Birla Cable share price today
Birla Cable Ltd · NSE: BIRLACABLE · Cables - Telecom · prices and results as of 5 November 2026, updated weekly · research updated 14 June 2026
Birla Cable share price today: ₹346.60 at the NSE close on 5 November 2026, up 122.8% in a year. Birla Cable (NSE: BIRLACABLE) is worth ₹1,045 crore, trades at a P/E of 12.5 and has closed between ₹112.05 and ₹408.25 over the past 52 weeks. Latest change: best operating margin in 15 quarters.
Birla Cable Ltd's results are improving, while its P/E is near the low end of its own history over 3.5 years, higher than only 1% of past readings.
The main question: yearly earnings per share moved +245.4% while the share price moved +122.8%.
The price has been rising for 22 weeks, and the P/E is lower than 99% of its own last 3.5 years. Over the last four quarters, results have been improving, with profit +3,700.0% on a year earlier, and 243% of the last 3 years' profit came in as cash. What will decide it: whether the price catches up with earnings that have already grown.
What is the Birla Cable share price today?
Birla Cable Ltd's share price was ₹346.60 at the close on 5 November 2026. It has been rising for 22 weeks. That is 39.7% above its average price over the last 200 trading days. In the last 52 weeks it traded between ₹112 and ₹408, and at that close it sat 79% of the way up from that low.
A share price tends to move through four phases: moving sideways (stage 1), rising (stage 2), stalling near a high (stage 3) and falling (stage 4). Today Birla Cable Ltd is in stage 2. The phase helps read everything below.
Over the past 13 weeks it has done better than the NIFTY 500, and it has stayed ahead for 15 weeks in a row.
1Y
Nov 2026: ₹347, 39.7% above its 200-day average. The price has been rising for 22 weeks.
- Price ₹347
- 50-day avg ₹328
- 200-day avg ₹248
| Week | Price | 50-day avg | 200-day avg |
|---|---|---|---|
| 31 Oct 2025 | ₹159 | ₹162 | ₹175 |
| 7 Nov 2025 | ₹156 | ₹161 | ₹175 |
| 14 Nov 2025 | ₹153 | ₹160 | ₹174 |
| 21 Nov 2025 | ₹149 | ₹158 | ₹172 |
| 28 Nov 2025 | ₹147 | ₹156 | ₹171 |
| 5 Dec 2025 | ₹139 | ₹153 | ₹170 |
| 12 Dec 2025 | ₹134 | ₹150 | ₹168 |
| 19 Dec 2025 | ₹137 | ₹147 | ₹166 |
| 26 Dec 2025 | ₹139 | ₹146 | ₹165 |
| 2 Jan 2026 | ₹137 | ₹144 | ₹164 |
| 9 Jan 2026 | ₹133 | ₹143 | ₹162 |
| 16 Jan 2026 | ₹134 | ₹141 | ₹161 |
| 23 Jan 2026 | ₹126 | ₹138 | ₹160 |
| 1 Feb 2026 | ₹134 | ₹137 | ₹158 |
| 6 Feb 2026 | ₹134 | ₹137 | ₹157 |
| 13 Feb 2026 | ₹143 | ₹139 | ₹157 |
| 20 Feb 2026 | ₹140 | ₹140 | ₹156 |
| 27 Feb 2026 | ₹149 | ₹140 | ₹155 |
| 6 Mar 2026 | ₹139 | ₹140 | ₹155 |
| 13 Mar 2026 | ₹131 | ₹139 | ₹154 |
| 20 Mar 2026 | ₹129 | ₹137 | ₹152 |
| 27 Mar 2026 | ₹112 | ₹134 | ₹151 |
| 2 Apr 2026 | ₹114 | ₹131 | ₹150 |
| 10 Apr 2026 | ₹130 | ₹130 | ₹149 |
| 17 Apr 2026 | ₹160 | ₹133 | ₹149 |
| 24 Apr 2026 | ₹156 | ₹137 | ₹149 |
| 30 Apr 2026 | ₹155 | ₹140 | ₹149 |
| 8 May 2026 | ₹174 | ₹144 | ₹150 |
| 15 May 2026 | ₹160 | ₹150 | ₹151 |
| 22 May 2026 | ₹160 | ₹151 | ₹151 |
| 29 May 2026 | ₹195 | ₹155 | ₹153 |
| 4 Jun 2026 | ₹236 | ₹165 | ₹155 |
| 5 Jun 2026 | ₹225 | ₹167 | ₹156 |
| 9 Jun 2026 | ₹203 | ₹171 | ₹157 |
| 10 Jun 2026 | ₹193 | ₹171 | ₹157 |
| 12 Jun 2026 | ₹195 | ₹173 | ₹158 |
| 17 Jun 2026 | ₹208 | ₹177 | ₹159 |
| 19 Jun 2026 | ₹227 | ₹180 | ₹161 |
| 24 Jun 2026 | ₹213 | ₹184 | ₹162 |
| 25 Jun 2026 | ₹209 | ₹185 | ₹163 |
| 1 Jul 2026 | ₹198 | ₹187 | ₹164 |
| 3 Jul 2026 | ₹192 | ₹188 | ₹165 |
| 10 Jul 2026 | ₹190 | ₹187 | ₹165 |
| 17 Jul 2026 | ₹183 | ₹187 | ₹167 |
| 24 Jul 2026 | ₹197 | ₹188 | ₹168 |
| 31 Jul 2026 | ₹205 | ₹190 | ₹169 |
| 7 Aug 2026 | ₹254 | ₹198 | ₹173 |
| 14 Aug 2026 | ₹290 | ₹215 | ₹178 |
| 21 Aug 2026 | ₹276 | ₹227 | ₹183 |
| 28 Aug 2026 | ₹294 | ₹236 | ₹188 |
| 4 Sep 2026 | ₹375 | ₹255 | ₹195 |
| 11 Sep 2026 | ₹391 | ₹275 | ₹204 |
| 18 Sep 2026 | ₹408 | ₹293 | ₹211 |
| 25 Sep 2026 | ₹363 | ₹306 | ₹219 |
| 28 Sep 2026 | ₹355 | ₹308 | ₹220 |
| 1 Oct 2026 | ₹384 | ₹316 | ₹225 |
| 9 Oct 2026 | ₹387 | ₹328 | ₹232 |
| 16 Oct 2026 | ₹346 | ₹335 | ₹239 |
| 23 Oct 2026 | ₹282 | ₹331 | ₹242 |
| 30 Oct 2026 | ₹316 | ₹328 | ₹245 |
| 5 Nov 2026 | ₹347 | ₹328 | ₹248 |
3Y
Nov 2026: ₹347, 39.7% above its 200-day average. The price has been rising for 22 weeks.
- Price ₹347
- 50-day avg ₹328
- 200-day avg ₹248
| Week | Price | 50-day avg | 200-day avg |
|---|---|---|---|
| 3 Nov 2023 | ₹278 | ₹304 | ₹227 |
| 12 Nov 2023 | ₹277 | ₹299 | ₹230 |
| 17 Nov 2023 | ₹279 | ₹295 | ₹232 |
| 24 Nov 2023 | ₹271 | ₹291 | ₹234 |
| 1 Dec 2023 | ₹264 | ₹287 | ₹235 |
| 8 Dec 2023 | ₹267 | ₹283 | ₹236 |
| 15 Dec 2023 | ₹282 | ₹282 | ₹238 |
| 22 Dec 2023 | ₹299 | ₹284 | ₹241 |
| 29 Dec 2023 | ₹286 | ₹285 | ₹243 |
| 5 Jan 2024 | ₹278 | ₹284 | ₹245 |
| 12 Jan 2024 | ₹278 | ₹282 | ₹246 |
| 20 Jan 2024 | ₹281 | ₹281 | ₹248 |
| 25 Jan 2024 | ₹275 | ₹281 | ₹249 |
| 2 Feb 2024 | ₹292 | ₹281 | ₹250 |
| 9 Feb 2024 | ₹304 | ₹285 | ₹253 |
| 16 Feb 2024 | ₹310 | ₹288 | ₹255 |
| 23 Feb 2024 | ₹319 | ₹291 | ₹258 |
| 2 Mar 2024 | ₹296 | ₹292 | ₹260 |
| 7 Mar 2024 | ₹269 | ₹290 | ₹261 |
| 15 Mar 2024 | ₹235 | ₹280 | ₹260 |
| 22 Mar 2024 | ₹238 | ₹271 | ₹258 |
| 28 Mar 2024 | ₹226 | ₹267 | ₹257 |
| 5 Apr 2024 | ₹255 | ₹264 | ₹257 |
| 12 Apr 2024 | ₹262 | ₹264 | ₹257 |
| 19 Apr 2024 | ₹259 | ₹263 | ₹257 |
| 26 Apr 2024 | ₹275 | ₹265 | ₹258 |
| 3 May 2024 | ₹269 | ₹266 | ₹259 |
| 10 May 2024 | ₹254 | ₹264 | ₹259 |
| 18 May 2024 | ₹241 | ₹259 | ₹257 |
| 24 May 2024 | ₹242 | ₹256 | ₹257 |
| 31 May 2024 | ₹232 | ₹252 | ₹256 |
| 7 Jun 2024 | ₹240 | ₹248 | ₹254 |
| 14 Jun 2024 | ₹253 | ₹249 | ₹254 |
| 21 Jun 2024 | ₹249 | ₹249 | ₹254 |
| 28 Jun 2024 | ₹241 | ₹248 | ₹254 |
| 5 Jul 2024 | ₹250 | ₹248 | ₹253 |
| 12 Jul 2024 | ₹247 | ₹248 | ₹253 |
| 19 Jul 2024 | ₹271 | ₹253 | ₹254 |
| 26 Jul 2024 | ₹292 | ₹260 | ₹256 |
| 2 Aug 2024 | ₹296 | ₹266 | ₹258 |
| 9 Aug 2024 | ₹273 | ₹268 | ₹259 |
| 16 Aug 2024 | ₹260 | ₹266 | ₹259 |
| 23 Aug 2024 | ₹279 | ₹268 | ₹259 |
| 30 Aug 2024 | ₹271 | ₹269 | ₹260 |
| 6 Sep 2024 | ₹264 | ₹269 | ₹261 |
| 13 Sep 2024 | ₹270 | ₹268 | ₹261 |
| 20 Sep 2024 | ₹257 | ₹267 | ₹261 |
| 27 Sep 2024 | ₹255 | ₹265 | ₹261 |
| 4 Oct 2024 | ₹248 | ₹263 | ₹260 |
| 11 Oct 2024 | ₹244 | ₹259 | ₹259 |
| 18 Oct 2024 | ₹237 | ₹255 | ₹258 |
| 25 Oct 2024 | ₹214 | ₹250 | ₹257 |
| 1 Nov 2024 | ₹228 | ₹245 | ₹255 |
| 8 Nov 2024 | ₹221 | ₹241 | ₹253 |
| 14 Nov 2024 | ₹205 | ₹237 | ₹252 |
| 22 Nov 2024 | ₹206 | ₹232 | ₹250 |
| 29 Nov 2024 | ₹218 | ₹229 | ₹248 |
| 6 Dec 2024 | ₹230 | ₹228 | ₹247 |
| 13 Dec 2024 | ₹227 | ₹229 | ₹246 |
| 20 Dec 2024 | ₹215 | ₹228 | ₹245 |
| 27 Dec 2024 | ₹211 | ₹226 | ₹244 |
| 3 Jan 2025 | ₹218 | ₹223 | ₹243 |
| 10 Jan 2025 | ₹199 | ₹220 | ₹241 |
| 17 Jan 2025 | ₹197 | ₹216 | ₹238 |
| 24 Jan 2025 | ₹191 | ₹212 | ₹236 |
| 1 Feb 2025 | ₹183 | ₹205 | ₹233 |
| 7 Feb 2025 | ₹185 | ₹201 | ₹231 |
| 14 Feb 2025 | ₹156 | ₹195 | ₹228 |
| 21 Feb 2025 | ₹159 | ₹188 | ₹224 |
| 28 Feb 2025 | ₹140 | ₹182 | ₹221 |
| 7 Mar 2025 | ₹148 | ₹175 | ₹217 |
| 13 Mar 2025 | ₹130 | ₹169 | ₹214 |
| 21 Mar 2025 | ₹147 | ₹164 | ₹210 |
| 28 Mar 2025 | ₹134 | ₹160 | ₹207 |
| 4 Apr 2025 | ₹149 | ₹159 | ₹205 |
| 11 Apr 2025 | ₹148 | ₹157 | ₹203 |
| 17 Apr 2025 | ₹155 | ₹156 | ₹201 |
| 25 Apr 2025 | ₹151 | ₹156 | ₹199 |
| 2 May 2025 | ₹146 | ₹155 | ₹197 |
| 9 May 2025 | ₹143 | ₹154 | ₹195 |
| 16 May 2025 | ₹168 | ₹154 | ₹193 |
| 23 May 2025 | ₹191 | ₹158 | ₹192 |
| 30 May 2025 | ₹183 | ₹163 | ₹192 |
| 6 Jun 2025 | ₹181 | ₹167 | ₹191 |
| 13 Jun 2025 | ₹179 | ₹169 | ₹191 |
| 20 Jun 2025 | ₹184 | ₹174 | ₹191 |
| 27 Jun 2025 | ₹183 | ₹175 | ₹190 |
| 4 Jul 2025 | ₹181 | ₹176 | ₹190 |
| 11 Jul 2025 | ₹178 | ₹177 | ₹189 |
| 18 Jul 2025 | ₹178 | ₹177 | ₹189 |
| 25 Jul 2025 | ₹172 | ₹176 | ₹188 |
| 1 Aug 2025 | ₹166 | ₹175 | ₹187 |
| 8 Aug 2025 | ₹168 | ₹174 | ₹186 |
| 14 Aug 2025 | ₹152 | ₹172 | ₹185 |
| 22 Aug 2025 | ₹161 | ₹169 | ₹184 |
| 29 Aug 2025 | ₹157 | ₹168 | ₹183 |
| 5 Sep 2025 | ₹158 | ₹166 | ₹182 |
| 12 Sep 2025 | ₹165 | ₹165 | ₹181 |
| 19 Sep 2025 | ₹173 | ₹166 | ₹180 |
| 26 Sep 2025 | ₹157 | ₹166 | ₹180 |
| 3 Oct 2025 | ₹162 | ₹165 | ₹179 |
| 10 Oct 2025 | ₹158 | ₹164 | ₹178 |
| 17 Oct 2025 | ₹155 | ₹163 | ₹177 |
| 24 Oct 2025 | ₹156 | ₹162 | ₹176 |
| 31 Oct 2025 | ₹159 | ₹162 | ₹175 |
| 7 Nov 2025 | ₹156 | ₹161 | ₹175 |
| 14 Nov 2025 | ₹153 | ₹160 | ₹174 |
| 21 Nov 2025 | ₹149 | ₹158 | ₹172 |
| 28 Nov 2025 | ₹147 | ₹156 | ₹171 |
| 5 Dec 2025 | ₹139 | ₹153 | ₹170 |
| 12 Dec 2025 | ₹134 | ₹150 | ₹168 |
| 19 Dec 2025 | ₹137 | ₹147 | ₹166 |
| 26 Dec 2025 | ₹139 | ₹146 | ₹165 |
| 2 Jan 2026 | ₹137 | ₹144 | ₹164 |
| 9 Jan 2026 | ₹133 | ₹143 | ₹162 |
| 16 Jan 2026 | ₹134 | ₹141 | ₹161 |
| 23 Jan 2026 | ₹126 | ₹138 | ₹160 |
| 1 Feb 2026 | ₹134 | ₹137 | ₹158 |
| 6 Feb 2026 | ₹134 | ₹137 | ₹157 |
| 13 Feb 2026 | ₹143 | ₹139 | ₹157 |
| 20 Feb 2026 | ₹140 | ₹140 | ₹156 |
| 27 Feb 2026 | ₹149 | ₹140 | ₹155 |
| 6 Mar 2026 | ₹139 | ₹140 | ₹155 |
| 13 Mar 2026 | ₹131 | ₹139 | ₹154 |
| 20 Mar 2026 | ₹129 | ₹137 | ₹152 |
| 27 Mar 2026 | ₹112 | ₹134 | ₹151 |
| 2 Apr 2026 | ₹114 | ₹131 | ₹150 |
| 10 Apr 2026 | ₹130 | ₹130 | ₹149 |
| 17 Apr 2026 | ₹160 | ₹133 | ₹149 |
| 24 Apr 2026 | ₹156 | ₹137 | ₹149 |
| 30 Apr 2026 | ₹155 | ₹140 | ₹149 |
| 8 May 2026 | ₹174 | ₹144 | ₹150 |
| 15 May 2026 | ₹160 | ₹150 | ₹151 |
| 22 May 2026 | ₹160 | ₹151 | ₹151 |
| 29 May 2026 | ₹195 | ₹155 | ₹153 |
| 4 Jun 2026 | ₹236 | ₹165 | ₹155 |
| 5 Jun 2026 | ₹225 | ₹167 | ₹156 |
| 9 Jun 2026 | ₹203 | ₹171 | ₹157 |
| 10 Jun 2026 | ₹193 | ₹171 | ₹157 |
| 12 Jun 2026 | ₹195 | ₹173 | ₹158 |
| 17 Jun 2026 | ₹208 | ₹177 | ₹159 |
| 19 Jun 2026 | ₹227 | ₹180 | ₹161 |
| 24 Jun 2026 | ₹213 | ₹184 | ₹162 |
| 25 Jun 2026 | ₹209 | ₹185 | ₹163 |
| 1 Jul 2026 | ₹198 | ₹187 | ₹164 |
| 3 Jul 2026 | ₹192 | ₹188 | ₹165 |
| 10 Jul 2026 | ₹190 | ₹187 | ₹165 |
| 17 Jul 2026 | ₹183 | ₹187 | ₹167 |
| 24 Jul 2026 | ₹197 | ₹188 | ₹168 |
| 31 Jul 2026 | ₹205 | ₹190 | ₹169 |
| 7 Aug 2026 | ₹254 | ₹198 | ₹173 |
| 14 Aug 2026 | ₹290 | ₹215 | ₹178 |
| 21 Aug 2026 | ₹276 | ₹227 | ₹183 |
| 28 Aug 2026 | ₹294 | ₹236 | ₹188 |
| 4 Sep 2026 | ₹375 | ₹255 | ₹195 |
| 11 Sep 2026 | ₹391 | ₹275 | ₹204 |
| 18 Sep 2026 | ₹408 | ₹293 | ₹211 |
| 25 Sep 2026 | ₹363 | ₹306 | ₹219 |
| 28 Sep 2026 | ₹355 | ₹308 | ₹220 |
| 1 Oct 2026 | ₹384 | ₹316 | ₹225 |
| 9 Oct 2026 | ₹387 | ₹328 | ₹232 |
| 16 Oct 2026 | ₹346 | ₹335 | ₹239 |
| 23 Oct 2026 | ₹282 | ₹331 | ₹242 |
| 30 Oct 2026 | ₹316 | ₹328 | ₹245 |
| 5 Nov 2026 | ₹347 | ₹328 | ₹248 |
5Y
Nov 2026: ₹347, 39.7% above its 200-day average. The price has been rising for 22 weeks.
- Price ₹347
- 50-day avg ₹328
- 200-day avg ₹248
| Week | Price | 50-day avg | 200-day avg |
|---|---|---|---|
| 29 Oct 2021 | ₹84 | ₹90 | ₹82 |
| 12 Nov 2021 | ₹93 | ₹89 | ₹82 |
| 26 Nov 2021 | ₹81 | ₹87 | ₹82 |
| 10 Dec 2021 | ₹87 | ₹85 | ₹82 |
| 24 Dec 2021 | ₹89 | ₹86 | ₹83 |
| 7 Jan 2022 | ₹106 | ₹92 | ₹85 |
| 21 Jan 2022 | ₹99 | ₹96 | ₹86 |
| 4 Feb 2022 | ₹102 | ₹97 | ₹87 |
| 18 Feb 2022 | ₹127 | ₹106 | ₹91 |
| 4 Mar 2022 | ₹144 | ₹114 | ₹94 |
| 17 Mar 2022 | ₹156 | ₹126 | ₹100 |
| 1 Apr 2022 | ₹157 | ₹137 | ₹105 |
| 13 Apr 2022 | ₹158 | ₹143 | ₹109 |
| 29 Apr 2022 | ₹140 | ₹144 | ₹113 |
| 13 May 2022 | ₹120 | ₹137 | ₹114 |
| 27 May 2022 | ₹123 | ₹134 | ₹115 |
| 10 Jun 2022 | ₹116 | ₹129 | ₹115 |
| 24 Jun 2022 | ₹107 | ₹121 | ₹114 |
| 8 Jul 2022 | ₹117 | ₹118 | ₹114 |
| 22 Jul 2022 | ₹130 | ₹121 | ₹115 |
| 5 Aug 2022 | ₹128 | ₹124 | ₹117 |
| 19 Aug 2022 | ₹121 | ₹123 | ₹117 |
| 2 Sep 2022 | ₹120 | ₹122 | ₹117 |
| 16 Sep 2022 | ₹140 | ₹130 | ₹120 |
| 30 Sep 2022 | ₹128 | ₹131 | ₹121 |
| 14 Oct 2022 | ₹133 | ₹132 | ₹122 |
| 28 Oct 2022 | ₹144 | ₹132 | ₹123 |
| 11 Nov 2022 | ₹155 | ₹138 | ₹126 |
| 25 Nov 2022 | ₹160 | ₹143 | ₹128 |
| 9 Dec 2022 | ₹151 | ₹148 | ₹131 |
| 23 Dec 2022 | ₹122 | ₹146 | ₹132 |
| 6 Jan 2023 | ₹150 | ₹146 | ₹133 |
| 20 Jan 2023 | ₹148 | ₹147 | ₹135 |
| 3 Feb 2023 | ₹141 | ₹145 | ₹135 |
| 17 Feb 2023 | ₹141 | ₹143 | ₹136 |
| 3 Mar 2023 | ₹133 | ₹139 | ₹135 |
| 17 Mar 2023 | ₹126 | ₹136 | ₹135 |
| 31 Mar 2023 | ₹125 | ₹132 | ₹134 |
| 13 Apr 2023 | ₹132 | ₹132 | ₹134 |
| 28 Apr 2023 | ₹133 | ₹132 | ₹133 |
| 12 May 2023 | ₹150 | ₹137 | ₹135 |
| 26 May 2023 | ₹176 | ₹147 | ₹138 |
| 9 Jun 2023 | ₹179 | ₹158 | ₹142 |
| 23 Jun 2023 | ₹169 | ₹164 | ₹145 |
| 7 Jul 2023 | ₹169 | ₹166 | ₹147 |
| 21 Jul 2023 | ₹181 | ₹169 | ₹150 |
| 4 Aug 2023 | ₹188 | ₹175 | ₹153 |
| 18 Aug 2023 | ₹232 | ₹192 | ₹160 |
| 1 Sep 2023 | ₹331 | ₹227 | ₹173 |
| 15 Sep 2023 | ₹348 | ₹276 | ₹193 |
| 29 Sep 2023 | ₹336 | ₹292 | ₹204 |
| 13 Oct 2023 | ₹329 | ₹302 | ₹215 |
| 27 Oct 2023 | ₹312 | ₹305 | ₹223 |
| 12 Nov 2023 | ₹277 | ₹299 | ₹230 |
| 24 Nov 2023 | ₹271 | ₹291 | ₹234 |
| 8 Dec 2023 | ₹267 | ₹283 | ₹236 |
| 22 Dec 2023 | ₹299 | ₹284 | ₹241 |
| 5 Jan 2024 | ₹278 | ₹284 | ₹245 |
| 20 Jan 2024 | ₹281 | ₹281 | ₹248 |
| 2 Feb 2024 | ₹292 | ₹281 | ₹250 |
| 16 Feb 2024 | ₹310 | ₹288 | ₹255 |
| 2 Mar 2024 | ₹296 | ₹292 | ₹260 |
| 15 Mar 2024 | ₹235 | ₹280 | ₹260 |
| 28 Mar 2024 | ₹226 | ₹267 | ₹257 |
| 12 Apr 2024 | ₹262 | ₹264 | ₹257 |
| 26 Apr 2024 | ₹275 | ₹265 | ₹258 |
| 10 May 2024 | ₹254 | ₹264 | ₹259 |
| 24 May 2024 | ₹242 | ₹256 | ₹257 |
| 7 Jun 2024 | ₹240 | ₹248 | ₹254 |
| 21 Jun 2024 | ₹249 | ₹249 | ₹254 |
| 5 Jul 2024 | ₹250 | ₹248 | ₹253 |
| 19 Jul 2024 | ₹271 | ₹253 | ₹254 |
| 2 Aug 2024 | ₹296 | ₹266 | ₹258 |
| 16 Aug 2024 | ₹260 | ₹266 | ₹259 |
| 30 Aug 2024 | ₹271 | ₹269 | ₹260 |
| 13 Sep 2024 | ₹270 | ₹268 | ₹261 |
| 27 Sep 2024 | ₹255 | ₹265 | ₹261 |
| 11 Oct 2024 | ₹244 | ₹259 | ₹259 |
| 25 Oct 2024 | ₹214 | ₹250 | ₹257 |
| 8 Nov 2024 | ₹221 | ₹241 | ₹253 |
| 22 Nov 2024 | ₹206 | ₹232 | ₹250 |
| 6 Dec 2024 | ₹230 | ₹228 | ₹247 |
| 20 Dec 2024 | ₹215 | ₹228 | ₹245 |
| 3 Jan 2025 | ₹218 | ₹223 | ₹243 |
| 17 Jan 2025 | ₹197 | ₹216 | ₹238 |
| 1 Feb 2025 | ₹183 | ₹205 | ₹233 |
| 14 Feb 2025 | ₹156 | ₹195 | ₹228 |
| 28 Feb 2025 | ₹140 | ₹182 | ₹221 |
| 13 Mar 2025 | ₹130 | ₹169 | ₹214 |
| 28 Mar 2025 | ₹134 | ₹160 | ₹207 |
| 11 Apr 2025 | ₹148 | ₹157 | ₹203 |
| 25 Apr 2025 | ₹151 | ₹156 | ₹199 |
| 9 May 2025 | ₹143 | ₹154 | ₹195 |
| 23 May 2025 | ₹191 | ₹158 | ₹192 |
| 6 Jun 2025 | ₹181 | ₹167 | ₹191 |
| 20 Jun 2025 | ₹184 | ₹174 | ₹191 |
| 4 Jul 2025 | ₹181 | ₹176 | ₹190 |
| 18 Jul 2025 | ₹178 | ₹177 | ₹189 |
| 1 Aug 2025 | ₹166 | ₹175 | ₹187 |
| 14 Aug 2025 | ₹152 | ₹172 | ₹185 |
| 29 Aug 2025 | ₹157 | ₹168 | ₹183 |
| 12 Sep 2025 | ₹165 | ₹165 | ₹181 |
| 26 Sep 2025 | ₹157 | ₹166 | ₹180 |
| 10 Oct 2025 | ₹158 | ₹164 | ₹178 |
| 24 Oct 2025 | ₹156 | ₹162 | ₹176 |
| 7 Nov 2025 | ₹156 | ₹161 | ₹175 |
| 21 Nov 2025 | ₹149 | ₹158 | ₹172 |
| 5 Dec 2025 | ₹139 | ₹153 | ₹170 |
| 19 Dec 2025 | ₹137 | ₹147 | ₹166 |
| 2 Jan 2026 | ₹137 | ₹144 | ₹164 |
| 16 Jan 2026 | ₹134 | ₹141 | ₹161 |
| 1 Feb 2026 | ₹134 | ₹137 | ₹158 |
| 13 Feb 2026 | ₹143 | ₹139 | ₹157 |
| 27 Feb 2026 | ₹149 | ₹140 | ₹155 |
| 13 Mar 2026 | ₹131 | ₹139 | ₹154 |
| 27 Mar 2026 | ₹112 | ₹134 | ₹151 |
| 10 Apr 2026 | ₹130 | ₹130 | ₹149 |
| 24 Apr 2026 | ₹156 | ₹137 | ₹149 |
| 8 May 2026 | ₹174 | ₹144 | ₹150 |
| 22 May 2026 | ₹160 | ₹151 | ₹151 |
| 4 Jun 2026 | ₹236 | ₹165 | ₹155 |
| 9 Jun 2026 | ₹203 | ₹171 | ₹157 |
| 12 Jun 2026 | ₹195 | ₹173 | ₹158 |
| 19 Jun 2026 | ₹227 | ₹180 | ₹161 |
| 25 Jun 2026 | ₹209 | ₹185 | ₹163 |
| 3 Jul 2026 | ₹192 | ₹188 | ₹165 |
| 17 Jul 2026 | ₹183 | ₹187 | ₹167 |
| 31 Jul 2026 | ₹205 | ₹190 | ₹169 |
| 14 Aug 2026 | ₹290 | ₹215 | ₹178 |
| 28 Aug 2026 | ₹294 | ₹236 | ₹188 |
| 11 Sep 2026 | ₹391 | ₹275 | ₹204 |
| 25 Sep 2026 | ₹363 | ₹306 | ₹219 |
| 1 Oct 2026 | ₹384 | ₹316 | ₹225 |
| 16 Oct 2026 | ₹346 | ₹335 | ₹239 |
| 30 Oct 2026 | ₹316 | ₹328 | ₹245 |
| 5 Nov 2026 | ₹347 | ₹328 | ₹248 |
10Y
Nov 2026: ₹347, 39.7% above its 200-day average. The price has been rising for 22 weeks.
- Price ₹347
- 50-day avg ₹328
- 200-day avg ₹248
| Week | Price | 50-day avg | 200-day avg |
|---|---|---|---|
| 30 Oct 2016 | ₹44 | ₹39 | ₹40 |
| 18 Nov 2016 | ₹34 | ₹39 | ₹40 |
| 9 Dec 2016 | ₹42 | ₹39 | ₹40 |
| 30 Dec 2016 | ₹39 | ₹40 | ₹40 |
| 20 Jan 2017 | ₹43 | ₹40 | ₹40 |
| 10 Feb 2017 | ₹43 | ₹42 | ₹41 |
| 3 Mar 2017 | ₹40 | ₹41 | ₹41 |
| 24 Mar 2017 | ₹39 | ₹40 | ₹40 |
| 13 Apr 2017 | ₹51 | ₹41 | ₹41 |
| 5 May 2017 | ₹44 | ₹43 | ₹41 |
| 26 May 2017 | ₹41 | ₹43 | ₹42 |
| 16 Jun 2017 | ₹42 | ₹43 | ₹42 |
| 7 Jul 2017 | ₹46 | ₹43 | ₹42 |
| 28 Jul 2017 | ₹49 | ₹45 | ₹42 |
| 18 Aug 2017 | ₹42 | ₹44 | ₹43 |
| 8 Sep 2017 | ₹45 | ₹43 | ₹43 |
| 29 Sep 2017 | ₹41 | ₹43 | ₹43 |
| 19 Oct 2017 | ₹60 | ₹46 | ₹44 |
| 10 Nov 2017 | ₹58 | ₹51 | ₹45 |
| 1 Dec 2017 | ₹70 | ₹56 | ₹48 |
| 22 Dec 2017 | ₹67 | ₹60 | ₹50 |
| 12 Jan 2018 | ₹64 | ₹62 | ₹52 |
| 2 Feb 2018 | ₹53 | ₹60 | ₹53 |
| 23 Feb 2018 | ₹64 | ₹61 | ₹54 |
| 16 Mar 2018 | ₹65 | ₹62 | ₹55 |
| 6 Apr 2018 | ₹77 | ₹63 | ₹56 |
| 27 Apr 2018 | ₹84 | ₹74 | ₹60 |
| 18 May 2018 | ₹72 | ₹74 | ₹62 |
| 8 Jun 2018 | ₹83 | ₹78 | ₹65 |
| 29 Jun 2018 | ₹79 | ₹80 | ₹68 |
| 20 Jul 2018 | ₹85 | ₹81 | ₹70 |
| 10 Aug 2018 | ₹126 | ₹91 | ₹74 |
| 31 Aug 2018 | ₹164 | ₹115 | ₹83 |
| 21 Sep 2018 | ₹158 | ₹135 | ₹93 |
| 12 Oct 2018 | ₹156 | ₹139 | ₹100 |
| 2 Nov 2018 | ₹170 | ₹144 | ₹106 |
| 22 Nov 2018 | ₹216 | ₹166 | ₹117 |
| 14 Dec 2018 | ₹192 | ₹180 | ₹129 |
| 4 Jan 2019 | ₹197 | ₹188 | ₹138 |
| 25 Jan 2019 | ₹172 | ₹186 | ₹144 |
| 15 Feb 2019 | ₹155 | ₹176 | ₹147 |
| 8 Mar 2019 | ₹171 | ₹171 | ₹149 |
| 29 Mar 2019 | ₹154 | ₹166 | ₹151 |
| 18 Apr 2019 | ₹139 | ₹157 | ₹150 |
| 10 May 2019 | ₹116 | ₹146 | ₹148 |
| 31 May 2019 | ₹113 | ₹130 | ₹142 |
| 21 Jun 2019 | ₹93 | ₹116 | ₹137 |
| 12 Jul 2019 | ₹91 | ₹104 | ₹130 |
| 2 Aug 2019 | ₹76 | ₹94 | ₹123 |
| 23 Aug 2019 | ₹45 | ₹79 | ₹115 |
| 13 Sep 2019 | ₹51 | ₹66 | ₹107 |
| 4 Oct 2019 | ₹48 | ₹60 | ₹100 |
| 27 Oct 2019 | ₹55 | ₹57 | ₹94 |
| 15 Nov 2019 | ₹66 | ₹62 | ₹91 |
| 6 Dec 2019 | ₹61 | ₹62 | ₹87 |
| 27 Dec 2019 | ₹57 | ₹60 | ₹83 |
| 17 Jan 2020 | ₹64 | ₹61 | ₹80 |
| 7 Feb 2020 | ₹56 | ₹59 | ₹77 |
| 28 Feb 2020 | ₹40 | ₹55 | ₹73 |
| 20 Mar 2020 | ₹29 | ₹48 | ₹69 |
| 9 Apr 2020 | ₹35 | ₹42 | ₹64 |
| 30 Apr 2020 | ₹41 | ₹42 | ₹62 |
| 22 May 2020 | ₹37 | ₹40 | ₹58 |
| 12 Jun 2020 | ₹44 | ₹41 | ₹56 |
| 3 Jul 2020 | ₹51 | ₹46 | ₹56 |
| 24 Jul 2020 | ₹51 | ₹48 | ₹55 |
| 14 Aug 2020 | ₹53 | ₹50 | ₹54 |
| 4 Sep 2020 | ₹57 | ₹54 | ₹55 |
| 25 Sep 2020 | ₹50 | ₹54 | ₹55 |
| 16 Oct 2020 | ₹51 | ₹53 | ₹55 |
| 6 Nov 2020 | ₹51 | ₹51 | ₹54 |
| 27 Nov 2020 | ₹53 | ₹51 | ₹53 |
| 18 Dec 2020 | ₹57 | ₹54 | ₹54 |
| 8 Jan 2021 | ₹68 | ₹56 | ₹55 |
| 29 Jan 2021 | ₹61 | ₹60 | ₹56 |
| 19 Feb 2021 | ₹63 | ₹61 | ₹57 |
| 12 Mar 2021 | ₹67 | ₹62 | ₹58 |
| 1 Apr 2021 | ₹63 | ₹62 | ₹58 |
| 23 Apr 2021 | ₹58 | ₹61 | ₹58 |
| 14 May 2021 | ₹64 | ₹61 | ₹59 |
| 4 Jun 2021 | ₹75 | ₹68 | ₹61 |
| 25 Jun 2021 | ₹115 | ₹80 | ₹66 |
| 16 Jul 2021 | ₹111 | ₹95 | ₹72 |
| 6 Aug 2021 | ₹101 | ₹99 | ₹77 |
| 27 Aug 2021 | ₹88 | ₹95 | ₹78 |
| 17 Sep 2021 | ₹83 | ₹91 | ₹79 |
| 8 Oct 2021 | ₹91 | ₹90 | ₹80 |
| 29 Oct 2021 | ₹84 | ₹90 | ₹82 |
| 18 Nov 2021 | ₹84 | ₹88 | ₹82 |
| 10 Dec 2021 | ₹87 | ₹85 | ₹82 |
| 31 Dec 2021 | ₹105 | ₹88 | ₹84 |
| 21 Jan 2022 | ₹99 | ₹96 | ₹86 |
| 11 Feb 2022 | ₹133 | ₹101 | ₹89 |
| 4 Mar 2022 | ₹144 | ₹114 | ₹94 |
| 25 Mar 2022 | ₹159 | ₹132 | ₹103 |
| 13 Apr 2022 | ₹158 | ₹143 | ₹109 |
| 6 May 2022 | ₹125 | ₹141 | ₹113 |
| 27 May 2022 | ₹123 | ₹134 | ₹115 |
| 17 Jun 2022 | ₹104 | ₹125 | ₹115 |
| 8 Jul 2022 | ₹117 | ₹118 | ₹114 |
| 29 Jul 2022 | ₹130 | ₹122 | ₹116 |
| 19 Aug 2022 | ₹121 | ₹123 | ₹117 |
| 9 Sep 2022 | ₹144 | ₹127 | ₹119 |
| 30 Sep 2022 | ₹128 | ₹131 | ₹121 |
| 21 Oct 2022 | ₹131 | ₹132 | ₹123 |
| 11 Nov 2022 | ₹155 | ₹138 | ₹126 |
| 2 Dec 2022 | ₹158 | ₹146 | ₹130 |
| 23 Dec 2022 | ₹122 | ₹146 | ₹132 |
| 13 Jan 2023 | ₹150 | ₹146 | ₹134 |
| 3 Feb 2023 | ₹141 | ₹145 | ₹135 |
| 24 Feb 2023 | ₹132 | ₹142 | ₹136 |
| 17 Mar 2023 | ₹126 | ₹136 | ₹135 |
| 6 Apr 2023 | ₹133 | ₹132 | ₹134 |
| 28 Apr 2023 | ₹133 | ₹132 | ₹133 |
| 19 May 2023 | ₹168 | ₹141 | ₹136 |
| 9 Jun 2023 | ₹179 | ₹158 | ₹142 |
| 30 Jun 2023 | ₹169 | ₹165 | ₹146 |
| 21 Jul 2023 | ₹181 | ₹169 | ₹150 |
| 11 Aug 2023 | ₹232 | ₹185 | ₹157 |
| 1 Sep 2023 | ₹331 | ₹227 | ₹173 |
| 22 Sep 2023 | ₹323 | ₹284 | ₹198 |
| 13 Oct 2023 | ₹329 | ₹302 | ₹215 |
| 3 Nov 2023 | ₹278 | ₹304 | ₹227 |
| 24 Nov 2023 | ₹271 | ₹291 | ₹234 |
| 15 Dec 2023 | ₹282 | ₹282 | ₹238 |
| 5 Jan 2024 | ₹278 | ₹284 | ₹245 |
| 25 Jan 2024 | ₹275 | ₹281 | ₹249 |
| 16 Feb 2024 | ₹310 | ₹288 | ₹255 |
| 7 Mar 2024 | ₹269 | ₹290 | ₹261 |
| 28 Mar 2024 | ₹226 | ₹267 | ₹257 |
| 19 Apr 2024 | ₹259 | ₹263 | ₹257 |
| 10 May 2024 | ₹254 | ₹264 | ₹259 |
| 31 May 2024 | ₹232 | ₹252 | ₹256 |
| 21 Jun 2024 | ₹249 | ₹249 | ₹254 |
| 12 Jul 2024 | ₹247 | ₹248 | ₹253 |
| 2 Aug 2024 | ₹296 | ₹266 | ₹258 |
| 23 Aug 2024 | ₹279 | ₹268 | ₹259 |
| 13 Sep 2024 | ₹270 | ₹268 | ₹261 |
| 4 Oct 2024 | ₹248 | ₹263 | ₹260 |
| 25 Oct 2024 | ₹214 | ₹250 | ₹257 |
| 14 Nov 2024 | ₹205 | ₹237 | ₹252 |
| 6 Dec 2024 | ₹230 | ₹228 | ₹247 |
| 27 Dec 2024 | ₹211 | ₹226 | ₹244 |
| 17 Jan 2025 | ₹197 | ₹216 | ₹238 |
| 7 Feb 2025 | ₹185 | ₹201 | ₹231 |
| 28 Feb 2025 | ₹140 | ₹182 | ₹221 |
| 21 Mar 2025 | ₹147 | ₹164 | ₹210 |
| 11 Apr 2025 | ₹148 | ₹157 | ₹203 |
| 2 May 2025 | ₹146 | ₹155 | ₹197 |
| 23 May 2025 | ₹191 | ₹158 | ₹192 |
| 13 Jun 2025 | ₹179 | ₹169 | ₹191 |
| 4 Jul 2025 | ₹181 | ₹176 | ₹190 |
| 25 Jul 2025 | ₹172 | ₹176 | ₹188 |
| 14 Aug 2025 | ₹152 | ₹172 | ₹185 |
| 5 Sep 2025 | ₹158 | ₹166 | ₹182 |
| 26 Sep 2025 | ₹157 | ₹166 | ₹180 |
| 17 Oct 2025 | ₹155 | ₹163 | ₹177 |
| 7 Nov 2025 | ₹156 | ₹161 | ₹175 |
| 28 Nov 2025 | ₹147 | ₹156 | ₹171 |
| 19 Dec 2025 | ₹137 | ₹147 | ₹166 |
| 9 Jan 2026 | ₹133 | ₹143 | ₹162 |
| 1 Feb 2026 | ₹134 | ₹137 | ₹158 |
| 20 Feb 2026 | ₹140 | ₹140 | ₹156 |
| 13 Mar 2026 | ₹131 | ₹139 | ₹154 |
| 2 Apr 2026 | ₹114 | ₹131 | ₹150 |
| 24 Apr 2026 | ₹156 | ₹137 | ₹149 |
| 15 May 2026 | ₹160 | ₹150 | ₹151 |
| 4 Jun 2026 | ₹236 | ₹165 | ₹155 |
| 10 Jun 2026 | ₹193 | ₹171 | ₹157 |
| 19 Jun 2026 | ₹227 | ₹180 | ₹161 |
| 1 Jul 2026 | ₹198 | ₹187 | ₹164 |
| 17 Jul 2026 | ₹183 | ₹187 | ₹167 |
| 7 Aug 2026 | ₹254 | ₹198 | ₹173 |
| 28 Aug 2026 | ₹294 | ₹236 | ₹188 |
| 18 Sep 2026 | ₹408 | ₹293 | ₹211 |
| 1 Oct 2026 | ₹384 | ₹316 | ₹225 |
| 23 Oct 2026 | ₹282 | ₹331 | ₹242 |
| 5 Nov 2026 | ₹347 | ₹328 | ₹248 |
Price stage: Falling from Oct 2025 to Jun 2026; Rising from Jun 2026 to Oct 2026.
Price stage: Rising from Nov 2023 to May 2024; Falling from May 2024 to Aug 2024; Rising from Aug 2024 to Oct 2024; Falling from Oct 2024 to Jun 2026; Rising from Jun 2026 to Oct 2026.
Price stage: Rising from Oct 2021 to Mar 2023; Falling from Mar 2023 to May 2023; Rising from Jun 2023 to May 2024; Falling from May 2024 to Aug 2024; Rising from Aug 2024 to Oct 2024; Falling from Oct 2024 to Jun 2026; Rising from Jun 2026 to Oct 2026.
Price stage: Falling from Oct 2016 to Jan 2017; Rising from Feb 2017 to Apr 2019; Falling from May 2019 to Jan 2021; Rising from Jan 2021 to Mar 2023; Falling from Apr 2023 to May 2023; Rising from Jun 2023 to May 2024; Falling from May 2024 to Aug 2024; Rising from Aug 2024 to Oct 2024; Falling from Oct 2024 to Jun 2026; Rising from Jun 2026 to Oct 2026.
Week by week since 2016: did it beat the NIFTY 500 over the past 13 weeks?
Ahead in 263 of 542 weeks
| Week | 13-week return vs NIFTY 500 |
|---|---|
| 13 May 2016 | no NIFTY 500 reading |
| 20 May 2016 | no NIFTY 500 reading |
| 27 May 2016 | no NIFTY 500 reading |
| 3 Jun 2016 | no NIFTY 500 reading |
| 10 Jun 2016 | no NIFTY 500 reading |
| 17 Jun 2016 | no NIFTY 500 reading |
| 24 Jun 2016 | no NIFTY 500 reading |
| 1 Jul 2016 | no NIFTY 500 reading |
| 8 Jul 2016 | no NIFTY 500 reading |
| 15 Jul 2016 | no NIFTY 500 reading |
| 22 Jul 2016 | no NIFTY 500 reading |
| 29 Jul 2016 | no NIFTY 500 reading |
| 5 Aug 2016 | no NIFTY 500 reading |
| 12 Aug 2016 | −3.4% |
| 19 Aug 2016 | −17.5% |
| 26 Aug 2016 | −14.6% |
| 2 Sep 2016 | −15.4% |
| 9 Sep 2016 | −11.7% |
| 16 Sep 2016 | −2.5% |
| 23 Sep 2016 | −0.2% |
| 30 Sep 2016 | −8.9% |
| 7 Oct 2016 | −5.8% |
| 14 Oct 2016 | −9.5% |
| 21 Oct 2016 | +6.2% |
| 30 Oct 2016 | +13.6% |
| 4 Nov 2016 | +8.8% |
| 11 Nov 2016 | +15.6% |
| 18 Nov 2016 | +3.9% |
| 25 Nov 2016 | +12.1% |
| 2 Dec 2016 | +31.5% |
| 9 Dec 2016 | +28.0% |
| 16 Dec 2016 | +16.2% |
| 23 Dec 2016 | +10.5% |
| 30 Dec 2016 | +14.9% |
| 6 Jan 2017 | +10.7% |
| 13 Jan 2017 | +9.2% |
| 20 Jan 2017 | −0.7% |
| 27 Jan 2017 | +3.7% |
| 3 Feb 2017 | +6.7% |
| 10 Feb 2017 | −1.2% |
| 17 Feb 2017 | +6.9% |
| 23 Feb 2017 | −2.1% |
| 3 Mar 2017 | −14.2% |
| 10 Mar 2017 | −22.2% |
| 17 Mar 2017 | −19.1% |
| 24 Mar 2017 | −15.5% |
| 31 Mar 2017 | −14.2% |
| 7 Apr 2017 | +1.5% |
| 13 Apr 2017 | +17.9% |
| 21 Apr 2017 | −0.7% |
| 28 Apr 2017 | −14.3% |
| 5 May 2017 | −15.5% |
| 12 May 2017 | −6.0% |
| 19 May 2017 | +2.4% |
| 26 May 2017 | −3.0% |
| 2 Jun 2017 | −5.1% |
| 9 Jun 2017 | +3.6% |
| 16 Jun 2017 | −1.5% |
| 23 Jun 2017 | +2.1% |
| 30 Jun 2017 | +2.0% |
| 7 Jul 2017 | −4.1% |
| 14 Jul 2017 | −22.8% |
| 21 Jul 2017 | −3.5% |
| 28 Jul 2017 | +1.4% |
| 4 Aug 2017 | +1.1% |
| 11 Aug 2017 | −15.3% |
| 18 Aug 2017 | −8.6% |
| 24 Aug 2017 | −0.6% |
| 1 Sep 2017 | +0.1% |
| 8 Sep 2017 | +3.6% |
| 15 Sep 2017 | −1.5% |
| 22 Sep 2017 | −1.1% |
| 29 Sep 2017 | −4.3% |
| 6 Oct 2017 | −2.6% |
| 13 Oct 2017 | +10.6% |
| 19 Oct 2017 | +21.0% |
| 27 Oct 2017 | +4.2% |
| 3 Nov 2017 | +25.8% |
| 10 Nov 2017 | +40.8% |
| 17 Nov 2017 | +30.4% |
| 24 Nov 2017 | +35.1% |
| 1 Dec 2017 | +57.7% |
| 8 Dec 2017 | +39.2% |
| 15 Dec 2017 | +41.7% |
| 22 Dec 2017 | +48.4% |
| 29 Dec 2017 | +49.5% |
| 5 Jan 2018 | +31.0% |
| 12 Jan 2018 | +20.8% |
| 19 Jan 2018 | −9.3% |
| 25 Jan 2018 | +5.8% |
| 2 Feb 2018 | −12.6% |
| 9 Feb 2018 | +6.8% |
| 16 Feb 2018 | +11.7% |
| 23 Feb 2018 | +7.1% |
| 1 Mar 2018 | −9.1% |
| 9 Mar 2018 | −6.3% |
| 16 Mar 2018 | +6.3% |
| 23 Mar 2018 | −4.8% |
| 28 Mar 2018 | −1.0% |
| 6 Apr 2018 | +23.1% |
| 13 Apr 2018 | +25.5% |
| 20 Apr 2018 | +60.4% |
| 27 Apr 2018 | +45.9% |
| 4 May 2018 | +39.3% |
| 11 May 2018 | +12.2% |
| 18 May 2018 | +13.0% |
| 25 May 2018 | +24.4% |
| 1 Jun 2018 | +34.5% |
| 8 Jun 2018 | +34.0% |
| 15 Jun 2018 | +26.9% |
| 22 Jun 2018 | +39.0% |
| 29 Jun 2018 | +27.1% |
| 6 Jul 2018 | +7.8% |
| 13 Jul 2018 | +8.1% |
| 20 Jul 2018 | −9.7% |
| 27 Jul 2018 | +4.5% |
| 3 Aug 2018 | +32.2% |
| 10 Aug 2018 | +71.0% |
| 17 Aug 2018 | +60.1% |
| 24 Aug 2018 | +96.0% |
| 31 Aug 2018 | +83.7% |
| 7 Sep 2018 | +97.7% |
| 14 Sep 2018 | +83.3% |
| 21 Sep 2018 | +85.3% |
| 28 Sep 2018 | +89.7% |
| 5 Oct 2018 | +63.3% |
| 12 Oct 2018 | +93.0% |
| 19 Oct 2018 | +73.9% |
| 26 Oct 2018 | +67.1% |
| 2 Nov 2018 | +75.4% |
| 9 Nov 2018 | +56.3% |
| 16 Nov 2018 | +67.2% |
| 22 Nov 2018 | +42.1% |
| 30 Nov 2018 | +39.8% |
| 7 Dec 2018 | +17.2% |
| 14 Dec 2018 | +24.8% |
| 21 Dec 2018 | +30.8% |
| 28 Dec 2018 | +34.2% |
| 4 Jan 2019 | +45.8% |
| 11 Jan 2019 | +15.7% |
| 18 Jan 2019 | +25.3% |
| 25 Jan 2019 | +19.9% |
| 1 Feb 2019 | −3.2% |
| 8 Feb 2019 | −4.4% |
| 15 Feb 2019 | −18.2% |
| 22 Feb 2019 | −23.3% |
| 1 Mar 2019 | −24.1% |
| 8 Mar 2019 | −11.6% |
| 15 Mar 2019 | −19.3% |
| 22 Mar 2019 | −28.8% |
| 29 Mar 2019 | −29.3% |
| 5 Apr 2019 | −31.3% |
| 12 Apr 2019 | −33.6% |
| 18 Apr 2019 | −30.8% |
| 26 Apr 2019 | −29.4% |
| 3 May 2019 | −23.1% |
| 10 May 2019 | −37.7% |
| 17 May 2019 | −29.2% |
| 24 May 2019 | −46.5% |
| 31 May 2019 | −40.2% |
| 7 Jun 2019 | −43.8% |
| 14 Jun 2019 | −38.4% |
| 21 Jun 2019 | −42.1% |
| 28 Jun 2019 | −41.8% |
| 5 Jul 2019 | −36.1% |
| 12 Jul 2019 | −31.1% |
| 19 Jul 2019 | −33.4% |
| 26 Jul 2019 | −35.2% |
| 2 Aug 2019 | −37.9% |
| 9 Aug 2019 | −32.0% |
| 16 Aug 2019 | −50.9% |
| 23 Aug 2019 | −48.6% |
| 30 Aug 2019 | −51.1% |
| 6 Sep 2019 | −48.7% |
| 13 Sep 2019 | −42.2% |
| 20 Sep 2019 | −40.0% |
| 27 Sep 2019 | −33.9% |
| 4 Oct 2019 | −44.0% |
| 11 Oct 2019 | −46.4% |
| 18 Oct 2019 | −38.2% |
| 27 Oct 2019 | −38.2% |
| 1 Nov 2019 | −30.5% |
| 8 Nov 2019 | −1.9% |
| 15 Nov 2019 | +20.1% |
| 22 Nov 2019 | +33.6% |
| 29 Nov 2019 | +32.4% |
| 6 Dec 2019 | +30.0% |
| 13 Dec 2019 | −1.4% |
| 20 Dec 2019 | +7.5% |
| 27 Dec 2019 | −4.0% |
| 3 Jan 2020 | +25.9% |
| 10 Jan 2020 | +25.5% |
| 17 Jan 2020 | +10.3% |
| 24 Jan 2020 | +4.4% |
| 1 Feb 2020 | −10.0% |
| 7 Feb 2020 | −35.0% |
| 14 Feb 2020 | −23.5% |
| 20 Feb 2020 | −20.6% |
| 28 Feb 2020 | −30.4% |
| 6 Mar 2020 | −20.0% |
| 13 Mar 2020 | −2.8% |
| 20 Mar 2020 | −18.7% |
| 27 Mar 2020 | −11.1% |
| 3 Apr 2020 | −20.7% |
| 9 Apr 2020 | −16.2% |
| 17 Apr 2020 | +0.5% |
| 24 Apr 2020 | −8.6% |
| 30 Apr 2020 | −2.1% |
| 8 May 2020 | −6.3% |
| 15 May 2020 | +1.1% |
| 22 May 2020 | −4.6% |
| 29 May 2020 | +10.8% |
| 5 Jun 2020 | +14.2% |
| 12 Jun 2020 | −0.5% |
| 19 Jun 2020 | +64.2% |
| 26 Jun 2020 | +33.7% |
| 3 Jul 2020 | +29.7% |
| 10 Jul 2020 | +26.5% |
| 17 Jul 2020 | −15.1% |
| 24 Jul 2020 | +7.7% |
| 31 Jul 2020 | −5.3% |
| 7 Aug 2020 | +8.6% |
| 14 Aug 2020 | +6.5% |
| 21 Aug 2020 | +38.3% |
| 28 Aug 2020 | +37.2% |
| 4 Sep 2020 | +10.2% |
| 11 Sep 2020 | +5.7% |
| 18 Sep 2020 | −10.7% |
| 25 Sep 2020 | −13.0% |
| 1 Oct 2020 | −8.6% |
| 9 Oct 2020 | −9.3% |
| 16 Oct 2020 | −8.1% |
| 23 Oct 2020 | −6.4% |
| 30 Oct 2020 | −5.4% |
| 6 Nov 2020 | −11.5% |
| 14 Nov 2020 | −18.1% |
| 20 Nov 2020 | −27.0% |
| 27 Nov 2020 | −26.2% |
| 4 Dec 2020 | −20.4% |
| 11 Dec 2020 | −10.7% |
| 18 Dec 2020 | −17.9% |
| 24 Dec 2020 | −16.8% |
| 1 Jan 2021 | −11.3% |
| 8 Jan 2021 | +4.6% |
| 15 Jan 2021 | +6.2% |
| 22 Jan 2021 | +5.6% |
| 29 Jan 2021 | +0.9% |
| 5 Feb 2021 | +3.6% |
| 12 Feb 2021 | +8.3% |
| 19 Feb 2021 | +6.5% |
| 26 Feb 2021 | −4.2% |
| 5 Mar 2021 | −6.6% |
| 12 Mar 2021 | +6.5% |
| 19 Mar 2021 | +4.4% |
| 26 Mar 2021 | +4.6% |
| 1 Apr 2021 | +3.7% |
| 9 Apr 2021 | −10.1% |
| 16 Apr 2021 | −12.7% |
| 23 Apr 2021 | −17.0% |
| 30 Apr 2021 | −5.5% |
| 7 May 2021 | −2.0% |
| 14 May 2021 | −0.7% |
| 21 May 2021 | +17.6% |
| 28 May 2021 | +24.2% |
| 4 Jun 2021 | +17.5% |
| 11 Jun 2021 | +20.6% |
| 18 Jun 2021 | +30.1% |
| 25 Jun 2021 | +82.5% |
| 2 Jul 2021 | +65.8% |
| 9 Jul 2021 | +64.8% |
| 16 Jul 2021 | +80.2% |
| 23 Jul 2021 | +78.0% |
| 30 Jul 2021 | +69.5% |
| 6 Aug 2021 | +51.4% |
| 13 Aug 2021 | +36.7% |
| 20 Aug 2021 | −3.3% |
| 27 Aug 2021 | +3.9% |
| 3 Sep 2021 | +6.3% |
| 9 Sep 2021 | −13.5% |
| 17 Sep 2021 | −18.6% |
| 24 Sep 2021 | −34.6% |
| 1 Oct 2021 | −32.4% |
| 8 Oct 2021 | −30.8% |
| 14 Oct 2021 | −27.9% |
| 22 Oct 2021 | −31.8% |
| 29 Oct 2021 | −30.7% |
| 4 Nov 2021 | −26.1% |
| 12 Nov 2021 | −10.9% |
| 18 Nov 2021 | −2.1% |
| 26 Nov 2021 | −9.6% |
| 3 Dec 2021 | −9.0% |
| 10 Dec 2021 | +3.2% |
| 17 Dec 2021 | +3.4% |
| 24 Dec 2021 | +2.0% |
| 31 Dec 2021 | +18.9% |
| 7 Jan 2022 | +16.4% |
| 14 Jan 2022 | +9.8% |
| 21 Jan 2022 | +15.5% |
| 28 Jan 2022 | +18.2% |
| 4 Feb 2022 | +22.1% |
| 11 Feb 2022 | +47.3% |
| 18 Feb 2022 | +54.5% |
| 25 Feb 2022 | +72.0% |
| 4 Mar 2022 | +84.2% |
| 11 Mar 2022 | +88.5% |
| 17 Mar 2022 | +85.3% |
| 25 Mar 2022 | +77.6% |
| 1 Apr 2022 | +51.0% |
| 8 Apr 2022 | +56.3% |
| 13 Apr 2022 | +53.9% |
| 22 Apr 2022 | +46.6% |
| 29 Apr 2022 | +47.5% |
| 6 May 2022 | +30.5% |
| 13 May 2022 | −3.8% |
| 20 May 2022 | +6.5% |
| 27 May 2022 | −8.5% |
| 3 Jun 2022 | −14.8% |
| 10 Jun 2022 | −21.0% |
| 17 Jun 2022 | −22.1% |
| 24 Jun 2022 | −22.8% |
| 1 Jul 2022 | −20.8% |
| 8 Jul 2022 | −18.7% |
| 15 Jul 2022 | −20.6% |
| 22 Jul 2022 | −7.5% |
| 29 Jul 2022 | −10.6% |
| 5 Aug 2022 | −6.9% |
| 12 Aug 2022 | −11.3% |
| 19 Aug 2022 | −16.0% |
| 26 Aug 2022 | −10.3% |
| 2 Sep 2022 | −11.6% |
| 9 Sep 2022 | +8.1% |
| 16 Sep 2022 | +16.7% |
| 23 Sep 2022 | +15.6% |
| 30 Sep 2022 | +9.9% |
| 7 Oct 2022 | +17.4% |
| 14 Oct 2022 | +5.6% |
| 21 Oct 2022 | −5.4% |
| 28 Oct 2022 | +6.8% |
| 4 Nov 2022 | +13.6% |
| 11 Nov 2022 | +28.9% |
| 18 Nov 2022 | +22.9% |
| 25 Nov 2022 | +27.4% |
| 2 Dec 2022 | +28.5% |
| 9 Dec 2022 | +2.3% |
| 16 Dec 2022 | +3.8% |
| 23 Dec 2022 | −13.9% |
| 30 Dec 2022 | +4.8% |
| 6 Jan 2023 | −0.4% |
| 13 Jan 2023 | +10.3% |
| 20 Jan 2023 | +13.1% |
| 27 Jan 2023 | −1.4% |
| 3 Feb 2023 | −2.7% |
| 10 Feb 2023 | −5.0% |
| 17 Feb 2023 | −2.1% |
| 24 Feb 2023 | −9.6% |
| 3 Mar 2023 | −10.0% |
| 10 Mar 2023 | −2.7% |
| 17 Mar 2023 | −7.5% |
| 24 Mar 2023 | +8.6% |
| 31 Mar 2023 | −5.3% |
| 6 Apr 2023 | −9.1% |
| 13 Apr 2023 | −8.0% |
| 21 Apr 2023 | −11.6% |
| 28 Apr 2023 | −5.5% |
| 5 May 2023 | +9.1% |
| 12 May 2023 | +3.5% |
| 19 May 2023 | +13.6% |
| 26 May 2023 | +25.9% |
| 2 Jun 2023 | +29.1% |
| 9 Jun 2023 | +24.5% |
| 16 Jun 2023 | +30.3% |
| 23 Jun 2023 | +22.9% |
| 30 Jun 2023 | +22.8% |
| 7 Jul 2023 | +15.8% |
| 14 Jul 2023 | +13.8% |
| 21 Jul 2023 | +26.8% |
| 28 Jul 2023 | +30.4% |
| 4 Aug 2023 | +9.4% |
| 11 Aug 2023 | +45.3% |
| 18 Aug 2023 | +29.1% |
| 25 Aug 2023 | +67.6% |
| 1 Sep 2023 | +74.5% |
| 8 Sep 2023 | +115.1% |
| 15 Sep 2023 | +86.6% |
| 22 Sep 2023 | +84.9% |
| 29 Sep 2023 | +95.9% |
| 6 Oct 2023 | +87.0% |
| 13 Oct 2023 | +93.0% |
| 20 Oct 2023 | +78.5% |
| 27 Oct 2023 | +68.1% |
| 3 Nov 2023 | +46.4% |
| 12 Nov 2023 | +15.1% |
| 17 Nov 2023 | +16.6% |
| 24 Nov 2023 | −17.4% |
| 1 Dec 2023 | −28.4% |
| 8 Dec 2023 | −40.6% |
| 15 Dec 2023 | −26.6% |
| 22 Dec 2023 | −18.7% |
| 29 Dec 2023 | −28.2% |
| 5 Jan 2024 | −26.6% |
| 12 Jan 2024 | −27.9% |
| 20 Jan 2024 | −28.4% |
| 25 Jan 2024 | −30.4% |
| 2 Feb 2024 | −11.3% |
| 9 Feb 2024 | −3.5% |
| 16 Feb 2024 | −3.2% |
| 23 Feb 2024 | +5.7% |
| 2 Mar 2024 | +7.2% |
| 7 Mar 2024 | −3.9% |
| 15 Mar 2024 | −21.3% |
| 22 Mar 2024 | −24.5% |
| 28 Mar 2024 | −27.4% |
| 5 Apr 2024 | −15.3% |
| 12 Apr 2024 | −10.8% |
| 19 Apr 2024 | −14.3% |
| 26 Apr 2024 | −6.1% |
| 3 May 2024 | −10.8% |
| 10 May 2024 | −20.5% |
| 18 May 2024 | −27.9% |
| 24 May 2024 | −30.2% |
| 31 May 2024 | −28.9% |
| 7 Jun 2024 | −22.8% |
| 14 Jun 2024 | −5.6% |
| 21 Jun 2024 | −7.1% |
| 28 Jun 2024 | −4.0% |
| 5 Jul 2024 | −11.9% |
| 12 Jul 2024 | −19.1% |
| 19 Jul 2024 | −6.0% |
| 26 Jul 2024 | −5.5% |
| 2 Aug 2024 | −0.4% |
| 9 Aug 2024 | −1.9% |
| 16 Aug 2024 | −2.0% |
| 23 Aug 2024 | +4.1% |
| 30 Aug 2024 | +4.3% |
| 6 Sep 2024 | +2.9% |
| 13 Sep 2024 | −0.8% |
| 20 Sep 2024 | −5.6% |
| 27 Sep 2024 | −0.6% |
| 4 Oct 2024 | −3.4% |
| 11 Oct 2024 | −3.3% |
| 18 Oct 2024 | −12.3% |
| 25 Oct 2024 | −23.6% |
| 1 Nov 2024 | −23.8% |
| 8 Nov 2024 | −15.6% |
| 14 Nov 2024 | −15.1% |
| 22 Nov 2024 | −22.4% |
| 29 Nov 2024 | −16.7% |
| 6 Dec 2024 | −12.0% |
| 13 Dec 2024 | −11.6% |
| 20 Dec 2024 | −8.1% |
| 27 Dec 2024 | −9.6% |
| 3 Jan 2025 | −6.5% |
| 10 Jan 2025 | −9.6% |
| 17 Jan 2025 | −10.4% |
| 24 Jan 2025 | −3.9% |
| 1 Feb 2025 | −14.2% |
| 7 Feb 2025 | −11.7% |
| 14 Feb 2025 | −18.3% |
| 21 Feb 2025 | −12.8% |
| 28 Feb 2025 | −23.5% |
| 7 Mar 2025 | −22.4% |
| 13 Mar 2025 | −33.7% |
| 21 Mar 2025 | −26.8% |
| 28 Mar 2025 | −31.3% |
| 4 Apr 2025 | −23.1% |
| 11 Apr 2025 | −25.0% |
| 17 Apr 2025 | −25.1% |
| 25 Apr 2025 | −24.5% |
| 2 May 2025 | −21.6% |
| 9 May 2025 | −30.6% |
| 16 May 2025 | −1.8% |
| 23 May 2025 | +8.9% |
| 30 May 2025 | +17.6% |
| 6 Jun 2025 | +7.4% |
| 13 Jun 2025 | +27.8% |
| 20 Jun 2025 | +15.7% |
| 27 Jun 2025 | +25.4% |
| 4 Jul 2025 | +5.9% |
| 11 Jul 2025 | +10.7% |
| 18 Jul 2025 | +9.2% |
| 25 Jul 2025 | +9.0% |
| 1 Aug 2025 | +10.9% |
| 8 Aug 2025 | +16.5% |
| 14 Aug 2025 | −11.3% |
| 22 Aug 2025 | −15.8% |
| 29 Aug 2025 | −14.3% |
| 5 Sep 2025 | −11.7% |
| 12 Sep 2025 | −10.3% |
| 19 Sep 2025 | −5.2% |
| 26 Sep 2025 | −11.7% |
| 3 Oct 2025 | −8.8% |
| 10 Oct 2025 | −10.7% |
| 17 Oct 2025 | −14.6% |
| 24 Oct 2025 | −13.5% |
| 31 Oct 2025 | −8.5% |
| 7 Nov 2025 | −12.1% |
| 14 Nov 2025 | −2.5% |
| 21 Nov 2025 | −12.7% |
| 28 Nov 2025 | −10.0% |
| 5 Dec 2025 | −13.9% |
| 12 Dec 2025 | −18.8% |
| 19 Dec 2025 | −23.6% |
| 26 Dec 2025 | −15.0% |
| 2 Jan 2026 | −19.5% |
| 9 Jan 2026 | −16.6% |
| 16 Jan 2026 | −9.7% |
| 23 Jan 2026 | −15.2% |
| 1 Feb 2026 | −15.1% |
| 6 Feb 2026 | −13.7% |
| 13 Feb 2026 | −5.9% |
| 20 Feb 2026 | −3.5% |
| 27 Feb 2026 | +6.7% |
| 6 Mar 2026 | +4.6% |
| 13 Mar 2026 | +4.5% |
| 20 Mar 2026 | +3.9% |
| 27 Mar 2026 | −7.3% |
| 2 Apr 2026 | −8.6% |
| 10 Apr 2026 | +2.0% |
| 17 Apr 2026 | +18.9% |
| 24 Apr 2026 | +24.4% |
| 30 Apr 2026 | +17.6% |
| 8 May 2026 | +35.0% |
| 15 May 2026 | +17.1% |
| 22 May 2026 | +17.3% |
| 29 May 2026 | +29.8% |
| 4 Jun 2026 | +69.7% |
| 5 Jun 2026 | +68.6% |
| 9 Jun 2026 | +52.5% |
| 10 Jun 2026 | +64.4% |
| 12 Jun 2026 | +68.5% |
| 17 Jun 2026 | +57.5% |
| 19 Jun 2026 | +41.2% |
| 24 Jun 2026 | +35.3% |
| 25 Jun 2026 | +34.8% |
| 1 Jul 2026 | +10.8% |
| 3 Jul 2026 | +16.3% |
| 10 Jul 2026 | +15.6% |
| 17 Jul 2026 | −9.2% |
| 24 Jul 2026 | −18.5% |
| 31 Jul 2026 | −13.3% |
| 7 Aug 2026 | +20.3% |
| 14 Aug 2026 | +45.9% |
| 21 Aug 2026 | +37.6% |
| 28 Aug 2026 | +39.5% |
| 4 Sep 2026 | +65.1% |
| 11 Sep 2026 | +85.1% |
| 18 Sep 2026 | +96.2% |
| 25 Sep 2026 | +85.8% |
| 28 Sep 2026 | +90.8% |
| 1 Oct 2026 | +108.2% |
| 9 Oct 2026 | +118.0% |
| 16 Oct 2026 | +78.2% |
| 23 Oct 2026 | +46.5% |
| 30 Oct 2026 | +31.8% |
| 5 Nov 2026 | +26.6% |
Over the last 11 years the share price moved +919% while the NIFTY 500 moved +231%, so it is ahead of the index over that whole period. The chart above shows the 13-week comparison for every week.
This page treats a rise as over when the price closes below its 200-day average on two Fridays in a row.
What changed at Birla Cable this quarter?
Three changes stood out: best operating margin in 15 quarters, highest quarterly profit in 15 quarters and highest quarterly revenue in 15 quarters.
Best operating margin in 15 quarters
Operating margin was 17% in the June 2026 quarter, against 4.4% a year earlier.
Highest quarterly profit in 15 quarters
Profit of ₹31 crore in the June 2026 quarter is the highest of the last 15 quarters.
Highest quarterly revenue in 15 quarters
Revenue of ₹267 crore in the June 2026 quarter is the highest of the last 15 quarters.
What are Birla Cable's latest quarterly results?
For July to September 2026 (the quarter ended 30 September 2026), Birla Cable reported revenue of ₹355 crore, up 101.7% from ₹176 crore a year earlier, and a profit of ₹38.0 crore, up 3,700.0% from ₹1.00 crore.
Birla Cable results: July to September 2026 against a year earlier
| Measure | July to September 2026 | July to September 2025 | Change |
|---|---|---|---|
| Revenue | ₹355 crore | ₹176 crore | +101.7% |
| Profit | ₹38.0 crore | ₹1.00 crore | +3,700.0% |
| Earnings per share | ₹12.60 | ₹0.24 | +5,150.0% |
| Operating margin | 15.0% | 4.1% | +10.9 points |
The next results, for October to December 2026, are due by 14 February 2027: listed companies must publish quarterly results within 45 days of the quarter's end (60 days for the January to March quarter).
From the company's reported quarterly results (quarter ended 30 September 2026). Revenue and profit in ₹ crore.
What is the Birla Cable share price history?
Birla Cable closed at ₹346.60 on 5 November 2026, up 122.8% from ₹155.60 a year earlier (7 November 2025) and up 302.3% over five years. Its highest weekly close since May 2016 was ₹408.25 on 18 September 2026.
Birla Cable share price: then and now
| When | Close | Change to 5 Nov 2026 |
|---|---|---|
| 1 week ago · 30 Oct 2026 | ₹316.00 | +9.7% |
| 1 month ago · 9 Oct 2026 | ₹386.55 | −10.3% |
| 6 months ago · 8 May 2026 | ₹173.75 | +99.5% |
| 1 year ago · 7 Nov 2025 | ₹155.60 | +122.8% |
| 3 years ago · 3 Nov 2023 | ₹277.80 | +24.8% |
| 5 years ago · 4 Nov 2021 | ₹86.15 | +302.3% |
| 10 years ago · 4 Nov 2016 | ₹41.50 | +735.2% |
| Earliest weekly close in our records · 13 May 2016 | ₹34.00 | +919.4% |
| Highest weekly close since May 2016, also the 52-week high · 18 Sep 2026 | ₹408.25 | −15.1% |
| Lowest weekly close since May 2016 · 20 Mar 2020 | ₹29.20 | +1,087.0% |
| 52-week low (weekly close) · 27 Mar 2026 | ₹112.05 | +209.3% |
Weekly closing prices. Each change is the move from that price to the 5 Nov 2026 close. A day's intraday high or low can go beyond these weekly closes.
555 weekly closes from 13 May 2016 to 5 November 2026.
What is the latest news on Birla Cable?
5 Nov 2026: Birla Cable closed at ₹346.60, up 9.7% on the week and down 10.3% on the month. Results for July to September 2026: Revenue up 101.7% and profit up 3,700.0% on a year earlier.
Earlier
- 27 Jul 2026: ex-date for a dividend of ₹1.25 a share.
What dividend does Birla Cable pay?
Birla Cable paid ₹1.25 a share in regular dividends in the 12 months to 5 November 2026 (1 payment), a yield of 0.36% at the ₹346.60 close on 5 November 2026. The last was a dividend of ₹1.25 a share, ex-date 27 July 2026.
Birla Cable dividends since 1 April 2021
| Ex-date | Dividend per share | Type |
|---|---|---|
| 27 Jul 2026Dividend | ₹1.25 | Dividend |
| 26 Jul 2024Dividend | ₹1.75 | Dividend |
| 4 Sep 2023Dividend | ₹2.50 | Dividend |
| 15 Sep 2022Dividend | ₹1.50 | Dividend |
| 15 Sep 2021Dividend | ₹1 | Dividend |
Amounts as the company declared them on the NSE. A dividend goes to whoever owns the shares before the ex-date. The record date is the same day as the ex-date for every payment here.
Yes. Birla Cable Ltd paid out 22% of its profit as dividends in FY26, and it paid a dividend in each of its last 4 reported years.
From the NSE corporate-actions record, read 5 November 2026.
What did Birla Cable management say on the latest results call?
Birla Cable's management made 0 promises we could check against what it later reported.
Our read after the January to March 2026 results, written 14 June 2026. The July to September 2026 results are out since, so this part may be out of date until we update it.
Which stock lists is Birla Cable on?
Birla Cable is not on any of our India lists this week.
Is Birla Cable profitable?
Birla Cable Ltd earned ₹38.0 Cr of net profit in the Sep 2026 quarter, +3,700.0% on the same quarter a year earlier. That is the 4th quarter in a row of profit growth. Full-year FY26 profit was ₹17.0 Cr. Over 3 years profit has grown −19.8% a year on average. That is 10.7% of the quarter's revenue.
Net profit is what is left after every cost, interest and tax. Earnings per share, dividends and book value all grow from it.
The same quarter a year earlier earned ₹1.0 Cr.
For the full year, FY26 profit was ₹17.0 Cr (+240.0% on the year before).
FY26 profit ₹17.0 Cr (+240.0% on the year before), −19.8% a year over 3 years
- Net profit ₹17.0
| Quarter | Net profit |
|---|---|
| FY23 | ₹33 |
| FY24 | ₹22 |
| FY25 | ₹5 |
| FY26 | ₹17 |
Growth on a year earlier
- Growth on a year earlier 240%
| Quarter | Growth on a year earlier |
|---|---|
| FY23 | – |
| FY24 | −33.3% |
| FY25 | −77.3% |
| FY26 | 240% |
Sep 2026: ₹38.0 Cr (+3,700.0% on a year earlier), the 4th quarter in a row of growth
- Net profit (quarterly) ₹38.0
| Quarter | Net profit (quarterly) |
|---|---|
| Dec 2023 | ₹4 |
| Mar 2024 | ₹2 |
| Jun 2024 | ₹0 |
| Sep 2024 | ₹2 |
| Dec 2024 | ₹1 |
| Mar 2025 | ₹1 |
| Jun 2025 | ₹1 |
| Sep 2025 | ₹1 |
| Dec 2025 | ₹4 |
| Mar 2026 | ₹11 |
| Jun 2026 | ₹31 |
| Sep 2026 | ₹38 |
Growth on a year earlier
- Growth on a year earlier 3,700%
| Quarter | Growth on a year earlier |
|---|---|
| Dec 2023 | −51.2% |
| Mar 2024 | −84.6% |
| Jun 2024 | −100% |
| Sep 2024 | −60% |
| Dec 2024 | −75% |
| Mar 2025 | −50% |
| Jun 2025 | – |
| Sep 2025 | −50% |
| Dec 2025 | 300% |
| Mar 2026 | 1,000% |
| Jun 2026 | 3,000% |
| Sep 2026 | 3,700% |
Why profit moved: revenue changed +101.7% on a year earlier and the margin moved +10.9 percentage points. Most of the change came from keeping more of each sale.
On average over the last four quarters, profit changed +2,000.0% and revenue +55.1%. Profit is growing faster than sales: fixed costs are spread over more sales, so each extra rupee of revenue adds more to profit.
How much revenue does Birla Cable make, and is it growing?
Birla Cable Ltd reported ₹355 Cr of revenue in the Sep 2026 quarter, +101.7% on the same quarter a year earlier. That is the 4th quarter in a row with growth on the year before. Over 3 years it has grown −0.9% a year on average. The last full year, FY26, came in at ₹771 Cr.
Revenue is everything the company billed its customers in the period.
The last four reported quarters add to ₹1,041 Cr.
FY26 revenue was ₹771 Cr, +16.5% on the year before.
FY26 revenue ₹771 Cr (+16.5% on the year before), −0.9% a year over 3 years
- Revenue ₹771
| Quarter | Revenue |
|---|---|
| FY23 | ₹792 |
| FY24 | ₹686 |
| FY25 | ₹662 |
| FY26 | ₹771 |
Growth on a year earlier
- Growth on a year earlier 16.5%
| Quarter | Growth on a year earlier |
|---|---|
| FY23 | – |
| FY24 | −13.4% |
| FY25 | −3.5% |
| FY26 | 16.5% |
Sep 2026: ₹355 Cr (+101.7% on a year earlier), the 4th quarter in a row of growth
- Revenue (quarterly) ₹355
| Quarter | Revenue (quarterly) |
|---|---|
| Dec 2023 | ₹162 |
| Mar 2024 | ₹175 |
| Jun 2024 | ₹166 |
| Sep 2024 | ₹182 |
| Dec 2024 | ₹158 |
| Mar 2025 | ₹156 |
| Jun 2025 | ₹176 |
| Sep 2025 | ₹176 |
| Dec 2025 | ₹205 |
| Mar 2026 | ₹214 |
| Jun 2026 | ₹267 |
| Sep 2026 | ₹355 |
Growth on a year earlier
- Growth on a year earlier 101.7%
| Quarter | Growth on a year earlier |
|---|---|
| Dec 2023 | −18.9% |
| Mar 2024 | −28.6% |
| Jun 2024 | −4.6% |
| Sep 2024 | 4% |
| Dec 2024 | −2.5% |
| Mar 2025 | −10.9% |
| Jun 2025 | 6% |
| Sep 2025 | −3.3% |
| Dec 2025 | 29.7% |
| Mar 2026 | 37.2% |
| Jun 2026 | 51.7% |
| Sep 2026 | 101.7% |
Recent pace: the last four quarters grew +55.1% on average, against −0.9% a year over the longer run, so this year is growing faster than its own long-run rate.
Is growth speeding up? Revenue over the last 12 months grew +56.3%, against +23.3% a year over the last 8 quarters (accelerating); profit over the last 12 months grew +2,000.0%, against +224.0% a year (accelerating).
How much of every ₹100 of sales does Birla Cable keep?
Birla Cable Ltd's operating margin was 15.0% in the Sep 2026 quarter, 10.9 percentage points higher than the same quarter a year ago. Across 4 years it has been between 4.9% and 8.0%. The latest quarter is above every full year in that period.
Operating margin is what is left from every ₹100 of sales after the costs of running the business, before interest and tax. It shows pricing power and cost control.
Why the margin moved: operating margin changed +11.3 percentage points on the year while gross margin changed +5.5 points. So the gain came mostly from costs below the gross margin, such as staff and overheads, measured against sales.
FY26: 6.0%, within a range of 4.9% to 8.0% over 4 years
- Operating margin 6.0%
| Quarter | Operating margin |
|---|---|
| FY23 | 8% |
| FY24 | 6% |
| FY25 | 4.9% |
| FY26 | 6% |
Change on the year before (points)
- Change on the year before (points) +1.1 pts
| Quarter | Change on the year before (points) |
|---|---|
| FY23 | – |
| FY24 | −2.0 pts |
| FY25 | −1.1 pts |
| FY26 | +1.1 pts |
Sep 2026: operating margin 15.0% (+10.9 points on a year earlier)
- Operating margin 15.0%
| Quarter | Operating margin |
|---|---|
| Dec 2023 | 7% |
| Mar 2024 | 4.1% |
| Jun 2024 | 3.9% |
| Sep 2024 | 5% |
| Dec 2024 | 6% |
| Mar 2025 | 5% |
| Jun 2025 | 4.4% |
| Sep 2025 | 4.1% |
| Dec 2025 | 5% |
| Mar 2026 | 9% |
| Jun 2026 | 17% |
| Sep 2026 | 15% |
Change on a year earlier (points)
- Change on a year earlier (points) +10.9 pts
| Quarter | Change on a year earlier (points) |
|---|---|
| Dec 2023 | −0.9 pts |
| Mar 2024 | −4.9 pts |
| Jun 2024 | −3.1 pts |
| Sep 2024 | −1.0 pts |
| Dec 2024 | −1.0 pts |
| Mar 2025 | +0.9 pts |
| Jun 2025 | +0.5 pts |
| Sep 2025 | −0.9 pts |
| Dec 2025 | −1.0 pts |
| Mar 2026 | +4.0 pts |
| Jun 2026 | +12.6 pts |
| Sep 2026 | +10.9 pts |
Is Birla Cable's profit turning into cash?
Over the last 3 years, 243% of Birla Cable Ltd's reported profit came in as cash from its operations, so the profit is backed by cash. In FY26 its operations used ₹21.0 Cr of cash, against ₹17.0 Cr of profit. After −₹2.0 Cr of spending on assets, free cash was −₹19.0 Cr: it spent more than its operations brought in.
The profit and loss account shows what was earned. The cash-flow statement shows the cash that actually came in. Comparing operating cash flow with profit is one of the best checks that a profit is real.
Cash-flow figures here are yearly, because quarterly cash statements are not published, so this section changes once a year.
FY26: operating cash −₹21.0 Cr against profit ₹17.0 Cr; 243% of 3 years' profit came in as cash
- Operating cash −₹21.0
- Net profit ₹17.0
- Free cash −₹19
| Quarter | Operating cash | Net profit | Free cash |
|---|---|---|---|
| FY23 | −₹8 | ₹33 | – |
| FY24 | ₹16 | ₹22 | −₹26 |
| FY25 | ₹112 | ₹5 | ₹85 |
| FY26 | −₹21 | ₹17 | −₹19 |
FY26: operating cash was −124% of profit (243% over three years)
- Operating cash as % of profit −124%
- Break-even line 100%
| Quarter | Operating cash as % of profit | Break-even line |
|---|---|---|
| FY23 | −24% | 100% |
| FY24 | 73% | 100% |
| FY25 | 300% | 100% |
| FY26 | −124% | 100% |
Why 243% of profit came in as cash: the cash cycle got 13 days longer between FY23 and FY26, so more of each rupee of profit waits in the business before it arrives.
What to look at next: the bigger use of cash is spending on new assets, at 1.6× depreciation over three years. The next section checks what that spending is building.
Where does Birla Cable's cash go?
Birla Cable Ltd's cash cycle, the days between paying suppliers and getting paid by customers, was 124 days in FY26, up from 111 days in FY23. It spent ₹67.0 Cr on assets over the last 3 years. Customers take 96 days to pay, and stock sits for 46 days on average.
Working capital is the cash tied up between paying suppliers and getting paid. Debtor days: how long customers take to pay. Inventory days: how long stock sits. The cash cycle: the whole loop, in days of sales.
At FY26 sales of ₹771 Cr, each day of that cycle ties up about ₹2.1 Cr, so roughly ₹262 Cr is tied up in the business at any time.
FY26: customers took 96 days to pay and stock sat for 46 days, about 1.5 months of sales sitting as stock, for a full cycle of 124 days, longer than FY23's 111.
The full loop: cash goes out to suppliers and production on day 0. Stock sits for 46 days. Customers pay about 96 days after that. Suppliers are paid at 18 days. Together that makes the 124-day cycle.
FY26: a 124-day cash cycle, +13 days compared with FY23
- Cash cycle 124d
- Inventory days 46d
- Debtor days 96d
- Payable days 18d
| Quarter | Cash cycle | Inventory days | Debtor days | Payable days |
|---|---|---|---|---|
| FY23 | 111d | 60d | 100d | 49d |
| FY24 | 148d | 51d | 114d | 17d |
| FY25 | 107d | 35d | 92d | 20d |
| FY26 | 124d | 46d | 96d | 18d |
Spending on assets: ₹67.0 Cr over the last 3 years, against ₹43.0 Cr of depreciation (the yearly wear and tear on existing assets). So it is building well beyond replacing what wears out. Work still in progress is ₹0.0 Cr (FY26): assets paid for that are not earning yet.
FY26: asset sales brought in ₹2.0 Cr more than it spent on new assets
- Capex −₹2.0
| Quarter | Capex |
|---|---|
| FY24 | ₹42 |
| FY25 | ₹27 |
| FY26 | −₹2 |
In short: the cash is going into new capacity, not getting stuck in the daily cycle. The question is whether the new capacity earns.
What is Birla Cable's P/E ratio, and how does it compare with its own history?
Birla Cable Ltd's P/E is 12.5×, about the lowest it has ever been. Its usual P/E (the middle reading) is 45.2×, over 3.5 years of weekly prices. This compares the share price with the company’s own past. It does not say what the business is worth.
P/E is the share price divided by a year's profit per share: how many rupees the market pays for each rupee of yearly profit.
P/E 12.5× against a usual 45.2×: about the lowest it has ever been
- P/E 12.5×
- Median 45.2×
| Week | P/E | Median |
|---|---|---|
| 5 May 2023 | 14.3× | 45.2× |
| 12 May 2023 | 13.7× | 45.2× |
| 19 May 2023 | 15.3× | 45.2× |
| 26 May 2023 | 16.0× | 45.2× |
| 2 Jun 2023 | 16.5× | 45.2× |
| 9 Jun 2023 | 16.3× | 45.2× |
| 16 Jun 2023 | 16.3× | 45.2× |
| 23 Jun 2023 | 15.4× | 45.2× |
| 30 Jun 2023 | 15.4× | 45.2× |
| 7 Jul 2023 | 15.5× | 45.2× |
| 14 Jul 2023 | 15.4× | 45.2× |
| 21 Jul 2023 | 16.5× | 45.2× |
| 28 Jul 2023 | 17.0× | 45.2× |
| 4 Aug 2023 | 17.1× | 45.2× |
| 11 Aug 2023 | 16.6× | 45.2× |
| 18 Aug 2023 | 16.6× | 45.2× |
| 25 Aug 2023 | 22.1× | 45.2× |
| 1 Sep 2023 | 23.8× | 45.2× |
| 8 Sep 2023 | 28.9× | 45.2× |
| 15 Sep 2023 | 25.0× | 45.2× |
| 22 Sep 2023 | 23.2× | 45.2× |
| 29 Sep 2023 | 24.2× | 45.2× |
| 6 Oct 2023 | 23.3× | 45.2× |
| 13 Oct 2023 | 23.6× | 45.2× |
| 20 Oct 2023 | 23.0× | 45.2× |
| 27 Oct 2023 | 22.3× | 45.2× |
| 3 Nov 2023 | 22.1× | 45.2× |
| 12 Nov 2023 | 22.1× | 45.2× |
| 17 Nov 2023 | 22.2× | 45.2× |
| 24 Nov 2023 | 21.6× | 45.2× |
| 1 Dec 2023 | 21.1× | 45.2× |
| 8 Dec 2023 | 21.3× | 45.2× |
| 15 Dec 2023 | 22.4× | 45.2× |
| 22 Dec 2023 | 23.8× | 45.2× |
| 29 Dec 2023 | 22.7× | 45.2× |
| 5 Jan 2024 | 22.1× | 45.2× |
| 12 Jan 2024 | 22.1× | 45.2× |
| 20 Jan 2024 | 22.4× | 45.2× |
| 25 Jan 2024 | 21.9× | 45.2× |
| 2 Feb 2024 | 26.4× | 45.2× |
| 9 Feb 2024 | 27.4× | 45.2× |
| 16 Feb 2024 | 27.9× | 45.2× |
| 23 Feb 2024 | 28.7× | 45.2× |
| 2 Mar 2024 | 26.7× | 45.2× |
| 7 Mar 2024 | 24.2× | 45.2× |
| 15 Mar 2024 | 21.0× | 45.2× |
| 22 Mar 2024 | 21.4× | 45.2× |
| 28 Mar 2024 | 20.3× | 45.2× |
| 5 Apr 2024 | 23.0× | 45.2× |
| 12 Apr 2024 | 23.6× | 45.2× |
| 19 Apr 2024 | 23.4× | 45.2× |
| 26 Apr 2024 | 24.7× | 45.2× |
| 3 May 2024 | 24.2× | 45.2× |
| 10 May 2024 | 34.4× | 45.2× |
| 18 May 2024 | 32.6× | 45.2× |
| 24 May 2024 | 32.8× | 45.2× |
| 31 May 2024 | 31.4× | 45.2× |
| 7 Jun 2024 | 32.5× | 45.2× |
| 14 Jun 2024 | 34.2× | 45.2× |
| 21 Jun 2024 | 33.7× | 45.2× |
| 28 Jun 2024 | 32.6× | 45.2× |
| 5 Jul 2024 | 33.9× | 45.2× |
| 12 Jul 2024 | 45.4× | 45.2× |
| 19 Jul 2024 | 49.8× | 45.2× |
| 26 Jul 2024 | 54.0× | 45.2× |
| 2 Aug 2024 | 54.6× | 45.2× |
| 9 Aug 2024 | 77.3× | 45.2× |
| 16 Aug 2024 | 73.7× | 45.2× |
| 23 Aug 2024 | 79.0× | 45.2× |
| 30 Aug 2024 | 77.0× | 45.2× |
| 6 Sep 2024 | 74.8× | 45.2× |
| 13 Sep 2024 | 76.6× | 45.2× |
| 20 Sep 2024 | 72.8× | 45.2× |
| 27 Sep 2024 | 72.3× | 45.2× |
| 4 Oct 2024 | 70.3× | 45.2× |
| 11 Oct 2024 | 69.4× | 45.2× |
| 18 Oct 2024 | 67.0× | 45.2× |
| 25 Oct 2024 | 87.3× | 45.2× |
| 1 Nov 2024 | 93.3× | 45.2× |
| 8 Nov 2024 | 90.1× | 45.2× |
| 14 Nov 2024 | 83.7× | 45.2× |
| 22 Nov 2024 | 83.9× | 45.2× |
| 29 Nov 2024 | 89.1× | 45.2× |
| 6 Dec 2024 | 93.7× | 45.2× |
| 13 Dec 2024 | 92.9× | 45.2× |
| 20 Dec 2024 | 87.6× | 45.2× |
| 27 Dec 2024 | 86.0× | 45.2× |
| 3 Jan 2025 | 87.9× | 45.2× |
| 10 Jan 2025 | 81.0× | 45.2× |
| 17 Jan 2025 | 80.5× | 45.2× |
| 24 Jan 2025 | 78.3× | 45.2× |
| 1 Feb 2025 | 74.6× | 45.2× |
| 7 Feb 2025 | 75.9× | 45.2× |
| 14 Feb 2025 | 93.0× | 45.2× |
| 21 Feb 2025 | 95.3× | 45.2× |
| 28 Feb 2025 | 83.8× | 45.2× |
| 7 Mar 2025 | 89.0× | 45.2× |
| 13 Mar 2025 | 78.5× | 45.2× |
| 21 Mar 2025 | 87.9× | 45.2× |
| 28 Mar 2025 | 80.5× | 45.2× |
| 4 Apr 2025 | 89.6× | 45.2× |
| 11 Apr 2025 | 88.9× | 45.2× |
| 17 Apr 2025 | 93.2× | 45.2× |
| 25 Apr 2025 | 91.0× | 45.2× |
| 2 May 2025 | 87.8× | 45.2× |
| 9 May 2025 | 85.6× | 45.2× |
| 16 May 2025 | 101.1× | 45.2× |
| 23 May 2025 | 111.9× | 45.2× |
| 30 May 2025 | 111.9× | 45.2× |
| 6 Jun 2025 | 111.5× | 45.2× |
| 13 Jun 2025 | 110.4× | 45.2× |
| 20 Jun 2025 | 111.9× | 45.2× |
| 27 Jun 2025 | 111.9× | 45.2× |
| 4 Jul 2025 | 111.8× | 45.2× |
| 11 Jul 2025 | 108.7× | 45.2× |
| 18 Jul 2025 | 109.5× | 45.2× |
| 25 Jul 2025 | 105.3× | 45.2× |
| 1 Aug 2025 | 102.0× | 45.2× |
| 8 Aug 2025 | 82.4× | 45.2× |
| 14 Aug 2025 | 75.1× | 45.2× |
| 22 Aug 2025 | 79.3× | 45.2× |
| 29 Aug 2025 | 77.3× | 45.2× |
| 5 Sep 2025 | 77.8× | 45.2× |
| 12 Sep 2025 | 81.0× | 45.2× |
| 19 Sep 2025 | 84.8× | 45.2× |
| 26 Sep 2025 | 76.9× | 45.2× |
| 3 Oct 2025 | 79.6× | 45.2× |
| 10 Oct 2025 | 77.5× | 45.2× |
| 17 Oct 2025 | 76.0× | 45.2× |
| 24 Oct 2025 | 76.5× | 45.2× |
| 31 Oct 2025 | 95.5× | 45.2× |
| 7 Nov 2025 | 93.6× | 45.2× |
| 14 Nov 2025 | 93.1× | 45.2× |
| 21 Nov 2025 | 89.3× | 45.2× |
| 28 Nov 2025 | 88.8× | 45.2× |
| 5 Dec 2025 | 83.2× | 45.2× |
| 12 Dec 2025 | 80.4× | 45.2× |
| 19 Dec 2025 | 82.1× | 45.2× |
| 26 Dec 2025 | 83.1× | 45.2× |
| 2 Jan 2026 | 82.1× | 45.2× |
| 9 Jan 2026 | 79.7× | 45.2× |
| 16 Jan 2026 | 80.2× | 45.2× |
| 23 Jan 2026 | 76.4× | 45.2× |
| 1 Feb 2026 | 52.8× | 45.2× |
| 6 Feb 2026 | 53.1× | 45.2× |
| 13 Feb 2026 | 56.7× | 45.2× |
| 20 Feb 2026 | 55.2× | 45.2× |
| 27 Feb 2026 | 58.3× | 45.2× |
| 6 Mar 2026 | 55.1× | 45.2× |
| 13 Mar 2026 | 51.5× | 45.2× |
| 20 Mar 2026 | 50.9× | 45.2× |
| 27 Mar 2026 | 44.3× | 45.2× |
| 2 Apr 2026 | 45.2× | 45.2× |
| 10 Apr 2026 | 51.8× | 45.2× |
| 17 Apr 2026 | 63.5× | 45.2× |
| 24 Apr 2026 | 61.9× | 45.2× |
| 30 Apr 2026 | 61.7× | 45.2× |
| 8 May 2026 | 68.5× | 45.2× |
| 15 May 2026 | 64.0× | 45.2× |
| 22 May 2026 | 28.3× | 45.2× |
| 29 May 2026 | 34.4× | 45.2× |
| 4 Jun 2026 | 42.0× | 45.2× |
| 5 Jun 2026 | 39.8× | 45.2× |
| 9 Jun 2026 | 36.1× | 45.2× |
| 10 Jun 2026 | 34.3× | 45.2× |
| 12 Jun 2026 | 34.5× | 45.2× |
| 17 Jun 2026 | 37.0× | 45.2× |
| 19 Jun 2026 | 40.4× | 45.2× |
| 24 Jun 2026 | 37.8× | 45.2× |
| 25 Jun 2026 | 36.9× | 45.2× |
| 1 Jul 2026 | 35.2× | 45.2× |
| 3 Jul 2026 | 34.2× | 45.2× |
| 10 Jul 2026 | 33.6× | 45.2× |
| 17 Jul 2026 | 32.8× | 45.2× |
| 24 Jul 2026 | 35.4× | 45.2× |
| 31 Jul 2026 | 36.6× | 45.2× |
| 7 Aug 2026 | 16.5× | 45.2× |
| 14 Aug 2026 | 18.7× | 45.2× |
| 21 Aug 2026 | 17.9× | 45.2× |
| 28 Aug 2026 | 19.1× | 45.2× |
| 4 Sep 2026 | 24.4× | 45.2× |
| 11 Sep 2026 | 25.5× | 45.2× |
| 18 Sep 2026 | 26.6× | 45.2× |
| 25 Sep 2026 | 23.5× | 45.2× |
| 28 Sep 2026 | 23.0× | 45.2× |
| 1 Oct 2026 | 24.9× | 45.2× |
| 9 Oct 2026 | 25.0× | 45.2× |
| 16 Oct 2026 | 22.5× | 45.2× |
| 23 Oct 2026 | 18.3× | 45.2× |
| 30 Oct 2026 | 20.5× | 45.2× |
| 5 Nov 2026 | 12.5× | 45.2× |
Earnings per share, 12 months
- Earnings per share, 12 months ₹28
| Week | Earnings per share, 12 months |
|---|---|
| 5 May 2023 | – |
| 12 May 2023 | – |
| 19 May 2023 | – |
| 26 May 2023 | – |
| 2 Jun 2023 | – |
| 9 Jun 2023 | – |
| 16 Jun 2023 | – |
| 23 Jun 2023 | – |
| 30 Jun 2023 | ₹11 |
| 7 Jul 2023 | ₹11 |
| 14 Jul 2023 | ₹11 |
| 21 Jul 2023 | ₹11 |
| 28 Jul 2023 | ₹11 |
| 4 Aug 2023 | ₹11 |
| 11 Aug 2023 | ₹11 |
| 18 Aug 2023 | ₹11 |
| 25 Aug 2023 | ₹11 |
| 1 Sep 2023 | ₹11 |
| 8 Sep 2023 | ₹11 |
| 15 Sep 2023 | ₹11 |
| 22 Sep 2023 | ₹11 |
| 29 Sep 2023 | ₹14 |
| 6 Oct 2023 | ₹14 |
| 13 Oct 2023 | ₹14 |
| 20 Oct 2023 | ₹14 |
| 27 Oct 2023 | ₹14 |
| 3 Nov 2023 | ₹14 |
| 12 Nov 2023 | ₹14 |
| 17 Nov 2023 | ₹14 |
| 24 Nov 2023 | ₹14 |
| 1 Dec 2023 | ₹14 |
| 8 Dec 2023 | ₹14 |
| 15 Dec 2023 | ₹14 |
| 22 Dec 2023 | ₹14 |
| 29 Dec 2023 | ₹13 |
| 5 Jan 2024 | ₹13 |
| 12 Jan 2024 | ₹13 |
| 20 Jan 2024 | ₹13 |
| 25 Jan 2024 | ₹13 |
| 2 Feb 2024 | ₹13 |
| 9 Feb 2024 | ₹13 |
| 16 Feb 2024 | ₹13 |
| 23 Feb 2024 | ₹13 |
| 2 Mar 2024 | ₹13 |
| 7 Mar 2024 | ₹13 |
| 15 Mar 2024 | ₹13 |
| 22 Mar 2024 | ₹13 |
| 28 Mar 2024 | ₹11 |
| 5 Apr 2024 | ₹11 |
| 12 Apr 2024 | ₹11 |
| 19 Apr 2024 | ₹11 |
| 26 Apr 2024 | ₹11 |
| 3 May 2024 | ₹11 |
| 10 May 2024 | ₹11 |
| 18 May 2024 | ₹11 |
| 24 May 2024 | ₹11 |
| 31 May 2024 | ₹11 |
| 7 Jun 2024 | ₹11 |
| 14 Jun 2024 | ₹11 |
| 21 Jun 2024 | ₹11 |
| 28 Jun 2024 | ₹7 |
| 5 Jul 2024 | ₹7 |
| 12 Jul 2024 | ₹7 |
| 19 Jul 2024 | ₹7 |
| 26 Jul 2024 | ₹7 |
| 2 Aug 2024 | ₹7 |
| 9 Aug 2024 | ₹7 |
| 16 Aug 2024 | ₹7 |
| 23 Aug 2024 | ₹7 |
| 30 Aug 2024 | ₹7 |
| 6 Sep 2024 | ₹7 |
| 13 Sep 2024 | ₹7 |
| 20 Sep 2024 | ₹7 |
| 27 Sep 2024 | ₹4 |
| 4 Oct 2024 | ₹4 |
| 11 Oct 2024 | ₹4 |
| 18 Oct 2024 | ₹4 |
| 25 Oct 2024 | ₹4 |
| 1 Nov 2024 | ₹4 |
| 8 Nov 2024 | ₹4 |
| 14 Nov 2024 | ₹4 |
| 22 Nov 2024 | ₹4 |
| 29 Nov 2024 | ₹4 |
| 6 Dec 2024 | ₹4 |
| 13 Dec 2024 | ₹4 |
| 20 Dec 2024 | ₹4 |
| 27 Dec 2024 | ₹3 |
| 3 Jan 2025 | ₹3 |
| 10 Jan 2025 | ₹3 |
| 17 Jan 2025 | ₹3 |
| 24 Jan 2025 | ₹3 |
| 1 Feb 2025 | ₹3 |
| 7 Feb 2025 | ₹3 |
| 14 Feb 2025 | ₹3 |
| 21 Feb 2025 | ₹3 |
| 28 Feb 2025 | ₹3 |
| 7 Mar 2025 | ₹3 |
| 13 Mar 2025 | ₹3 |
| 21 Mar 2025 | ₹3 |
| 28 Mar 2025 | ₹2 |
| 4 Apr 2025 | ₹2 |
| 11 Apr 2025 | ₹2 |
| 17 Apr 2025 | ₹2 |
| 25 Apr 2025 | ₹2 |
| 2 May 2025 | ₹2 |
| 9 May 2025 | ₹2 |
| 16 May 2025 | ₹2 |
| 23 May 2025 | ₹2 |
| 30 May 2025 | ₹2 |
| 6 Jun 2025 | ₹2 |
| 13 Jun 2025 | ₹2 |
| 20 Jun 2025 | ₹2 |
| 27 Jun 2025 | ₹2 |
| 4 Jul 2025 | ₹2 |
| 11 Jul 2025 | ₹2 |
| 18 Jul 2025 | ₹2 |
| 25 Jul 2025 | ₹2 |
| 1 Aug 2025 | ₹2 |
| 8 Aug 2025 | ₹2 |
| 14 Aug 2025 | ₹2 |
| 22 Aug 2025 | ₹2 |
| 29 Aug 2025 | ₹2 |
| 5 Sep 2025 | ₹2 |
| 12 Sep 2025 | ₹2 |
| 19 Sep 2025 | ₹2 |
| 26 Sep 2025 | ₹2 |
| 3 Oct 2025 | ₹2 |
| 10 Oct 2025 | ₹2 |
| 17 Oct 2025 | ₹2 |
| 24 Oct 2025 | ₹2 |
| 31 Oct 2025 | ₹2 |
| 7 Nov 2025 | ₹2 |
| 14 Nov 2025 | ₹2 |
| 21 Nov 2025 | ₹2 |
| 28 Nov 2025 | ₹2 |
| 5 Dec 2025 | ₹2 |
| 12 Dec 2025 | ₹2 |
| 19 Dec 2025 | ₹2 |
| 26 Dec 2025 | ₹2 |
| 2 Jan 2026 | ₹2 |
| 9 Jan 2026 | ₹2 |
| 16 Jan 2026 | ₹2 |
| 23 Jan 2026 | ₹2 |
| 1 Feb 2026 | ₹2 |
| 6 Feb 2026 | ₹2 |
| 13 Feb 2026 | ₹2 |
| 20 Feb 2026 | ₹2 |
| 27 Feb 2026 | ₹2 |
| 6 Mar 2026 | ₹2 |
| 13 Mar 2026 | ₹2 |
| 20 Mar 2026 | ₹2 |
| 27 Mar 2026 | ₹3 |
| 2 Apr 2026 | ₹3 |
| 10 Apr 2026 | ₹3 |
| 17 Apr 2026 | ₹3 |
| 24 Apr 2026 | ₹3 |
| 30 Apr 2026 | ₹3 |
| 8 May 2026 | ₹3 |
| 15 May 2026 | ₹3 |
| 22 May 2026 | ₹3 |
| 29 May 2026 | ₹3 |
| 4 Jun 2026 | ₹3 |
| 5 Jun 2026 | ₹3 |
| 9 Jun 2026 | ₹3 |
| 10 Jun 2026 | ₹3 |
| 12 Jun 2026 | ₹3 |
| 17 Jun 2026 | ₹3 |
| 19 Jun 2026 | ₹3 |
| 24 Jun 2026 | ₹3 |
| 25 Jun 2026 | ₹6 |
| 1 Jul 2026 | ₹6 |
| 3 Jul 2026 | ₹6 |
| 10 Jul 2026 | ₹6 |
| 17 Jul 2026 | ₹6 |
| 24 Jul 2026 | ₹6 |
| 31 Jul 2026 | ₹6 |
| 7 Aug 2026 | ₹6 |
| 14 Aug 2026 | ₹6 |
| 21 Aug 2026 | ₹6 |
| 28 Aug 2026 | ₹6 |
| 4 Sep 2026 | ₹6 |
| 11 Sep 2026 | ₹6 |
| 18 Sep 2026 | ₹6 |
| 25 Sep 2026 | ₹6 |
| 28 Sep 2026 | ₹15 |
| 1 Oct 2026 | ₹15 |
| 9 Oct 2026 | ₹15 |
| 16 Oct 2026 | ₹15 |
| 23 Oct 2026 | ₹15 |
| 30 Oct 2026 | ₹15 |
| 5 Nov 2026 | ₹28 |
PEG 0.02: below 1.0, so the P/E is smaller than the earnings growth rate
- PEG 0.02×
- PEG = 1.0 1.00×
| Quarter | PEG | PEG = 1.0 |
|---|---|---|
| Q3 FY24 | 3.17× | 1.00× |
| Q3 FY26 | 1.06× | 1.00× |
| Q4 FY26 | 0.08× | 1.00× |
| Q1 FY27 | 0.02× | 1.00× |
Why the multiple is where it is: over the past year earnings per share moved +245.4% while the price moved +122.8%. Earnings did better than the price, which pulled the multiple down within its own range.
Where the price move came from: over 3 years the price moved +7.7% a year; about +30.2% a year came from earnings growth and about −22.5 percentage points from the multiple (the market paying less). The split is approximate (price return minus earnings growth). It shows how much of the move came from the market paying a different multiple.
In short: the multiple is low against its own past, so the earnings trend underneath matters more than the multiple.
Is the Birla Cable business getting better or worse?
Birla Cable Ltd's business is getting better. Profit growth hit its low 6 quarters ago at −82.6% and has recovered to +2000.0%, with ROCE steady at 5.8%. This is based on 12 quarters of 4 measures.
Every business is somewhere on a path of getting better or worse, and this section names where. The last 12 quarters of growth in revenue, profit and earnings per share, plus the return the business earns on its capital, are read as lines. Getting worse: the lines are falling. Turning around: a low point has just formed and the last few quarters are rising from it. Getting better: the rise from the low has lasted. Growing steadily: steady growth with healthy returns. Slowing from a peak: still high, but slowing. When the lines disagree the result is mixed; too little history means no reading. CAGR (compound annual growth rate) is the steady yearly rate that would turn the starting value into the latest one. It is the fairest way to compare growth over different periods. If the 1-year figure is much bigger than the 10-year one, recent growth is running faster than the long-run trend. A dash means there is no figure for that period, or the starting year was a loss, where a growth rate means nothing.
Growth year by year: revenue +16.5% in FY26, profit +240.0%
- Revenue growth 16.5%
| Quarter | Revenue growth |
|---|---|
| FY23 | – |
| FY24 | −13.4% |
| FY25 | −3.5% |
| FY26 | 16.5% |
Profit growth, EPS growth
- Profit growth 240%
- EPS growth 245.4%
| Quarter | Profit growth | EPS growth |
|---|---|---|
| FY23 | – | – |
| FY24 | −33.3% | −32.8% |
| FY25 | −77.3% | −77.9% |
| FY26 | 240% | 245.4% |
Three growth lines over twelve quarters: revenue accelerating, profit accelerating
- Revenue 56.3%
| Quarter | Revenue |
|---|---|
| Dec 2023 | 6.7% |
| Mar 2024 | −13.4% |
| Jun 2024 | −17.1% |
| Sep 2024 | −13.7% |
| Dec 2024 | −9.9% |
| Mar 2025 | −3.5% |
| Jun 2025 | −0.9% |
| Sep 2025 | −2.8% |
| Dec 2025 | 4.7% |
| Mar 2026 | 16.5% |
| Jun 2026 | 28.3% |
| Sep 2026 | 56.3% |
Profit, EPS
- Profit 300%
- EPS 300%
| Quarter | Profit | EPS |
|---|---|---|
| Dec 2023 | 9% | 8.1% |
| Mar 2024 | −30.7% | −32.7% |
| Jun 2024 | −73.9% | −74.6% |
| Sep 2024 | −79.1% | −80.4% |
| Dec 2024 | −85.3% | −84.9% |
| Mar 2025 | −82.6% | −77.9% |
| Jun 2025 | −54.5% | −42.5% |
| Sep 2025 | −50% | −32.5% |
| Dec 2025 | 40% | 50.9% |
| Mar 2026 | 300% | 245.4% |
| Jun 2026 | 300% | 300% |
| Sep 2026 | 300% | 300% |
ROCE: the return line, worked out each quarter
- ROCE 5.8%
| Quarter | ROCE |
|---|---|
| Dec 2023 | 22.1% |
| Mar 2024 | 14.2% |
| Jun 2024 | 8.8% |
| Sep 2024 | 7.1% |
| Dec 2024 | 6.3% |
| Mar 2025 | 6.3% |
| Jun 2025 | 6.6% |
| Sep 2025 | 5.8% |
| Dec 2025 | – |
| Mar 2026 | – |
| Jun 2026 | – |
| Sep 2026 | – |
Why it matters: a lasting rise from a low is what this page is built to show.
Compound annual growth rate (%)
Compound annual growth rate over each period, %. Revenue, profit and EPS come from yearly figures; the share price row is price growth over the same periods. A dash means no figure for that period, or the starting year was a loss.
| Measure | 1yr | 3yr | 5yr | 10yr |
|---|---|---|---|---|
| Revenue | +16.5% | −0.9% | — | — |
| Profit | +240.0% | −19.8% | — | — |
| EPS | +245.4% | −20.0% | — | — |
| Share price | +122.8% | +7.7% | +32.1% | +23.6% |
How much does Birla Cable earn on its capital?
Birla Cable Ltd earned a ROCE of 9% in FY26. That is up from a low of 5% in FY25. Its return on capital used (ROIC) is 1.0 percentage points above its cost of capital, so growth here adds value, not just size. It comes from a 2.2% net margin and 1.66× asset turnover (sales divided by assets).
Return on capital employed (ROCE) is the profit the whole business earns on all the money in it, from shareholders and lenders together. It is the best single test of whether growth adds value or just size.
Why the return is what it is (FY26): a 2.2% net margin × 1.66× asset turnover × 1.65× leverage (assets divided by equity) ≈ 6.0% on equity. The margin does its share; borrowing is a big part of it.
The key test, return on capital used minus the cost of capital: 13.0% − 12.0% = +1.0 percentage points. The 12.0% is a standard assumption for the cost of capital in India, not an estimate for this company. Read the sign and size of the gap, not the decimals. Positive but thin: it creates value with little room for error.
The 13.0% ROIC above is the latest reading, as reported. The yearly chart below shows FY26 at 6.3%, and the quarterly chart works out each 12-month window from the quarterly figures, so the readings differ by date, not by method.
FY26: ROCE 9%, the climb back from FY25's 5%
- ROCE 9%
- ROIC (annual) 6.3%
- Cost of capital 12%
| Quarter | ROCE | ROIC (annual) | Cost of capital |
|---|---|---|---|
| FY24 | 10% | 5.7% | 12% |
| FY25 | 5% | 3.3% | 12% |
| FY26 | 9% | 6.3% | 12% |
Q4 FY26: ROCE 10.1% (last 12 months) against a 12.0% cost of capital
- ROCE (12 months) 10.1%
- ROIC (12 months) 14%
- Cost of capital 12.0%
| Quarter | ROCE (12 months) | ROIC (12 months) | Cost of capital |
|---|---|---|---|
| Q2 FY24 | 15% | 10.4% | 12% |
| Q3 FY24 | – | 9.4% | 12% |
| Q4 FY24 | 8.9% | 5.7% | 12% |
| Q1 FY25 | – | 4.3% | 12% |
| Q2 FY25 | 6.1% | 3.9% | 12% |
| Q3 FY25 | – | 3.2% | 12% |
| Q4 FY25 | 5.7% | 3.3% | 12% |
| Q1 FY26 | – | 3.5% | 12% |
| Q2 FY26 | 5.1% | 3% | 12% |
| Q3 FY26 | – | 3.4% | 12% |
| Q4 FY26 | 10.1% | 6.3% | 12% |
| Q1 FY27 | – | 14% | 12% |
Does Birla Cable have too much debt?
Birla Cable Ltd has total debt of ₹133 Cr against shareholder equity of ₹281 Cr as of Jun 2026, so its debt is 0.47× its equity. Year by year, that ratio went from 0.44 in FY22 to 0.47 in FY26. Keep that borrowing in mind when reading the returns on this page.
Debt-to-equity shows how much of the business is paid for with borrowed money. Lower is safer, and the direction matters as much as the level.
FY26: debt ₹133 Cr, 0.47× equity
- Total debt ₹133
| Quarter | Total debt |
|---|---|
| FY22 | ₹82 |
| FY23 | ₹129 |
| FY24 | ₹165 |
| FY25 | ₹111 |
| FY26 | ₹133 |
Debt-to-equity
- Debt-to-equity 0.47×
| Quarter | Debt-to-equity |
|---|---|
| FY22 | 0.44× |
| FY23 | 0.56× |
| FY24 | 0.66× |
| FY25 | 0.44× |
| FY26 | 0.47× |
Jun 2026: debt ₹133 Cr, debt-to-equity 0.47
- Total debt (quarterly) ₹133
| Quarter | Total debt (quarterly) |
|---|---|
| Sep 2023 | ₹153 |
| Dec 2023 | ₹153 |
| Mar 2024 | ₹165 |
| Jun 2024 | ₹165 |
| Sep 2024 | ₹148 |
| Dec 2024 | ₹148 |
| Mar 2025 | ₹111 |
| Jun 2025 | ₹111 |
| Sep 2025 | ₹112 |
| Dec 2025 | ₹112 |
| Mar 2026 | ₹133 |
| Jun 2026 | ₹133 |
Debt-to-equity
- Debt-to-equity 0.47×
| Quarter | Debt-to-equity |
|---|---|
| Sep 2023 | 0.62× |
| Dec 2023 | 0.62× |
| Mar 2024 | 0.66× |
| Jun 2024 | 0.66× |
| Sep 2024 | 0.56× |
| Dec 2024 | 0.56× |
| Mar 2025 | 0.44× |
| Jun 2025 | 0.44× |
| Sep 2025 | 0.41× |
| Dec 2025 | 0.41× |
| Mar 2026 | 0.47× |
| Jun 2026 | 0.47× |
What is the Birla Cable shareholding pattern?
No group of Birla Cable Ltd's owners changed its stake by a full percentage point over the last two years. Promoters moved +0.0 points over the same period, to 66.3%. This uses the four owner groups that companies report every quarter; nothing is guessed between filings.
Who owns the company each quarter: promoters (the founders or controlling owners), foreign institutions, domestic institutions such as mutual funds, and the public. When people close to the business steadily raise their stake, that is worth noticing; a quiet list is also an answer.
Over the last two years: Foreign institutions: +0.9 points over 8 quarters, to 0.9%; Promoters: +0.0 points over 8 quarters, to 66.3%; Domestic institutions: +0.0 points over 8 quarters, to 0.1%.
Year ends: foreign institutions −0.3 points from Mar 2024 to Mar 2026
- Promoters 66.35%
- Foreign inst. 0%
- Domestic inst. 0.01%
- Public 33.64%
| Quarter | Promoters | Foreign inst. | Domestic inst. | Public |
|---|---|---|---|---|
| Mar 2024 | 66.35% | 0.34% | 0.01% | 33.31% |
| Mar 2025 | 66.35% | 0.13% | 0.01% | 33.52% |
| Mar 2026 | 66.35% | 0% | 0.01% | 33.64% |
No owner group moved a full point in two years
- Promoters 66.35%
- Foreign inst. 0.87%
- Domestic inst. 0.06%
- Public 32.72%
| Quarter | Promoters | Foreign inst. | Domestic inst. | Public |
|---|---|---|---|---|
| Sep 2023 | 66.35% | 0.01% | 0.09% | 33.56% |
| Dec 2023 | 66.35% | 0% | 0.01% | 33.64% |
| Mar 2024 | 66.35% | 0.34% | 0.01% | 33.31% |
| Jun 2024 | 66.35% | 0.03% | 0.01% | 33.61% |
| Sep 2024 | 66.35% | 0% | 0.01% | 33.65% |
| Dec 2024 | 66.35% | 0% | 0.01% | 33.65% |
| Mar 2025 | 66.35% | 0.13% | 0.01% | 33.52% |
| Jun 2025 | 66.35% | 0.05% | 0.01% | 33.6% |
| Sep 2025 | 66.35% | 0.01% | 0.01% | 33.64% |
| Dec 2025 | 66.35% | 0.02% | 0.01% | 33.62% |
| Mar 2026 | 66.35% | 0% | 0.01% | 33.64% |
| Jun 2026 | 66.35% | 0.02% | 0.01% | 33.62% |
| Sep 2026 | 66.35% | 0.87% | 0.06% | 32.72% |
How far is Birla Cable from balance-sheet trouble?
For Birla Cable Ltd, the Z-score is not available, so we say so rather than guess one. It estimates how far the balance sheet is from trouble; it is not a forecast of failure. The debt, cash-flow and return sections show the balance-sheet figures we do have, each with its own date.
The Z-score estimates how far a company is from balance-sheet trouble. Above about 3 is safe; below about 1.8 is the danger zone. It was built for manufacturers, so it is not used for banks and lenders.
How does Birla Cable rank in its industry?
74.5 out of 100, rank 1 of 5 in Cables - Telecom, with 100% of the evidence available.
Birla Cable Ltd scores 74.5 out of 100 against the 5 companies it is compared with in Cables - Telecom, ranking 1. The evidence is balanced: no factor stands out, so another reported quarter is needed before the picture is clearer.
The four parts add up to the total exactly: 30.7 + 11.3 + 16.8 + 15.7 = 74.5. This is the same number shown on the industry page; it is worked out once for the whole group and read here.
What would change it: The score would fall if profit growth turns negative or margins stop improving while the share price lags its sector.
Which companies is Birla Cable compared with?
Birla Cable ranks 1 of 5 Cables - Telecom companies on the 4-Factor Sector Score, with 74.5 out of 100.
- 1Birla Cable Ltd this pageBIRLACABLE · leader · Most evidence points up · 100% evidence74.5out of 100
How the score adds up
Growth & earnings 30.7/35 · Revenue 28.3% · Profit 100% · Operating margin change 10.9 points · 100% evidenceCapital efficiency 11.3/25 · ROCE 9% · Operating margin 15% · 100% evidenceValuation 16.8/20 · P/E 12.5× · PEG 0.85 · 100% evidenceRelative strength 15.7/20 · Lead over its industry -1.4% · Lead over NIFTY 500 63.7% · 1 year 98.4% · 100% evidence · 12 of 12 weeks aheadExact sum: 30.7 + 11.3 + 16.8 + 15.7 = 74.5 · What this means: The evidence is balanced: no factor stands out, so another reported quarter is needed before the picture is clearer. - 2Sterlite Technologies LtdSTLTECH · leader · Evidence leans up · 75% evidence58.8out of 100
How the score adds up
Growth & earnings 29.3/35 · Revenue 74% · Profit 100% · Operating margin change 20 points · 95% evidenceCapital efficiency 7.0/25 · ROCE 7.7% · Operating margin 32% · 76% evidenceValuation 8.5/20 · P/E 56.6× · PEG — · 15% evidenceRelative strength 14.0/20 · Lead over its industry 48% · Lead over NIFTY 500 109.7% · 1 year 604.6% · 100% evidence · 12 of 12 weeks aheadExact sum: 29.3 + 7 + 8.5 + 14 = 58.8 · What this means: The evidence is balanced: no factor stands out, so another reported quarter is needed before the picture is clearer. - 3Finolex Cables LtdFINCABLES · breaking out · Evidence leans down · 96% evidence44.3out of 100
How the score adds up
Growth & earnings 20.3/35 · Revenue 26.5% · Profit 29% · Operating margin change 2 points · 88% evidenceCapital efficiency 16.5/25 · ROCE 16% · Operating margin 12% · 100% evidenceValuation 3.3/20 · P/E 21.8× · PEG 2.78 · 100% evidenceRelative strength 4.2/20 · Lead over its industry -32.7% · Lead over NIFTY 500 19.4% · 1 year 45.1% · 100% evidence · 12 of 12 weeks aheadExact sum: 20.3 + 16.5 + 3.3 + 4.2 = 44.3 · What this means: A strong business with a high valuation: it would need rising earnings, or a lower multiple, to score better on value. - 4Paramount Communications LtdPARACABLES · turning · Evidence leans down · 100% evidence38.7out of 100
How the score adds up
Growth & earnings 14.5/35 · Revenue 19.4% · Profit -1.4% · Operating margin change 5.6 points · 100% evidenceCapital efficiency 11.0/25 · ROCE 12.4% · Operating margin 7% · 100% evidenceValuation 8.2/20 · P/E 31× · PEG 1.68 · 100% evidenceRelative strength 5.0/20 · Lead over its industry -25.6% · Lead over NIFTY 500 29.2% · 1 year 41.9% · 100% evidence · 1 of 12 weeks aheadExact sum: 14.5 + 11 + 8.2 + 5 = 38.7 · What this means: The evidence is balanced: no factor stands out, so another reported quarter is needed before the picture is clearer. - 5Vindhya Telelinks LtdVINDHYATEL · leader · Evidence leans down · 100% evidence37.3out of 100
How the score adds up
Growth & earnings 8.5/35 · Revenue -17.5% · Profit 0.4% · Operating margin change 4 points · 100% evidenceCapital efficiency 5.8/25 · ROCE 8.2% · Operating margin 12% · 100% evidenceValuation 11.7/20 · P/E 12.2× · PEG 1.06 · 100% evidenceRelative strength 11.3/20 · Lead over its industry -6.8% · Lead over NIFTY 500 58.7% · 1 year 97.6% · 100% evidence · 12 of 12 weeks aheadExact sum: 8.5 + 5.8 + 11.7 + 11.3 = 37.3 · What this means: The evidence is balanced: no factor stands out, so another reported quarter is needed before the picture is clearer.
Missing figures are not scored as bad. They lower the confidence and pull the final score toward the middle. Relative strength counts only when the company has a reading for this week; with no reading, that factor is left out and its 20 points are shared across the other three in proportion. PEG is not shown when the ratio cannot mean anything: the company must be making a profit, its price-to-earnings must be positive, and its three-year earnings growth must fall between 5% and 60%. Dividing a price multiple by a loss, or by growth measured off a tiny base, produces a number that looks precise and tells you nothing. Under relative strength, one mark per week shows the last 12 weeks: a mark is filled where the company led NIFTY 500 by 5% or more over the 13 weeks ending that week, which is the same test used everywhere on this site. Price stage places the company on the same six-step path the industry is placed on (basing, turning, breaking out, leader, fading, asleep), read from how many weeks running it has led NIFTY 500 and whether that lead is growing or shrinking. It describes where the share price stands, not the direction of earnings, and it is not a recommendation; it is left blank for a company whose weekly history is too short or too stale to read.
The figures in this ranking come from the industry comparison: results through the Sep 2026 quarter, and the P/E at that quarter's end. The sections above use the latest weekly price, so a P/E or return there can differ a little from the one here. The stage words in this ranking (such as losing its lead or breaking out) describe the lead over the index, not the price phase in the price section.
Related companies: Cables - Telecom, all 5 compared on one page.
Which companies are close to Birla Cable in size?
Birla Cable is the 5th largest of 5 Cables - Telecom companies on Sector Alpha by market value (scores of 30 October 2026). Just above it: Sterlite Technologies, Finolex Cables, Vindhya Telelinks and Paramount Communications. It is the smallest.
Cables - Telecom companies close in size
- Sterlite Technologies Ltd ₹42,397 crore
- Finolex Cables Ltd ₹17,435 crore
- Vindhya Telelinks Ltd ₹3,130 crore
- Paramount Communications Ltd ₹2,233 crore
- Birla Cable Ltd ₹1,045 crore
All 5 Cables - Telecom companies, largest first
Companies close in size in other industries
- RIR Power Electronics Ltd ₹1,052 crore · Electronics - Equipment/Components
- Pranav Constructions Ltd ₹1,047 crore
- Birla Cable Ltd ₹1,045 crore
- Bafna Pharmaceuticals Ltd ₹1,044 crore · Pharma - Formulators
- Dolat Algotech Ltd ₹1,044 crore · Finance & Investments - Others
What else do people ask about Birla Cable?
What were Birla Cable's latest quarterly results?
Birla Cable Ltd reported revenue of ₹355 Cr and net profit of ₹38.0 Cr for the Sep 2026 quarter. Revenue rose 101.7% and profit rose 3,700.0% compared with a year earlier. Earnings per share were ₹12.60.
The operating margin was 15.0%, 10.9 percentage points higher than a year earlier (as of 5 November 2026).
What is Birla Cable's market cap?
Birla Cable Ltd's market capitalisation is ₹1,045 Cr at a share price of ₹346.60. Market cap is the share price times the number of shares, so it changes whenever the price moves (as of 5 November 2026).
How is Birla Cable performing?
Birla Cable Ltd's share price has been rising for 22 weeks. In its latest quarter, revenue rose 101.7% and profit rose 3,700.0% compared with a year earlier. Over the past 13 weeks it has done better than the NIFTY 500, for 15 weeks running (as of 5 November 2026).
Will Birla Cable's share price go up?
This page does not forecast Birla Cable Ltd's share price. What it shows instead: the share price is ₹346.60, and it has been rising for 22 weeks. Its P/E of 12.5× is higher than 1% of its own last 4 years (as of 5 November 2026).
Where is Birla Cable in its business cycle?
Birla Cable Ltd's FY26 operating margin was 6.0%, against a 4-year range of 4.9% to 8.0%: the middle of its own range, neither a peak nor a low. The latest quarter was 15.0%.
Comparing margins with a company's own long history is a good way to see where it is in its cycle (as of 5 November 2026).
What could break the Birla Cable story?
The main question: yearly earnings per share moved +245.4% while the share price moved +122.8%. On price, this page treats a rise as over when the share price closes below its 200-day average on two Fridays in a row (as of 5 November 2026).
Is Birla Cable a stock worth studying right now?
What the numbers show: Birla Cable Ltd's results are improving, while its P/E is near the low end of its own history over 3.5 years, higher than only 1% of past readings. The main open question: whether the price catches up with earnings that have already grown.
Every number on this page is worked out by code from the published figures, with no forecasts and no price opinions (as of 5 November 2026).
Where do these numbers come from?
Sector Alpha, written by code from the published numbers. Data as of 5 November 2026.
Every chart on this page is drawn by code from the published figures, with no forecasts and no price opinions.
See the plain-text version of this page.
More lists
Every Sector Alpha list, grouped
Stock screens
Market lists
Themes
Sectors
US stocks
X · Instagram · YouTube · About · Newsletter · Newsletter archive