulled the multiple down within its own range.

Where the price move came from: over 5 years the price moved +20.2% a year; about +30.0% a year came from earnings growth and about −9.8 percentage points from the multiple (the market paying less). The split is approximate (price return minus earnings growth). It shows how much of the move came from the market paying a different multiple.

In short: the multiple is low against its own past, so the earnings trend underneath matters more than the multiple.

Is the J Kumar Infraprojects business getting better or worse?

J Kumar Infraprojects Ltd's business is getting worse. Revenue, profit and EPS growth are shrinking: revenue growth is −2.5% in the latest quarter, against +19.6% at its best in 12 quarters, with ROCE falling at 19.0%. This is based on 12 quarters of 4 measures.

Every business is somewhere on a path of getting better or worse, and this section names where. The last 12 quarters of growth in revenue, profit and earnings per share, plus the return the business earns on its capital, are read as lines. Getting worse: the lines are falling. Turning around: a low point has just formed and the last few quarters are rising from it. Getting better: the rise from the low has lasted. Growing steadily: steady growth with healthy returns. Slowing from a peak: still high, but slowing. When the lines disagree the result is mixed; too little history means no reading. CAGR (compound annual growth rate) is the steady yearly rate that would turn the starting value into the latest one. It is the fairest way to compare growth over different periods. If the 1-year figure is much bigger than the 10-year one, recent growth is running faster than the long-run trend. A dash means there is no figure for that period, or the starting year was a loss, where a growth rate means nothing.

Growth year by year: revenue +0.5% in FY26, profit −1.0%

  • Revenue growth 0.5%
Growth year by year: revenue +0.5% in FY26, profit −1.0%
QuarterRevenue growth
FY16–
FY174.3%
FY23167.2%
FY2416.1%
FY2516.7%
FY260.5%

Profit growth, EPS growth

  • Profit growth −1%
  • EPS growth −1.2%
Profit growth, EPS growth
QuarterProfit growthEPS growth
FY16––
FY1710.4%9.8%
FY23158.5%159.9%
FY2420.8%20.5%
FY2518.1%18.3%
FY26−1%−1.2%
Growth on the year before, each year, %. Top: revenue. Below: net profit and earnings per share, on their own scale because profit growth swings much more. Zero line drawn.

Three growth lines over twelve quarters: revenue rolling over, profit rolling over

  • Revenue −2.5%
Three growth lines over twelve quarters: revenue rolling over, profit rolling over
QuarterRevenue
Sep 20238.4%
Dec 20239.7%
Mar 202416.1%
Jun 202415.9%
Sep 202417.8%
Dec 202419.6%
Mar 202516.7%
Jun 202517.2%
Sep 202514%
Dec 20255.2%
Mar 20260.5%
Jun 2026−2.5%

Profit, EPS

  • Profit −6.4%
  • EPS −6.6%
Profit, EPS
QuarterProfitEPS
Sep 202310.6%11.1%
Dec 202310.2%10.3%
Mar 202420.4%20.6%
Jun 202420.6%20.8%
Sep 202424.4%24.1%
Dec 202425.1%25.1%
Mar 202518.1%18.3%
Jun 202518%18.2%
Sep 202512.7%12.9%
Dec 20253.2%3.2%
Mar 2026−1%−1.2%
Jun 2026−6.4%−6.6%
Growth on a year earlier, % at each quarter end. Top: revenue. Below: profit and earnings per share, on their own scale because they swing much more. Each is measured over the last 12 months. A gap means there is no reading for that quarter.

ROCE: the return line, worked out each quarter

  • ROCE 19%
ROCE: the return line, worked out each quarter
QuarterROCE
Sep 202318.1%
Dec 202320.9%
Mar 202420.6%
Jun 202421.6%
Sep 202421.5%
Dec 202422.8%
Mar 202521.8%
Jun 202522.8%
Sep 202521.6%
Dec 202520.8%
Mar 202619.1%
Jun 202619%
Operating profit over the last 12 months (before interest and tax) as a share of average capital employed (total assets minus current liabilities), %.
FallingRevenue growth · latest −2.5%, range −2.5% to +19.6%
FallingProfit growth · latest −6.4%, range −6.4% to +25.1%
FallingEPS growth · latest −6.6%, range −6.6% to +25.1%
Turning downROCE · latest 19.0%, range 18.1% to 22.8%

Why it matters: falling lines mean any ratio below that looks low should be read with that direction in mind.

Compound annual growth rate (%)

Compound annual growth rate over each period, %. Revenue, profit and EPS come from yearly figures; the share price row is price growth over the same periods. A dash means no figure for that period, or the starting year was a loss.

Compound annual growth rate (%)
Measure1yr3yr5yr10yr
Revenue+0.5%+10.8%—+14.3%
Profit−1.0%+12.2%—+15.0%
EPS−1.2%+12.1%—+14.9%
Share price−32.1%−0.2%+20.2%+8.3%
+1.8%Revenue growth (Jun 2026) · latest quarter against a year ago
−5.8%Profit growth (Jun 2026) · latest quarter against a year ago
14.3%Revenue, 10 years · yearly growth over the long run

How much does J Kumar Infraprojects earn on its capital?

J Kumar Infraprojects Ltd earned a ROCE of 18% in FY26. That is up from a low of 13% in FY17. Its return on capital used (ROIC) is 1.2 percentage points above its cost of capital, so growth here adds value, not just size. It comes from a 6.8% net margin and 0.92× asset turnover (sales divided by assets).

Return on capital employed (ROCE) is the profit the whole business earns on all the money in it, from shareholders and lenders together. It is the best single test of whether growth adds value or just size.

Why the return is what it is (FY26): a 6.8% net margin × 0.92× asset turnover × 1.84× leverage (assets divided by equity) ≈ 11.5% on equity. The margin does its share; borrowing is a big part of it.

The key test, return on capital used minus the cost of capital: 13.2% − 12.0% = +1.2 percentage points. The 12.0% is a standard assumption for the cost of capital in India, not an estimate for this company. Read the sign and size of the gap, not the decimals. Positive but thin: it creates value with little room for error.

FY26: ROCE 18%, the climb back from FY17's 13%

  • ROCE 18%
  • ROIC (annual) 13.6%
  • Cost of capital 12%
FY26: ROCE 18%, the climb back from FY17's 13%
QuarterROCEROIC (annual)Cost of capital
FY1713%–12%
FY2418%14.6%12%
FY2520%15.7%12%
FY2618%13.6%12%
Return on capital employed each year, % (line); ROIC each year, % (line). 4-year window, low years included. The flat line is the 12.0% cost of capital used on this page.

Q4 FY26: ROCE 16.1% (last 12 months) against a 12.0% cost of capital

  • ROCE (12 months) 16.1%
  • ROIC (12 months) 14.7%
  • Cost of capital 12.0%
Q4 FY26: ROCE 16.1% (last 12 months) against a 12.0% cost of capital
QuarterROCE (12 months)ROIC (12 months)Cost of capital
Q2 FY2417.1%14%12%
Q3 FY24–13.9%12%
Q4 FY2418.2%14%12%
Q1 FY25–14.8%12%
Q2 FY2519.2%15.1%12%
Q3 FY25–15.5%12%
Q4 FY2519.3%16.1%12%
Q1 FY26–16.2%12%
Q2 FY2618.6%16.5%12%
Q3 FY26–16.4%12%
Q4 FY2616.1%15.6%12%
Q1 FY27–14.7%12%
ROCE and ROIC over the last 12 months, each quarter, %; the flat line is the cost of capital. Last 12 quarters, lined up with the yearly figure.

Does J Kumar Infraprojects have too much debt?

J Kumar Infraprojects Ltd has total debt of ₹621 Cr against shareholder equity of ₹3,368 Cr as of Jun 2026, so its debt is 0.18× its equity, which is very little. Year by year, that ratio went from 0.23 in FY22 to 0.19 in FY26. So the returns on this page come from the business, not from borrowed money.

Debt-to-equity shows how much of the business is paid for with borrowed money. Lower is safer, and the direction matters as much as the level.

FY26: debt ₹628 Cr, 0.19× equity

  • Total debt ₹628
FY26: debt ₹628 Cr, 0.19× equity
QuarterTotal debt
FY22₹486
FY23₹552
FY24₹679
FY25₹713
FY26₹628

Debt-to-equity

  • Debt-to-equity 0.19×
Debt-to-equity
QuarterDebt-to-equity
FY220.23×
FY230.24×
FY240.26×
FY250.24×
FY260.19×
Top: total debt each year, ₹ Cr. Below: debt-to-equity, ×. 5-year window.

Jun 2026: debt ₹621 Cr, debt-to-equity 0.18

  • Total debt (quarterly) ₹621
Jun 2026: debt ₹621 Cr, debt-to-equity 0.18
QuarterTotal debt (quarterly)
Sep 2023₹669
Dec 2023₹669
Mar 2024₹679
Jun 2024₹593
Sep 2024₹781
Dec 2024₹781
Mar 2025₹713
Jun 2025₹704
Sep 2025₹780
Dec 2025₹780
Mar 2026₹628
Jun 2026₹621

Debt-to-equity

  • Debt-to-equity 0.18×
Debt-to-equity
QuarterDebt-to-equity
Sep 20230.27×
Dec 20230.27×
Mar 20240.26×
Jun 20240.22×
Sep 20240.28×
Dec 20240.28×
Mar 20250.24×
Jun 20250.23×
Sep 20250.25×
Dec 20250.25×
Mar 20260.19×
Jun 20260.18×
Top: total debt each quarter, ₹ Cr. Below: debt-to-equity, ×. Last 12 quarters. Indian companies report the full balance sheet every six months, so the quarter in between repeats the last reading.

What is the J Kumar Infraprojects shareholding pattern?

Foreign institutions raised their stake in J Kumar Infraprojects Ltd by 1.8 percentage points over 8 quarters, the biggest change among its owners. Foreign institutions now own 11.8% of the company. Domestic institutions moved −1.3 points over the same period, to 15.3%. This uses the four owner groups that companies report every quarter; nothing is guessed between filings.

Who owns the company each quarter: promoters (the founders or controlling owners), foreign institutions, domestic institutions such as mutual funds, and the public. When people close to the business steadily raise their stake, that is worth noticing; a quiet list is also an answer.

Over the last two years: Foreign institutions: +1.8 points over 8 quarters, to 11.8%; Domestic institutions: −1.3 points over 8 quarters, to 15.3%; Promoters: +0.0 points over 8 quarters, to 46.6%.

Why the owners changed: foreign institutions drove it (+1.8 points), with the other side taken by domestic institutions (−1.3 points). They raised their stake step by step.

Year ends: foreign institutions +2.4 points from Mar 2024 to Mar 2026

  • Promoters 46.64%
  • Foreign inst. 12.55%
  • Domestic inst. 15.16%
  • Public 25.65%
Year ends: foreign institutions +2.4 points from Mar 2024 to Mar 2026
QuarterPromotersForeign inst.Domestic inst.Public
Mar 202446.64%10.14%16.53%26.7%
Mar 202546.64%11.95%15.5%25.9%
Mar 202646.64%12.55%15.16%25.65%
Shareholding at each year end (March quarter), % of the company. 3 year ends on file.

Foreign institutions raised their stake by 1.8 points over 8 quarters

  • Promoters 46.64%
  • Foreign inst. 11.8%
  • Domestic inst. 15.26%
  • Public 26.29%
Foreign institutions raised their stake by 1.8 points over 8 quarters
QuarterPromotersForeign inst.Domestic inst.Public
Sep 202346.64%10.01%14.79%28.54%
Dec 202346.64%8.7%16.64%28%
Mar 202446.64%10.14%16.53%26.7%
Jun 202446.64%10.47%16.94%25.95%
Sep 202446.64%9.99%16.58%26.78%
Dec 202446.64%10.5%16.17%26.68%
Mar 202546.64%11.95%15.5%25.9%
Jun 202546.64%12.6%15.42%25.33%
Sep 202546.64%12.85%15.41%25.09%
Dec 202546.64%12.73%15.26%25.37%
Mar 202646.64%12.55%15.16%25.65%
Jun 202646.64%11.68%15.16%26.52%
Sep 202646.64%11.8%15.26%26.29%
Shareholding by owner group, % of the company, each quarter, last 13 quarters.

How far is J Kumar Infraprojects from balance-sheet trouble?

For J Kumar Infraprojects Ltd, the Z-score is not available, so we say so rather than guess one. It estimates how far the balance sheet is from trouble; it is not a forecast of failure. The debt, cash-flow and return sections show the balance-sheet figures we do have, each with its own date.

The Z-score estimates how far a company is from balance-sheet trouble. Above about 3 is safe; below about 1.8 is the danger zone. It was built for manufacturers, so it is not used for banks and lenders.

How does J Kumar Infraprojects rank in its industry?

44.7 out of 100, rank 5 of 6 in EPC, with 81% of the evidence available.

J Kumar Infraprojects Ltd scores 44.7 out of 100 against the 6 companies it is compared with in EPC, ranking 5. The valuation scores well, but earnings are not improving yet, so the business does not back up the low multiple so far.

The four parts add up to the total exactly: 8.9 + 12.1 + 15.5 + 8.2 = 44.7. This is the same number shown on the industry page; it is worked out once for the whole group and read here.

What would change it: The score would fall if profit growth turns negative or margins stop improving while the share price lags its sector.

Which companies is J Kumar Infraprojects compared with?

J Kumar Infraprojects ranks 5 of 6 EPC companies on the 4-Factor Sector Score, with 44.7 out of 100.

  1. 1Advait Energy Transitions LimitedADVAIT · quiet · Most evidence points up · 82% evidence66.5out of 100GrowthCapitalValuationRelative
    How the score adds upGrowth & earnings 28.4/35 · Revenue 48.2% · Profit 66.7% · Operating margin change 3 points · 95% evidenceCapital efficiency 16.5/25 · ROCE 26% · Operating margin 14% · 76% evidenceValuation 10.0/20 · P/E 27× · PEG — · 50% evidenceRelative strength 11.6/20 · Lead over its industry 6.7% · Lead over NIFTY 500 -7.4% · 1 year -7.4% · 100% evidence · 1 of 12 weeks aheadExact sum: 28.4 + 16.5 + 10 + 11.6 = 66.5 · What this means: Earnings, capital efficiency and relative strength all agree. The open questions are about management, upcoming events and risks.
  2. 2Viviana Power Tech LtdVIVIANA · breaking out · Most evidence points up · 60% evidence66.1out of 100GrowthCapitalValuationRelative
    How the score adds upGrowth & earnings 26.4/35 · Revenue 100% · Profit 100% · Operating margin change -4 points · 95% evidenceCapital efficiency 18.4/25 · ROCE 49.8% · Operating margin 15% · 76% evidenceValuation 10.3/20 · P/E 11.6× · PEG — · 15% evidenceRelative strength 11.0/20 · Lead over its industry — · Lead over NIFTY 500 -3.4% · 1 year -30.6% · 25% evidence · 4 of 12 weeks aheadExact sum: 26.4 + 18.4 + 10.3 + 11 = 66.1 · What this means: Earnings, capital efficiency and relative strength all agree. The open questions are about management, upcoming events and risks.
  3. 3Transrail Lighting LtdTRANSRAILL · quiet · Evidence leans up · 64% evidence51.2out of 100GrowthCapitalValuationRelative
    How the score adds upGrowth & earnings 14.9/35 · Revenue 15.1% · Profit 5.9% · Operating margin change 0 points · 88% evidenceCapital efficiency 17.8/25 · ROCE 33.3% · Operating margin 12% · 100% evidenceValuation 9.7/20 · P/E 13.4× · PEG — · 15% evidenceRelative strength 8.8/20 · Lead over its industry — · Lead over NIFTY 500 -14.1% · 1 year -41.8% · 25% evidence · 0 of 12 weeks aheadExact sum: 14.9 + 17.8 + 9.7 + 8.8 = 51.2 · What this means: The evidence is balanced: no factor stands out, so another reported quarter is needed before the picture is clearer.
  4. 4Ahluwalia Contracts (India) LtdAHLUCONT · quiet · Evidence leans down · 81% evidence47.8out of 100GrowthCapitalValuationRelative
    How the score adds upGrowth & earnings 10.7/35 · Revenue 12% · Profit 1.4% · Operating margin change -4.8 points · 88% evidenceCapital efficiency 12.1/25 · ROCE 20.4% · Operating margin 4.2% · 100% evidenceValuation 17.5/20 · P/E 15.7× · PEG 0.33 · 100% evidenceRelative strength 7.5/20 · Lead over its industry — · Lead over NIFTY 500 -30.2% · 1 year -44.6% · 25% evidence · 0 of 12 weeks aheadExact sum: 10.7 + 12.1 + 17.5 + 7.5 = 47.8 · What this means: The valuation scores well, but earnings are not improving yet, so the business does not back up the low multiple so far.
  5. 5J Kumar Infraprojects Ltd this pageJKIL · quiet · Evidence leans down · 81% evidence44.7out of 100GrowthCapitalValuationRelative
    How the score adds upGrowth & earnings 8.9/35 · Revenue -2.5% · Profit -6.4% · Operating margin change -1 points · 88% evidenceCapital efficiency 12.1/25 · ROCE 18.4% · Operating margin 14% · 100% evidenceValuation 15.5/20 · P/E 7.9× · PEG 1.48 · 100% evidenceRelative strength 8.2/20 · Lead over its industry — · Lead over NIFTY 500 -16.8% · 1 year -38.4% · 25% evidence · 1 of 12 weeks aheadExact sum: 8.9 + 12.1 + 15.5 + 8.2 = 44.7 · What this means: The valuation scores well, but earnings are not improving yet, so the business does not back up the low multiple so far.
  6. 6Dilip Buildcon LtdDBL · quiet · Too little evidence to rank firmly · 56% evidence44.4out of 100GrowthCapitalValuationRelative
    How the score adds upGrowth & earnings 14.3/35 · Revenue -19.1% · Profit 29.1% · Operating margin change -2 points · 83% evidenceCapital efficiency 9.7/25 · ROCE 13.1% · Operating margin 18% · 76% evidenceValuation 10.9/20 · P/E 10.9× · PEG — · 15% evidenceRelative strength 9.5/20 · Lead over its industry — · Lead over NIFTY 500 -9.1% · 1 year -24.1% · 25% evidence · 0 of 12 weeks aheadExact sum: 14.3 + 9.7 + 10.9 + 9.5 = 44.4 · What this means: Some evidence is missing, so the score is pulled toward the middle on purpose.

Missing figures are not scored as bad. They lower the confidence and pull the final score toward the middle. Relative strength counts only when the company has a reading for this week; with no reading, that factor is left out and its 20 points are shared across the other three in proportion. PEG is not shown when the ratio cannot mean anything: the company must be making a profit, its price-to-earnings must be positive, and its three-year earnings growth must fall between 5% and 60%. Dividing a price multiple by a loss, or by growth measured off a tiny base, produces a number that looks precise and tells you nothing. Under relative strength, one mark per week shows the last 12 weeks: a mark is filled where the company led NIFTY 500 by 5% or more over the 13 weeks ending that week, which is the same test used everywhere on this site. Price stage places the company on the same six-step path the industry is placed on (basing, turning, breaking out, leader, fading, asleep), read from how many weeks running it has led NIFTY 500 and whether that lead is growing or shrinking. It describes where the share price stands, not the direction of earnings, and it is not a recommendation; it is left blank for a company whose weekly history is too short or too stale to read.

The figures in this ranking come from the industry comparison: results through the Sep 2026 quarter, and the P/E at that quarter's end. The sections above use the latest weekly price, so a P/E or return there can differ a little from the one here. The stage words in this ranking (such as losing its lead or breaking out) describe the lead over the index, not the price phase in the price section.

Related companies: EPC, all 6 compared on one page.

Which companies are close to J Kumar Infraprojects in size?

J Kumar Infraprojects is the 4th largest of 6 EPC companies on Sector Alpha by market value (scores of 30 October 2026). Just above it: Dilip Buildcon, Transrail Lighting and Ahluwalia Contracts (India). Just below it: Advait Energy Transitions and Viviana Power Tech.

EPC companies close in size

  1. Dilip Buildcon Ltd ₹6,105 crore
  2. Transrail Lighting Ltd ₹5,695 crore
  3. Ahluwalia Contracts (India) Ltd ₹3,535 crore
  4. J Kumar Infraprojects Ltd ₹3,069 crore
  5. Advait Energy Transitions Limited ₹1,798 crore
  6. Viviana Power Tech Ltd ₹725 crore

All 6 EPC companies, largest first

Companies close in size in other industries

  1. TruAlt Bioenergy Ltd ₹3,084 crore · Miscellaneous
  2. Lords Mark Industries Limited ₹3,079 crore · Miscellaneous
  3. J Kumar Infraprojects Ltd ₹3,069 crore
  4. Windsor Machines Ltd ₹3,064 crore · Capital Goods - Engineering Heavy
  5. Sangam (India) Ltd ₹3,059 crore · Textiles - Spinning

What else do people ask about J Kumar Infraprojects?

What is J Kumar Infraprojects's share price today?

J Kumar Infraprojects Ltd's share price is ₹421.00, −32.1% over the past year. The whole company is worth ₹3,182 Cr on the market.

In the last 52 weeks it traded between ₹406 to ₹620; today it is 7% of the way up from the low, 16.6% below its 200-day average (as of 4 November 2026).

What were J Kumar Infraprojects's latest quarterly results?

J Kumar Infraprojects Ltd reported revenue of ₹1,511 Cr and net profit of ₹97.0 Cr for the Jun 2026 quarter. Revenue rose 1.8% and profit fell 5.8% compared with a year earlier. Earnings per share were ₹12.89.

The operating margin was 14.0%, 1.0 percentage points lower than a year earlier (as of 4 November 2026).

What is J Kumar Infraprojects's market cap?

J Kumar Infraprojects Ltd's market capitalisation is ₹3,182 Cr at a share price of ₹421.00. Market cap is the share price times the number of shares, so it changes whenever the price moves (as of 4 November 2026).

How is J Kumar Infraprojects performing?

J Kumar Infraprojects Ltd's share price has been falling for 61 weeks. In its latest quarter, revenue rose 1.8% and profit fell 5.8% compared with a year earlier. Over the past 13 weeks it has done worse than the NIFTY 500, for 11 weeks running (as of 4 November 2026).

Will J Kumar Infraprojects's share price go up?

This page does not forecast J Kumar Infraprojects Ltd's share price. What it shows instead: the share price is ₹421.00, and it has been falling for 61 weeks. Its P/E of 8.2× is higher than 8% of its own last 9 years (as of 4 November 2026).

Who owns J Kumar Infraprojects?

Promoters own 46.6% of J Kumar Infraprojects Ltd, foreign institutions 11.8%, domestic institutions 15.3% and the public 26.3% (latest quarter). The biggest change over the last two years: Foreign institutions raised their stake by 1.8 percentage points over 8 quarters (as of 4 November 2026).

Does J Kumar Infraprojects have too much debt?

No, J Kumar Infraprojects Ltd has little debt: its debt is 0.18× its equity, and its operating profit is 5 times its interest bill. FY26 borrowings were ₹621 Cr against equity of ₹3,369 Cr.

So the returns on this page come from the business, not borrowed money (as of 4 November 2026).

Where is J Kumar Infraprojects in its business cycle?

J Kumar Infraprojects Ltd's FY26 operating margin was 14.0%, against a 6-year range of 14.0% to 16.0%: the low end of its own range, which is often where recoveries start. The latest quarter was 14.0%.

Comparing margins with a company's own long history is a good way to see where it is in its cycle (as of 4 November 2026).

What could break the J Kumar Infraprojects story?

The main question: yearly earnings per share moved −1.2% while the share price moved −32.1%. On price, this page treats a rise as over when the share price closes below its 200-day average on two Fridays in a row (as of 4 November 2026).

Is J Kumar Infraprojects a stock worth studying right now?

What the numbers show: J Kumar Infraprojects Ltd's P/E is near the low end of its own history, higher than only 8% of past readings, and its quarterly results are still getting worse. The main open question: whether the price catches up with earnings that have already grown.

Every number on this page is worked out by code from the published figures, with no forecasts and no price opinions (as of 4 November 2026).

Is there a J Kumar Infraprojects share price forecast for 2026?

What management itself guided: FY27 revenue growth of 15%, near ₹6,500 crore.

Where do these numbers come from?

Sector Alpha, written by code from the published numbers. Data as of 4 November 2026.

Every chart on this page is drawn by code from the published figures, with no forecasts and no price opinions.

See the plain-text version of this page.

More lists

Every Sector Alpha list, grouped

X · Instagram · YouTube · About · Newsletter · Newsletter archive
This is research, not advice. We’re not SEBI-registered.