Techno Electric & Engineering Company share price today

Techno Electric & Engineering Company Ltd · NSE: TECHNOE · Data Centre · price as of the 4 November 2026 close, updated every trading day · results updated weekly · research updated 12 August 2026

Techno Electric & Engineering Company share price today: ₹884.40 at the NSE close on 4 November 2026, down 31.1% in a year. Techno Electric & Engineering Company (NSE: TECHNOE) is worth ₹10,290 crore, trades at a P/E of 23.9 and has closed between ₹824.60 and ₹1,334.50 over the past 52 weeks. Latest change: revenue up on a year earlier for 7 quarters in a row.

MixedBusiness trend from the last 12 quarters
₹884.40Price −31.1% in a year
23.9×P/E higher than 53% of the last 7.8 years
₹630 CrRevenue (Jun 2026) +19.8% on a year ago
₹93.0 CrProfit (Jun 2026) −31.6% on a year ago
16.0%Operating margin −2.0 points on a year ago
15%ROCE FY26
18.2%ROIC against a 12.0% cost of capital: +6.2 points

Techno Electric & Engineering Company Ltd's share price, valuation and earnings point in different directions. The next one or two quarters should make it clearer.

The main question: yearly earnings per share moved +12.0% while the share price moved −31.1%.

The price has been falling for 21 weeks, and the P/E is higher than 53% of its own last 7.8 years. Over the last four quarters, results have been deteriorating, with profit −31.6% on a year earlier, and −29% of the last 3 years' profit came in as cash. What will decide it: whether the price catches up with earnings that have already grown.

Techno Electric & Engineering Company is one of the companies compared in a full read in the Sector Alpha newsletter.

What is the Techno Electric & Engineering Company share price today?

Techno Electric & Engineering Company Ltd's share price was ₹884.40 at the close on 4 November 2026. It has been falling for 21 weeks. That is 16.3% below its average price over the last 200 trading days. Over the past 13 weeks it has done worse than the NIFTY 500, and it has been behind for 28 weeks running.

A share price tends to move through four phases: moving sideways (stage 1), rising (stage 2), stalling near a high (stage 3) and falling (stage 4). Today Techno Electric & Engineering Company Ltd is in stage 4. The phase helps read everything below.

In the last 52 weeks it traded between ₹825 and ₹1,335, and at that close it sat 12% of the way up from that low.

1Y

Nov 2026: ₹884, 16.3% below its 200-day average. The price has been falling for 21 weeks.

  • Price ₹884
  • 50-day avg ₹949
  • 200-day avg ₹1,057
Nov 2026: ₹884, 16.3% below its 200-day average. The price has been falling for 21 weeks.
WeekPrice50-day avg200-day avg
31 Oct 2025₹1,319₹1,383₹1,358
7 Nov 2025₹1,283₹1,370₹1,356
14 Nov 2025₹1,227₹1,350₹1,351
21 Nov 2025₹1,170₹1,323₹1,344
28 Nov 2025₹1,205₹1,299₹1,336
5 Dec 2025₹1,098₹1,270₹1,327
12 Dec 2025₹1,104₹1,237₹1,315
19 Dec 2025₹1,093₹1,210₹1,304
26 Dec 2025₹1,086₹1,194₹1,296
2 Jan 2026₹1,111₹1,172₹1,285
9 Jan 2026₹1,007₹1,151₹1,274
16 Jan 2026₹975₹1,127₹1,263
23 Jan 2026₹893₹1,089₹1,246
1 Feb 2026₹996₹1,064₹1,232
6 Feb 2026₹1,036₹1,059₹1,222
13 Feb 2026₹1,049₹1,064₹1,216
20 Feb 2026₹1,144₹1,073₹1,211
27 Feb 2026₹1,173₹1,091₹1,208
6 Mar 2026₹1,120₹1,097₹1,206
13 Mar 2026₹1,087₹1,097₹1,200
20 Mar 2026₹1,090₹1,096₹1,195
27 Mar 2026₹1,032₹1,089₹1,189
17 Apr 2026₹1,234₹1,097₹1,179
24 Apr 2026₹1,224₹1,124₹1,183
30 Apr 2026₹1,283₹1,147₹1,186
8 May 2026₹1,257₹1,171₹1,191
15 May 2026₹1,196₹1,179₹1,192
22 May 2026₹1,335₹1,191₹1,195
29 May 2026₹1,079₹1,189₹1,194
4 Jun 2026₹1,011₹1,167₹1,188
5 Jun 2026₹1,017₹1,161₹1,186
10 Jun 2026₹992₹1,143₹1,181
12 Jun 2026₹1,039₹1,134₹1,178
17 Jun 2026₹1,085₹1,128₹1,175
19 Jun 2026₹1,079₹1,124₹1,173
24 Jun 2026₹1,074₹1,120₹1,171
25 Jun 2026₹1,087₹1,119₹1,170
1 Jul 2026₹1,082₹1,114₹1,167
3 Jul 2026₹1,082₹1,111₹1,165
10 Jul 2026₹1,050₹1,102₹1,160
17 Jul 2026₹1,034₹1,091₹1,154
24 Jul 2026₹992₹1,076₹1,147
31 Jul 2026₹980₹1,059₹1,139
7 Aug 2026₹1,066₹1,050₹1,133
14 Aug 2026₹968₹1,043₹1,127
21 Aug 2026₹987₹1,033₹1,120
28 Aug 2026₹1,026₹1,028₹1,114
4 Sep 2026₹980₹1,018₹1,108
11 Sep 2026₹972₹1,010₹1,101
18 Sep 2026₹1,030₹1,006₹1,097
25 Sep 2026₹1,006₹1,006₹1,092
1 Oct 2026₹999₹1,005₹1,088
9 Oct 2026₹955₹999₹1,083
16 Oct 2026₹947₹990₹1,076
23 Oct 2026₹825₹973₹1,069
30 Oct 2026₹829₹949₹1,057
4 Nov 2026₹884₹949₹1,057
Weekly closing price (₹) with its 50-day and 200-day averages. The strip under the chart shows the phase: tan sideways, green rising, yellow stalling near a high, orange falling. 1-year window.

3Y

Nov 2026: ₹884, 16.3% below its 200-day average. The price has been falling for 21 weeks.

  • Price ₹884
  • 50-day avg ₹949
  • 200-day avg ₹1,057
Nov 2026: ₹884, 16.3% below its 200-day average. The price has been falling for 21 weeks.
WeekPrice50-day avg200-day avg
3 Nov 2023₹490₹501₹428
12 Nov 2023₹615₹515₹436
17 Nov 2023₹672₹533₹444
24 Nov 2023₹685₹564₹456
1 Dec 2023₹706₹585₹466
8 Dec 2023₹764₹614₹480
15 Dec 2023₹767₹641₹494
22 Dec 2023₹754₹660₹506
29 Dec 2023₹800₹676₹516
5 Jan 2024₹803₹701₹531
12 Jan 2024₹798₹718₹543
20 Jan 2024₹807₹732₹557
25 Jan 2024₹803₹740₹565
2 Feb 2024₹766₹750₹576
9 Feb 2024₹797₹756₹586
16 Feb 2024₹831₹762₹596
23 Feb 2024₹762₹765₹605
2 Mar 2024₹747₹758₹612
7 Mar 2024₹742₹755₹617
15 Mar 2024₹651₹739₹620
22 Mar 2024₹706₹724₹621
28 Mar 2024₹772₹727₹625
5 Apr 2024₹838₹743₹634
12 Apr 2024₹819₹756₹642
19 Apr 2024₹923₹774₹651
26 Apr 2024₹969₹808₹667
3 May 2024₹1,021₹840₹681
10 May 2024₹1,031₹871₹697
18 May 2024₹1,118₹920₹720
24 May 2024₹1,177₹954₹737
31 May 2024₹1,418₹995₹758
7 Jun 2024₹1,231₹1,052₹785
14 Jun 2024₹1,457₹1,113₹815
21 Jun 2024₹1,442₹1,163₹840
28 Jun 2024₹1,553₹1,230₹873
5 Jul 2024₹1,475₹1,282₹905
12 Jul 2024₹1,447₹1,320₹933
19 Jul 2024₹1,478₹1,345₹955
26 Jul 2024₹1,688₹1,395₹988
2 Aug 2024₹1,710₹1,447₹1,021
9 Aug 2024₹1,648₹1,479₹1,051
16 Aug 2024₹1,647₹1,502₹1,074
23 Aug 2024₹1,693₹1,539₹1,104
30 Aug 2024₹1,635₹1,562₹1,132
6 Sep 2024₹1,554₹1,569₹1,155
13 Sep 2024₹1,601₹1,578₹1,178
20 Sep 2024₹1,519₹1,574₹1,196
27 Sep 2024₹1,631₹1,577₹1,215
4 Oct 2024₹1,530₹1,576₹1,229
11 Oct 2024₹1,720₹1,591₹1,250
18 Oct 2024₹1,731₹1,621₹1,275
25 Oct 2024₹1,471₹1,610₹1,289
1 Nov 2024₹1,594₹1,594₹1,300
8 Nov 2024₹1,617₹1,598₹1,315
14 Nov 2024₹1,445₹1,582₹1,322
22 Nov 2024₹1,487₹1,566₹1,328
29 Nov 2024₹1,474₹1,549₹1,335
6 Dec 2024₹1,504₹1,541₹1,343
13 Dec 2024₹1,444₹1,524₹1,348
20 Dec 2024₹1,625₹1,529₹1,358
27 Dec 2024₹1,560₹1,537₹1,367
3 Jan 2025₹1,641₹1,556₹1,380
10 Jan 2025₹1,399₹1,546₹1,387
17 Jan 2025₹1,289₹1,501₹1,382
24 Jan 2025₹1,110₹1,450₹1,374
1 Feb 2025₹1,043₹1,368₹1,356
7 Feb 2025₹1,088₹1,316₹1,343
14 Feb 2025₹926₹1,255₹1,325
21 Feb 2025₹1,000₹1,202₹1,308
28 Feb 2025₹974₹1,167₹1,294
7 Mar 2025₹957₹1,128₹1,277
13 Mar 2025₹901₹1,095₹1,263
21 Mar 2025₹1,035₹1,075₹1,249
28 Mar 2025₹1,003₹1,065₹1,238
4 Apr 2025₹981₹1,057₹1,229
11 Apr 2025₹988₹1,040₹1,218
17 Apr 2025₹1,058₹1,040₹1,212
25 Apr 2025₹1,101₹1,055₹1,208
2 May 2025₹1,066₹1,058₹1,203
9 May 2025₹1,083₹1,061₹1,197
16 May 2025₹1,280₹1,084₹1,196
23 May 2025₹1,218₹1,112₹1,198
30 May 2025₹1,410₹1,158₹1,206
6 Jun 2025₹1,484₹1,218₹1,220
13 Jun 2025₹1,454₹1,269₹1,234
20 Jun 2025₹1,481₹1,309₹1,246
27 Jun 2025₹1,592₹1,350₹1,260
4 Jul 2025₹1,576₹1,394₹1,277
11 Jul 2025₹1,598₹1,432₹1,293
18 Jul 2025₹1,527₹1,453₹1,305
25 Jul 2025₹1,442₹1,459₹1,314
1 Aug 2025₹1,419₹1,456₹1,320
8 Aug 2025₹1,380₹1,446₹1,324
14 Aug 2025₹1,494₹1,443₹1,328
22 Aug 2025₹1,545₹1,451₹1,336
29 Aug 2025₹1,513₹1,463₹1,343
5 Sep 2025₹1,506₹1,474₹1,352
12 Sep 2025₹1,442₹1,475₹1,359
19 Sep 2025₹1,417₹1,468₹1,362
26 Sep 2025₹1,278₹1,450₹1,363
3 Oct 2025₹1,372₹1,435₹1,362
10 Oct 2025₹1,368₹1,418₹1,361
17 Oct 2025₹1,324₹1,405₹1,360
24 Oct 2025₹1,312₹1,394₹1,359
31 Oct 2025₹1,319₹1,383₹1,358
7 Nov 2025₹1,283₹1,370₹1,356
14 Nov 2025₹1,227₹1,350₹1,351
21 Nov 2025₹1,170₹1,323₹1,344
28 Nov 2025₹1,205₹1,299₹1,336
5 Dec 2025₹1,098₹1,270₹1,327
12 Dec 2025₹1,104₹1,237₹1,315
19 Dec 2025₹1,093₹1,210₹1,304
26 Dec 2025₹1,086₹1,194₹1,296
2 Jan 2026₹1,111₹1,172₹1,285
9 Jan 2026₹1,007₹1,151₹1,274
16 Jan 2026₹975₹1,127₹1,263
23 Jan 2026₹893₹1,089₹1,246
1 Feb 2026₹996₹1,064₹1,232
6 Feb 2026₹1,036₹1,059₹1,222
13 Feb 2026₹1,049₹1,064₹1,216
20 Feb 2026₹1,144₹1,073₹1,211
27 Feb 2026₹1,173₹1,091₹1,208
6 Mar 2026₹1,120₹1,097₹1,206
13 Mar 2026₹1,087₹1,097₹1,200
20 Mar 2026₹1,090₹1,096₹1,195
27 Mar 2026₹1,032₹1,089₹1,189
17 Apr 2026₹1,234₹1,097₹1,179
24 Apr 2026₹1,224₹1,124₹1,183
30 Apr 2026₹1,283₹1,147₹1,186
8 May 2026₹1,257₹1,171₹1,191
15 May 2026₹1,196₹1,179₹1,192
22 May 2026₹1,335₹1,191₹1,195
29 May 2026₹1,079₹1,189₹1,194
4 Jun 2026₹1,011₹1,167₹1,188
5 Jun 2026₹1,017₹1,161₹1,186
10 Jun 2026₹992₹1,143₹1,181
12 Jun 2026₹1,039₹1,134₹1,178
17 Jun 2026₹1,085₹1,128₹1,175
19 Jun 2026₹1,079₹1,124₹1,173
24 Jun 2026₹1,074₹1,120₹1,171
25 Jun 2026₹1,087₹1,119₹1,170
1 Jul 2026₹1,082₹1,114₹1,167
3 Jul 2026₹1,082₹1,111₹1,165
10 Jul 2026₹1,050₹1,102₹1,160
17 Jul 2026₹1,034₹1,091₹1,154
24 Jul 2026₹992₹1,076₹1,147
31 Jul 2026₹980₹1,059₹1,139
7 Aug 2026₹1,066₹1,050₹1,133
14 Aug 2026₹968₹1,043₹1,127
21 Aug 2026₹987₹1,033₹1,120
28 Aug 2026₹1,026₹1,028₹1,114
4 Sep 2026₹980₹1,018₹1,108
11 Sep 2026₹972₹1,010₹1,101
18 Sep 2026₹1,030₹1,006₹1,097
25 Sep 2026₹1,006₹1,006₹1,092
1 Oct 2026₹999₹1,005₹1,088
9 Oct 2026₹955₹999₹1,083
16 Oct 2026₹947₹990₹1,076
23 Oct 2026₹825₹973₹1,069
30 Oct 2026₹829₹949₹1,057
4 Nov 2026₹884₹949₹1,057
Weekly closing price (₹) with its 50-day and 200-day averages. The strip under the chart shows the phase: tan sideways, green rising, yellow stalling near a high, orange falling. 3-year window.

5Y

Nov 2026: ₹884, 16.3% below its 200-day average. The price has been falling for 21 weeks.

  • Price ₹884
  • 50-day avg ₹949
  • 200-day avg ₹1,057
Nov 2026: ₹884, 16.3% below its 200-day average. The price has been falling for 21 weeks.
WeekPrice50-day avg200-day avg
29 Oct 2021₹258₹279₹282
12 Nov 2021₹253₹273₹280
26 Nov 2021₹243₹267₹278
10 Dec 2021₹235₹255₹273
24 Dec 2021₹229₹249₹270
7 Jan 2022₹246₹247₹267
21 Jan 2022₹247₹250₹266
4 Feb 2022₹253₹249₹264
18 Feb 2022₹260₹249₹263
4 Mar 2022₹235₹247₹261
17 Mar 2022₹235₹244₹259
1 Apr 2022₹256₹244₹258
13 Apr 2022₹276₹251₹258
29 Apr 2022₹289₹263₹261
13 May 2022₹267₹270₹263
27 May 2022₹267₹273₹265
10 Jun 2022₹287₹276₹267
24 Jun 2022₹281₹273₹267
8 Jul 2022₹307₹281₹269
22 Jul 2022₹298₹288₹272
5 Aug 2022₹291₹289₹274
19 Aug 2022₹284₹290₹276
2 Sep 2022₹287₹289₹277
16 Sep 2022₹278₹288₹278
30 Sep 2022₹264₹282₹277
14 Oct 2022₹280₹281₹277
28 Oct 2022₹281₹281₹277
11 Nov 2022₹286₹283₹278
25 Nov 2022₹300₹286₹279
9 Dec 2022₹320₹296₹283
23 Dec 2022₹311₹304₹286
6 Jan 2023₹364₹315₹291
20 Jan 2023₹366₹331₹298
3 Feb 2023₹342₹337₹303
17 Feb 2023₹362₹345₹308
3 Mar 2023₹338₹341₹311
17 Mar 2023₹336₹338₹312
31 Mar 2023₹338₹335₹314
13 Apr 2023₹338₹336₹316
28 Apr 2023₹372₹341₹319
12 May 2023₹369₹350₹323
26 May 2023₹401₹361₹329
9 Jun 2023₹369₹366₹334
23 Jun 2023₹353₹364₹336
7 Jul 2023₹396₹367₹339
21 Jul 2023₹457₹388₹348
4 Aug 2023₹463₹417₹360
18 Aug 2023₹483₹434₹370
1 Sep 2023₹535₹458₹383
15 Sep 2023₹513₹482₹397
29 Sep 2023₹505₹491₹407
13 Oct 2023₹517₹499₹416
27 Oct 2023₹509₹503₹425
12 Nov 2023₹615₹515₹436
24 Nov 2023₹685₹564₹456
8 Dec 2023₹764₹614₹480
22 Dec 2023₹754₹660₹506
5 Jan 2024₹803₹701₹531
20 Jan 2024₹807₹732₹557
2 Feb 2024₹766₹750₹576
16 Feb 2024₹831₹762₹596
2 Mar 2024₹747₹758₹612
15 Mar 2024₹651₹739₹620
28 Mar 2024₹772₹727₹625
12 Apr 2024₹819₹756₹642
26 Apr 2024₹969₹808₹667
10 May 2024₹1,031₹871₹697
24 May 2024₹1,177₹954₹737
7 Jun 2024₹1,231₹1,052₹785
21 Jun 2024₹1,442₹1,163₹840
5 Jul 2024₹1,475₹1,282₹905
19 Jul 2024₹1,478₹1,345₹955
2 Aug 2024₹1,710₹1,447₹1,021
16 Aug 2024₹1,647₹1,502₹1,074
30 Aug 2024₹1,635₹1,562₹1,132
13 Sep 2024₹1,601₹1,578₹1,178
27 Sep 2024₹1,631₹1,577₹1,215
11 Oct 2024₹1,720₹1,591₹1,250
25 Oct 2024₹1,471₹1,610₹1,289
8 Nov 2024₹1,617₹1,598₹1,315
22 Nov 2024₹1,487₹1,566₹1,328
6 Dec 2024₹1,504₹1,541₹1,343
20 Dec 2024₹1,625₹1,529₹1,358
3 Jan 2025₹1,641₹1,556₹1,380
17 Jan 2025₹1,289₹1,501₹1,382
1 Feb 2025₹1,043₹1,368₹1,356
14 Feb 2025₹926₹1,255₹1,325
28 Feb 2025₹974₹1,167₹1,294
13 Mar 2025₹901₹1,095₹1,263
28 Mar 2025₹1,003₹1,065₹1,238
11 Apr 2025₹988₹1,040₹1,218
25 Apr 2025₹1,101₹1,055₹1,208
9 May 2025₹1,083₹1,061₹1,197
23 May 2025₹1,218₹1,112₹1,198
6 Jun 2025₹1,484₹1,218₹1,220
20 Jun 2025₹1,481₹1,309₹1,246
4 Jul 2025₹1,576₹1,394₹1,277
18 Jul 2025₹1,527₹1,453₹1,305
1 Aug 2025₹1,419₹1,456₹1,320
14 Aug 2025₹1,494₹1,443₹1,328
29 Aug 2025₹1,513₹1,463₹1,343
12 Sep 2025₹1,442₹1,475₹1,359
26 Sep 2025₹1,278₹1,450₹1,363
10 Oct 2025₹1,368₹1,418₹1,361
24 Oct 2025₹1,312₹1,394₹1,359
7 Nov 2025₹1,283₹1,370₹1,356
21 Nov 2025₹1,170₹1,323₹1,344
5 Dec 2025₹1,098₹1,270₹1,327
19 Dec 2025₹1,093₹1,210₹1,304
2 Jan 2026₹1,111₹1,172₹1,285
16 Jan 2026₹975₹1,127₹1,263
1 Feb 2026₹996₹1,064₹1,232
13 Feb 2026₹1,049₹1,064₹1,216
27 Feb 2026₹1,173₹1,091₹1,208
13 Mar 2026₹1,087₹1,097₹1,200
27 Mar 2026₹1,032₹1,089₹1,189
24 Apr 2026₹1,224₹1,124₹1,183
8 May 2026₹1,257₹1,171₹1,191
22 May 2026₹1,335₹1,191₹1,195
4 Jun 2026₹1,011₹1,167₹1,188
10 Jun 2026₹992₹1,143₹1,181
17 Jun 2026₹1,085₹1,128₹1,175
24 Jun 2026₹1,074₹1,120₹1,171
1 Jul 2026₹1,082₹1,114₹1,167
10 Jul 2026₹1,050₹1,102₹1,160
24 Jul 2026₹992₹1,076₹1,147
7 Aug 2026₹1,066₹1,050₹1,133
21 Aug 2026₹987₹1,033₹1,120
4 Sep 2026₹980₹1,018₹1,108
18 Sep 2026₹1,030₹1,006₹1,097
1 Oct 2026₹999₹1,005₹1,088
16 Oct 2026₹947₹990₹1,076
30 Oct 2026₹829₹949₹1,057
4 Nov 2026₹884₹949₹1,057
Weekly closing price (₹) with its 50-day and 200-day averages. The strip under the chart shows the phase: tan sideways, green rising, yellow stalling near a high, orange falling. 5-year window.

Price stage: Rising from Oct 2025 to Nov 2025; Falling from Nov 2025 to May 2026; Sideways in Jun 2026; Falling from Jun 2026 to Oct 2026.

Price stage: Rising from Nov 2023 to Feb 2025; Falling from Feb 2025 to Jun 2025; Rising from Jul 2025 to Nov 2025; Falling from Nov 2025 to May 2026; Sideways in Jun 2026; Falling from Jun 2026 to Oct 2026.

Price stage: Falling from Oct 2021 to May 2022; Rising from Jun 2022 to Oct 2022; Sideways from Oct 2022 to Nov 2022; Rising from Dec 2022 to Feb 2025; Falling from Feb 2025 to Jun 2025; Rising from Jul 2025 to Nov 2025; Falling from Nov 2025 to Oct 2026.

Week by week since 2018: did it beat the NIFTY 500 over the past 13 weeks?

Ahead in 206 of 404 weeks

Week by week since 2018: did it beat the NIFTY 500 over the past 13 weeks?
Week13-week return vs NIFTY 500
7 Dec 2018no NIFTY 500 reading
14 Dec 2018no NIFTY 500 reading
21 Dec 2018no NIFTY 500 reading
28 Dec 2018no NIFTY 500 reading
4 Jan 2019no NIFTY 500 reading
11 Jan 2019no NIFTY 500 reading
18 Jan 2019no NIFTY 500 reading
25 Jan 2019no NIFTY 500 reading
1 Feb 2019no NIFTY 500 reading
8 Feb 2019no NIFTY 500 reading
15 Feb 2019no NIFTY 500 reading
22 Feb 2019no NIFTY 500 reading
1 Mar 2019no NIFTY 500 reading
8 Mar 2019−10.4%
15 Mar 2019−7.0%
22 Mar 2019−5.0%
29 Mar 2019−0.5%
5 Apr 2019+4.4%
12 Apr 2019+2.3%
18 Apr 2019+0.7%
26 Apr 2019−13.0%
3 May 2019−3.4%
10 May 2019−2.3%
17 May 2019−11.4%
24 May 2019−22.0%
31 May 2019+0.1%
7 Jun 2019+5.3%
14 Jun 2019−2.4%
21 Jun 2019−11.1%
28 Jun 2019−3.0%
5 Jul 2019+5.2%
12 Jul 2019+1.2%
19 Jul 2019+3.8%
26 Jul 2019+13.8%
2 Aug 2019+11.2%
9 Aug 2019+9.3%
16 Aug 2019+16.3%
23 Aug 2019+15.5%
30 Aug 2019+11.7%
6 Sep 2019+7.8%
13 Sep 2019+14.0%
20 Sep 2019+17.0%
27 Sep 2019+3.8%
4 Oct 2019+3.5%
11 Oct 2019+5.9%
18 Oct 2019−0.8%
27 Oct 2019−4.2%
1 Nov 2019−1.9%
8 Nov 2019−2.6%
15 Nov 2019−3.2%
22 Nov 2019−5.7%
29 Nov 2019−4.2%
6 Dec 2019−0.2%
13 Dec 2019−4.3%
20 Dec 2019+0.4%
27 Dec 2019−0.5%
3 Jan 2020−4.5%
10 Jan 2020−2.4%
17 Jan 2020+5.9%
24 Jan 2020+10.7%
1 Feb 2020+7.2%
7 Feb 2020+9.9%
14 Feb 2020+9.1%
20 Feb 2020+17.4%
28 Feb 2020+16.3%
6 Mar 2020+18.8%
13 Mar 2020+24.4%
20 Mar 2020+8.6%
27 Mar 2020+2.4%
3 Apr 2020+4.7%
9 Apr 2020+5.2%
17 Apr 2020+0.4%
24 Apr 2020−9.4%
30 Apr 2020−7.1%
8 May 2020−10.1%
15 May 2020−8.6%
22 May 2020−14.2%
29 May 2020−28.0%
5 Jun 2020−29.5%
12 Jun 2020−43.6%
19 Jun 2020−35.3%
26 Jun 2020−28.1%
3 Jul 2020−36.0%
10 Jul 2020−36.5%
17 Jul 2020−40.4%
24 Jul 2020−31.2%
31 Jul 2020−32.2%
7 Aug 2020−33.3%
14 Aug 2020−34.8%
21 Aug 2020−23.3%
28 Aug 2020+3.9%
4 Sep 2020−7.6%
11 Sep 2020−11.4%
18 Sep 2020−2.8%
25 Sep 2020−10.5%
1 Oct 2020−3.5%
9 Oct 2020−7.6%
16 Oct 2020−0.1%
23 Oct 2020+4.1%
30 Oct 2020+0.0%
6 Nov 2020+1.1%
14 Nov 2020+3.9%
20 Nov 2020−3.3%
27 Nov 2020−14.7%
4 Dec 2020−14.1%
11 Dec 2020−8.3%
18 Dec 2020−14.0%
24 Dec 2020−19.3%
1 Jan 2021−12.5%
8 Jan 2021+8.9%
15 Jan 2021+8.0%
22 Jan 2021+13.6%
29 Jan 2021+5.2%
5 Feb 2021+17.1%
12 Feb 2021+10.9%
19 Feb 2021+9.6%
26 Feb 2021+17.2%
5 Mar 2021+25.9%
12 Mar 2021+23.7%
19 Mar 2021+20.1%
26 Mar 2021+43.5%
1 Apr 2021+37.8%
9 Apr 2021+24.1%
16 Apr 2021+20.6%
23 Apr 2021+3.8%
30 Apr 2021+16.2%
7 May 2021+9.0%
14 May 2021+14.2%
21 May 2021+17.0%
28 May 2021+8.8%
4 Jun 2021+5.1%
11 Jun 2021+3.6%
18 Jun 2021+2.3%
25 Jun 2021+0.8%
2 Jul 2021−6.7%
9 Jul 2021−13.7%
16 Jul 2021−10.6%
23 Jul 2021−2.0%
30 Jul 2021−8.2%
6 Aug 2021−9.2%
13 Aug 2021−18.4%
20 Aug 2021−25.4%
27 Aug 2021−22.5%
3 Sep 2021−23.2%
9 Sep 2021−28.5%
17 Sep 2021−26.1%
24 Sep 2021−31.6%
1 Oct 2021−23.6%
8 Oct 2021−23.4%
14 Oct 2021−27.3%
22 Oct 2021−26.1%
29 Oct 2021−25.3%
4 Nov 2021−24.2%
12 Nov 2021−22.0%
18 Nov 2021−11.1%
26 Nov 2021−16.4%
3 Dec 2021−22.1%
10 Dec 2021−14.8%
17 Dec 2021−13.9%
24 Dec 2021−13.1%
31 Dec 2021−16.8%
7 Jan 2022−13.4%
14 Jan 2022−6.7%
21 Jan 2022−5.4%
28 Jan 2022−4.9%
4 Feb 2022−0.9%
11 Feb 2022+0.5%
18 Feb 2022+2.9%
25 Feb 2022+3.4%
4 Mar 2022+7.9%
11 Mar 2022+6.1%
17 Mar 2022+0.6%
25 Mar 2022+4.0%
1 Apr 2022+6.7%
8 Apr 2022+15.9%
13 Apr 2022+12.8%
22 Apr 2022+18.5%
29 Apr 2022+23.7%
6 May 2022+27.7%
13 May 2022+15.4%
20 May 2022+18.2%
27 May 2022+11.3%
3 Jun 2022+18.4%
10 Jun 2022+26.2%
17 Jun 2022+16.8%
24 Jun 2022+27.6%
1 Jul 2022+23.9%
8 Jul 2022+20.1%
15 Jul 2022+14.4%
22 Jul 2022+5.5%
29 Jul 2022−2.0%
5 Aug 2022−12.4%
12 Aug 2022+0.0%
19 Aug 2022−13.6%
26 Aug 2022−1.6%
2 Sep 2022−6.8%
9 Sep 2022−16.6%
16 Sep 2022−5.9%
23 Sep 2022−11.5%
30 Sep 2022−18.1%
7 Oct 2022−16.8%
14 Oct 2022−13.8%
21 Oct 2022−12.1%
28 Oct 2022−8.5%
4 Nov 2022−4.7%
11 Nov 2022−4.8%
18 Nov 2022−1.0%
25 Nov 2022+0.7%
2 Dec 2022+9.0%
9 Dec 2022+9.0%
16 Dec 2022+12.4%
23 Dec 2022+7.9%
30 Dec 2022+21.9%
6 Jan 2023+26.9%
13 Jan 2023+22.9%
20 Jan 2023+30.6%
27 Jan 2023+28.1%
3 Feb 2023+21.8%
10 Feb 2023+35.0%
17 Feb 2023+30.5%
24 Feb 2023+19.0%
3 Mar 2023+10.8%
10 Mar 2023+14.2%
17 Mar 2023+13.5%
24 Mar 2023+10.2%
31 Mar 2023+6.8%
6 Apr 2023−3.2%
13 Apr 2023+0.0%
21 Apr 2023−3.6%
28 Apr 2023+4.0%
5 May 2023+5.1%
12 May 2023−4.0%
19 May 2023+1.3%
26 May 2023+12.7%
2 Jun 2023+5.7%
9 Jun 2023−1.1%
16 Jun 2023−5.3%
23 Jun 2023−3.4%
30 Jun 2023−5.0%
7 Jul 2023+3.9%
14 Jul 2023+13.6%
21 Jul 2023+17.8%
28 Jul 2023+21.6%
4 Aug 2023+15.4%
11 Aug 2023+18.7%
18 Aug 2023+15.8%
25 Aug 2023+14.4%
1 Sep 2023+31.9%
8 Sep 2023+40.0%
15 Sep 2023+35.2%
22 Sep 2023+39.0%
29 Sep 2023+35.6%
6 Oct 2023+27.9%
13 Oct 2023+17.4%
20 Oct 2023+14.0%
27 Oct 2023+4.4%
3 Nov 2023+4.4%
12 Nov 2023+25.6%
17 Nov 2023+35.0%
24 Nov 2023+34.6%
1 Dec 2023+23.9%
8 Dec 2023+32.0%
15 Dec 2023+41.8%
22 Dec 2023+35.5%
29 Dec 2023+45.3%
5 Jan 2024+40.9%
12 Jan 2024+42.0%
20 Jan 2024+40.5%
25 Jan 2024+39.4%
2 Feb 2024+39.8%
9 Feb 2024+16.7%
16 Feb 2024+9.6%
23 Feb 2024−0.6%
2 Mar 2024+0.7%
7 Mar 2024−7.7%
15 Mar 2024−19.6%
22 Mar 2024−10.5%
28 Mar 2024−9.9%
5 Apr 2024−2.8%
12 Apr 2024−2.1%
19 Apr 2024+7.8%
26 Apr 2024+14.8%
3 May 2024+30.3%
10 May 2024+25.2%
18 May 2024+29.0%
24 May 2024+48.3%
31 May 2024+82.8%
7 Jun 2024+54.1%
14 Jun 2024+110.6%
21 Jun 2024+92.6%
28 Jun 2024+90.4%
5 Jul 2024+66.2%
12 Jul 2024+63.1%
19 Jul 2024+49.6%
26 Jul 2024+62.1%
2 Aug 2024+57.2%
9 Aug 2024+50.5%
16 Aug 2024+37.3%
23 Aug 2024+32.7%
30 Aug 2024+2.5%
6 Sep 2024+19.1%
13 Sep 2024+2.4%
20 Sep 2024−3.3%
27 Sep 2024−1.2%
4 Oct 2024+1.0%
11 Oct 2024+16.8%
18 Oct 2024+17.5%
25 Oct 2024−9.6%
1 Nov 2024−7.6%
8 Nov 2024+1.4%
14 Nov 2024−6.4%
22 Nov 2024−8.2%
29 Nov 2024−7.1%
6 Dec 2024−2.5%
13 Dec 2024−5.8%
20 Dec 2024+15.1%
27 Dec 2024+3.5%
3 Jan 2025+13.0%
10 Jan 2025−9.7%
17 Jan 2025−19.3%
24 Jan 2025−17.9%
1 Feb 2025−29.2%
7 Feb 2025−28.1%
14 Feb 2025−30.1%
21 Feb 2025−22.7%
28 Feb 2025−21.6%
7 Mar 2025−23.2%
13 Mar 2025−28.6%
21 Mar 2025−31.3%
28 Mar 2025−30.7%
4 Apr 2025−31.7%
11 Apr 2025−28.7%
17 Apr 2025−21.8%
25 Apr 2025−4.5%
2 May 2025+0.8%
9 May 2025−8.1%
16 May 2025+28.5%
23 May 2025+10.2%
30 May 2025+32.1%
6 Jun 2025+40.0%
13 Jun 2025+51.6%
20 Jun 2025+33.6%
27 Jun 2025+47.9%
4 Jul 2025+44.8%
11 Jul 2025+52.1%
18 Jul 2025+39.0%
25 Jul 2025+26.3%
1 Aug 2025+30.5%
8 Aug 2025+26.6%
14 Aug 2025+14.9%
22 Aug 2025+26.9%
29 Aug 2025+7.0%
5 Sep 2025+2.6%
12 Sep 2025−3.1%
19 Sep 2025−3.8%
26 Sep 2025−17.1%
3 Oct 2025−11.0%
10 Oct 2025−14.0%
17 Oct 2025−14.7%
24 Oct 2025−13.0%
31 Oct 2025−11.5%
7 Nov 2025−12.0%
14 Nov 2025−21.1%
21 Nov 2025−29.5%
28 Nov 2025−24.0%
5 Dec 2025−28.5%
12 Dec 2025−23.7%
19 Dec 2025−25.7%
26 Dec 2025−19.2%
2 Jan 2026−22.9%
9 Jan 2026−26.8%
16 Jan 2026−22.4%
23 Jan 2026−28.3%
1 Feb 2026−23.5%
6 Feb 2026−19.1%
13 Feb 2026−13.5%
20 Feb 2026+0.1%
27 Feb 2026+2.8%
6 Mar 2026+6.0%
13 Mar 2026+5.1%
20 Mar 2026+9.6%
27 Mar 2026+7.4%
17 Apr 2026+15.3%
24 Apr 2026+24.1%
30 Apr 2026+30.3%
8 May 2026+43.1%
15 May 2026+23.9%
22 May 2026+33.6%
29 May 2026+7.1%
4 Jun 2026−7.6%
5 Jun 2026−13.6%
10 Jun 2026−12.0%
12 Jun 2026−7.5%
17 Jun 2026−8.2%
19 Jun 2026−6.0%
24 Jun 2026−13.5%
25 Jun 2026−12.2%
1 Jul 2026−16.4%
3 Jul 2026−17.4%
10 Jul 2026−15.8%
17 Jul 2026−25.5%
24 Jul 2026−9.2%
31 Jul 2026−7.5%
7 Aug 2026−0.7%
14 Aug 2026−6.8%
21 Aug 2026−9.1%
28 Aug 2026−7.1%
4 Sep 2026−9.7%
11 Sep 2026−8.4%
18 Sep 2026−4.0%
25 Sep 2026−4.0%
1 Oct 2026−1.5%
9 Oct 2026−2.7%
16 Oct 2026−3.9%
23 Oct 2026−10.4%
30 Oct 2026−8.7%
4 Nov 2026−9.4%
Each bar is one week, from 2018 to now (404 weeks with a reading). Green means the stock's return over the previous 13 weeks beat the NIFTY 500; red means it trailed. The colour is strongest at a gap of 25 percentage points or more. A gap means there is no reading for that week.

Over the last 7.9 years the share price moved +257% while the NIFTY 500 moved +143%, so it is ahead of the index over that whole period. It was last ahead over 13 weeks in the week of 29 May 2026. The chart above shows the 13-week comparison for every week.

This page treats a rise as over when the price closes below its 200-day average on two Fridays in a row.

What changed at Techno Electric & Engineering Company this quarter?

Two changes stood out: revenue up on a year earlier for 7 quarters in a row and indian funds and insurers (DIIs) cut their stake for 3 quarters in a row.

  1. Revenue up on a year earlier for 7 quarters in a row

    In the June 2026 quarter revenue was ₹630 crore, +19.8% on a year earlier.

    Why: Revenue rose because the company's engineering and construction work was strong and it took in more orders.

    Next results: check whether the larger order book turns into revenue, since management says most delivery depends on second-half project execution and customer land handovers.

    From the earnings call on 12 Aug 2026.

  2. Indian funds and insurers (DIIs) cut their stake for 3 quarters in a row

    From 23.1% to 21.3% of the company by the September 2026 quarter.

What are Techno Electric & Engineering Company's latest quarterly results?

For April to June 2026 (the quarter ended 30 June 2026), Techno Electric & Engineering Company reported revenue of ₹630 crore, up 19.8% from ₹526 crore a year earlier, and a profit of ₹93.0 crore, down 31.6% from ₹136 crore.

Techno Electric & Engineering Company results: April to June 2026 against a year earlier

Techno Electric & Engineering Company results: April to June 2026 against a year earlier
MeasureApril to June 2026April to June 2025Change
Revenue₹630 crore₹526 crore+19.8%
Profit₹93.0 crore₹136 crore−31.6%
Earnings per share₹8.02₹11.70−31.5%
Operating margin16.0%18.0%−2.0 points

The next results, for July to September 2026, are due by 14 November 2026: listed companies must publish quarterly results within 45 days of the quarter's end (60 days for the January to March quarter).

Techno Electric & Engineering Company's management discussed these results on a call held on 12 August 2026; what it said is further down this page.

From the company's reported quarterly results (quarter ended 30 June 2026). Revenue and profit in ₹ crore.

What is the Techno Electric & Engineering Company share price history?

Techno Electric & Engineering Company closed at ₹884.40 on 4 November 2026, down 31.1% from ₹1,283.30 a year earlier (7 November 2025) and up 235.1% over five years. Its highest weekly close since December 2018 was ₹1,731.40 on 18 October 2024.

Techno Electric & Engineering Company share price: then and now

Techno Electric & Engineering Company share price: then and now
WhenCloseChange to 4 Nov 2026
1 week ago · 30 Oct 2026₹829.30+6.6%
1 month ago · 1 Oct 2026₹998.60−11.4%
6 months ago · 8 May 2026₹1,257.20−29.7%
1 year ago · 7 Nov 2025₹1,283.30−31.1%
3 years ago · 3 Nov 2023₹490.15+80.4%
5 years ago · 4 Nov 2021₹263.95+235.1%
Earliest weekly close in our records · 7 Dec 2018₹247.70+257.0%
Highest weekly close since December 2018 · 18 Oct 2024₹1,731.40−48.9%
Lowest weekly close since December 2018 · 7 Aug 2020₹174.70+406.2%
52-week high (weekly close) · 22 May 2026₹1,334.50−33.7%
52-week low (weekly close) · 23 Oct 2026₹824.60+7.3%

Weekly closing prices. Each change is the move from that price to the 4 Nov 2026 close. A day's intraday high or low can go beyond these weekly closes.

417 weekly closes from 7 December 2018 to 4 November 2026.

What is the latest news on Techno Electric & Engineering Company?

4 Nov 2026: Techno Electric & Engineering Company closed at ₹884.40, up 6.6% on the week and down 11.4% on the month. 11 Sep 2026: ex-date for a dividend of ₹7 a share.

Earlier

  • 12 Aug 2026: Techno Electric & Engineering Company held its results call for April to June 2026. Management guided: FY27 revenue at least ₹4,000 crore and top- and bottom-line growth at least 25%; year-end order-book goal ₹4,000 crore likely exceeded; delivery remains H2-weighted.
  • Results for April to June 2026: Revenue up 19.8% and profit down 31.6% on a year earlier.

What dividend does Techno Electric & Engineering Company pay?

Techno Electric & Engineering Company paid ₹7 a share in regular dividends in the 12 months to 5 November 2026 (1 payment), a yield of 0.79% at the ₹884.40 close on 4 November 2026. The last was a dividend of ₹7 a share, ex-date 11 September 2026.

Techno Electric & Engineering Company dividends since 1 April 2021

Techno Electric & Engineering Company dividends since 1 April 2021
Ex-dateDividend per shareTypeRecord date
11 Sep 2026Dividend₹7Dividendsame day
12 Sep 2025Dividend₹9Dividendsame day
13 Sep 2024Dividend₹7Dividendsame day
15 Sep 2023Dividend₹6Dividendsame day
15 Sep 2022Dividend₹2Dividend16 Sep 2022
20 Sep 2021Dividend₹4Dividend—

Amounts as the company declared them on the NSE. A dividend goes to whoever owns the shares before the ex-date.

5 of 5Of the last 5 financial years, years with an NSE dividend record

Yes. Techno Electric & Engineering Company Ltd paid out 17% of its profit as dividends in FY26, and it paid a dividend in 6 of its last 10 reported years.

From the NSE corporate-actions record, read 5 November 2026.

What did Techno Electric & Engineering Company management say on the latest results call?

On the call for April to June 2026, held on 12 August 2026, Techno Electric & Engineering Company's management guided: FY27 revenue at least ₹4,000 crore and top- and bottom-line growth at least 25%; year-end order-book goal ₹4,000 crore likely exceeded; delivery remains H2-weighted.

“No, we are not buying GPUs, let me make it clear to my colleagues. We are only providing infrastructure to house GPU owned by some third party. So our- so our role will always be limited to infrastructure to house CPU or GPU.”C.P. Gupta, Chairman & Managing Director, on the call for April to June 2026

What management guided

  • FY27 operating margin 13-14%.
  • FY27 data-center revenue around ₹40 crore remains in place.
  • FY27 data-center capital spending envelope about ₹1,000 crore; Noida/Kolkata program ₹500-600 crore, Chennai expansion demand-gated, Noida planned January to March 2027 and Kolkata not before FY28.
  • Smart-meter deployment complete by December 2026; FY27 collections about ₹450 crore against about ₹400 crore deployment outflow, with no further capital spending.

Management’s own plans and goals, from our notes of the call. A plan is not a result.

Source: the call transcript.

From the call for April to June 2026, 12 August 2026.

What to watch in Techno Electric & Engineering Company's next results?

When Techno Electric & Engineering Company reports July to September 2026, these are the 4 checks that show whether the story is still on course. First: Chennai customer closures and billing conversion - test whether the current pipeline begins translating into reported segment revenue.

Techno Electric & Engineering Company: what to watch next quarter
What to check (from the call)
Chennai customer closures and billing conversion - test whether the current pipeline begins translating into reported segment revenue.
Transmission L1 conversion and order-book build - check continued power-heavy mix and execution visibility.
Ishanagar transmission-asset monetisation - check completion and cash or earnings conversion from contract assets.
Smart-meter completion - verify remaining installations and transition into cash-generative annuity mode.

Which stock lists is Techno Electric & Engineering Company on?

Techno Electric & Engineering Company is on 2 of our India lists: 52 week high & low and AI & data centre stocks.

Is Techno Electric & Engineering Company profitable?

Techno Electric & Engineering Company Ltd earned ₹93.0 Cr of net profit in the Jun 2026 quarter, −31.6% on the same quarter a year earlier. Full-year FY26 profit was ₹474 Cr. Over 9 years profit has grown 26.8% a year on average. That is 14.8% of the quarter's revenue. The same quarter a year earlier earned ₹136 Cr.

Net profit is what is left after every cost, interest and tax. Earnings per share, dividends and book value all grow from it.

For the full year, FY26 profit was ₹474 Cr (+12.1% on the year before).

FY26 profit ₹474 Cr (+12.1% on the year before), 26.8% a year over 9 years

  • Net profit ₹474
FY26 profit ₹474 Cr (+12.1% on the year before), 26.8% a year over 9 years
QuarterNet profit
FY17₹56
FY18₹206
FY19₹193
FY20₹179
FY21₹182
FY22₹264
FY23₹187
FY24₹268
FY25₹423
FY26₹474

Growth on a year earlier

  • Growth on a year earlier 12.1%
Growth on a year earlier
QuarterGrowth on a year earlier
FY17–
FY18267.9%
FY19−6.3%
FY20−7.3%
FY211.7%
FY2245.1%
FY23−29.2%
FY2443.3%
FY2557.8%
FY2612.1%
Top: net profit each year, ₹ Cr. Below: growth on the year before, %. 10-year window. A grey bar is lower than the year before.

Jun 2026: ₹93.0 Cr (−31.6% on a year earlier)

  • Net profit (quarterly) ₹93.0
Jun 2026: ₹93.0 Cr (−31.6% on a year earlier)
QuarterNet profit (quarterly)
Sep 2023₹74
Dec 2023₹92
Mar 2024₹78
Jun 2024₹98
Sep 2024₹94
Dec 2024₹96
Mar 2025₹135
Jun 2025₹136
Sep 2025₹104
Dec 2025₹119
Mar 2026₹115
Jun 2026₹93

Growth on a year earlier

  • Growth on a year earlier −31.6%
Growth on a year earlier
QuarterGrowth on a year earlier
Sep 202325.4%
Dec 2023196.8%
Mar 202427.9%
Jun 2024292%
Sep 202427%
Dec 20244.3%
Mar 202573.1%
Jun 202538.8%
Sep 202510.6%
Dec 202524%
Mar 2026−14.8%
Jun 2026−31.6%
Top: net profit each quarter, ₹ Cr. Below: growth on the same quarter a year earlier, %. Last 12 quarters. A grey bar is lower than the quarter before.

Why profit moved: revenue changed +19.8% on a year earlier and the margin moved −2.0 percentage points. Sales did the work while the margin got thinner.

On average over the last four quarters, profit changed −3.0% and revenue +43.0%. Profit is growing slower than sales: rising costs are taking part of the growth.

How much revenue does Techno Electric & Engineering Company make, and is it growing?

Techno Electric & Engineering Company Ltd reported ₹630 Cr of revenue in the Jun 2026 quarter, +19.8% on the same quarter a year earlier. That is the 7th quarter in a row with growth on the year before. Over 9 years it has grown 44.3% a year on average. The last full year, FY26, came in at ₹3,252 Cr.

Revenue is everything the company billed its customers in the period.

The last four reported quarters add to ₹3,355 Cr.

FY26 revenue was ₹3,252 Cr, +43.3% on the year before.

FY26 revenue ₹3,252 Cr (+43.3% on the year before), 44.3% a year over 9 years

  • Revenue ₹3,252
FY26 revenue ₹3,252 Cr (+43.3% on the year before), 44.3% a year over 9 years
QuarterRevenue
FY17₹120
FY18₹1,283
FY19₹986
FY20₹871
FY21₹884
FY22₹999
FY23₹830
FY24₹1,502
FY25₹2,269
FY26₹3,252

Growth on a year earlier

  • Growth on a year earlier 43.3%
Growth on a year earlier
QuarterGrowth on a year earlier
FY17–
FY18969.2%
FY19−23.1%
FY20−11.7%
FY211.5%
FY2213%
FY23−16.9%
FY2481%
FY2551.1%
FY2643.3%
Top: revenue each year, ₹ Cr. Below: growth on the year before, %. 10-year window. A grey bar is lower than the year before.

Jun 2026: ₹630 Cr (+19.8% on a year earlier), the 7th quarter in a row of growth

  • Revenue (quarterly) ₹630
Jun 2026: ₹630 Cr (+19.8% on a year earlier), the 7th quarter in a row of growth
QuarterRevenue (quarterly)
Sep 2023₹462
Dec 2023₹327
Mar 2024₹440
Jun 2024₹375
Sep 2024₹441
Dec 2024₹636
Mar 2025₹816
Jun 2025₹526
Sep 2025₹843
Dec 2025₹872
Mar 2026₹1,010
Jun 2026₹630

Growth on a year earlier

  • Growth on a year earlier 19.8%
Growth on a year earlier
QuarterGrowth on a year earlier
Sep 2023102.6%
Dec 202376.8%
Mar 202440.6%
Jun 202436.9%
Sep 2024−4.5%
Dec 202494.5%
Mar 202585.5%
Jun 202540.3%
Sep 202591.2%
Dec 202537.1%
Mar 202623.8%
Jun 202619.8%
Top: revenue each quarter, ₹ Cr. Below: growth on the same quarter a year earlier, %. Last 12 quarters. A grey bar is lower than the quarter before.

Recent pace: the last four quarters grew +43.0% on average, against 44.3% a year over the longer run, so this year is growing slower than its own long-run rate.

Is growth speeding up? Revenue over the last 12 months grew +38.7%, against +44.6% a year over the last 8 quarters (rolling over); profit over the last 12 months grew −6.5%, against +12.3% a year (rolling over).

How much of every ₹100 of sales does Techno Electric & Engineering Company keep?

Techno Electric & Engineering Company Ltd's operating margin was 16.0% in the Jun 2026 quarter, 2.0 percentage points lower than the same quarter a year ago. Across 10 years it has been between 11.0% and 91.0%. The latest quarter is within that range.

Operating margin is what is left from every ₹100 of sales after the costs of running the business, before interest and tax. It shows pricing power and cost control.

Why the margin moved: operating margin changed −1.8 percentage points on the year while gross margin changed −0.4 points. So the drop came mostly from costs below the gross margin, such as staff and overheads, measured against sales.

FY26: 14.0%, within a range of 11.0% to 91.0% over 10 years

  • Operating margin 14.0%
FY26: 14.0%, within a range of 11.0% to 91.0% over 10 years
QuarterOperating margin
FY1791%
FY1823%
FY1925%
FY2025%
FY2124%
FY2216%
FY2311%
FY2414%
FY2515%
FY2614%

Change on the year before (points)

  • Change on the year before (points) −1.0 pts
Change on the year before (points)
QuarterChange on the year before (points)
FY17–
FY18−68.0 pts
FY19+2.0 pts
FY200.0 pts
FY21−1.0 pts
FY22−8.0 pts
FY23−5.0 pts
FY24+3.0 pts
FY25+1.0 pts
FY26−1.0 pts
Operating margin each year, % (top). Below: change on the year before, in percentage points. 10-year window.

Jun 2026: operating margin 16.0% (−2.0 points on a year earlier)

  • Operating margin 16.0%
Jun 2026: operating margin 16.0% (−2.0 points on a year earlier)
QuarterOperating margin
Sep 202317%
Dec 202317%
Mar 202412%
Jun 202414%
Sep 202416%
Dec 202414%
Mar 202516%
Jun 202518%
Sep 202513%
Dec 202514%
Mar 202613%
Jun 202616%

Change on a year earlier (points)

  • Change on a year earlier (points) −2.0 pts
Change on a year earlier (points)
QuarterChange on a year earlier (points)
Sep 2023–
Dec 2023+4.0 pts
Mar 2024+9.7 pts
Jun 2024+6.0 pts
Sep 2024−1.0 pts
Dec 2024−3.0 pts
Mar 2025+4.0 pts
Jun 2025+4.0 pts
Sep 2025−3.0 pts
Dec 20250.0 pts
Mar 2026−3.0 pts
Jun 2026−2.0 pts
Top: quarterly operating margin, %. Below: change on the same quarter a year earlier, in percentage points. Last 12 quarters. Operating profit as a share of revenue, each quarter.

Is Techno Electric & Engineering Company's profit turning into cash?

Over the last 3 years Techno Electric & Engineering Company Ltd's operations used more cash than they brought in, so cash conversion was −29%, a gap worth watching. In FY26 its operations used ₹590 Cr of cash, against ₹474 Cr of profit.

The profit and loss account shows what was earned. The cash-flow statement shows the cash that actually came in. Comparing operating cash flow with profit is one of the best checks that a profit is real.

After ₹87.0 Cr of spending on assets, free cash was −₹677 Cr: it spent more than its operations brought in.

Cash-flow figures here are yearly, because quarterly cash statements are not published, so this section changes once a year.

FY26: operating cash −₹590 Cr against profit ₹474 Cr; −29% of 3 years' profit came in as cash

  • Operating cash −₹590
  • Net profit ₹474
  • Free cash −₹677
FY26: operating cash −₹590 Cr against profit ₹474 Cr; −29% of 3 years' profit came in as cash
QuarterOperating cashNet profitFree cash
FY17₹160₹56–
FY18₹212₹206₹201
FY19₹198₹193₹195
FY20₹112₹179₹108
FY21₹125₹182₹125
FY22₹259₹264₹260
FY23₹93₹187₹368
FY24−₹198₹268−₹382
FY25₹453₹423₹285
FY26−₹590₹474−₹677
Operating cash flow and net profit each year, ₹ Cr. The line is free cash flow: operating cash minus spending on assets. 10-year window, yearly figures.

FY26: operating cash was −124% of profit (−29% over three years)

  • Operating cash as % of profit −124%
  • Break-even line 100%
FY26: operating cash was −124% of profit (−29% over three years)
QuarterOperating cash as % of profitBreak-even line
FY17286%100%
FY18103%100%
FY19103%100%
FY2063%100%
FY2169%100%
FY2298%100%
FY2350%100%
FY24−74%100%
FY25107%100%
FY26−124%100%
Operating cash as a share of net profit, each year, % (line). The flat line marks 100%, meaning all of the profit came in as cash.

Why −29% of profit came in as cash: the cash cycle got 82 days shorter between FY21 and FY26, so cash that used to wait in the business now arrives sooner. When less than 70% of profit comes in as cash, it is the thing to watch on this page.

What to look at next: the bigger use of cash is spending on new assets, at 13.3× depreciation over three years. The next section checks what that spending is building.

Where does Techno Electric & Engineering Company's cash go?

Techno Electric & Engineering Company Ltd's cash cycle, the days between paying suppliers and getting paid by customers, was 137 days in FY26, down from 219 days in FY21. It spent ₹439 Cr on assets over the last 3 years. Customers take 137 days to pay, and stock sits for 0 days on average.

Working capital is the cash tied up between paying suppliers and getting paid. Debtor days: how long customers take to pay. Inventory days: how long stock sits. The cash cycle: the whole loop, in days of sales.

At FY26 sales of ₹3,252 Cr, each day of that cycle ties up about ₹8.9 Cr, so roughly ₹1,221 Cr is tied up in the business at any time.

FY26: customers took 137 days to pay and stock sat for 0 days, about 0.0 months of sales sitting as stock, for a full cycle of 137 days, shorter than FY21's 219.

FY26: a 137-day cash cycle, −82 days compared with FY21

  • Cash cycle 137d
  • Inventory days 0d
  • Debtor days 137d
  • Payable days 173d
FY26: a 137-day cash cycle, −82 days compared with FY21
QuarterCash cycleInventory daysDebtor daysPayable days
FY17230d–230d–
FY1834d3d216d185d
FY19202d–202d–
FY20240d–240d–
FY21219d–219d–
FY2222d13d213d205d
FY2338d59d282d303d
FY2415d8d180d173d
FY25108d0d108d–
FY26137d0d137d–
Debtor days, inventory days, payable days and the full cash cycle, each year. 10-year window.

Spending on assets: ₹439 Cr over the last 3 years, against ₹33.0 Cr of depreciation (the yearly wear and tear on existing assets). So it is building well beyond replacing what wears out. Work still in progress is ₹72.0 Cr (FY26): assets paid for that are not earning yet.

FY26: capex ₹87.0 Cr, work in progress ₹72.0 Cr, a build-out

  • Capex ₹87.0
  • Work-in-progress ₹72.0
FY26: capex ₹87.0 Cr, work in progress ₹72.0 Cr, a build-out
QuarterCapexWork-in-progress
FY18₹11₹0
FY19₹3₹0
FY20₹4₹0
FY21₹0₹0
FY22−₹1₹0
FY23−₹275₹95
FY24₹184₹276
FY25₹168₹442
FY26₹87₹72
Capital spending each year, ₹ Cr, with work in progress, ₹ Cr, as the line. Quarterly capital-spending figures are not available for India, so this is yearly.

In short: the cash is going into new capacity, not getting stuck in the daily cycle. The question is whether the new capacity earns.

What is Techno Electric & Engineering Company's P/E ratio, and how does it compare with its own history?

Techno Electric & Engineering Company Ltd's P/E is 23.9×, in the middle of its own history: higher than 53% of past readings. Its usual P/E (the middle reading) is 19.9×, over 7.8 years of weekly prices. This compares the share price with the company’s own past. It does not say what the business is worth.

P/E is the share price divided by a year's profit per share: how many rupees the market pays for each rupee of yearly profit.

P/E 23.9× against a usual 19.9×: in the middle of its own history: higher than 53% of past readings

  • P/E 22.4×
  • Median 19.9×
P/E 23.9× against a usual 19.9×: in the middle of its own history: higher than 53% of past readings
WeekP/EMedian
11 Jan 201913.2×19.9×
25 Jan 201913.7×19.9×
8 Feb 201912.7×19.9×
22 Feb 201914.7×19.9×
8 Mar 201912.8×19.9×
22 Mar 201914.2×19.9×
5 Apr 201914.4×19.9×
18 Apr 201914.5×19.9×
3 May 201912.6×19.9×
17 May 201912.3×19.9×
31 May 201913.3×19.9×
14 Jun 201912.9×19.9×
28 Jun 201914.4×19.9×
12 Jul 201913.9×19.9×
26 Jul 201913.8×19.9×
9 Aug 201913.4×19.9×
23 Aug 201913.4×19.9×
6 Sep 201913.6×19.9×
20 Sep 201915.1×19.9×
4 Oct 201915.6×19.9×
18 Oct 201915.1×19.9×
1 Nov 201915.3×19.9×
15 Nov 201915.2×19.9×
29 Nov 201915.3×19.9×
13 Dec 201915.7×19.9×
27 Dec 201916.1×19.9×
10 Jan 202016.2×19.9×
24 Jan 202017.2×19.9×
7 Feb 202017.1×19.9×
20 Feb 202017.0×19.9×
6 Mar 202016.7×19.9×
20 Mar 202012.3×19.9×
3 Apr 202012.4×19.9×
17 Apr 202012.8×19.9×
30 Apr 202011.6×19.9×
15 May 202011.1×19.9×
29 May 202010.3×19.9×
12 Jun 202010.9×19.9×
26 Jun 202011.2×19.9×
10 Jul 202011.2×19.9×
24 Jul 202010.9×19.9×
7 Aug 202010.7×19.9×
21 Aug 202012.2×19.9×
4 Sep 202013.9×19.9×
18 Sep 202014.1×19.9×
1 Oct 202013.7×19.9×
16 Oct 202013.1×19.9×
30 Oct 202013.0×19.9×
14 Nov 202015.4×19.9×
27 Nov 202015.8×19.9×
11 Dec 202016.4×19.9×
24 Dec 202014.8×19.9×
8 Jan 202118.5×19.9×
22 Jan 202119.1×19.9×
5 Feb 202119.8×19.9×
19 Feb 202117.0×19.9×
5 Mar 202119.0×19.9×
19 Mar 202118.1×19.9×
1 Apr 202119.8×19.9×
16 Apr 202119.2×19.9×
30 Apr 202118.4×19.9×
14 May 202119.7×19.9×
28 May 202120.5×19.9×
11 Jun 202121.0×19.9×
25 Jun 202120.9×19.9×
9 Jul 202119.5×19.9×
23 Jul 202119.4×19.9×
6 Aug 202118.8×19.9×
20 Aug 202115.6×19.9×
3 Sep 202116.7×19.9×
17 Sep 202115.9×19.9×
1 Oct 202116.2×19.9×
14 Oct 202115.6×19.9×
29 Oct 202114.7×19.9×
12 Nov 202114.4×19.9×
26 Nov 202115.1×19.9×
10 Dec 202114.6×19.9×
24 Dec 202114.2×19.9×
7 Jan 202215.3×19.9×
21 Jan 202215.3×19.9×
4 Feb 202215.7×19.9×
18 Feb 202211.7×19.9×
4 Mar 202210.6×19.9×
17 Mar 202210.6×19.9×
1 Apr 202211.5×19.9×
13 Apr 202212.4×19.9×
29 Apr 202213.1×19.9×
13 May 202212.0×19.9×
27 May 202212.1×19.9×
10 Jun 202211.3×19.9×
24 Jun 202211.1×19.9×
8 Jul 202212.1×19.9×
22 Jul 202211.7×19.9×
5 Aug 202211.5×19.9×
19 Aug 202212.4×19.9×
2 Sep 202212.5×19.9×
16 Sep 202212.1×19.9×
30 Sep 202211.5×19.9×
14 Oct 202212.2×19.9×
28 Oct 202212.2×19.9×
11 Nov 202212.4×19.9×
25 Nov 202214.7×19.9×
9 Dec 202215.4×19.9×
23 Dec 202215.0×19.9×
6 Jan 202317.5×19.9×
20 Jan 202317.6×19.9×
3 Feb 202316.4×19.9×
17 Feb 202329.2×19.9×
3 Mar 202327.3×19.9×
17 Mar 202327.1×19.9×
31 Mar 202327.2×19.9×
13 Apr 202327.2×19.9×
28 Apr 202330.0×19.9×
12 May 202329.8×19.9×
26 May 202332.3×19.9×
9 Jun 202342.2×19.9×
23 Jun 202340.3×19.9×
7 Jul 202345.2×19.9×
21 Jul 202352.2×19.9×
4 Aug 202352.9×19.9×
18 Aug 202351.7×19.9×
1 Sep 202357.2×19.9×
15 Sep 202354.9×19.9×
29 Sep 202354.0×19.9×
13 Oct 202355.3×19.9×
27 Oct 202354.4×19.9×
12 Nov 202347.8×19.9×
24 Nov 202353.3×19.9×
8 Dec 202359.5×19.9×
22 Dec 202358.7×19.9×
5 Jan 202459.7×19.9×
20 Jan 202459.7×19.9×
2 Feb 202459.6×19.9×
16 Feb 202445.0×19.9×
2 Mar 202440.5×19.9×
15 Mar 202435.3×19.9×
28 Mar 202441.8×19.9×
12 Apr 202444.4×19.9×
26 Apr 202452.5×19.9×
10 May 202455.9×19.9×
24 May 202459.7×19.9×
7 Jun 202448.9×19.9×
21 Jun 202457.2×19.9×
5 Jul 202458.6×19.9×
19 Jul 202459.7×19.9×
2 Aug 202459.7×19.9×
16 Aug 202459.7×19.9×
30 Aug 202459.7×19.9×
13 Sep 202459.7×19.9×
27 Sep 202459.7×19.9×
11 Oct 202459.7×19.9×
25 Oct 202457.7×19.9×
8 Nov 202459.7×19.9×
22 Nov 202454.6×19.9×
6 Dec 202455.2×19.9×
20 Dec 202459.6×19.9×
3 Jan 202559.7×19.9×
17 Jan 202547.3×19.9×
1 Feb 202538.3×19.9×
14 Feb 202533.6×19.9×
28 Feb 202535.3×19.9×
13 Mar 202532.6×19.9×
28 Mar 202536.4×19.9×
11 Apr 202535.8×19.9×
25 Apr 202539.9×19.9×
9 May 202539.2×19.9×
23 May 202544.1×19.9×
6 Jun 202545.6×19.9×
20 Jun 202545.5×19.9×
4 Jul 202548.5×19.9×
18 Jul 202547.0×19.9×
1 Aug 202543.6×19.9×
14 Aug 202539.9×19.9×
29 Aug 202540.4×19.9×
12 Sep 202538.5×19.9×
26 Sep 202534.1×19.9×
10 Oct 202536.5×19.9×
24 Oct 202535.0×19.9×
7 Nov 202534.2×19.9×
21 Nov 202530.6×19.9×
5 Dec 202528.7×19.9×
19 Dec 202528.5×19.9×
2 Jan 202629.0×19.9×
16 Jan 202625.5×19.9×
1 Feb 202626.0×19.9×
13 Feb 202626.0×19.9×
27 Feb 202629.1×19.9×
13 Mar 202626.9×19.9×
27 Mar 202625.6×19.9×
10 Apr 202627.7×19.9×
24 Apr 202630.4×19.9×
8 May 202631.2×19.9×
22 May 202633.1×19.9×
4 Jun 202626.2×19.9×
10 Jun 202625.7×19.9×
17 Jun 202628.1×19.9×
24 Jun 202627.8×19.9×
1 Jul 202628.1×19.9×
10 Jul 202627.2×19.9×
24 Jul 202625.7×19.9×
7 Aug 202627.6×19.9×
21 Aug 202626.6×19.9×
4 Sep 202626.4×19.9×
18 Sep 202627.8×19.9×
1 Oct 202626.9×19.9×
16 Oct 202625.5×19.9×
30 Oct 202622.4×19.9×

Earnings per share, 12 months

  • Earnings per share, 12 months ₹37
Earnings per share, 12 months
WeekEarnings per share, 12 months
11 Jan 2019–
25 Jan 2019–
8 Feb 2019–
22 Feb 2019–
8 Mar 2019–
22 Mar 2019–
5 Apr 2019₹18
18 Apr 2019₹18
3 May 2019₹18
17 May 2019₹18
31 May 2019₹18
14 Jun 2019₹18
28 Jun 2019₹19
12 Jul 2019₹19
26 Jul 2019₹19
9 Aug 2019₹19
23 Aug 2019₹19
6 Sep 2019₹19
20 Sep 2019₹18
4 Oct 2019₹18
18 Oct 2019₹18
1 Nov 2019₹18
15 Nov 2019₹18
29 Nov 2019₹18
13 Dec 2019₹18
27 Dec 2019₹18
10 Jan 2020₹18
24 Jan 2020₹18
7 Feb 2020₹18
20 Feb 2020₹18
6 Mar 2020₹18
20 Mar 2020₹18
3 Apr 2020₹18
17 Apr 2020₹18
30 Apr 2020₹18
15 May 2020₹18
29 May 2020₹18
12 Jun 2020₹18
26 Jun 2020₹18
10 Jul 2020₹18
24 Jul 2020₹18
7 Aug 2020₹18
21 Aug 2020₹18
4 Sep 2020₹18
18 Sep 2020₹18
1 Oct 2020₹15
16 Oct 2020₹15
30 Oct 2020₹15
14 Nov 2020₹15
27 Nov 2020₹15
11 Dec 2020₹15
24 Dec 2020₹14
8 Jan 2021₹14
22 Jan 2021₹14
5 Feb 2021₹14
19 Feb 2021₹14
5 Mar 2021₹14
19 Mar 2021₹14
1 Apr 2021₹16
16 Apr 2021₹16
30 Apr 2021₹16
14 May 2021₹16
28 May 2021₹16
11 Jun 2021₹16
25 Jun 2021₹16
9 Jul 2021₹16
23 Jul 2021₹16
6 Aug 2021₹16
20 Aug 2021₹16
3 Sep 2021₹16
17 Sep 2021₹18
1 Oct 2021₹18
14 Oct 2021₹18
29 Oct 2021₹18
12 Nov 2021₹18
26 Nov 2021₹18
10 Dec 2021₹18
24 Dec 2021₹18
7 Jan 2022₹16
21 Jan 2022₹16
4 Feb 2022₹16
18 Feb 2022₹16
4 Mar 2022₹16
17 Mar 2022₹16
1 Apr 2022₹22
13 Apr 2022₹22
29 Apr 2022₹22
13 May 2022₹22
27 May 2022₹22
10 Jun 2022₹22
24 Jun 2022₹25
8 Jul 2022₹25
22 Jul 2022₹25
5 Aug 2022₹25
19 Aug 2022₹25
2 Sep 2022₹25
16 Sep 2022₹25
30 Sep 2022₹23
14 Oct 2022₹23
28 Oct 2022₹23
11 Nov 2022₹23
25 Nov 2022₹23
9 Dec 2022₹23
23 Dec 2022₹23
6 Jan 2023₹21
20 Jan 2023₹21
3 Feb 2023₹21
17 Feb 2023₹21
3 Mar 2023₹21
17 Mar 2023₹21
31 Mar 2023₹12
13 Apr 2023₹12
28 Apr 2023₹12
12 May 2023₹12
26 May 2023₹12
9 Jun 2023₹12
23 Jun 2023₹9
7 Jul 2023₹9
21 Jul 2023₹9
4 Aug 2023₹9
18 Aug 2023₹9
1 Sep 2023₹9
15 Sep 2023₹9
29 Sep 2023₹9
13 Oct 2023₹9
27 Oct 2023₹9
12 Nov 2023₹9
24 Nov 2023₹9
8 Dec 2023₹9
22 Dec 2023₹9
5 Jan 2024₹13
20 Jan 2024₹13
2 Feb 2024₹13
16 Feb 2024₹13
2 Mar 2024₹13
15 Mar 2024₹13
28 Mar 2024₹19
12 Apr 2024₹19
26 Apr 2024₹19
10 May 2024₹19
24 May 2024₹19
7 Jun 2024₹19
21 Jun 2024₹25
5 Jul 2024₹25
19 Jul 2024₹25
2 Aug 2024₹25
16 Aug 2024₹25
30 Aug 2024₹25
13 Sep 2024₹25
27 Sep 2024₹26
11 Oct 2024₹26
25 Oct 2024₹26
8 Nov 2024₹26
22 Nov 2024₹26
6 Dec 2024₹26
20 Dec 2024₹26
3 Jan 2025₹27
17 Jan 2025₹27
1 Feb 2025₹27
14 Feb 2025₹27
28 Feb 2025₹27
13 Mar 2025₹27
28 Mar 2025₹28
11 Apr 2025₹28
25 Apr 2025₹28
9 May 2025₹28
23 May 2025₹28
6 Jun 2025₹28
20 Jun 2025₹33
4 Jul 2025₹33
18 Jul 2025₹33
1 Aug 2025₹33
14 Aug 2025₹33
29 Aug 2025₹33
12 Sep 2025₹33
26 Sep 2025₹38
10 Oct 2025₹38
24 Oct 2025₹38
7 Nov 2025₹38
21 Nov 2025₹38
5 Dec 2025₹38
19 Dec 2025₹38
2 Jan 2026₹38
16 Jan 2026₹38
1 Feb 2026₹38
13 Feb 2026₹38
27 Feb 2026₹38
13 Mar 2026₹38
27 Mar 2026₹40
10 Apr 2026₹40
24 Apr 2026₹40
8 May 2026₹40
22 May 2026₹40
4 Jun 2026₹40
10 Jun 2026₹40
17 Jun 2026₹40
24 Jun 2026₹39
1 Jul 2026₹39
10 Jul 2026₹39
24 Jul 2026₹39
7 Aug 2026₹39
21 Aug 2026₹39
4 Sep 2026₹39
18 Sep 2026₹39
1 Oct 2026₹37
16 Oct 2026₹37
30 Oct 2026₹37
Top: P/E each week. Below: earnings per share, trailing twelve months, leaving out one-off items, a step line that moves once a quarter; 7.8 years of history; short peaks above 60× are drawn at the top edge.

PEG 0.73: below 1.0, so the P/E is smaller than the earnings growth rate

  • PEG 0.73×
  • PEG = 1.0 1.00×
PEG 0.73: below 1.0, so the P/E is smaller than the earnings growth rate
QuarterPEGPEG = 1.0
Q1 FY221.25×1.00×
Q2 FY221.45×1.00×
Q3 FY221.45×1.00×
Q4 FY220.48×1.00×
Q1 FY230.57×1.00×
Q2 FY230.57×1.00×
Q3 FY231.21×1.00×
Q4 FY233.00×1.00×
Q1 FY244.52×1.00×
Q2 FY244.52×1.00×
Q3 FY240.86×1.00×
Q4 FY240.75×1.00×
Q1 FY251.16×1.00×
Q2 FY251.35×1.00×
Q3 FY251.13×1.00×
Q4 FY251.08×1.00×
Q1 FY261.47×1.00×
Q2 FY261.05×1.00×
Q3 FY260.78×1.00×
Q4 FY260.75×1.00×
Q1 FY270.73×1.00×
PEG each quarter: the P/E divided by the yearly growth rate of earnings. The flat line marks 1.0. Below it the P/E is smaller than the growth rate; above it the P/E is bigger. Last 21 quarters.
23.9×P/E · higher than 53% of its last 7.8 years
n/mPEG · cannot be worked out, because 3-year earnings growth is not available

Why the multiple is where it is: over the past year earnings per share moved +12.0% while the price moved −31.1%. Earnings did better than the price, which pulled the multiple down within its own range.

Where the price move came from: over 5 years the price moved +27.4% a year; about +16.1% a year came from earnings growth and about +11.3 percentage points from the multiple (the market paying more). The split is approximate (price return minus earnings growth). It shows how much of the move came from the market paying a different multiple.

In short: the multiple is about average against its own past, so the earnings trend underneath matters more than the multiple.

Is the Techno Electric & Engineering Company business getting better or worse?

Techno Electric & Engineering Company Ltd's business is giving mixed signals. There is no clear direction across the growth lines, with ROCE falling at 13.2%; each line tells part of the story. This is based on 12 quarters of 4 measures.

Every business is somewhere on a path of getting better or worse, and this section names where. The last 12 quarters of growth in revenue, profit and earnings per share, plus the return the business earns on its capital, are read as lines. Getting worse: the lines are falling. Turning around: a low point has just formed and the last few quarters are rising from it. Getting better: the rise from the low has lasted. Growing steadily: steady growth with healthy returns. Slowing from a peak: still high, but slowing. When the lines disagree the result is mixed; too little history means no reading. CAGR (compound annual growth rate) is the steady yearly rate that would turn the starting value into the latest one. It is the fairest way to compare growth over different periods. If the 1-year figure is much bigger than the 10-year one, recent growth is running faster than the long-run trend. A dash means there is no figure for that period, or the starting year was a loss, where a growth rate means nothing.

Growth year by year: revenue +43.3% in FY26, profit +12.1%

  • Revenue growth 43.3%
Growth year by year: revenue +43.3% in FY26, profit +12.1%
QuarterRevenue growth
FY17–
FY18969.2%
FY19−23.1%
FY20−11.7%
FY211.5%
FY2213%
FY23−16.9%
FY2481%
FY2551.1%
FY2643.3%

Profit growth, EPS growth

  • Profit growth 12.1%
  • EPS growth 12%
Profit growth, EPS growth
QuarterProfit growthEPS growth
FY17––
FY18267.9%266.7%
FY19−6.3%300%
FY20−7.3%−5.1%
FY211.7%1.5%
FY2245.1%45.1%
FY23−29.2%−27.6%
FY2443.3%43.7%
FY2557.8%45.8%
FY2612.1%12%
Growth on the year before, each year, %. Top: revenue. Below: net profit and earnings per share, on their own scale because profit growth swings much more. Zero line drawn. Turnaround-year jumps are drawn at the edge (▲).

Three growth lines over twelve quarters: revenue rolling over, profit rolling over

  • Revenue 38.7%
Three growth lines over twelve quarters: revenue rolling over, profit rolling over
QuarterRevenue
Sep 202326.2%
Dec 202354.8%
Mar 202467.2%
Jun 202460.4%
Sep 202428.3%
Dec 202437.5%
Mar 202550.9%
Jun 202550.8%
Sep 202578.2%
Dec 202561.6%
Mar 202643.3%
Jun 202638.7%

Profit, EPS

  • Profit −6.5%
  • EPS −6.5%
Profit, EPS
QuarterProfitEPS
Sep 2023−30.5%−28.7%
Dec 20234.6%6.8%
Mar 202443.9%45.7%
Jun 202494.3%95.3%
Sep 202489.5%85.6%
Dec 202445.2%39.7%
Mar 202557.2%48.4%
Jun 202534.8%24.9%
Sep 202530.1%22.7%
Dec 202535%30%
Mar 202612.1%10%
Jun 2026−6.5%−6.5%
Growth on a year earlier, % at each quarter end. Top: revenue. Below: profit and earnings per share, on their own scale because they swing much more. Each is measured over the last 12 months. A gap means there is no reading for that quarter.

ROCE: the return line, worked out each quarter

  • ROCE 13.2%
ROCE: the return line, worked out each quarter
QuarterROCE
Sep 202312.3%
Dec 202314.8%
Mar 202415%
Jun 202418.2%
Sep 202413.5%
Dec 202414.5%
Mar 202516.8%
Jun 202518.2%
Sep 202515.1%
Dec 202515.5%
Mar 202614.2%
Jun 202613.2%
Operating profit over the last 12 months (before interest and tax) as a share of average capital employed (total assets minus current liabilities), %.
Turning downRevenue growth · latest +38.7%, range +26.2% to +78.2%
FallingProfit growth · latest −6.5%, range −30.5% to +94.3%
FallingEPS growth · latest −6.5%, range −28.7% to +95.3%
FallingROCE · latest 13.2%, range 12.3% to 18.2%

Why it matters: when the lines disagree, each line above matters more than any single label.

Compound annual growth rate (%)

Compound annual growth rate over each period, %. Revenue, profit and EPS come from yearly figures; the share price row is price growth over the same periods. A dash means no figure for that period, or the starting year was a loss.

Compound annual growth rate (%)
Measure1yr3yr5yr10yr
Revenue+43.3%+57.6%+29.8%—
Profit+12.1%+36.3%+21.1%—
EPS+12.0%+32.9%+19.8%—
Share price−31.1%+21.7%+27.4%—
+19.8%Revenue growth (Jun 2026) · latest quarter against a year ago
−31.6%Profit growth (Jun 2026) · latest quarter against a year ago
44.3%Revenue, 9 years · yearly growth over the long run

How much does Techno Electric & Engineering Company earn on its capital?

Techno Electric & Engineering Company Ltd earned a ROCE of 15% in FY26. That is up from a low of 8% in FY23. Its return on capital used (ROIC) is 6.2 percentage points above its cost of capital, so growth here adds value, not just size.

Return on capital employed (ROCE) is the profit the whole business earns on all the money in it, from shareholders and lenders together. It is the best single test of whether growth adds value or just size.

It comes from a 14.6% net margin and 0.55× asset turnover (sales divided by assets).

Why the return is what it is (FY26): a 14.6% net margin × 0.55× asset turnover × 1.42× leverage (assets divided by equity) ≈ 11.4% on equity. The margin does its share; borrowing plays a small part, so this return is earned, not borrowed.

The key test, return on capital used minus the cost of capital: 18.2% − 12.0% = +6.2 percentage points. The 12.0% is a standard assumption for the cost of capital in India, not an estimate for this company. Read the sign and size of the gap, not the decimals. A gap this wide means each rupee put back into the business creates more than a rupee of value.

The 18.2% ROIC above is the latest reading, as reported. The yearly chart below shows FY26 at 25.3%, and the quarterly chart works out each 12-month window from the quarterly figures, so the readings differ by date, not by method.

FY26: ROCE 15%, the climb back from FY23's 8%

  • ROCE 15%
  • ROIC (annual) 25.3%
  • Cost of capital 12%
FY26: ROCE 15%, the climb back from FY23's 8%
QuarterROCEROIC (annual)Cost of capital
FY1826%–12%
FY1920%–12%
FY2013%–12%
FY2112%–12%
FY2218%14.4%12%
FY238%8.8%12%
FY2417%24.9%12%
FY2517%30.1%12%
FY2615%25.3%12%
Return on capital employed each year, % (line); ROIC each year, % (line). 9-year window, low years included. The flat line is the 12.0% cost of capital used on this page.

Q4 FY26: ROCE 9.6% (last 12 months) against a 12.0% cost of capital

  • ROCE (12 months) 9.6%
  • ROIC (12 months) 29.2%
  • Cost of capital 12.0%
Q4 FY26: ROCE 9.6% (last 12 months) against a 12.0% cost of capital
QuarterROCE (12 months)ROIC (12 months)Cost of capital
Q2 FY245.5%10.3%12%
Q3 FY24–15.4%12%
Q4 FY248.9%23.2%12%
Q1 FY25–30.1%12%
Q2 FY255.9%31.9%12%
Q3 FY25–28.9%12%
Q4 FY258.1%28.8%12%
Q1 FY26–34.2%12%
Q2 FY269.3%38.7%12%
Q3 FY26–38.3%12%
Q4 FY269.6%35.9%12%
Q1 FY27–29.2%12%
ROCE and ROIC over the last 12 months, each quarter, %; the flat line is the cost of capital. Last 12 quarters, lined up with the yearly figure.

Does Techno Electric & Engineering Company have too much debt?

Techno Electric & Engineering Company Ltd has total debt of ₹72.0 Cr against shareholder equity of ₹4,157 Cr as of Jun 2026, so its debt is 0.02× its equity, which is very little. Year by year, that ratio went from 0.01 in FY25 to 0.02 in FY26.

Debt-to-equity shows how much of the business is paid for with borrowed money. Lower is safer, and the direction matters as much as the level.

So the returns on this page come from the business, not from borrowed money.

FY26: debt ₹72.0 Cr, 0.02× equity

  • Total debt ₹72.0
FY26: debt ₹72.0 Cr, 0.02× equity
QuarterTotal debt
FY25₹39
FY26₹72

Debt-to-equity

  • Debt-to-equity 0.02×
Debt-to-equity
QuarterDebt-to-equity
FY250.01×
FY260.02×
Top: total debt each year, ₹ Cr. Below: debt-to-equity, ×. 2-year window.

Jun 2026: debt ₹72.0 Cr, debt-to-equity 0.02

  • Total debt (quarterly) ₹72.0
Jun 2026: debt ₹72.0 Cr, debt-to-equity 0.02
QuarterTotal debt (quarterly)
Jun 2021₹40
Sep 2021₹40
Dec 2021₹40
Sep 2022₹20
Dec 2022₹20
Mar 2025₹39
Jun 2025₹39
Sep 2025₹61
Dec 2025₹61
Mar 2026₹72
Jun 2026₹72

Debt-to-equity

  • Debt-to-equity 0.02×
Debt-to-equity
QuarterDebt-to-equity
Jun 20210.02×
Sep 20210.02×
Dec 20210.02×
Sep 20220.01×
Dec 20220.01×
Mar 20250.01×
Jun 20250.01×
Sep 20250.02×
Dec 20250.02×
Mar 20260.02×
Jun 20260.02×
Top: total debt each quarter, ₹ Cr. Below: debt-to-equity, ×. Last 11 quarters. Indian companies report the full balance sheet every six months, so the quarter in between repeats the last reading.

What is the Techno Electric & Engineering Company shareholding pattern?

Domestic institutions cut their stake in Techno Electric & Engineering Company Ltd by 2.8 percentage points over 8 quarters, the biggest change among its owners. Domestic institutions now own 21.3% of the company. Foreign institutions moved −1.7 points over the same period, to 8.1%. This uses the four owner groups that companies report every quarter; nothing is guessed between filings.

Who owns the company each quarter: promoters (the founders or controlling owners), foreign institutions, domestic institutions such as mutual funds, and the public. When people close to the business steadily raise their stake, that is worth noticing; a quiet list is also an answer.

Over the last two years: Domestic institutions: −2.8 points over 8 quarters, to 21.3%; Foreign institutions: −1.7 points over 8 quarters, to 8.1%; Promoters: +0.0 points over 8 quarters, to 56.9%.

Why the owners changed: domestic institutions drove it (−2.8 points), together with foreign institutions (−1.7 points). They reduced their stake.

Year ends: promoters −4.6 points from Mar 2024 to Mar 2026

  • Promoters 56.93%
  • Foreign inst. 8.65%
  • Domestic inst. 22.72%
  • Public 11.7%
Year ends: promoters −4.6 points from Mar 2024 to Mar 2026
QuarterPromotersForeign inst.Domestic inst.Public
Mar 202461.52%3.85%23.76%10.86%
Mar 202556.93%9.33%24.5%9.24%
Mar 202656.93%8.65%22.72%11.7%
Shareholding at each year end (March quarter), % of the company. 3 year ends on file.

Domestic institutions cut their stake by 2.8 points over 8 quarters

  • Promoters 56.93%
  • Foreign inst. 8.09%
  • Domestic inst. 21.33%
  • Public 13.66%
Domestic institutions cut their stake by 2.8 points over 8 quarters
QuarterPromotersForeign inst.Domestic inst.Public
Sep 202361.52%2.29%24.58%11.63%
Dec 202361.52%3.21%23.98%11.27%
Mar 202461.52%3.85%23.76%10.86%
Jun 202461.52%4.39%22.78%11.33%
Sep 202456.93%9.8%24.12%9.15%
Dec 202456.93%9.92%24.03%9.12%
Mar 202556.93%9.33%24.5%9.24%
Jun 202556.93%8.98%24.04%10.07%
Sep 202556.93%9.22%22.62%11.24%
Dec 202556.93%8.53%23.05%11.47%
Mar 202656.93%8.65%22.72%11.7%
Jun 202656.93%8.08%21.61%13.39%
Sep 202656.93%8.09%21.33%13.66%
Shareholding by owner group, % of the company, each quarter, last 13 quarters.

How far is Techno Electric & Engineering Company from balance-sheet trouble?

For Techno Electric & Engineering Company Ltd, the Z-score is not available, so we say so rather than guess one. It estimates how far the balance sheet is from trouble; it is not a forecast of failure. The debt, cash-flow and return sections show the balance-sheet figures we do have, each with its own date.

The Z-score estimates how far a company is from balance-sheet trouble. Above about 3 is safe; below about 1.8 is the danger zone. It was built for manufacturers, so it is not used for banks and lenders.

How does Techno Electric & Engineering Company rank in its industry?

41.3 out of 100, rank 5 of 5 in Data Centre, with 81% of the evidence available.

Techno Electric & Engineering Company Ltd scores 41.3 out of 100 against the 5 companies it is compared with in Data Centre, ranking 5. The evidence is balanced: no factor stands out, so another reported quarter is needed before the picture is clearer.

The four parts add up to the total exactly: 9.8 + 12.1 + 11.9 + 7.5 = 41.3. This is the same number shown on the industry page; it is worked out once for the whole group and read here.

What would change it: The score would fall if profit growth turns negative or margins stop improving while the share price lags its sector.

Which companies is Techno Electric & Engineering Company compared with?

Techno Electric & Engineering Company ranks 5 of 5 Data Centre companies on the 4-Factor Sector Score, with 41.3 out of 100.

  1. 1E2E Networks LtdE2E · leader · Evidence leans up · 74% evidence59.4out of 100GrowthCapitalValuationRelative
    How the score adds upGrowth & earnings 27.6/35 · Revenue 100% · Profit 100% · Operating margin change 36 points · 74% evidenceCapital efficiency 9.3/25 · ROCE -0.5% · Operating margin 77% · 100% evidenceValuation 8.5/20 · P/E 91.2× · PEG — · 15% evidenceRelative strength 14.0/20 · Lead over its industry 35% · Lead over NIFTY 500 44.3% · 1 year 68.3% · 100% evidence · 12 of 12 weeks aheadExact sum: 27.6 + 9.3 + 8.5 + 14 = 59.4 · What this means: The evidence is balanced: no factor stands out, so another reported quarter is needed before the picture is clearer.
  2. 2Netweb Technologies India LtdNETWEB · losing its lead · Evidence leans up · 83% evidence54.9out of 100GrowthCapitalValuationRelative
    How the score adds upGrowth & earnings 20.1/35 · Revenue 100% · Profit 100% · Operating margin change 0 points · 100% evidenceCapital efficiency 17.4/25 · ROCE 37.5% · Operating margin 15% · 100% evidenceValuation 9.3/20 · P/E 67.8× · PEG — · 15% evidenceRelative strength 8.1/20 · Lead over its industry -2.2% · Lead over NIFTY 500 9.5% · 1 year 3.3% · 100% evidence · 9 of 12 weeks aheadExact sum: 20.1 + 17.4 + 9.3 + 8.1 = 54.9 · What this means: The evidence is balanced: no factor stands out, so another reported quarter is needed before the picture is clearer.
  3. 3Black Box LtdBBOX · turning · Evidence leans up · 96% evidence51.2out of 100GrowthCapitalValuationRelative
    How the score adds upGrowth & earnings 12.2/35 · Revenue 12.2% · Profit 6.1% · Operating margin change 1 points · 88% evidenceCapital efficiency 15.3/25 · ROCE 21.6% · Operating margin 9% · 100% evidenceValuation 4.5/20 · P/E 49.5× · PEG 2.36 · 100% evidenceRelative strength 19.2/20 · Lead over its industry 8.9% · Lead over NIFTY 500 20.5% · 1 year 50.1% · 100% evidence · 3 of 12 weeks aheadExact sum: 12.2 + 15.3 + 4.5 + 19.2 = 51.2 · What this means: Relative strength against the index is 20.5%, and revenue and profit growth are weak.
  4. 4Anant Raj LtdANANTRAJ · quiet · Evidence leans down · 93% evidence45.2out of 100GrowthCapitalValuationRelative
    How the score adds upGrowth & earnings 22.4/35 · Revenue 12.3% · Profit 21.3% · Operating margin change 3 points · 100% evidenceCapital efficiency 11.8/25 · ROCE 12.1% · Operating margin 30% · 100% evidenceValuation 10.2/20 · P/E 27× · PEG 1.81 · 65% evidenceRelative strength 0.8/20 · Lead over its industry -25.2% · Lead over NIFTY 500 -13.9% · 1 year -30.6% · 100% evidence · 8 of 12 weeks aheadExact sum: 22.4 + 11.8 + 10.2 + 0.8 = 45.2 · What this means: The evidence is balanced: no factor stands out, so another reported quarter is needed before the picture is clearer.
  5. 5Techno Electric & Engineering Company Ltd this pageTECHNOE · quiet · Evidence leans down · 81% evidence41.3out of 100GrowthCapitalValuationRelative
    How the score adds upGrowth & earnings 9.8/35 · Revenue 38.7% · Profit -6.5% · Operating margin change -2 points · 88% evidenceCapital efficiency 12.1/25 · ROCE 14.9% · Operating margin 16% · 100% evidenceValuation 11.9/20 · P/E 22.4× · PEG 1.63 · 100% evidenceRelative strength 7.5/20 · Lead over its industry — · Lead over NIFTY 500 -18.8% · 1 year -37.1% · 25% evidence · 0 of 12 weeks aheadExact sum: 9.8 + 12.1 + 11.9 + 7.5 = 41.3 · What this means: The evidence is balanced: no factor stands out, so another reported quarter is needed before the picture is clearer.

Missing figures are not scored as bad. They lower the confidence and pull the final score toward the middle. Relative strength counts only when the company has a reading for this week; with no reading, that factor is left out and its 20 points are shared across the other three in proportion. PEG is not shown when the ratio cannot mean anything: the company must be making a profit, its price-to-earnings must be positive, and its three-year earnings growth must fall between 5% and 60%. Dividing a price multiple by a loss, or by growth measured off a tiny base, produces a number that looks precise and tells you nothing. Under relative strength, one mark per week shows the last 12 weeks: a mark is filled where the company led NIFTY 500 by 5% or more over the 13 weeks ending that week, which is the same test used everywhere on this site. Price stage places the company on the same six-step path the industry is placed on (basing, turning, breaking out, leader, fading, asleep), read from how many weeks running it has led NIFTY 500 and whether that lead is growing or shrinking. It describes where the share price stands, not the direction of earnings, and it is not a recommendation; it is left blank for a company whose weekly history is too short or too stale to read.

The figures in this ranking come from the industry comparison: results through the Sep 2026 quarter, and the P/E at that quarter's end. The sections above use the latest weekly price, so a P/E or return there can differ a little from the one here. The stage words in this ranking (such as losing its lead or breaking out) describe the lead over the index, not the price phase in the price section.

Related companies: Data Centre, all 5 compared on one page.

Which companies are close to Techno Electric & Engineering Company in size?

Techno Electric & Engineering Company is the 5th largest of 5 Data Centre companies on Sector Alpha by market value (scores of 30 October 2026). Just above it: Netweb Technologies India, Anant Raj, Black Box and E2E Networks. It is the smallest.

Data Centre companies close in size

  1. Netweb Technologies India Ltd ₹24,805 crore
  2. Anant Raj Ltd ₹16,097 crore
  3. Black Box Ltd ₹14,150 crore
  4. E2E Networks Ltd ₹10,698 crore
  5. Techno Electric & Engineering Company Ltd ₹9,645 crore

All 5 Data Centre companies, largest first

Companies close in size in other industries

  1. India Cements Ltd ₹9,672 crore · Cement
  2. Viyash Scientific Ltd ₹9,648 crore · Pharma - Animal
  3. Techno Electric & Engineering Company Ltd ₹9,645 crore
  4. Powergrid Infrastructure Investment Trust ₹9,585 crore · Infrastructure Investment Trusts
  5. Can Fin Homes Ltd ₹9,582 crore · Finance - Housing

What else do people ask about Techno Electric & Engineering Company?

What is Techno Electric & Engineering Company's share price today?

Techno Electric & Engineering Company Ltd's share price is ₹884.40, −31.1% over the past year. The whole company is worth ₹10,290 Cr on the market.

In the last 52 weeks it traded between ₹825 to ₹1,335; today it is 12% of the way up from the low, 16.3% below its 200-day average (as of 4 November 2026).

What were Techno Electric & Engineering Company's latest quarterly results?

Techno Electric & Engineering Company Ltd reported revenue of ₹630 Cr and net profit of ₹93.0 Cr for the Jun 2026 quarter. Revenue rose 19.8% and profit fell 31.6% compared with a year earlier. Earnings per share were ₹8.02 (as of 4 November 2026).

What is Techno Electric & Engineering Company's market cap?

Techno Electric & Engineering Company Ltd's market capitalisation is ₹10,290 Cr at a share price of ₹884.40. Market cap is the share price times the number of shares, so it changes whenever the price moves (as of 4 November 2026).

How is Techno Electric & Engineering Company performing?

Techno Electric & Engineering Company Ltd's share price has been falling for 21 weeks. In its latest quarter, revenue rose 19.8% and profit fell 31.6% compared with a year earlier.

Over the past 13 weeks it has done worse than the NIFTY 500, for 28 weeks running (as of 4 November 2026).

Will Techno Electric & Engineering Company's share price go up?

This page does not forecast Techno Electric & Engineering Company Ltd's share price. What it shows instead: the share price is ₹884.40, and it has been falling for 21 weeks. Its P/E of 23.9× is higher than 53% of its own last 8 years (as of 4 November 2026).

Who owns Techno Electric & Engineering Company?

Promoters own 56.9% of Techno Electric & Engineering Company Ltd, foreign institutions 8.1%, domestic institutions 21.3% and the public 13.7% (latest quarter). The biggest change over the last two years: Domestic institutions cut their stake by 2.8 percentage points over 8 quarters (as of 4 November 2026).

Where is Techno Electric & Engineering Company in its business cycle?

Techno Electric & Engineering Company Ltd's FY26 operating margin was 14.0%, against a 10-year range of 11.0% to 91.0%: the low end of its own range, which is often where recoveries start. The latest quarter was 16.0%.

Comparing margins with a company's own long history is a good way to see where it is in its cycle (as of 4 November 2026).

What could break the Techno Electric & Engineering Company story?

The main question: yearly earnings per share moved +12.0% while the share price moved −31.1%. On price, this page treats a rise as over when the share price closes below its 200-day average on two Fridays in a row (as of 4 November 2026).

Is Techno Electric & Engineering Company a stock worth studying right now?

What the numbers show: Techno Electric & Engineering Company Ltd's share price, valuation and earnings point in different directions. The next one or two quarters should make it clearer. The main open question: whether the price catches up with earnings that have already grown.

Every number on this page is worked out by code from the published figures, with no forecasts and no price opinions (as of 4 November 2026).

Is there a Techno Electric & Engineering Company share price forecast for 2026?

What management itself guided: FY27 revenue at least ₹4,000 crore and top- and bottom-line growth at least 25%; year-end order-book goal ₹4,000 crore likely exceeded; delivery remains H2-weighted.

Where do these numbers come from?

Sector Alpha, written by code from the published numbers. Data as of 4 November 2026.

Every chart on this page is drawn by code from the published figures, with no forecasts and no price opinions.

See the plain-text version of this page.

More lists

Every Sector Alpha list, grouped

X · Instagram · YouTube · About · Newsletter · Newsletter archive
This is research, not advice. We’re not SEBI-registered.