Crane NXT share price today
Crane NXT, Co. · CXT · Industrials · Specialty Industrial Machinery · price as of the 4 November 2026 close, updated every trading day · results updated weekly · All US stock lists
Crane NXT share price: $61.62 at the close on 4 November 2026, −1.3% in a year.
Crane NXT, Co.'s results are improving, and its P/E is near the top of its own history, higher than 99% of past readings.
The main question: results are strong, and the P/E is higher than 99% of its own history.
The price has been stalling near its high for 7 weeks, and the P/E is higher than 99% of its own last 3.6 years. Over the last four quarters, results have been improving, with profit +42.2% on a year earlier, and 141% of the last 3 years' profit came in as cash. What will decide it: whether earnings grow enough to match the multiple.
What is the Crane NXT share price today?
Crane NXT, Co.'s share price was $61.62 at the close on 4 November 2026. It has been stalling near its high for 7 weeks. That is 28.4% above its average price over the last 200 trading days.
A share price tends to move through four phases: moving sideways (stage 1), rising (stage 2), stalling near a high (stage 3) and falling (stage 4). Today Crane NXT, Co. is in stage 3. The phase helps read everything below.
In the last 52 weeks it traded between $36 and $62, and at that close it sat 97% of the way up from that low. Over the past 13 weeks it has done better than the S&P 500, and it has stayed ahead for 4 weeks in a row.
1Y
Nov 2026: $61.62, 28.4% above its 200-day average. The price has been stalling near its high for 7 weeks.
- Price $61.62
- 50-day avg $51.65
- 200-day avg $47.98
| Week | Price | 50-day avg | 200-day avg |
|---|---|---|---|
| 31 Oct 2025 | $63.25 | $63.56 | $57.31 |
| 7 Nov 2025 | $62.45 | $63.67 | $57.27 |
| 14 Nov 2025 | $58.59 | $63.71 | $57.20 |
| 21 Nov 2025 | $54.30 | $63.10 | $56.97 |
| 28 Nov 2025 | $56.30 | $62.92 | $56.88 |
| 5 Dec 2025 | $58.10 | $62.56 | $56.84 |
| 12 Dec 2025 | $51.79 | $61.53 | $56.79 |
| 19 Dec 2025 | $47.20 | $59.54 | $56.63 |
| 26 Dec 2025 | $48.35 | $58.07 | $56.52 |
| 2 Jan 2026 | $47.73 | $56.51 | $56.39 |
| 9 Jan 2026 | $49.98 | $54.85 | $56.28 |
| 16 Jan 2026 | $52.20 | $53.55 | $56.25 |
| 23 Jan 2026 | $51.04 | $52.67 | $56.35 |
| 30 Jan 2026 | $50.52 | $51.74 | $56.48 |
| 6 Feb 2026 | $56.05 | $51.55 | $56.69 |
| 13 Feb 2026 | $52.76 | $51.28 | $56.87 |
| 20 Feb 2026 | $52.10 | $50.87 | $56.97 |
| 27 Feb 2026 | $48.29 | $50.51 | $56.96 |
| 6 Mar 2026 | $46.12 | $50.55 | $56.78 |
| 13 Mar 2026 | $42.27 | $50.14 | $56.55 |
| 20 Mar 2026 | $40.37 | $49.45 | $56.25 |
| 27 Mar 2026 | $41.15 | $48.68 | $55.94 |
| 2 Apr 2026 | $40.19 | $47.78 | $55.64 |
| 10 Apr 2026 | $43.88 | $46.97 | $55.34 |
| 17 Apr 2026 | $46.40 | $46.40 | $55.11 |
| 24 Apr 2026 | $44.94 | $45.54 | $54.83 |
| 1 May 2026 | $44.60 | $44.67 | $54.50 |
| 8 May 2026 | $45.31 | $44.03 | $54.17 |
| 15 May 2026 | $38.21 | $43.33 | $53.71 |
| 22 May 2026 | $41.11 | $42.79 | $53.26 |
| 29 May 2026 | $38.84 | $42.60 | $52.86 |
| 5 Jun 2026 | $36.13 | $42.03 | $52.26 |
| 12 Jun 2026 | $42.47 | $41.86 | $51.70 |
| 18 Jun 2026 | $46.93 | $42.09 | $51.39 |
| 26 Jun 2026 | $48.64 | $42.28 | $51.02 |
| 2 Jul 2026 | $52.50 | $42.72 | $50.83 |
| 10 Jul 2026 | $50.83 | $43.29 | $50.66 |
| 17 Jul 2026 | $51.27 | $43.97 | $50.34 |
| 24 Jul 2026 | $52.86 | $44.71 | $49.97 |
| 31 Jul 2026 | $51.95 | $46.08 | $49.61 |
| 7 Aug 2026 | $53.33 | $47.45 | $49.27 |
| 14 Aug 2026 | $51.66 | $48.84 | $48.90 |
| 21 Aug 2026 | $50.20 | $50.05 | $48.53 |
| 28 Aug 2026 | $50.13 | $50.78 | $48.21 |
| 4 Sep 2026 | $50.06 | $51.11 | $47.96 |
| 11 Sep 2026 | $51.99 | $51.14 | $47.88 |
| 18 Sep 2026 | $45.61 | $50.79 | $47.66 |
| 25 Sep 2026 | $47.72 | $50.43 | $47.41 |
| 2 Oct 2026 | $48.78 | $50.05 | $47.25 |
| 9 Oct 2026 | $50.45 | $49.66 | $47.30 |
| 16 Oct 2026 | $54.72 | $49.62 | $47.42 |
| 23 Oct 2026 | $56.88 | $50.11 | $47.63 |
| 30 Oct 2026 | $58.60 | $51.00 | $47.84 |
| 4 Nov 2026 | $61.62 | $51.65 | $47.98 |
3Y
Nov 2026: $61.62, 28.4% above its 200-day average. The price has been stalling near its high for 7 weeks.
- Price $61.62
- 50-day avg $51.65
- 200-day avg $47.98
| Week | Price | 50-day avg | 200-day avg |
|---|---|---|---|
| 3 Nov 2023 | $54.21 | $55.22 | – |
| 10 Nov 2023 | $51.06 | $54.36 | – |
| 17 Nov 2023 | $53.20 | $53.78 | – |
| 24 Nov 2023 | $52.83 | $53.42 | – |
| 1 Dec 2023 | $52.95 | $52.84 | – |
| 8 Dec 2023 | $51.09 | $52.40 | – |
| 15 Dec 2023 | $53.51 | $52.20 | – |
| 22 Dec 2023 | $59.24 | $52.52 | – |
| 29 Dec 2023 | $56.87 | $52.93 | – |
| 5 Jan 2024 | $54.23 | $53.23 | – |
| 12 Jan 2024 | $55.42 | $53.58 | – |
| 19 Jan 2024 | $57.40 | $53.75 | $54.14 |
| 26 Jan 2024 | $58.02 | $54.55 | $54.52 |
| 2 Feb 2024 | $59.60 | $55.18 | $54.82 |
| 9 Feb 2024 | $60.19 | $55.87 | $55.09 |
| 16 Feb 2024 | $58.79 | $56.59 | $55.38 |
| 23 Feb 2024 | $60.56 | $57.27 | $55.62 |
| 1 Mar 2024 | $59.25 | $57.85 | $55.85 |
| 8 Mar 2024 | $59.59 | $58.01 | $56.03 |
| 15 Mar 2024 | $60.75 | $58.34 | $56.21 |
| 22 Mar 2024 | $60.82 | $58.95 | $56.38 |
| 28 Mar 2024 | $61.90 | $59.42 | $56.47 |
| 5 Apr 2024 | $57.71 | $59.54 | $56.56 |
| 12 Apr 2024 | $60.91 | $59.84 | $56.72 |
| 19 Apr 2024 | $61.33 | $60.07 | $56.86 |
| 26 Apr 2024 | $62.65 | $60.36 | $57.00 |
| 3 May 2024 | $61.52 | $60.58 | $57.09 |
| 10 May 2024 | $60.24 | $60.80 | $57.19 |
| 17 May 2024 | $60.41 | $60.91 | $57.26 |
| 24 May 2024 | $61.58 | $61.01 | $57.31 |
| 31 May 2024 | $63.22 | $61.14 | $57.34 |
| 7 Jun 2024 | $61.01 | $61.19 | $57.38 |
| 14 Jun 2024 | $60.37 | $61.27 | $57.41 |
| 21 Jun 2024 | $64.62 | $61.52 | $57.50 |
| 28 Jun 2024 | $61.42 | $61.49 | $57.59 |
| 5 Jul 2024 | $56.90 | $61.23 | $57.61 |
| 12 Jul 2024 | $57.14 | $60.66 | $57.60 |
| 19 Jul 2024 | $59.22 | $60.46 | $57.70 |
| 26 Jul 2024 | $63.84 | $60.58 | $57.90 |
| 2 Aug 2024 | $58.44 | $60.64 | $58.10 |
| 9 Aug 2024 | $56.72 | $60.12 | $58.20 |
| 16 Aug 2024 | $57.81 | $59.58 | $58.33 |
| 23 Aug 2024 | $58.75 | $59.28 | $58.44 |
| 30 Aug 2024 | $58.75 | $58.92 | $58.65 |
| 6 Sep 2024 | $55.68 | $58.44 | $58.72 |
| 13 Sep 2024 | $58.29 | $58.12 | $58.82 |
| 20 Sep 2024 | $59.00 | $58.32 | $58.99 |
| 27 Sep 2024 | $55.79 | $58.13 | $59.13 |
| 4 Oct 2024 | $55.88 | $57.58 | $59.19 |
| 11 Oct 2024 | $55.06 | $56.76 | $59.10 |
| 18 Oct 2024 | $58.21 | $56.76 | $59.08 |
| 25 Oct 2024 | $55.26 | $56.66 | $59.11 |
| 1 Nov 2024 | $53.98 | $56.42 | $59.10 |
| 8 Nov 2024 | $56.68 | $56.13 | $59.04 |
| 15 Nov 2024 | $55.49 | $56.04 | $58.97 |
| 22 Nov 2024 | $60.11 | $56.13 | $58.93 |
| 29 Nov 2024 | $62.68 | $56.47 | $58.99 |
| 6 Dec 2024 | $60.67 | $56.91 | $59.07 |
| 13 Dec 2024 | $59.84 | $57.44 | $59.11 |
| 20 Dec 2024 | $56.44 | $57.79 | $59.07 |
| 27 Dec 2024 | $58.01 | $57.99 | $59.02 |
| 3 Jan 2025 | $59.62 | $58.11 | $58.98 |
| 10 Jan 2025 | $61.84 | $58.57 | $58.99 |
| 17 Jan 2025 | $63.72 | $59.46 | $59.05 |
| 24 Jan 2025 | $63.70 | $60.18 | $59.19 |
| 31 Jan 2025 | $63.97 | $60.97 | $59.24 |
| 7 Feb 2025 | $61.90 | $61.57 | $59.30 |
| 14 Feb 2025 | $59.81 | $61.24 | $59.21 |
| 21 Feb 2025 | $58.12 | $61.02 | $59.18 |
| 28 Feb 2025 | $55.82 | $60.60 | $59.06 |
| 7 Mar 2025 | $54.20 | $60.21 | $58.89 |
| 14 Mar 2025 | $54.58 | $59.78 | $58.70 |
| 21 Mar 2025 | $52.97 | $59.28 | $58.51 |
| 28 Mar 2025 | $51.34 | $58.27 | $58.30 |
| 4 Apr 2025 | $45.03 | $56.73 | $58.01 |
| 11 Apr 2025 | $45.36 | $54.84 | $57.56 |
| 17 Apr 2025 | $44.66 | $53.31 | $57.24 |
| 25 Apr 2025 | $46.61 | $51.70 | $56.93 |
| 2 May 2025 | $48.14 | $50.52 | $56.67 |
| 9 May 2025 | $52.80 | $49.74 | $56.39 |
| 16 May 2025 | $55.30 | $49.83 | $56.22 |
| 23 May 2025 | $51.99 | $49.80 | $56.07 |
| 30 May 2025 | $53.61 | $49.70 | $56.04 |
| 6 Jun 2025 | $54.09 | $49.75 | $55.95 |
| 13 Jun 2025 | $54.47 | $50.11 | $55.89 |
| 20 Jun 2025 | $54.55 | $50.99 | $55.83 |
| 27 Jun 2025 | $53.72 | $51.89 | $55.79 |
| 3 Jul 2025 | $56.51 | $52.81 | $55.76 |
| 11 Jul 2025 | $58.61 | $53.92 | $55.74 |
| 18 Jul 2025 | $57.26 | $54.86 | $55.74 |
| 25 Jul 2025 | $59.45 | $55.47 | $55.81 |
| 1 Aug 2025 | $57.09 | $55.92 | $55.93 |
| 8 Aug 2025 | $60.59 | $56.41 | $55.97 |
| 15 Aug 2025 | $59.65 | $57.07 | $56.09 |
| 22 Aug 2025 | $63.33 | $57.66 | $56.24 |
| 29 Aug 2025 | $59.73 | $58.23 | $56.38 |
| 5 Sep 2025 | $61.10 | $58.73 | $56.47 |
| 12 Sep 2025 | $60.31 | $59.33 | $56.58 |
| 19 Sep 2025 | $56.47 | $59.41 | $56.47 |
| 26 Sep 2025 | $65.07 | $59.93 | $56.48 |
| 3 Oct 2025 | $66.47 | $60.74 | $56.61 |
| 10 Oct 2025 | $65.57 | $61.51 | $56.85 |
| 17 Oct 2025 | $66.86 | $62.49 | $57.08 |
| 24 Oct 2025 | $66.02 | $63.11 | $57.26 |
| 31 Oct 2025 | $63.25 | $63.56 | $57.31 |
| 7 Nov 2025 | $62.45 | $63.67 | $57.27 |
| 14 Nov 2025 | $58.59 | $63.71 | $57.20 |
| 21 Nov 2025 | $54.30 | $63.10 | $56.97 |
| 28 Nov 2025 | $56.30 | $62.92 | $56.88 |
| 5 Dec 2025 | $58.10 | $62.56 | $56.84 |
| 12 Dec 2025 | $51.79 | $61.53 | $56.79 |
| 19 Dec 2025 | $47.20 | $59.54 | $56.63 |
| 26 Dec 2025 | $48.35 | $58.07 | $56.52 |
| 2 Jan 2026 | $47.73 | $56.51 | $56.39 |
| 9 Jan 2026 | $49.98 | $54.85 | $56.28 |
| 16 Jan 2026 | $52.20 | $53.55 | $56.25 |
| 23 Jan 2026 | $51.04 | $52.67 | $56.35 |
| 30 Jan 2026 | $50.52 | $51.74 | $56.48 |
| 6 Feb 2026 | $56.05 | $51.55 | $56.69 |
| 13 Feb 2026 | $52.76 | $51.28 | $56.87 |
| 20 Feb 2026 | $52.10 | $50.87 | $56.97 |
| 27 Feb 2026 | $48.29 | $50.51 | $56.96 |
| 6 Mar 2026 | $46.12 | $50.55 | $56.78 |
| 13 Mar 2026 | $42.27 | $50.14 | $56.55 |
| 20 Mar 2026 | $40.37 | $49.45 | $56.25 |
| 27 Mar 2026 | $41.15 | $48.68 | $55.94 |
| 2 Apr 2026 | $40.19 | $47.78 | $55.64 |
| 10 Apr 2026 | $43.88 | $46.97 | $55.34 |
| 17 Apr 2026 | $46.40 | $46.40 | $55.11 |
| 24 Apr 2026 | $44.94 | $45.54 | $54.83 |
| 1 May 2026 | $44.60 | $44.67 | $54.50 |
| 8 May 2026 | $45.31 | $44.03 | $54.17 |
| 15 May 2026 | $38.21 | $43.33 | $53.71 |
| 22 May 2026 | $41.11 | $42.79 | $53.26 |
| 29 May 2026 | $38.84 | $42.60 | $52.86 |
| 5 Jun 2026 | $36.13 | $42.03 | $52.26 |
| 12 Jun 2026 | $42.47 | $41.86 | $51.70 |
| 18 Jun 2026 | $46.93 | $42.09 | $51.39 |
| 26 Jun 2026 | $48.64 | $42.28 | $51.02 |
| 2 Jul 2026 | $52.50 | $42.72 | $50.83 |
| 10 Jul 2026 | $50.83 | $43.29 | $50.66 |
| 17 Jul 2026 | $51.27 | $43.97 | $50.34 |
| 24 Jul 2026 | $52.86 | $44.71 | $49.97 |
| 31 Jul 2026 | $51.95 | $46.08 | $49.61 |
| 7 Aug 2026 | $53.33 | $47.45 | $49.27 |
| 14 Aug 2026 | $51.66 | $48.84 | $48.90 |
| 21 Aug 2026 | $50.20 | $50.05 | $48.53 |
| 28 Aug 2026 | $50.13 | $50.78 | $48.21 |
| 4 Sep 2026 | $50.06 | $51.11 | $47.96 |
| 11 Sep 2026 | $51.99 | $51.14 | $47.88 |
| 18 Sep 2026 | $45.61 | $50.79 | $47.66 |
| 25 Sep 2026 | $47.72 | $50.43 | $47.41 |
| 2 Oct 2026 | $48.78 | $50.05 | $47.25 |
| 9 Oct 2026 | $50.45 | $49.66 | $47.30 |
| 16 Oct 2026 | $54.72 | $49.62 | $47.42 |
| 23 Oct 2026 | $56.88 | $50.11 | $47.63 |
| 30 Oct 2026 | $58.60 | $51.00 | $47.84 |
| 4 Nov 2026 | $61.62 | $51.65 | $47.98 |
Price stage: Sideways from Oct 2025 to Dec 2025; Sideways from Dec 2025 to Mar 2026; Falling from Apr 2026 to Jun 2026; Sideways from Jul 2026 to Nov 2026.
Price stage: Rising from Aug 2024 to Sep 2024; Sideways from Sep 2024 to Nov 2024; Rising from Nov 2024 to Feb 2025; Sideways from Feb 2025 to Mar 2025; Falling from Apr 2025 to Jun 2025; Sideways from Jul 2025 to Dec 2025; Sideways from Dec 2025 to Mar 2026; Falling from Apr 2026 to Jun 2026; Sideways from Jul 2026 to Nov 2026.
Week by week since 2023: did it beat the S&P 500 over the past 13 weeks?
Ahead in 63 of 176 weeks
| Week | 13-week return vs S&P 500 |
|---|---|
| 31 Mar 2023 | no S&P 500 reading |
| 6 Apr 2023 | no S&P 500 reading |
| 14 Apr 2023 | no S&P 500 reading |
| 21 Apr 2023 | no S&P 500 reading |
| 28 Apr 2023 | no S&P 500 reading |
| 5 May 2023 | no S&P 500 reading |
| 12 May 2023 | no S&P 500 reading |
| 19 May 2023 | no S&P 500 reading |
| 26 May 2023 | no S&P 500 reading |
| 2 Jun 2023 | no S&P 500 reading |
| 9 Jun 2023 | no S&P 500 reading |
| 16 Jun 2023 | no S&P 500 reading |
| 23 Jun 2023 | no S&P 500 reading |
| 30 Jun 2023 | +36.8% |
| 7 Jul 2023 | +21.3% |
| 14 Jul 2023 | +14.3% |
| 21 Jul 2023 | +5.5% |
| 28 Jul 2023 | +10.9% |
| 4 Aug 2023 | +9.9% |
| 11 Aug 2023 | +13.7% |
| 18 Aug 2023 | +6.7% |
| 25 Aug 2023 | +5.8% |
| 1 Sep 2023 | +4.5% |
| 8 Sep 2023 | −1.4% |
| 15 Sep 2023 | +3.0% |
| 22 Sep 2023 | +4.0% |
| 29 Sep 2023 | +2.0% |
| 6 Oct 2023 | −0.9% |
| 13 Oct 2023 | −2.7% |
| 20 Oct 2023 | −3.5% |
| 27 Oct 2023 | −0.9% |
| 3 Nov 2023 | −1.6% |
| 10 Nov 2023 | −14.1% |
| 17 Nov 2023 | −14.0% |
| 24 Nov 2023 | −13.8% |
| 1 Dec 2023 | −14.0% |
| 8 Dec 2023 | −14.3% |
| 15 Dec 2023 | −12.3% |
| 22 Dec 2023 | −4.9% |
| 29 Dec 2023 | −8.8% |
| 5 Jan 2024 | −9.8% |
| 12 Jan 2024 | −5.3% |
| 19 Jan 2024 | −1.5% |
| 26 Jan 2024 | −4.7% |
| 2 Feb 2024 | −3.8% |
| 9 Feb 2024 | +4.1% |
| 16 Feb 2024 | −0.3% |
| 23 Feb 2024 | +3.1% |
| 1 Mar 2024 | +0.2% |
| 8 Mar 2024 | +5.4% |
| 15 Mar 2024 | +4.9% |
| 22 Mar 2024 | −7.4% |
| 28 Mar 2024 | −1.2% |
| 5 Apr 2024 | −4.4% |
| 12 Apr 2024 | +2.7% |
| 19 Apr 2024 | +4.2% |
| 26 Apr 2024 | +3.7% |
| 3 May 2024 | −0.2% |
| 10 May 2024 | −3.8% |
| 17 May 2024 | −3.2% |
| 24 May 2024 | −2.6% |
| 31 May 2024 | +3.9% |
| 7 Jun 2024 | −2.0% |
| 14 Jun 2024 | −7.1% |
| 21 Jun 2024 | +1.8% |
| 28 Jun 2024 | −4.8% |
| 5 Jul 2024 | −8.4% |
| 12 Jul 2024 | −15.8% |
| 19 Jul 2024 | −14.3% |
| 26 Jul 2024 | −5.2% |
| 2 Aug 2024 | −9.2% |
| 9 Aug 2024 | −8.2% |
| 16 Aug 2024 | −9.0% |
| 23 Aug 2024 | −10.8% |
| 30 Aug 2024 | −14.0% |
| 6 Sep 2024 | −9.9% |
| 13 Sep 2024 | −7.0% |
| 20 Sep 2024 | −13.1% |
| 27 Sep 2024 | −14.2% |
| 4 Oct 2024 | −5.1% |
| 11 Oct 2024 | −7.1% |
| 18 Oct 2024 | −8.2% |
| 25 Oct 2024 | −19.8% |
| 1 Nov 2024 | −14.8% |
| 8 Nov 2024 | −12.3% |
| 15 Nov 2024 | −9.7% |
| 22 Nov 2024 | −3.6% |
| 29 Nov 2024 | −0.2% |
| 6 Dec 2024 | −3.5% |
| 13 Dec 2024 | −4.8% |
| 20 Dec 2024 | −8.4% |
| 27 Dec 2024 | −0.1% |
| 3 Jan 2025 | +3.4% |
| 10 Jan 2025 | +12.2% |
| 17 Jan 2025 | +7.2% |
| 24 Jan 2025 | +10.3% |
| 31 Jan 2025 | +13.1% |
| 7 Feb 2025 | +8.8% |
| 14 Feb 2025 | +3.7% |
| 21 Feb 2025 | −4.1% |
| 28 Feb 2025 | −9.6% |
| 7 Mar 2025 | −5.4% |
| 14 Mar 2025 | −1.9% |
| 21 Mar 2025 | −1.6% |
| 28 Mar 2025 | −4.9% |
| 4 Apr 2025 | −9.8% |
| 11 Apr 2025 | −18.6% |
| 17 Apr 2025 | −18.0% |
| 25 Apr 2025 | −17.4% |
| 2 May 2025 | −18.9% |
| 9 May 2025 | −8.6% |
| 16 May 2025 | −5.0% |
| 23 May 2025 | −7.1% |
| 30 May 2025 | −3.2% |
| 6 Jun 2025 | −4.2% |
| 13 Jun 2025 | −6.3% |
| 20 Jun 2025 | −2.4% |
| 27 Jun 2025 | −6.0% |
| 3 Jul 2025 | +1.7% |
| 11 Jul 2025 | +12.4% |
| 18 Jul 2025 | +9.0% |
| 25 Jul 2025 | +11.8% |
| 1 Aug 2025 | +8.9% |
| 8 Aug 2025 | +1.8% |
| 15 Aug 2025 | −0.4% |
| 22 Aug 2025 | +10.4% |
| 29 Aug 2025 | +2.0% |
| 5 Sep 2025 | +4.9% |
| 12 Sep 2025 | +0.6% |
| 19 Sep 2025 | −8.2% |
| 26 Sep 2025 | +13.5% |
| 3 Oct 2025 | +10.6% |
| 10 Oct 2025 | +7.2% |
| 17 Oct 2025 | +10.9% |
| 24 Oct 2025 | +4.7% |
| 31 Oct 2025 | +1.1% |
| 7 Nov 2025 | −2.2% |
| 14 Nov 2025 | −6.2% |
| 21 Nov 2025 | −16.4% |
| 28 Nov 2025 | −11.7% |
| 5 Dec 2025 | −10.9% |
| 12 Dec 2025 | −17.8% |
| 19 Dec 2025 | −19.0% |
| 26 Dec 2025 | −30.0% |
| 2 Jan 2026 | −30.3% |
| 9 Jan 2026 | −30.1% |
| 16 Jan 2026 | −26.0% |
| 23 Jan 2026 | −24.5% |
| 30 Jan 2026 | −21.6% |
| 6 Feb 2026 | −13.2% |
| 13 Feb 2026 | −11.4% |
| 20 Feb 2026 | −8.7% |
| 27 Feb 2026 | −14.6% |
| 6 Mar 2026 | −18.7% |
| 13 Mar 2026 | −15.5% |
| 20 Mar 2026 | −9.8% |
| 27 Mar 2026 | −6.7% |
| 2 Apr 2026 | −11.8% |
| 10 Apr 2026 | −10.1% |
| 17 Apr 2026 | −13.8% |
| 24 Apr 2026 | −15.5% |
| 1 May 2026 | −15.9% |
| 8 May 2026 | −26.0% |
| 15 May 2026 | −36.0% |
| 22 May 2026 | −29.2% |
| 29 May 2026 | −29.8% |
| 5 Jun 2026 | −31.4% |
| 12 Jun 2026 | −11.5% |
| 18 Jun 2026 | +1.1% |
| 26 Jun 2026 | +3.2% |
| 2 Jul 2026 | +17.1% |
| 10 Jul 2026 | +4.7% |
| 17 Jul 2026 | +5.8% |
| 24 Jul 2026 | +14.1% |
| 31 Jul 2026 | +12.8% |
| 7 Aug 2026 | +12.9% |
| 14 Aug 2026 | +30.2% |
| 21 Aug 2026 | +19.4% |
| 28 Aug 2026 | +27.4% |
| 4 Sep 2026 | +34.1% |
| 11 Sep 2026 | +19.4% |
| 18 Sep 2026 | −4.8% |
| 25 Sep 2026 | −7.7% |
| 2 Oct 2026 | −10.4% |
| 9 Oct 2026 | −3.9% |
| 16 Oct 2026 | +4.0% |
| 23 Oct 2026 | +4.8% |
| 30 Oct 2026 | +11.6% |
| 4 Nov 2026 | +16.4% |
Over the last 3.6 years the share price moved +58% while the S&P 500 moved +87%, so it is behind the index over that whole period. The chart above shows the 13-week comparison for every week.
This page treats a rise as over when the price closes below its 200-day average on two Fridays in a row.
What dividend does Crane NXT pay?
Crane NXT, Co. paid $0.70 per share over the last four reported quarters. The most recent declaration was $0.18 for Jun 2026. At today's price of $61.62 that is a yield of 1.14%, based on dividends already paid, not a forecast.
A dividend is cash paid out for each share. The 12-month total is the four most recent quarters added together.
Dividend per share each quarter: latest $0.18 (Jun 2026)
- Dividend per share $0.18
| Quarter | Dividend per share |
|---|---|
| Sep 2023 | $0.14 |
| Dec 2023 | $0.14 |
| Mar 2024 | $0.16 |
| Jun 2024 | $0.16 |
| Sep 2024 | $0.16 |
| Dec 2024 | $0.16 |
| Mar 2025 | $0.17 |
| Jun 2025 | $0.17 |
| Sep 2025 | $0.17 |
| Dec 2025 | $0.17 |
| Mar 2026 | $0.18 |
| Jun 2026 | $0.18 |
Which stock lists is Crane NXT on?
Crane NXT is not in the Nasdaq 100, the S&P 500 or the Dow Jones 30, and is not on the US tech stocks list.
Is Crane NXT profitable?
Crane NXT, Co. earned $35.4 M of net profit in the Jun 2026 quarter, +42.2% on the same quarter a year earlier. Full-year FY25 profit was $145 M. Over 4 years profit has grown −5.0% a year on average. That is 7.2% of the quarter's revenue. The same quarter a year earlier earned $24.9 M.
Net profit is what is left after every cost, interest and tax. Earnings per share, dividends and book value all grow from it.
For the full year, FY25 profit was $145 M (−21.2% on the year before).
FY25 profit $145 M (−21.2% on the year before), −5.0% a year over 4 years
- Net profit $145 M
| Quarter | Net profit |
|---|---|
| FY21 | $178 M |
| FY22 | $205 M |
| FY23 | $188 M |
| FY24 | $184 M |
| FY25 | $145 M |
Growth on a year earlier
- Growth on a year earlier −21.2%
| Quarter | Growth on a year earlier |
|---|---|
| FY21 | – |
| FY22 | 15.1% |
| FY23 | −8.1% |
| FY24 | −2.2% |
| FY25 | −21.2% |
Jun 2026: $35.4 M (+42.2% on a year earlier)
- Net profit (quarterly) $35.4 M
| Quarter | Net profit (quarterly) |
|---|---|
| Sep 2023 | $51.9 M |
| Dec 2023 | $49.5 M |
| Mar 2024 | $37.8 M |
| Jun 2024 | $41.6 M |
| Sep 2024 | $47.1 M |
| Dec 2024 | $57.6 M |
| Mar 2025 | $21.7 M |
| Jun 2025 | $24.9 M |
| Sep 2025 | $50.5 M |
| Dec 2025 | $48.0 M |
| Mar 2026 | $6.4 M |
| Jun 2026 | $35.4 M |
Growth on a year earlier
- Growth on a year earlier 42.2%
| Quarter | Growth on a year earlier |
|---|---|
| Sep 2023 | 16.4% |
| Dec 2023 | −20.2% |
| Mar 2024 | −13.5% |
| Jun 2024 | −3.7% |
| Sep 2024 | −9.2% |
| Dec 2024 | 16.4% |
| Mar 2025 | −42.6% |
| Jun 2025 | −40.1% |
| Sep 2025 | 7.2% |
| Dec 2025 | −16.7% |
| Mar 2026 | −70.5% |
| Jun 2026 | 42.2% |
Why profit moved: revenue changed +22.0% on a year earlier and the margin moved −1.2 percentage points. Sales did the work, and the margin was about flat.
On average over the last four quarters, profit changed −9.4% and revenue +17.3%. Profit is growing slower than sales: rising costs are taking part of the growth.
How much revenue does Crane NXT make, and is it growing?
Crane NXT, Co. reported $493 M of revenue in the Jun 2026 quarter, +22.0% on the same quarter a year earlier. That is the 9th quarter in a row with growth on the year before. Over 4 years it has grown 5.3% a year on average. The last full year, FY25, came in at $1.7 B.
Revenue is everything the company billed its customers in the period.
The last four reported quarters add to $1.8 B.
FY25 revenue was $1.7 B, +11.4% on the year before.
FY25 revenue $1.7 B (+11.4% on the year before), 5.3% a year over 4 years
- Revenue $1.7 B
| Quarter | Revenue |
|---|---|
| FY21 | $1.3 B |
| FY22 | $1.3 B |
| FY23 | $1.4 B |
| FY24 | $1.5 B |
| FY25 | $1.7 B |
Growth on a year earlier
- Growth on a year earlier 11.4%
| Quarter | Growth on a year earlier |
|---|---|
| FY21 | – |
| FY22 | −0.4% |
| FY23 | 3.8% |
| FY24 | 6.9% |
| FY25 | 11.4% |
Jun 2026: $493 M (+22.0% on a year earlier), the 9th quarter in a row of growth
- Revenue (quarterly) $493 M
| Quarter | Revenue (quarterly) |
|---|---|
| Sep 2023 | $353 M |
| Dec 2023 | $357 M |
| Mar 2024 | $314 M |
| Jun 2024 | $371 M |
| Sep 2024 | $404 M |
| Dec 2024 | $399 M |
| Mar 2025 | $330 M |
| Jun 2025 | $404 M |
| Sep 2025 | $445 M |
| Dec 2025 | $477 M |
| Mar 2026 | $388 M |
| Jun 2026 | $493 M |
Growth on a year earlier
- Growth on a year earlier 22%
| Quarter | Growth on a year earlier |
|---|---|
| Sep 2023 | 5.3% |
| Dec 2023 | 5.5% |
| Mar 2024 | −4.7% |
| Jun 2024 | 5.2% |
| Sep 2024 | 14.3% |
| Dec 2024 | 11.8% |
| Mar 2025 | 5.3% |
| Jun 2025 | 9.1% |
| Sep 2025 | 10.3% |
| Dec 2025 | 19.5% |
| Mar 2026 | 17.4% |
| Jun 2026 | 22% |
Recent pace: the last four quarters grew +17.3% on average, against 5.3% a year over the longer run, so this year is growing faster than its own long-run rate.
Is growth speeding up? Revenue over the last 12 months grew +17.3%, against +13.7% a year over the last 8 quarters (accelerating); profit over the last 12 months grew −7.3%, against −11.9% a year (accelerating).
How much of every $100 of sales does Crane NXT keep?
Crane NXT, Co.'s operating margin was 15.6% in the Jun 2026 quarter, 1.2 percentage points lower than the same quarter a year ago. Across 5 years it has been between 17.3% and 22.9%. The latest quarter is below every full year in that period.
Operating margin is what is left from every $100 of sales after the costs of running the business, before interest and tax. It shows pricing power and cost control.
Why the margin moved: operating margin changed −1.2 percentage points on the year while gross margin changed +0.6 points. So the drop came mostly from costs below the gross margin, such as staff and overheads, measured against sales.
FY25: 17.3%, within a range of 17.3% to 22.9% over 5 years
- Operating margin 17.3%
| Quarter | Operating margin |
|---|---|
| FY21 | 20.5% |
| FY22 | 22.9% |
| FY23 | 22.1% |
| FY24 | 19.9% |
| FY25 | 17.3% |
Change on the year before (points)
- Change on the year before (points) −2.6 pts
| Quarter | Change on the year before (points) |
|---|---|
| FY21 | – |
| FY22 | +2.4 pts |
| FY23 | −0.8 pts |
| FY24 | −2.2 pts |
| FY25 | −2.6 pts |
Jun 2026: operating margin 15.6% (−1.2 points on a year earlier)
- Operating margin 15.6%
| Quarter | Operating margin |
|---|---|
| Sep 2023 | 23.5% |
| Dec 2023 | 19.8% |
| Mar 2024 | 18.8% |
| Jun 2024 | 20.1% |
| Sep 2024 | 20.3% |
| Dec 2024 | 19.4% |
| Mar 2025 | 11.6% |
| Jun 2025 | 16.8% |
| Sep 2025 | 20.7% |
| Dec 2025 | 18.4% |
| Mar 2026 | 12% |
| Jun 2026 | 15.6% |
Change on a year earlier (points)
- Change on a year earlier (points) −1.2 pts
| Quarter | Change on a year earlier (points) |
|---|---|
| Sep 2023 | +0.1 pts |
| Dec 2023 | −2.7 pts |
| Mar 2024 | −2.0 pts |
| Jun 2024 | −3.9 pts |
| Sep 2024 | −3.2 pts |
| Dec 2024 | −0.4 pts |
| Mar 2025 | −7.2 pts |
| Jun 2025 | −3.3 pts |
| Sep 2025 | +0.4 pts |
| Dec 2025 | −1.0 pts |
| Mar 2026 | +0.4 pts |
| Jun 2026 | −1.2 pts |
Is Crane NXT's profit turning into cash?
Over the last 3 years, 141% of Crane NXT, Co.'s reported profit came in as cash from its operations, so the profit is backed by cash. In FY25 it brought in $242 M of operating cash against $145 M of profit. After $43.2 M of spending on assets, $198 M was left over as free cash.
The profit and loss account shows what was earned. The cash-flow statement shows the cash that actually came in. Comparing operating cash flow with profit is one of the best checks that a profit is real.
Cash-flow figures here are yearly, because quarterly cash statements are not published, so this section changes once a year.
FY25: operating cash $242 M against profit $145 M; 141% of 3 years' profit came in as cash
- Operating cash $242 M
- Net profit $145 M
- Free cash $198 M
| Quarter | Operating cash | Net profit | Free cash |
|---|---|---|---|
| FY21 | $277 M | $178 M | $258 M |
| FY22 | $306 M | $205 M | $285 M |
| FY23 | $276 M | $188 M | $245 M |
| FY24 | $214 M | $184 M | $169 M |
| FY25 | $242 M | $145 M | $198 M |
Jun 2026: operating cash $86.7 M = 245% of the quarter's profit
- Operating cash (quarterly) $86.7 M
| Quarter | Operating cash (quarterly) |
|---|---|
| Sep 2023 | $103 M |
| Dec 2023 | $78.5 M |
| Mar 2024 | $9.5 M |
| Jun 2024 | $56.8 M |
| Sep 2024 | $66.7 M |
| Dec 2024 | $81.1 M |
| Mar 2025 | −$19.1 M |
| Jun 2025 | $62.8 M |
| Sep 2025 | $92.0 M |
| Dec 2025 | $106 M |
| Mar 2026 | −$14.0 M |
| Jun 2026 | $86.7 M |
Operating cash as % of profit
- Operating cash as % of profit 245%
| Quarter | Operating cash as % of profit |
|---|---|
| Sep 2023 | 198% |
| Dec 2023 | 159% |
| Mar 2024 | 25% |
| Jun 2024 | 137% |
| Sep 2024 | 142% |
| Dec 2024 | 141% |
| Mar 2025 | −88% |
| Jun 2025 | 252% |
| Sep 2025 | 182% |
| Dec 2025 | 220% |
| Mar 2026 | −219% |
| Jun 2026 | 245% |
Why: the cash figure is clear, but the day counts behind it are not in our data, so we show it without guessing the reason.
What to look at next: the main use of cash is spending on assets. The next section checks what that spending is building.
Where does Crane NXT's cash go?
Crane NXT, Co. does not report the customer, stock and supplier day counts a cash cycle needs, so this section looks at its spending on assets instead. It spent $120 M on assets over the last 3 years. Averaged over those years that is 2.4% of FY25 revenue a year.
Working capital is the cash tied up between paying suppliers and getting paid. Debtor days: how long customers take to pay. Inventory days: how long stock sits. The cash cycle: the whole loop, in days of sales.
Nothing is estimated in place of the missing day counts, so no cash-cycle chart is drawn.
Spending on assets: $120 M over the last 3 years.
FY25: capex $43.2 M, steady spending
- Capex $43.2 M
| Quarter | Capex |
|---|---|
| FY21 | $18.6 M |
| FY22 | $21.3 M |
| FY23 | $31.1 M |
| FY24 | $45.4 M |
| FY25 | $43.2 M |
Jun 2026: capex $13.3 M in the quarter
- Capex (quarterly) $13.3 M
| Quarter | Capex (quarterly) |
|---|---|
| Sep 2023 | $7.6 M |
| Dec 2023 | $15.0 M |
| Mar 2024 | $12.5 M |
| Jun 2024 | $8.9 M |
| Sep 2024 | $13.2 M |
| Dec 2024 | $10.8 M |
| Mar 2025 | $13.1 M |
| Jun 2025 | $7.0 M |
| Sep 2025 | $13.3 M |
| Dec 2025 | $9.8 M |
| Mar 2026 | $10.1 M |
| Jun 2026 | $13.3 M |
Free cash
- Free cash $73.4 M
| Quarter | Free cash |
|---|---|
| Sep 2023 | $95.2 M |
| Dec 2023 | $63.5 M |
| Mar 2024 | −$3.0 M |
| Jun 2024 | $47.9 M |
| Sep 2024 | $53.5 M |
| Dec 2024 | $70.3 M |
| Mar 2025 | −$32.2 M |
| Jun 2025 | $55.8 M |
| Sep 2025 | $78.7 M |
| Dec 2025 | $96.0 M |
| Mar 2026 | −$24.1 M |
| Jun 2026 | $73.4 M |
In short: the cash is going into new capacity, not getting stuck in the daily cycle. The question is whether the new capacity earns.
What is Crane NXT's P/E ratio, and how does it compare with its own history?
Crane NXT, Co.'s P/E is 25.5×, about the highest it has ever been. Its usual P/E (the middle reading) is 18.6×, over 3.6 years of weekly prices. This compares the share price with the company’s own past. It does not say what the business is worth.
P/E is the share price divided by a year's profit per share: how many dollars the market pays for each dollar of yearly profit.
P/E 25.5× against a usual 18.6×: about the highest it has ever been
- P/E 24.8×
- Median 18.6×
| Week | P/E | Median |
|---|---|---|
| 31 Mar 2023 | 11.1× | 18.6× |
| 6 Apr 2023 | 12.5× | 18.6× |
| 14 Apr 2023 | 13.1× | 18.6× |
| 21 Apr 2023 | 14.0× | 18.6× |
| 28 Apr 2023 | 13.5× | 18.6× |
| 5 May 2023 | 13.7× | 18.6× |
| 12 May 2023 | 14.1× | 18.6× |
| 19 May 2023 | 15.3× | 18.6× |
| 26 May 2023 | 15.2× | 18.6× |
| 2 Jun 2023 | 15.7× | 18.6× |
| 9 Jun 2023 | 16.0× | 18.6× |
| 16 Jun 2023 | 15.7× | 18.6× |
| 23 Jun 2023 | 15.6× | 18.6× |
| 30 Jun 2023 | 16.6× | 18.6× |
| 7 Jul 2023 | 16.6× | 18.6× |
| 14 Jul 2023 | 16.6× | 18.6× |
| 21 Jul 2023 | 16.7× | 18.6× |
| 28 Jul 2023 | 16.8× | 18.6× |
| 4 Aug 2023 | 16.7× | 18.6× |
| 11 Aug 2023 | 17.7× | 18.6× |
| 18 Aug 2023 | 17.5× | 18.6× |
| 25 Aug 2023 | 17.4× | 18.6× |
| 1 Sep 2023 | 17.8× | 18.6× |
| 8 Sep 2023 | 16.9× | 18.6× |
| 15 Sep 2023 | 16.8× | 18.6× |
| 22 Sep 2023 | 16.6× | 18.6× |
| 29 Sep 2023 | 16.4× | 18.6× |
| 6 Oct 2023 | 15.6× | 18.6× |
| 13 Oct 2023 | 15.0× | 18.6× |
| 20 Oct 2023 | 14.5× | 18.6× |
| 27 Oct 2023 | 14.5× | 18.6× |
| 3 Nov 2023 | 15.4× | 18.6× |
| 10 Nov 2023 | 14.6× | 18.6× |
| 17 Nov 2023 | 15.2× | 18.6× |
| 24 Nov 2023 | 15.1× | 18.6× |
| 1 Dec 2023 | 15.1× | 18.6× |
| 8 Dec 2023 | 14.6× | 18.6× |
| 15 Dec 2023 | 15.3× | 18.6× |
| 22 Dec 2023 | 16.9× | 18.6× |
| 29 Dec 2023 | 16.2× | 18.6× |
| 5 Jan 2024 | 16.5× | 18.6× |
| 12 Jan 2024 | 16.9× | 18.6× |
| 19 Jan 2024 | 17.5× | 18.6× |
| 26 Jan 2024 | 17.7× | 18.6× |
| 2 Feb 2024 | 18.1× | 18.6× |
| 9 Feb 2024 | 18.3× | 18.6× |
| 16 Feb 2024 | 17.9× | 18.6× |
| 23 Feb 2024 | 18.4× | 18.6× |
| 1 Mar 2024 | 18.1× | 18.6× |
| 8 Mar 2024 | 18.1× | 18.6× |
| 15 Mar 2024 | 18.5× | 18.6× |
| 22 Mar 2024 | 18.5× | 18.6× |
| 28 Mar 2024 | 18.9× | 18.6× |
| 5 Apr 2024 | 18.2× | 18.6× |
| 12 Apr 2024 | 19.2× | 18.6× |
| 19 Apr 2024 | 19.3× | 18.6× |
| 26 Apr 2024 | 19.7× | 18.6× |
| 3 May 2024 | 19.4× | 18.6× |
| 10 May 2024 | 19.0× | 18.6× |
| 17 May 2024 | 19.0× | 18.6× |
| 24 May 2024 | 19.4× | 18.6× |
| 31 May 2024 | 19.9× | 18.6× |
| 7 Jun 2024 | 19.2× | 18.6× |
| 14 Jun 2024 | 19.0× | 18.6× |
| 21 Jun 2024 | 20.4× | 18.6× |
| 28 Jun 2024 | 19.4× | 18.6× |
| 5 Jul 2024 | 18.1× | 18.6× |
| 12 Jul 2024 | 18.2× | 18.6× |
| 19 Jul 2024 | 18.8× | 18.6× |
| 26 Jul 2024 | 20.3× | 18.6× |
| 2 Aug 2024 | 18.6× | 18.6× |
| 9 Aug 2024 | 18.1× | 18.6× |
| 16 Aug 2024 | 18.4× | 18.6× |
| 23 Aug 2024 | 18.7× | 18.6× |
| 30 Aug 2024 | 18.7× | 18.6× |
| 6 Sep 2024 | 17.7× | 18.6× |
| 13 Sep 2024 | 18.6× | 18.6× |
| 20 Sep 2024 | 18.8× | 18.6× |
| 27 Sep 2024 | 17.8× | 18.6× |
| 4 Oct 2024 | 18.3× | 18.6× |
| 11 Oct 2024 | 18.0× | 18.6× |
| 18 Oct 2024 | 19.1× | 18.6× |
| 25 Oct 2024 | 18.1× | 18.6× |
| 1 Nov 2024 | 17.7× | 18.6× |
| 8 Nov 2024 | 18.6× | 18.6× |
| 15 Nov 2024 | 18.2× | 18.6× |
| 22 Nov 2024 | 19.7× | 18.6× |
| 29 Nov 2024 | 20.5× | 18.6× |
| 6 Dec 2024 | 19.9× | 18.6× |
| 13 Dec 2024 | 19.6× | 18.6× |
| 20 Dec 2024 | 18.5× | 18.6× |
| 27 Dec 2024 | 19.0× | 18.6× |
| 3 Jan 2025 | 18.7× | 18.6× |
| 10 Jan 2025 | 19.4× | 18.6× |
| 17 Jan 2025 | 20.0× | 18.6× |
| 24 Jan 2025 | 20.0× | 18.6× |
| 31 Jan 2025 | 20.1× | 18.6× |
| 7 Feb 2025 | 19.4× | 18.6× |
| 14 Feb 2025 | 18.8× | 18.6× |
| 21 Feb 2025 | 18.2× | 18.6× |
| 28 Feb 2025 | 17.5× | 18.6× |
| 7 Mar 2025 | 17.0× | 18.6× |
| 14 Mar 2025 | 17.1× | 18.6× |
| 21 Mar 2025 | 16.6× | 18.6× |
| 28 Mar 2025 | 16.1× | 18.6× |
| 4 Apr 2025 | 15.5× | 18.6× |
| 11 Apr 2025 | 15.6× | 18.6× |
| 17 Apr 2025 | 15.4× | 18.6× |
| 25 Apr 2025 | 16.0× | 18.6× |
| 2 May 2025 | 16.6× | 18.6× |
| 9 May 2025 | 18.2× | 18.6× |
| 16 May 2025 | 19.0× | 18.6× |
| 23 May 2025 | 17.9× | 18.6× |
| 30 May 2025 | 18.4× | 18.6× |
| 6 Jun 2025 | 18.6× | 18.6× |
| 13 Jun 2025 | 18.7× | 18.6× |
| 20 Jun 2025 | 18.8× | 18.6× |
| 27 Jun 2025 | 18.5× | 18.6× |
| 3 Jul 2025 | 21.6× | 18.6× |
| 11 Jul 2025 | 22.4× | 18.6× |
| 18 Jul 2025 | 21.9× | 18.6× |
| 25 Jul 2025 | 22.7× | 18.6× |
| 1 Aug 2025 | 21.8× | 18.6× |
| 8 Aug 2025 | 23.1× | 18.6× |
| 15 Aug 2025 | 22.8× | 18.6× |
| 22 Aug 2025 | 24.2× | 18.6× |
| 29 Aug 2025 | 22.8× | 18.6× |
| 5 Sep 2025 | 23.4× | 18.6× |
| 12 Sep 2025 | 23.1× | 18.6× |
| 19 Sep 2025 | 21.6× | 18.6× |
| 26 Sep 2025 | 24.8× | 18.6× |
| 3 Oct 2025 | 24.8× | 18.6× |
| 10 Oct 2025 | 24.5× | 18.6× |
| 17 Oct 2025 | 24.8× | 18.6× |
| 24 Oct 2025 | 24.7× | 18.6× |
| 31 Oct 2025 | 23.6× | 18.6× |
| 7 Nov 2025 | 23.3× | 18.6× |
| 14 Nov 2025 | 21.9× | 18.6× |
| 21 Nov 2025 | 20.3× | 18.6× |
| 28 Nov 2025 | 21.0× | 18.6× |
| 5 Dec 2025 | 21.7× | 18.6× |
| 12 Dec 2025 | 19.4× | 18.6× |
| 19 Dec 2025 | 17.6× | 18.6× |
| 26 Dec 2025 | 18.1× | 18.6× |
| 2 Jan 2026 | 19.1× | 18.6× |
| 9 Jan 2026 | 20.0× | 18.6× |
| 16 Jan 2026 | 20.9× | 18.6× |
| 23 Jan 2026 | 20.4× | 18.6× |
| 30 Jan 2026 | 20.2× | 18.6× |
| 6 Feb 2026 | 22.4× | 18.6× |
| 13 Feb 2026 | 21.1× | 18.6× |
| 20 Feb 2026 | 20.9× | 18.6× |
| 27 Feb 2026 | 19.3× | 18.6× |
| 6 Mar 2026 | 18.5× | 18.6× |
| 13 Mar 2026 | 16.9× | 18.6× |
| 20 Mar 2026 | 16.2× | 18.6× |
| 27 Mar 2026 | 16.5× | 18.6× |
| 2 Apr 2026 | 18.0× | 18.6× |
| 10 Apr 2026 | 19.7× | 18.6× |
| 17 Apr 2026 | 20.8× | 18.6× |
| 24 Apr 2026 | 20.2× | 18.6× |
| 1 May 2026 | 20.0× | 18.6× |
| 8 May 2026 | 20.3× | 18.6× |
| 15 May 2026 | 17.1× | 18.6× |
| 22 May 2026 | 18.4× | 18.6× |
| 29 May 2026 | 17.4× | 18.6× |
| 5 Jun 2026 | 16.2× | 18.6× |
| 12 Jun 2026 | 19.1× | 18.6× |
| 18 Jun 2026 | 21.1× | 18.6× |
| 26 Jun 2026 | 21.8× | 18.6× |
| 2 Jul 2026 | 21.8× | 18.6× |
| 10 Jul 2026 | 21.1× | 18.6× |
| 17 Jul 2026 | 21.3× | 18.6× |
| 24 Jul 2026 | 21.9× | 18.6× |
| 31 Jul 2026 | 21.6× | 18.6× |
| 7 Aug 2026 | 22.1× | 18.6× |
| 14 Aug 2026 | 21.4× | 18.6× |
| 21 Aug 2026 | 20.8× | 18.6× |
| 28 Aug 2026 | 20.8× | 18.6× |
| 4 Sep 2026 | 20.8× | 18.6× |
| 11 Sep 2026 | 21.6× | 18.6× |
| 18 Sep 2026 | 18.9× | 18.6× |
| 25 Sep 2026 | 19.8× | 18.6× |
| 2 Oct 2026 | 20.3× | 18.6× |
| 9 Oct 2026 | 20.9× | 18.6× |
| 16 Oct 2026 | 22.7× | 18.6× |
| 23 Oct 2026 | 23.6× | 18.6× |
| 30 Oct 2026 | 24.3× | 18.6× |
| 4 Nov 2026 | 24.8× | 18.6× |
Earnings per share, 12 months
- Earnings per share, 12 months $2.41
| Week | Earnings per share, 12 months |
|---|---|
| 31 Mar 2023 | $3.51 |
| 6 Apr 2023 | $3.51 |
| 14 Apr 2023 | $3.51 |
| 21 Apr 2023 | $3.51 |
| 28 Apr 2023 | $3.51 |
| 5 May 2023 | $3.51 |
| 12 May 2023 | $3.51 |
| 19 May 2023 | $3.51 |
| 26 May 2023 | $3.51 |
| 2 Jun 2023 | $3.51 |
| 9 Jun 2023 | $3.51 |
| 16 Jun 2023 | $3.51 |
| 23 Jun 2023 | $3.51 |
| 30 Jun 2023 | $3.40 |
| 7 Jul 2023 | $3.40 |
| 14 Jul 2023 | $3.40 |
| 21 Jul 2023 | $3.40 |
| 28 Jul 2023 | $3.40 |
| 4 Aug 2023 | $3.40 |
| 11 Aug 2023 | $3.40 |
| 18 Aug 2023 | $3.40 |
| 25 Aug 2023 | $3.40 |
| 1 Sep 2023 | $3.40 |
| 8 Sep 2023 | $3.40 |
| 15 Sep 2023 | $3.40 |
| 22 Sep 2023 | $3.40 |
| 29 Sep 2023 | $3.40 |
| 6 Oct 2023 | $3.40 |
| 13 Oct 2023 | $3.40 |
| 20 Oct 2023 | $3.40 |
| 27 Oct 2023 | $3.40 |
| 3 Nov 2023 | $3.40 |
| 10 Nov 2023 | $3.40 |
| 17 Nov 2023 | $3.40 |
| 24 Nov 2023 | $3.40 |
| 1 Dec 2023 | $3.40 |
| 8 Dec 2023 | $3.40 |
| 15 Dec 2023 | $3.40 |
| 22 Dec 2023 | $3.40 |
| 29 Dec 2023 | $3.51 |
| 5 Jan 2024 | $3.51 |
| 12 Jan 2024 | $3.51 |
| 19 Jan 2024 | $3.51 |
| 26 Jan 2024 | $3.51 |
| 2 Feb 2024 | $3.51 |
| 9 Feb 2024 | $3.51 |
| 16 Feb 2024 | $3.51 |
| 23 Feb 2024 | $3.51 |
| 1 Mar 2024 | $3.51 |
| 8 Mar 2024 | $3.51 |
| 15 Mar 2024 | $3.51 |
| 22 Mar 2024 | $3.51 |
| 28 Mar 2024 | $3.28 |
| 5 Apr 2024 | $3.28 |
| 12 Apr 2024 | $3.28 |
| 19 Apr 2024 | $3.28 |
| 26 Apr 2024 | $3.28 |
| 3 May 2024 | $3.28 |
| 10 May 2024 | $3.28 |
| 17 May 2024 | $3.28 |
| 24 May 2024 | $3.28 |
| 31 May 2024 | $3.28 |
| 7 Jun 2024 | $3.28 |
| 14 Jun 2024 | $3.28 |
| 21 Jun 2024 | $3.28 |
| 28 Jun 2024 | $3.17 |
| 5 Jul 2024 | $3.17 |
| 12 Jul 2024 | $3.17 |
| 19 Jul 2024 | $3.17 |
| 26 Jul 2024 | $3.17 |
| 2 Aug 2024 | $3.17 |
| 9 Aug 2024 | $3.17 |
| 16 Aug 2024 | $3.17 |
| 23 Aug 2024 | $3.17 |
| 30 Aug 2024 | $3.17 |
| 6 Sep 2024 | $3.17 |
| 13 Sep 2024 | $3.17 |
| 20 Sep 2024 | $3.17 |
| 27 Sep 2024 | $3.14 |
| 4 Oct 2024 | $3.14 |
| 11 Oct 2024 | $3.14 |
| 18 Oct 2024 | $3.14 |
| 25 Oct 2024 | $3.14 |
| 1 Nov 2024 | $3.14 |
| 8 Nov 2024 | $3.14 |
| 15 Nov 2024 | $3.14 |
| 22 Nov 2024 | $3.14 |
| 29 Nov 2024 | $3.14 |
| 6 Dec 2024 | $3.14 |
| 13 Dec 2024 | $3.14 |
| 20 Dec 2024 | $3.14 |
| 27 Dec 2024 | $3.05 |
| 3 Jan 2025 | $3.05 |
| 10 Jan 2025 | $3.05 |
| 17 Jan 2025 | $3.05 |
| 24 Jan 2025 | $3.05 |
| 31 Jan 2025 | $3.05 |
| 7 Feb 2025 | $3.05 |
| 14 Feb 2025 | $3.05 |
| 21 Feb 2025 | $3.05 |
| 28 Feb 2025 | $3.05 |
| 7 Mar 2025 | $3.05 |
| 14 Mar 2025 | $3.05 |
| 21 Mar 2025 | $3.05 |
| 28 Mar 2025 | $3.19 |
| 4 Apr 2025 | $3.19 |
| 11 Apr 2025 | $3.19 |
| 17 Apr 2025 | $3.19 |
| 25 Apr 2025 | $3.19 |
| 2 May 2025 | $3.19 |
| 9 May 2025 | $3.19 |
| 16 May 2025 | $3.19 |
| 23 May 2025 | $3.19 |
| 30 May 2025 | $3.19 |
| 6 Jun 2025 | $3.19 |
| 13 Jun 2025 | $3.19 |
| 20 Jun 2025 | $3.19 |
| 27 Jun 2025 | $2.91 |
| 3 Jul 2025 | $2.91 |
| 11 Jul 2025 | $2.91 |
| 18 Jul 2025 | $2.91 |
| 25 Jul 2025 | $2.91 |
| 1 Aug 2025 | $2.91 |
| 8 Aug 2025 | $2.91 |
| 15 Aug 2025 | $2.91 |
| 22 Aug 2025 | $2.91 |
| 29 Aug 2025 | $2.91 |
| 5 Sep 2025 | $2.91 |
| 12 Sep 2025 | $2.91 |
| 19 Sep 2025 | $2.91 |
| 26 Sep 2025 | $2.62 |
| 3 Oct 2025 | $2.62 |
| 10 Oct 2025 | $2.62 |
| 17 Oct 2025 | $2.62 |
| 24 Oct 2025 | $2.62 |
| 31 Oct 2025 | $2.62 |
| 7 Nov 2025 | $2.62 |
| 14 Nov 2025 | $2.62 |
| 21 Nov 2025 | $2.62 |
| 28 Nov 2025 | $2.62 |
| 5 Dec 2025 | $2.62 |
| 12 Dec 2025 | $2.62 |
| 19 Dec 2025 | $2.62 |
| 26 Dec 2025 | $2.68 |
| 2 Jan 2026 | $2.68 |
| 9 Jan 2026 | $2.68 |
| 16 Jan 2026 | $2.68 |
| 23 Jan 2026 | $2.68 |
| 30 Jan 2026 | $2.68 |
| 6 Feb 2026 | $2.68 |
| 13 Feb 2026 | $2.68 |
| 20 Feb 2026 | $2.68 |
| 27 Feb 2026 | $2.68 |
| 6 Mar 2026 | $2.68 |
| 13 Mar 2026 | $2.68 |
| 20 Mar 2026 | $2.68 |
| 27 Mar 2026 | $2.50 |
| 2 Apr 2026 | $2.50 |
| 10 Apr 2026 | $2.50 |
| 17 Apr 2026 | $2.50 |
| 24 Apr 2026 | $2.50 |
| 1 May 2026 | $2.50 |
| 8 May 2026 | $2.50 |
| 15 May 2026 | $2.50 |
| 22 May 2026 | $2.50 |
| 29 May 2026 | $2.50 |
| 5 Jun 2026 | $2.50 |
| 12 Jun 2026 | $2.50 |
| 18 Jun 2026 | $2.50 |
| 26 Jun 2026 | $2.23 |
| 2 Jul 2026 | $2.23 |
| 10 Jul 2026 | $2.23 |
| 17 Jul 2026 | $2.23 |
| 24 Jul 2026 | $2.23 |
| 31 Jul 2026 | $2.23 |
| 7 Aug 2026 | $2.23 |
| 14 Aug 2026 | $2.23 |
| 21 Aug 2026 | $2.23 |
| 28 Aug 2026 | $2.23 |
| 4 Sep 2026 | $2.23 |
| 11 Sep 2026 | $2.23 |
| 18 Sep 2026 | $2.23 |
| 25 Sep 2026 | $2.41 |
| 2 Oct 2026 | $2.41 |
| 9 Oct 2026 | $2.41 |
| 16 Oct 2026 | $2.41 |
| 23 Oct 2026 | $2.41 |
| 30 Oct 2026 | $2.41 |
| 4 Nov 2026 | $2.41 |
PEG 1.27 at the Jun 2026 quarter end: above 1.0, so the P/E is bigger than the earnings growth rate
- PEG 1.27×
- PEG = 1.0 1.00×
| Quarter | PEG | PEG = 1.0 |
|---|---|---|
| Jun 2023 | 1.44× | 1.00× |
| Sep 2023 | 1.52× | 1.00× |
| Dec 2023 | 1.55× | 1.00× |
| Mar 2024 | 1.61× | 1.00× |
| Jun 2024 | 1.57× | 1.00× |
| Sep 2024 | 1.38× | 1.00× |
| Dec 2024 | 1.48× | 1.00× |
| Mar 2025 | 1.38× | 1.00× |
| Jun 2025 | 1.34× | 1.00× |
| Sep 2025 | 1.62× | 1.00× |
| Dec 2025 | 1.21× | 1.00× |
| Mar 2026 | 1.06× | 1.00× |
| Jun 2026 | 1.27× | 1.00× |
Why the multiple is where it is: over the past year earnings per share moved −21.6% while the price moved −1.3%. The price did better than earnings, which pushed the multiple up within its own range.
Where the price move came from: over 3 years the price moved +4.4% a year; about −11.8% a year came from earnings growth and about +16.2 percentage points from the multiple (the market paying more). The split is approximate (price return minus earnings growth). It shows how much of the move came from the market paying a different multiple.
In short: the multiple is high against its own past, so the earnings trend underneath matters more than the multiple.
Is the Crane NXT business getting better or worse?
Crane NXT, Co.'s business is getting worse. Profit and EPS growth are shrinking: profit growth is −7.3% in the latest quarter, against −2.2% at its best in 12 quarters, with ROCE steady at 11.7%. This is based on 12 quarters of 4 measures.
Every business is somewhere on a path of getting better or worse, and this section names where. The last 12 quarters of growth in revenue, profit and earnings per share, plus the return the business earns on its capital, are read as lines. Getting worse: the lines are falling. Turning around: a low point has just formed and the last few quarters are rising from it. Getting better: the rise from the low has lasted. Growing steadily: steady growth with healthy returns. Slowing from a peak: still high, but slowing. When the lines disagree the result is mixed; too little history means no reading. CAGR (compound annual growth rate) is the steady yearly rate that would turn the starting value into the latest one. It is the fairest way to compare growth over different periods. If the 1-year figure is much bigger than the 10-year one, recent growth is running faster than the long-run trend. A dash means there is no figure for that period, or the starting year was a loss, where a growth rate means nothing.
Growth year by year: revenue +11.4% in FY25, profit −21.2%
- Revenue growth 11.4%
| Quarter | Revenue growth |
|---|---|
| FY21 | – |
| FY22 | −0.4% |
| FY23 | 3.8% |
| FY24 | 6.9% |
| FY25 | 11.4% |
Profit growth, EPS growth
- Profit growth −21.2%
- EPS growth −21.6%
| Quarter | Profit growth | EPS growth |
|---|---|---|
| FY21 | – | – |
| FY22 | 15.1% | 15% |
| FY23 | −8.1% | −9.1% |
| FY24 | −2.2% | −2.7% |
| FY25 | −21.2% | −21.6% |
Three growth lines over twelve quarters: revenue accelerating, profit accelerating
- Revenue 17.3%
| Quarter | Revenue |
|---|---|
| Sep 2023 | −22.5% |
| Dec 2023 | 3.8% |
| Mar 2024 | 2.9% |
| Jun 2024 | 2.9% |
| Sep 2024 | 5.2% |
| Dec 2024 | 6.9% |
| Mar 2025 | 9.3% |
| Jun 2025 | 10.3% |
| Sep 2025 | 9.3% |
| Dec 2025 | 11.4% |
| Mar 2026 | 14% |
| Jun 2026 | 17.3% |
Profit, EPS
- Profit −7.3%
- EPS −8%
| Quarter | Profit | EPS |
|---|---|---|
| Sep 2023 | −5.1% | −5.6% |
| Dec 2023 | −8.1% | −8.5% |
| Mar 2024 | −8.4% | −9.5% |
| Jun 2024 | −6.6% | −7.5% |
| Sep 2024 | −12.4% | −13% |
| Dec 2024 | −2.2% | −2.9% |
| Mar 2025 | −7.9% | −8.4% |
| Jun 2025 | −16.3% | −16.7% |
| Sep 2025 | −12.1% | −12.3% |
| Dec 2025 | −21.2% | −21.7% |
| Mar 2026 | −22.7% | −23.3% |
| Jun 2026 | −7.3% | −8% |
ROCE: the return line, worked out each quarter
- ROCE 11.7%
| Quarter | ROCE |
|---|---|
| Sep 2023 | 19.8% |
| Dec 2023 | 18.6% |
| Mar 2024 | 18% |
| Jun 2024 | 15.4% |
| Sep 2024 | 15.3% |
| Dec 2024 | 16.2% |
| Mar 2025 | 14.8% |
| Jun 2025 | 12.8% |
| Sep 2025 | 13% |
| Dec 2025 | 13.1% |
| Mar 2026 | 12.4% |
| Jun 2026 | 11.7% |
Why it matters: falling lines mean any ratio below that looks low should be read with that direction in mind.
Compound annual growth rate (%)
Compound annual growth rate over each period, %. Revenue, profit and EPS come from yearly figures; the stock price row is price growth over the same periods. A dash means no figure for that period, or the starting year was a loss.
| Measure | 1yr | 3yr | 5yr | 10yr |
|---|---|---|---|---|
| Revenue | +11.4% | +7.3% | — | — |
| Profit | −21.2% | −10.9% | — | — |
| EPS | −21.6% | −11.5% | — | — |
| Stock price | −1.3% | +4.4% | — | — |
How much does Crane NXT earn on its capital?
Crane NXT, Co. earned a ROE of 12% in FY25. Its return on capital used (ROIC) is 1.6 percentage points above its cost of capital, so growth here adds value, not just size. It comes from a 8.8% net margin and 0.53× asset turnover (sales divided by assets).
Return on equity (ROE) is the profit the business earns on its shareholders’ money. We do not have the full capital split, so ROE is the longest history we can draw here.
Why the return is what it is (FY25): a 8.8% net margin × 0.53× asset turnover × 2.48× leverage (assets divided by equity) ≈ 11.6% on equity. The margin does its share; borrowing is a big part of it.
The key test, return on capital used minus the cost of capital: 9.5% − 7.9% = +1.6 percentage points. The 7.9% is an estimate of this company's own cost of capital. Read the sign and size of the gap, not the decimals. Positive but thin: it creates value with little room for error.
The 9.5% ROIC above is the latest reading, as reported. The yearly chart below shows FY25 at 11.6%, and the quarterly chart works out each 12-month window from the quarterly figures, so the readings differ by date, not by method.
FY25: ROE 12%, the full history
- ROE 11.5%
- ROIC (annual) 11.6%
- Cost of capital 7.9%
| Quarter | ROE | ROIC (annual) | Cost of capital |
|---|---|---|---|
| FY21 | 23.3% | 14.1% | 7.9% |
| FY22 | 26.1% | 17% | 7.9% |
| FY23 | 19.5% | 16.8% | 7.9% |
| FY24 | 17.3% | 15.3% | 7.9% |
| FY25 | 11.5% | 11.6% | 7.9% |
Jun 2026: ROIC 10.9% (last 12 months) against a 7.9% cost of capital
- ROIC (12 months) 10.9%
- ROE (12 months) 2.2%
- Cost of capital 7.9%
| Quarter | ROIC (12 months) | ROE (12 months) | Cost of capital |
|---|---|---|---|
| Sep 2023 | 18.9% | – | 7.9% |
| Dec 2023 | 17.7% | 24% | 7.9% |
| Mar 2024 | 18.3% | 21.6% | 7.9% |
| Jun 2024 | 16.2% | 15.7% | 7.9% |
| Sep 2024 | 15.3% | 17% | 7.9% |
| Dec 2024 | 14.5% | 18.3% | 7.9% |
| Mar 2025 | 14.8% | 21.6% | 7.9% |
| Jun 2025 | 13.2% | 8% | 7.9% |
| Sep 2025 | 12.2% | 8.8% | 7.9% |
| Dec 2025 | 11.9% | 17% | 7.9% |
| Mar 2026 | 11.2% | 15.4% | 7.9% |
| Jun 2026 | 10.9% | 2.2% | 7.9% |
Does Crane NXT have too much debt?
Crane NXT, Co. has total debt of $1.5 B against shareholder equity of $1.3 B as of Jun 2026, so its debt is 1.14× its equity. Year by year, that ratio went from 1.15 in FY21 to 0.96 in FY25. Keep that borrowing in mind when reading the returns on this page.
Debt-to-equity shows how much of the business is paid for with borrowed money. Lower is safer, and the direction matters as much as the level.
FY25: debt $1.2 B, 0.96× equity
- Total debt $1.2 B
| Quarter | Total debt |
|---|---|
| FY21 | $876 M |
| FY22 | $881 M |
| FY23 | $695 M |
| FY24 | $814 M |
| FY25 | $1.2 B |
Debt-to-equity
- Debt-to-equity 0.96×
| Quarter | Debt-to-equity |
|---|---|
| FY21 | 1.15× |
| FY22 | 1.12× |
| FY23 | 0.72× |
| FY24 | 0.76× |
| FY25 | 0.96× |
Jun 2026: debt $1.5 B, debt-to-equity 1.14
- Total debt (quarterly) $1.5 B
| Quarter | Total debt (quarterly) |
|---|---|
| Sep 2023 | $766 M |
| Dec 2023 | $695 M |
| Mar 2024 | $678 M |
| Jun 2024 | $867 M |
| Sep 2024 | $804 M |
| Dec 2024 | $814 M |
| Mar 2025 | $816 M |
| Jun 2025 | $1.1 B |
| Sep 2025 | $1.1 B |
| Dec 2025 | $1.2 B |
| Mar 2026 | $1.5 B |
| Jun 2026 | $1.5 B |
Debt-to-equity
- Debt-to-equity 1.14×
| Quarter | Debt-to-equity |
|---|---|
| Sep 2023 | 0.88× |
| Dec 2023 | 0.72× |
| Mar 2024 | 0.70× |
| Jun 2024 | 0.88× |
| Sep 2024 | 0.75× |
| Dec 2024 | 0.76× |
| Mar 2025 | 0.74× |
| Jun 2025 | 0.97× |
| Sep 2025 | 0.90× |
| Dec 2025 | 0.96× |
| Mar 2026 | 1.21× |
| Jun 2026 | 1.14× |
What is the Crane NXT shareholding pattern?
16.9% of Crane NXT, Co.'s tradable shares are in short positions, which are bets that the price will fall, so a large group of traders is betting against it. At normal trading volumes, closing those positions would take about 17.2 days. US companies do not publish a quarter-by-quarter list of owners, so this page uses short interest instead.
There is no quarter-by-quarter list of owners here, so we look at short interest: the share of tradable shares held in short positions, which gain if the price falls.
It is a single reading at one point in time; we do not have its history.
Why it is at this level: the figure does not say who has the short positions or why, so we show the level without guessing the story.
How far is Crane NXT from balance-sheet trouble?
For Crane NXT, Co., the Z-score is 1.82. A Z-score above about 3 is safe and below about 1.8 signals danger, so this is in the grey area between the two. It estimates how far the balance sheet is from trouble; it is not a forecast of failure.
The Z-score estimates how far a company is from balance-sheet trouble. Above about 3 is safe; below about 1.8 is the danger zone. It was built for manufacturers, so it is not used for banks and lenders.
Why it matters: a Z-score of 1.82 is in the grey area, neither clearly safe nor clearly in trouble.
How does Crane NXT rank in its industry?
There is no score against its industry: Crane NXT, Co. is not among the largest members shown in this industry comparison for Specialty Industrial Machinery.
The score ranks a company within its industry: each measure is scored against the other members. Without that group there is no score, so none is shown.
Which companies is Crane NXT compared with?
No sector comparison is shown here, not among the largest members shown in this industry comparison.
Which companies are close to Crane NXT in size?
Crane NXT is the 36th largest of 57 Specialty Industrial Machinery companies on Sector Alpha by market value (scores of 4 November 2026). Just above it: Mirion Technologies, Inc., Mueller Water Products, Inc. and Kadant Inc. Just below it: Standex International Corporation, Helios Technologies, Inc. and NuScale Power Corporation.
Specialty Industrial Machinery companies close in size
- Mirion Technologies, Inc. $4.4 billion
- Mueller Water Products, Inc. $3.8 billion
- Kadant Inc. $3.6 billion
- Crane NXT, Co. $3.5 billion
- Standex International Corporation $3 billion
- Helios Technologies, Inc. $2.2 billion
- NuScale Power Corporation $2.2 billion
All 57 Specialty Industrial Machinery companies, largest first
Companies close in size in other industries
- Lemonade, Inc. $3.6 billion · Insurance - Property & Casualty
- HNI Corporation $3.5 billion · Furnishings, Fixtures & Appliances
- Crane NXT, Co. $3.5 billion
- USA Compression Partners, LP $3.5 billion · Oil & Gas Equipment & Services
- Shift4 Payments, Inc. $3.5 billion · Software - Infrastructure
What else do people ask about Crane NXT?
What were Crane NXT's latest quarterly results?
Crane NXT, Co. reported revenue of $493 M and net profit of $35.4 M for the Jun 2026 quarter. Revenue rose 22.0% and profit rose 42.2% compared with a year earlier. Earnings per share were $0.61.
The operating margin was 15.6%, 1.2 percentage points lower than a year earlier (as of 4 November 2026).
What is Crane NXT's market cap?
Crane NXT, Co.'s market capitalisation is $3.5 B at a stock price of $61.62. Market cap is the share price times the number of shares, so it changes whenever the price moves (as of 4 November 2026).
How is Crane NXT performing?
Crane NXT, Co.'s share price has been stalling near its high for 7 weeks. In its latest quarter, revenue rose 22.0% and profit rose 42.2% compared with a year earlier.
Over the past 13 weeks it has done better than the S&P 500, for 4 weeks running (as of 4 November 2026).
Will Crane NXT's stock price go up?
This page does not forecast Crane NXT, Co.'s stock price. What it shows instead: the stock price is $61.62, and it has been stalling near its high for 7 weeks. Its P/E of 25.5× is higher than 99% of its own last 4 years (as of 4 November 2026).
Where is Crane NXT in its business cycle?
Crane NXT, Co.'s FY25 operating margin was 17.3%, against a 5-year range of 17.3% to 22.9%: the low end of its own range, which is often where recoveries start. The latest quarter was 15.6%.
Comparing margins with a company's own long history is a good way to see where it is in its cycle (as of 4 November 2026).
What could break the Crane NXT story?
The main question: results are strong, and the P/E is higher than 99% of its own history. On price, this page treats a rise as over when the share price closes below its 200-day average on two Fridays in a row (as of 4 November 2026).
Is Crane NXT a stock worth studying right now?
What the numbers show: Crane NXT, Co.'s results are improving, and its P/E is near the top of its own history, higher than 99% of past readings. The main open question: whether earnings grow enough to match the multiple.
Every number on this page is worked out by code from the published figures, with no forecasts and no price opinions (as of 4 November 2026).
Where do these numbers come from?
Sector Alpha, written by code from the published numbers. Data as of 4 November 2026.
Every chart on this page is drawn by code from the published figures, with no forecasts and no price opinions.
See the plain-text version of this page.
More lists
Every Sector Alpha list, grouped
Stock screens
Market lists
Themes
Sectors
US stocks
X · Instagram · YouTube · About · Newsletter · Newsletter archive
This is research, not advice. We’re not SEBI-registered.