Techno Electric & Engineering Company share price today
Techno Electric & Engineering Company Ltd · NSE: TECHNOE · Data Centre · price as of the 4 November 2026 close, updated every trading day · results updated weekly · research updated 12 August 2026
Techno Electric & Engineering Company share price today: ₹884.40 at the NSE close on 4 November 2026, down 31.1% in a year. Techno Electric & Engineering Company (NSE: TECHNOE) is worth ₹10,290 crore, trades at a P/E of 23.9 and has closed between ₹824.60 and ₹1,334.50 over the past 52 weeks. Latest change: revenue up on a year earlier for 7 quarters in a row.
Techno Electric & Engineering Company Ltd's share price, valuation and earnings point in different directions. The next one or two quarters should make it clearer.
The main question: yearly earnings per share moved +12.0% while the share price moved −31.1%.
The price has been falling for 21 weeks, and the P/E is higher than 53% of its own last 7.8 years. Over the last four quarters, results have been deteriorating, with profit −31.6% on a year earlier, and −29% of the last 3 years' profit came in as cash. What will decide it: whether the price catches up with earnings that have already grown.
Techno Electric & Engineering Company is one of the companies compared in a full read in the Sector Alpha newsletter.
What is the Techno Electric & Engineering Company share price today?
Techno Electric & Engineering Company Ltd's share price was ₹884.40 at the close on 4 November 2026. It has been falling for 21 weeks. That is 16.3% below its average price over the last 200 trading days. Over the past 13 weeks it has done worse than the NIFTY 500, and it has been behind for 28 weeks running.
A share price tends to move through four phases: moving sideways (stage 1), rising (stage 2), stalling near a high (stage 3) and falling (stage 4). Today Techno Electric & Engineering Company Ltd is in stage 4. The phase helps read everything below.
In the last 52 weeks it traded between ₹825 and ₹1,335, and at that close it sat 12% of the way up from that low.
1Y
Nov 2026: ₹884, 16.3% below its 200-day average. The price has been falling for 21 weeks.
- Price ₹884
- 50-day avg ₹949
- 200-day avg ₹1,057
| Week | Price | 50-day avg | 200-day avg |
|---|---|---|---|
| 31 Oct 2025 | ₹1,319 | ₹1,383 | ₹1,358 |
| 7 Nov 2025 | ₹1,283 | ₹1,370 | ₹1,356 |
| 14 Nov 2025 | ₹1,227 | ₹1,350 | ₹1,351 |
| 21 Nov 2025 | ₹1,170 | ₹1,323 | ₹1,344 |
| 28 Nov 2025 | ₹1,205 | ₹1,299 | ₹1,336 |
| 5 Dec 2025 | ₹1,098 | ₹1,270 | ₹1,327 |
| 12 Dec 2025 | ₹1,104 | ₹1,237 | ₹1,315 |
| 19 Dec 2025 | ₹1,093 | ₹1,210 | ₹1,304 |
| 26 Dec 2025 | ₹1,086 | ₹1,194 | ₹1,296 |
| 2 Jan 2026 | ₹1,111 | ₹1,172 | ₹1,285 |
| 9 Jan 2026 | ₹1,007 | ₹1,151 | ₹1,274 |
| 16 Jan 2026 | ₹975 | ₹1,127 | ₹1,263 |
| 23 Jan 2026 | ₹893 | ₹1,089 | ₹1,246 |
| 1 Feb 2026 | ₹996 | ₹1,064 | ₹1,232 |
| 6 Feb 2026 | ₹1,036 | ₹1,059 | ₹1,222 |
| 13 Feb 2026 | ₹1,049 | ₹1,064 | ₹1,216 |
| 20 Feb 2026 | ₹1,144 | ₹1,073 | ₹1,211 |
| 27 Feb 2026 | ₹1,173 | ₹1,091 | ₹1,208 |
| 6 Mar 2026 | ₹1,120 | ₹1,097 | ₹1,206 |
| 13 Mar 2026 | ₹1,087 | ₹1,097 | ₹1,200 |
| 20 Mar 2026 | ₹1,090 | ₹1,096 | ₹1,195 |
| 27 Mar 2026 | ₹1,032 | ₹1,089 | ₹1,189 |
| 17 Apr 2026 | ₹1,234 | ₹1,097 | ₹1,179 |
| 24 Apr 2026 | ₹1,224 | ₹1,124 | ₹1,183 |
| 30 Apr 2026 | ₹1,283 | ₹1,147 | ₹1,186 |
| 8 May 2026 | ₹1,257 | ₹1,171 | ₹1,191 |
| 15 May 2026 | ₹1,196 | ₹1,179 | ₹1,192 |
| 22 May 2026 | ₹1,335 | ₹1,191 | ₹1,195 |
| 29 May 2026 | ₹1,079 | ₹1,189 | ₹1,194 |
| 4 Jun 2026 | ₹1,011 | ₹1,167 | ₹1,188 |
| 5 Jun 2026 | ₹1,017 | ₹1,161 | ₹1,186 |
| 10 Jun 2026 | ₹992 | ₹1,143 | ₹1,181 |
| 12 Jun 2026 | ₹1,039 | ₹1,134 | ₹1,178 |
| 17 Jun 2026 | ₹1,085 | ₹1,128 | ₹1,175 |
| 19 Jun 2026 | ₹1,079 | ₹1,124 | ₹1,173 |
| 24 Jun 2026 | ₹1,074 | ₹1,120 | ₹1,171 |
| 25 Jun 2026 | ₹1,087 | ₹1,119 | ₹1,170 |
| 1 Jul 2026 | ₹1,082 | ₹1,114 | ₹1,167 |
| 3 Jul 2026 | ₹1,082 | ₹1,111 | ₹1,165 |
| 10 Jul 2026 | ₹1,050 | ₹1,102 | ₹1,160 |
| 17 Jul 2026 | ₹1,034 | ₹1,091 | ₹1,154 |
| 24 Jul 2026 | ₹992 | ₹1,076 | ₹1,147 |
| 31 Jul 2026 | ₹980 | ₹1,059 | ₹1,139 |
| 7 Aug 2026 | ₹1,066 | ₹1,050 | ₹1,133 |
| 14 Aug 2026 | ₹968 | ₹1,043 | ₹1,127 |
| 21 Aug 2026 | ₹987 | ₹1,033 | ₹1,120 |
| 28 Aug 2026 | ₹1,026 | ₹1,028 | ₹1,114 |
| 4 Sep 2026 | ₹980 | ₹1,018 | ₹1,108 |
| 11 Sep 2026 | ₹972 | ₹1,010 | ₹1,101 |
| 18 Sep 2026 | ₹1,030 | ₹1,006 | ₹1,097 |
| 25 Sep 2026 | ₹1,006 | ₹1,006 | ₹1,092 |
| 1 Oct 2026 | ₹999 | ₹1,005 | ₹1,088 |
| 9 Oct 2026 | ₹955 | ₹999 | ₹1,083 |
| 16 Oct 2026 | ₹947 | ₹990 | ₹1,076 |
| 23 Oct 2026 | ₹825 | ₹973 | ₹1,069 |
| 30 Oct 2026 | ₹829 | ₹949 | ₹1,057 |
| 4 Nov 2026 | ₹884 | ₹949 | ₹1,057 |
3Y
Nov 2026: ₹884, 16.3% below its 200-day average. The price has been falling for 21 weeks.
- Price ₹884
- 50-day avg ₹949
- 200-day avg ₹1,057
| Week | Price | 50-day avg | 200-day avg |
|---|---|---|---|
| 3 Nov 2023 | ₹490 | ₹501 | ₹428 |
| 12 Nov 2023 | ₹615 | ₹515 | ₹436 |
| 17 Nov 2023 | ₹672 | ₹533 | ₹444 |
| 24 Nov 2023 | ₹685 | ₹564 | ₹456 |
| 1 Dec 2023 | ₹706 | ₹585 | ₹466 |
| 8 Dec 2023 | ₹764 | ₹614 | ₹480 |
| 15 Dec 2023 | ₹767 | ₹641 | ₹494 |
| 22 Dec 2023 | ₹754 | ₹660 | ₹506 |
| 29 Dec 2023 | ₹800 | ₹676 | ₹516 |
| 5 Jan 2024 | ₹803 | ₹701 | ₹531 |
| 12 Jan 2024 | ₹798 | ₹718 | ₹543 |
| 20 Jan 2024 | ₹807 | ₹732 | ₹557 |
| 25 Jan 2024 | ₹803 | ₹740 | ₹565 |
| 2 Feb 2024 | ₹766 | ₹750 | ₹576 |
| 9 Feb 2024 | ₹797 | ₹756 | ₹586 |
| 16 Feb 2024 | ₹831 | ₹762 | ₹596 |
| 23 Feb 2024 | ₹762 | ₹765 | ₹605 |
| 2 Mar 2024 | ₹747 | ₹758 | ₹612 |
| 7 Mar 2024 | ₹742 | ₹755 | ₹617 |
| 15 Mar 2024 | ₹651 | ₹739 | ₹620 |
| 22 Mar 2024 | ₹706 | ₹724 | ₹621 |
| 28 Mar 2024 | ₹772 | ₹727 | ₹625 |
| 5 Apr 2024 | ₹838 | ₹743 | ₹634 |
| 12 Apr 2024 | ₹819 | ₹756 | ₹642 |
| 19 Apr 2024 | ₹923 | ₹774 | ₹651 |
| 26 Apr 2024 | ₹969 | ₹808 | ₹667 |
| 3 May 2024 | ₹1,021 | ₹840 | ₹681 |
| 10 May 2024 | ₹1,031 | ₹871 | ₹697 |
| 18 May 2024 | ₹1,118 | ₹920 | ₹720 |
| 24 May 2024 | ₹1,177 | ₹954 | ₹737 |
| 31 May 2024 | ₹1,418 | ₹995 | ₹758 |
| 7 Jun 2024 | ₹1,231 | ₹1,052 | ₹785 |
| 14 Jun 2024 | ₹1,457 | ₹1,113 | ₹815 |
| 21 Jun 2024 | ₹1,442 | ₹1,163 | ₹840 |
| 28 Jun 2024 | ₹1,553 | ₹1,230 | ₹873 |
| 5 Jul 2024 | ₹1,475 | ₹1,282 | ₹905 |
| 12 Jul 2024 | ₹1,447 | ₹1,320 | ₹933 |
| 19 Jul 2024 | ₹1,478 | ₹1,345 | ₹955 |
| 26 Jul 2024 | ₹1,688 | ₹1,395 | ₹988 |
| 2 Aug 2024 | ₹1,710 | ₹1,447 | ₹1,021 |
| 9 Aug 2024 | ₹1,648 | ₹1,479 | ₹1,051 |
| 16 Aug 2024 | ₹1,647 | ₹1,502 | ₹1,074 |
| 23 Aug 2024 | ₹1,693 | ₹1,539 | ₹1,104 |
| 30 Aug 2024 | ₹1,635 | ₹1,562 | ₹1,132 |
| 6 Sep 2024 | ₹1,554 | ₹1,569 | ₹1,155 |
| 13 Sep 2024 | ₹1,601 | ₹1,578 | ₹1,178 |
| 20 Sep 2024 | ₹1,519 | ₹1,574 | ₹1,196 |
| 27 Sep 2024 | ₹1,631 | ₹1,577 | ₹1,215 |
| 4 Oct 2024 | ₹1,530 | ₹1,576 | ₹1,229 |
| 11 Oct 2024 | ₹1,720 | ₹1,591 | ₹1,250 |
| 18 Oct 2024 | ₹1,731 | ₹1,621 | ₹1,275 |
| 25 Oct 2024 | ₹1,471 | ₹1,610 | ₹1,289 |
| 1 Nov 2024 | ₹1,594 | ₹1,594 | ₹1,300 |
| 8 Nov 2024 | ₹1,617 | ₹1,598 | ₹1,315 |
| 14 Nov 2024 | ₹1,445 | ₹1,582 | ₹1,322 |
| 22 Nov 2024 | ₹1,487 | ₹1,566 | ₹1,328 |
| 29 Nov 2024 | ₹1,474 | ₹1,549 | ₹1,335 |
| 6 Dec 2024 | ₹1,504 | ₹1,541 | ₹1,343 |
| 13 Dec 2024 | ₹1,444 | ₹1,524 | ₹1,348 |
| 20 Dec 2024 | ₹1,625 | ₹1,529 | ₹1,358 |
| 27 Dec 2024 | ₹1,560 | ₹1,537 | ₹1,367 |
| 3 Jan 2025 | ₹1,641 | ₹1,556 | ₹1,380 |
| 10 Jan 2025 | ₹1,399 | ₹1,546 | ₹1,387 |
| 17 Jan 2025 | ₹1,289 | ₹1,501 | ₹1,382 |
| 24 Jan 2025 | ₹1,110 | ₹1,450 | ₹1,374 |
| 1 Feb 2025 | ₹1,043 | ₹1,368 | ₹1,356 |
| 7 Feb 2025 | ₹1,088 | ₹1,316 | ₹1,343 |
| 14 Feb 2025 | ₹926 | ₹1,255 | ₹1,325 |
| 21 Feb 2025 | ₹1,000 | ₹1,202 | ₹1,308 |
| 28 Feb 2025 | ₹974 | ₹1,167 | ₹1,294 |
| 7 Mar 2025 | ₹957 | ₹1,128 | ₹1,277 |
| 13 Mar 2025 | ₹901 | ₹1,095 | ₹1,263 |
| 21 Mar 2025 | ₹1,035 | ₹1,075 | ₹1,249 |
| 28 Mar 2025 | ₹1,003 | ₹1,065 | ₹1,238 |
| 4 Apr 2025 | ₹981 | ₹1,057 | ₹1,229 |
| 11 Apr 2025 | ₹988 | ₹1,040 | ₹1,218 |
| 17 Apr 2025 | ₹1,058 | ₹1,040 | ₹1,212 |
| 25 Apr 2025 | ₹1,101 | ₹1,055 | ₹1,208 |
| 2 May 2025 | ₹1,066 | ₹1,058 | ₹1,203 |
| 9 May 2025 | ₹1,083 | ₹1,061 | ₹1,197 |
| 16 May 2025 | ₹1,280 | ₹1,084 | ₹1,196 |
| 23 May 2025 | ₹1,218 | ₹1,112 | ₹1,198 |
| 30 May 2025 | ₹1,410 | ₹1,158 | ₹1,206 |
| 6 Jun 2025 | ₹1,484 | ₹1,218 | ₹1,220 |
| 13 Jun 2025 | ₹1,454 | ₹1,269 | ₹1,234 |
| 20 Jun 2025 | ₹1,481 | ₹1,309 | ₹1,246 |
| 27 Jun 2025 | ₹1,592 | ₹1,350 | ₹1,260 |
| 4 Jul 2025 | ₹1,576 | ₹1,394 | ₹1,277 |
| 11 Jul 2025 | ₹1,598 | ₹1,432 | ₹1,293 |
| 18 Jul 2025 | ₹1,527 | ₹1,453 | ₹1,305 |
| 25 Jul 2025 | ₹1,442 | ₹1,459 | ₹1,314 |
| 1 Aug 2025 | ₹1,419 | ₹1,456 | ₹1,320 |
| 8 Aug 2025 | ₹1,380 | ₹1,446 | ₹1,324 |
| 14 Aug 2025 | ₹1,494 | ₹1,443 | ₹1,328 |
| 22 Aug 2025 | ₹1,545 | ₹1,451 | ₹1,336 |
| 29 Aug 2025 | ₹1,513 | ₹1,463 | ₹1,343 |
| 5 Sep 2025 | ₹1,506 | ₹1,474 | ₹1,352 |
| 12 Sep 2025 | ₹1,442 | ₹1,475 | ₹1,359 |
| 19 Sep 2025 | ₹1,417 | ₹1,468 | ₹1,362 |
| 26 Sep 2025 | ₹1,278 | ₹1,450 | ₹1,363 |
| 3 Oct 2025 | ₹1,372 | ₹1,435 | ₹1,362 |
| 10 Oct 2025 | ₹1,368 | ₹1,418 | ₹1,361 |
| 17 Oct 2025 | ₹1,324 | ₹1,405 | ₹1,360 |
| 24 Oct 2025 | ₹1,312 | ₹1,394 | ₹1,359 |
| 31 Oct 2025 | ₹1,319 | ₹1,383 | ₹1,358 |
| 7 Nov 2025 | ₹1,283 | ₹1,370 | ₹1,356 |
| 14 Nov 2025 | ₹1,227 | ₹1,350 | ₹1,351 |
| 21 Nov 2025 | ₹1,170 | ₹1,323 | ₹1,344 |
| 28 Nov 2025 | ₹1,205 | ₹1,299 | ₹1,336 |
| 5 Dec 2025 | ₹1,098 | ₹1,270 | ₹1,327 |
| 12 Dec 2025 | ₹1,104 | ₹1,237 | ₹1,315 |
| 19 Dec 2025 | ₹1,093 | ₹1,210 | ₹1,304 |
| 26 Dec 2025 | ₹1,086 | ₹1,194 | ₹1,296 |
| 2 Jan 2026 | ₹1,111 | ₹1,172 | ₹1,285 |
| 9 Jan 2026 | ₹1,007 | ₹1,151 | ₹1,274 |
| 16 Jan 2026 | ₹975 | ₹1,127 | ₹1,263 |
| 23 Jan 2026 | ₹893 | ₹1,089 | ₹1,246 |
| 1 Feb 2026 | ₹996 | ₹1,064 | ₹1,232 |
| 6 Feb 2026 | ₹1,036 | ₹1,059 | ₹1,222 |
| 13 Feb 2026 | ₹1,049 | ₹1,064 | ₹1,216 |
| 20 Feb 2026 | ₹1,144 | ₹1,073 | ₹1,211 |
| 27 Feb 2026 | ₹1,173 | ₹1,091 | ₹1,208 |
| 6 Mar 2026 | ₹1,120 | ₹1,097 | ₹1,206 |
| 13 Mar 2026 | ₹1,087 | ₹1,097 | ₹1,200 |
| 20 Mar 2026 | ₹1,090 | ₹1,096 | ₹1,195 |
| 27 Mar 2026 | ₹1,032 | ₹1,089 | ₹1,189 |
| 17 Apr 2026 | ₹1,234 | ₹1,097 | ₹1,179 |
| 24 Apr 2026 | ₹1,224 | ₹1,124 | ₹1,183 |
| 30 Apr 2026 | ₹1,283 | ₹1,147 | ₹1,186 |
| 8 May 2026 | ₹1,257 | ₹1,171 | ₹1,191 |
| 15 May 2026 | ₹1,196 | ₹1,179 | ₹1,192 |
| 22 May 2026 | ₹1,335 | ₹1,191 | ₹1,195 |
| 29 May 2026 | ₹1,079 | ₹1,189 | ₹1,194 |
| 4 Jun 2026 | ₹1,011 | ₹1,167 | ₹1,188 |
| 5 Jun 2026 | ₹1,017 | ₹1,161 | ₹1,186 |
| 10 Jun 2026 | ₹992 | ₹1,143 | ₹1,181 |
| 12 Jun 2026 | ₹1,039 | ₹1,134 | ₹1,178 |
| 17 Jun 2026 | ₹1,085 | ₹1,128 | ₹1,175 |
| 19 Jun 2026 | ₹1,079 | ₹1,124 | ₹1,173 |
| 24 Jun 2026 | ₹1,074 | ₹1,120 | ₹1,171 |
| 25 Jun 2026 | ₹1,087 | ₹1,119 | ₹1,170 |
| 1 Jul 2026 | ₹1,082 | ₹1,114 | ₹1,167 |
| 3 Jul 2026 | ₹1,082 | ₹1,111 | ₹1,165 |
| 10 Jul 2026 | ₹1,050 | ₹1,102 | ₹1,160 |
| 17 Jul 2026 | ₹1,034 | ₹1,091 | ₹1,154 |
| 24 Jul 2026 | ₹992 | ₹1,076 | ₹1,147 |
| 31 Jul 2026 | ₹980 | ₹1,059 | ₹1,139 |
| 7 Aug 2026 | ₹1,066 | ₹1,050 | ₹1,133 |
| 14 Aug 2026 | ₹968 | ₹1,043 | ₹1,127 |
| 21 Aug 2026 | ₹987 | ₹1,033 | ₹1,120 |
| 28 Aug 2026 | ₹1,026 | ₹1,028 | ₹1,114 |
| 4 Sep 2026 | ₹980 | ₹1,018 | ₹1,108 |
| 11 Sep 2026 | ₹972 | ₹1,010 | ₹1,101 |
| 18 Sep 2026 | ₹1,030 | ₹1,006 | ₹1,097 |
| 25 Sep 2026 | ₹1,006 | ₹1,006 | ₹1,092 |
| 1 Oct 2026 | ₹999 | ₹1,005 | ₹1,088 |
| 9 Oct 2026 | ₹955 | ₹999 | ₹1,083 |
| 16 Oct 2026 | ₹947 | ₹990 | ₹1,076 |
| 23 Oct 2026 | ₹825 | ₹973 | ₹1,069 |
| 30 Oct 2026 | ₹829 | ₹949 | ₹1,057 |
| 4 Nov 2026 | ₹884 | ₹949 | ₹1,057 |
5Y
Nov 2026: ₹884, 16.3% below its 200-day average. The price has been falling for 21 weeks.
- Price ₹884
- 50-day avg ₹949
- 200-day avg ₹1,057
| Week | Price | 50-day avg | 200-day avg |
|---|---|---|---|
| 29 Oct 2021 | ₹258 | ₹279 | ₹282 |
| 12 Nov 2021 | ₹253 | ₹273 | ₹280 |
| 26 Nov 2021 | ₹243 | ₹267 | ₹278 |
| 10 Dec 2021 | ₹235 | ₹255 | ₹273 |
| 24 Dec 2021 | ₹229 | ₹249 | ₹270 |
| 7 Jan 2022 | ₹246 | ₹247 | ₹267 |
| 21 Jan 2022 | ₹247 | ₹250 | ₹266 |
| 4 Feb 2022 | ₹253 | ₹249 | ₹264 |
| 18 Feb 2022 | ₹260 | ₹249 | ₹263 |
| 4 Mar 2022 | ₹235 | ₹247 | ₹261 |
| 17 Mar 2022 | ₹235 | ₹244 | ₹259 |
| 1 Apr 2022 | ₹256 | ₹244 | ₹258 |
| 13 Apr 2022 | ₹276 | ₹251 | ₹258 |
| 29 Apr 2022 | ₹289 | ₹263 | ₹261 |
| 13 May 2022 | ₹267 | ₹270 | ₹263 |
| 27 May 2022 | ₹267 | ₹273 | ₹265 |
| 10 Jun 2022 | ₹287 | ₹276 | ₹267 |
| 24 Jun 2022 | ₹281 | ₹273 | ₹267 |
| 8 Jul 2022 | ₹307 | ₹281 | ₹269 |
| 22 Jul 2022 | ₹298 | ₹288 | ₹272 |
| 5 Aug 2022 | ₹291 | ₹289 | ₹274 |
| 19 Aug 2022 | ₹284 | ₹290 | ₹276 |
| 2 Sep 2022 | ₹287 | ₹289 | ₹277 |
| 16 Sep 2022 | ₹278 | ₹288 | ₹278 |
| 30 Sep 2022 | ₹264 | ₹282 | ₹277 |
| 14 Oct 2022 | ₹280 | ₹281 | ₹277 |
| 28 Oct 2022 | ₹281 | ₹281 | ₹277 |
| 11 Nov 2022 | ₹286 | ₹283 | ₹278 |
| 25 Nov 2022 | ₹300 | ₹286 | ₹279 |
| 9 Dec 2022 | ₹320 | ₹296 | ₹283 |
| 23 Dec 2022 | ₹311 | ₹304 | ₹286 |
| 6 Jan 2023 | ₹364 | ₹315 | ₹291 |
| 20 Jan 2023 | ₹366 | ₹331 | ₹298 |
| 3 Feb 2023 | ₹342 | ₹337 | ₹303 |
| 17 Feb 2023 | ₹362 | ₹345 | ₹308 |
| 3 Mar 2023 | ₹338 | ₹341 | ₹311 |
| 17 Mar 2023 | ₹336 | ₹338 | ₹312 |
| 31 Mar 2023 | ₹338 | ₹335 | ₹314 |
| 13 Apr 2023 | ₹338 | ₹336 | ₹316 |
| 28 Apr 2023 | ₹372 | ₹341 | ₹319 |
| 12 May 2023 | ₹369 | ₹350 | ₹323 |
| 26 May 2023 | ₹401 | ₹361 | ₹329 |
| 9 Jun 2023 | ₹369 | ₹366 | ₹334 |
| 23 Jun 2023 | ₹353 | ₹364 | ₹336 |
| 7 Jul 2023 | ₹396 | ₹367 | ₹339 |
| 21 Jul 2023 | ₹457 | ₹388 | ₹348 |
| 4 Aug 2023 | ₹463 | ₹417 | ₹360 |
| 18 Aug 2023 | ₹483 | ₹434 | ₹370 |
| 1 Sep 2023 | ₹535 | ₹458 | ₹383 |
| 15 Sep 2023 | ₹513 | ₹482 | ₹397 |
| 29 Sep 2023 | ₹505 | ₹491 | ₹407 |
| 13 Oct 2023 | ₹517 | ₹499 | ₹416 |
| 27 Oct 2023 | ₹509 | ₹503 | ₹425 |
| 12 Nov 2023 | ₹615 | ₹515 | ₹436 |
| 24 Nov 2023 | ₹685 | ₹564 | ₹456 |
| 8 Dec 2023 | ₹764 | ₹614 | ₹480 |
| 22 Dec 2023 | ₹754 | ₹660 | ₹506 |
| 5 Jan 2024 | ₹803 | ₹701 | ₹531 |
| 20 Jan 2024 | ₹807 | ₹732 | ₹557 |
| 2 Feb 2024 | ₹766 | ₹750 | ₹576 |
| 16 Feb 2024 | ₹831 | ₹762 | ₹596 |
| 2 Mar 2024 | ₹747 | ₹758 | ₹612 |
| 15 Mar 2024 | ₹651 | ₹739 | ₹620 |
| 28 Mar 2024 | ₹772 | ₹727 | ₹625 |
| 12 Apr 2024 | ₹819 | ₹756 | ₹642 |
| 26 Apr 2024 | ₹969 | ₹808 | ₹667 |
| 10 May 2024 | ₹1,031 | ₹871 | ₹697 |
| 24 May 2024 | ₹1,177 | ₹954 | ₹737 |
| 7 Jun 2024 | ₹1,231 | ₹1,052 | ₹785 |
| 21 Jun 2024 | ₹1,442 | ₹1,163 | ₹840 |
| 5 Jul 2024 | ₹1,475 | ₹1,282 | ₹905 |
| 19 Jul 2024 | ₹1,478 | ₹1,345 | ₹955 |
| 2 Aug 2024 | ₹1,710 | ₹1,447 | ₹1,021 |
| 16 Aug 2024 | ₹1,647 | ₹1,502 | ₹1,074 |
| 30 Aug 2024 | ₹1,635 | ₹1,562 | ₹1,132 |
| 13 Sep 2024 | ₹1,601 | ₹1,578 | ₹1,178 |
| 27 Sep 2024 | ₹1,631 | ₹1,577 | ₹1,215 |
| 11 Oct 2024 | ₹1,720 | ₹1,591 | ₹1,250 |
| 25 Oct 2024 | ₹1,471 | ₹1,610 | ₹1,289 |
| 8 Nov 2024 | ₹1,617 | ₹1,598 | ₹1,315 |
| 22 Nov 2024 | ₹1,487 | ₹1,566 | ₹1,328 |
| 6 Dec 2024 | ₹1,504 | ₹1,541 | ₹1,343 |
| 20 Dec 2024 | ₹1,625 | ₹1,529 | ₹1,358 |
| 3 Jan 2025 | ₹1,641 | ₹1,556 | ₹1,380 |
| 17 Jan 2025 | ₹1,289 | ₹1,501 | ₹1,382 |
| 1 Feb 2025 | ₹1,043 | ₹1,368 | ₹1,356 |
| 14 Feb 2025 | ₹926 | ₹1,255 | ₹1,325 |
| 28 Feb 2025 | ₹974 | ₹1,167 | ₹1,294 |
| 13 Mar 2025 | ₹901 | ₹1,095 | ₹1,263 |
| 28 Mar 2025 | ₹1,003 | ₹1,065 | ₹1,238 |
| 11 Apr 2025 | ₹988 | ₹1,040 | ₹1,218 |
| 25 Apr 2025 | ₹1,101 | ₹1,055 | ₹1,208 |
| 9 May 2025 | ₹1,083 | ₹1,061 | ₹1,197 |
| 23 May 2025 | ₹1,218 | ₹1,112 | ₹1,198 |
| 6 Jun 2025 | ₹1,484 | ₹1,218 | ₹1,220 |
| 20 Jun 2025 | ₹1,481 | ₹1,309 | ₹1,246 |
| 4 Jul 2025 | ₹1,576 | ₹1,394 | ₹1,277 |
| 18 Jul 2025 | ₹1,527 | ₹1,453 | ₹1,305 |
| 1 Aug 2025 | ₹1,419 | ₹1,456 | ₹1,320 |
| 14 Aug 2025 | ₹1,494 | ₹1,443 | ₹1,328 |
| 29 Aug 2025 | ₹1,513 | ₹1,463 | ₹1,343 |
| 12 Sep 2025 | ₹1,442 | ₹1,475 | ₹1,359 |
| 26 Sep 2025 | ₹1,278 | ₹1,450 | ₹1,363 |
| 10 Oct 2025 | ₹1,368 | ₹1,418 | ₹1,361 |
| 24 Oct 2025 | ₹1,312 | ₹1,394 | ₹1,359 |
| 7 Nov 2025 | ₹1,283 | ₹1,370 | ₹1,356 |
| 21 Nov 2025 | ₹1,170 | ₹1,323 | ₹1,344 |
| 5 Dec 2025 | ₹1,098 | ₹1,270 | ₹1,327 |
| 19 Dec 2025 | ₹1,093 | ₹1,210 | ₹1,304 |
| 2 Jan 2026 | ₹1,111 | ₹1,172 | ₹1,285 |
| 16 Jan 2026 | ₹975 | ₹1,127 | ₹1,263 |
| 1 Feb 2026 | ₹996 | ₹1,064 | ₹1,232 |
| 13 Feb 2026 | ₹1,049 | ₹1,064 | ₹1,216 |
| 27 Feb 2026 | ₹1,173 | ₹1,091 | ₹1,208 |
| 13 Mar 2026 | ₹1,087 | ₹1,097 | ₹1,200 |
| 27 Mar 2026 | ₹1,032 | ₹1,089 | ₹1,189 |
| 24 Apr 2026 | ₹1,224 | ₹1,124 | ₹1,183 |
| 8 May 2026 | ₹1,257 | ₹1,171 | ₹1,191 |
| 22 May 2026 | ₹1,335 | ₹1,191 | ₹1,195 |
| 4 Jun 2026 | ₹1,011 | ₹1,167 | ₹1,188 |
| 10 Jun 2026 | ₹992 | ₹1,143 | ₹1,181 |
| 17 Jun 2026 | ₹1,085 | ₹1,128 | ₹1,175 |
| 24 Jun 2026 | ₹1,074 | ₹1,120 | ₹1,171 |
| 1 Jul 2026 | ₹1,082 | ₹1,114 | ₹1,167 |
| 10 Jul 2026 | ₹1,050 | ₹1,102 | ₹1,160 |
| 24 Jul 2026 | ₹992 | ₹1,076 | ₹1,147 |
| 7 Aug 2026 | ₹1,066 | ₹1,050 | ₹1,133 |
| 21 Aug 2026 | ₹987 | ₹1,033 | ₹1,120 |
| 4 Sep 2026 | ₹980 | ₹1,018 | ₹1,108 |
| 18 Sep 2026 | ₹1,030 | ₹1,006 | ₹1,097 |
| 1 Oct 2026 | ₹999 | ₹1,005 | ₹1,088 |
| 16 Oct 2026 | ₹947 | ₹990 | ₹1,076 |
| 30 Oct 2026 | ₹829 | ₹949 | ₹1,057 |
| 4 Nov 2026 | ₹884 | ₹949 | ₹1,057 |
Price stage: Rising from Oct 2025 to Nov 2025; Falling from Nov 2025 to May 2026; Sideways in Jun 2026; Falling from Jun 2026 to Oct 2026.
Price stage: Rising from Nov 2023 to Feb 2025; Falling from Feb 2025 to Jun 2025; Rising from Jul 2025 to Nov 2025; Falling from Nov 2025 to May 2026; Sideways in Jun 2026; Falling from Jun 2026 to Oct 2026.
Price stage: Falling from Oct 2021 to May 2022; Rising from Jun 2022 to Oct 2022; Sideways from Oct 2022 to Nov 2022; Rising from Dec 2022 to Feb 2025; Falling from Feb 2025 to Jun 2025; Rising from Jul 2025 to Nov 2025; Falling from Nov 2025 to Oct 2026.
Week by week since 2018: did it beat the NIFTY 500 over the past 13 weeks?
Ahead in 206 of 404 weeks
| Week | 13-week return vs NIFTY 500 |
|---|---|
| 7 Dec 2018 | no NIFTY 500 reading |
| 14 Dec 2018 | no NIFTY 500 reading |
| 21 Dec 2018 | no NIFTY 500 reading |
| 28 Dec 2018 | no NIFTY 500 reading |
| 4 Jan 2019 | no NIFTY 500 reading |
| 11 Jan 2019 | no NIFTY 500 reading |
| 18 Jan 2019 | no NIFTY 500 reading |
| 25 Jan 2019 | no NIFTY 500 reading |
| 1 Feb 2019 | no NIFTY 500 reading |
| 8 Feb 2019 | no NIFTY 500 reading |
| 15 Feb 2019 | no NIFTY 500 reading |
| 22 Feb 2019 | no NIFTY 500 reading |
| 1 Mar 2019 | no NIFTY 500 reading |
| 8 Mar 2019 | −10.4% |
| 15 Mar 2019 | −7.0% |
| 22 Mar 2019 | −5.0% |
| 29 Mar 2019 | −0.5% |
| 5 Apr 2019 | +4.4% |
| 12 Apr 2019 | +2.3% |
| 18 Apr 2019 | +0.7% |
| 26 Apr 2019 | −13.0% |
| 3 May 2019 | −3.4% |
| 10 May 2019 | −2.3% |
| 17 May 2019 | −11.4% |
| 24 May 2019 | −22.0% |
| 31 May 2019 | +0.1% |
| 7 Jun 2019 | +5.3% |
| 14 Jun 2019 | −2.4% |
| 21 Jun 2019 | −11.1% |
| 28 Jun 2019 | −3.0% |
| 5 Jul 2019 | +5.2% |
| 12 Jul 2019 | +1.2% |
| 19 Jul 2019 | +3.8% |
| 26 Jul 2019 | +13.8% |
| 2 Aug 2019 | +11.2% |
| 9 Aug 2019 | +9.3% |
| 16 Aug 2019 | +16.3% |
| 23 Aug 2019 | +15.5% |
| 30 Aug 2019 | +11.7% |
| 6 Sep 2019 | +7.8% |
| 13 Sep 2019 | +14.0% |
| 20 Sep 2019 | +17.0% |
| 27 Sep 2019 | +3.8% |
| 4 Oct 2019 | +3.5% |
| 11 Oct 2019 | +5.9% |
| 18 Oct 2019 | −0.8% |
| 27 Oct 2019 | −4.2% |
| 1 Nov 2019 | −1.9% |
| 8 Nov 2019 | −2.6% |
| 15 Nov 2019 | −3.2% |
| 22 Nov 2019 | −5.7% |
| 29 Nov 2019 | −4.2% |
| 6 Dec 2019 | −0.2% |
| 13 Dec 2019 | −4.3% |
| 20 Dec 2019 | +0.4% |
| 27 Dec 2019 | −0.5% |
| 3 Jan 2020 | −4.5% |
| 10 Jan 2020 | −2.4% |
| 17 Jan 2020 | +5.9% |
| 24 Jan 2020 | +10.7% |
| 1 Feb 2020 | +7.2% |
| 7 Feb 2020 | +9.9% |
| 14 Feb 2020 | +9.1% |
| 20 Feb 2020 | +17.4% |
| 28 Feb 2020 | +16.3% |
| 6 Mar 2020 | +18.8% |
| 13 Mar 2020 | +24.4% |
| 20 Mar 2020 | +8.6% |
| 27 Mar 2020 | +2.4% |
| 3 Apr 2020 | +4.7% |
| 9 Apr 2020 | +5.2% |
| 17 Apr 2020 | +0.4% |
| 24 Apr 2020 | −9.4% |
| 30 Apr 2020 | −7.1% |
| 8 May 2020 | −10.1% |
| 15 May 2020 | −8.6% |
| 22 May 2020 | −14.2% |
| 29 May 2020 | −28.0% |
| 5 Jun 2020 | −29.5% |
| 12 Jun 2020 | −43.6% |
| 19 Jun 2020 | −35.3% |
| 26 Jun 2020 | −28.1% |
| 3 Jul 2020 | −36.0% |
| 10 Jul 2020 | −36.5% |
| 17 Jul 2020 | −40.4% |
| 24 Jul 2020 | −31.2% |
| 31 Jul 2020 | −32.2% |
| 7 Aug 2020 | −33.3% |
| 14 Aug 2020 | −34.8% |
| 21 Aug 2020 | −23.3% |
| 28 Aug 2020 | +3.9% |
| 4 Sep 2020 | −7.6% |
| 11 Sep 2020 | −11.4% |
| 18 Sep 2020 | −2.8% |
| 25 Sep 2020 | −10.5% |
| 1 Oct 2020 | −3.5% |
| 9 Oct 2020 | −7.6% |
| 16 Oct 2020 | −0.1% |
| 23 Oct 2020 | +4.1% |
| 30 Oct 2020 | +0.0% |
| 6 Nov 2020 | +1.1% |
| 14 Nov 2020 | +3.9% |
| 20 Nov 2020 | −3.3% |
| 27 Nov 2020 | −14.7% |
| 4 Dec 2020 | −14.1% |
| 11 Dec 2020 | −8.3% |
| 18 Dec 2020 | −14.0% |
| 24 Dec 2020 | −19.3% |
| 1 Jan 2021 | −12.5% |
| 8 Jan 2021 | +8.9% |
| 15 Jan 2021 | +8.0% |
| 22 Jan 2021 | +13.6% |
| 29 Jan 2021 | +5.2% |
| 5 Feb 2021 | +17.1% |
| 12 Feb 2021 | +10.9% |
| 19 Feb 2021 | +9.6% |
| 26 Feb 2021 | +17.2% |
| 5 Mar 2021 | +25.9% |
| 12 Mar 2021 | +23.7% |
| 19 Mar 2021 | +20.1% |
| 26 Mar 2021 | +43.5% |
| 1 Apr 2021 | +37.8% |
| 9 Apr 2021 | +24.1% |
| 16 Apr 2021 | +20.6% |
| 23 Apr 2021 | +3.8% |
| 30 Apr 2021 | +16.2% |
| 7 May 2021 | +9.0% |
| 14 May 2021 | +14.2% |
| 21 May 2021 | +17.0% |
| 28 May 2021 | +8.8% |
| 4 Jun 2021 | +5.1% |
| 11 Jun 2021 | +3.6% |
| 18 Jun 2021 | +2.3% |
| 25 Jun 2021 | +0.8% |
| 2 Jul 2021 | −6.7% |
| 9 Jul 2021 | −13.7% |
| 16 Jul 2021 | −10.6% |
| 23 Jul 2021 | −2.0% |
| 30 Jul 2021 | −8.2% |
| 6 Aug 2021 | −9.2% |
| 13 Aug 2021 | −18.4% |
| 20 Aug 2021 | −25.4% |
| 27 Aug 2021 | −22.5% |
| 3 Sep 2021 | −23.2% |
| 9 Sep 2021 | −28.5% |
| 17 Sep 2021 | −26.1% |
| 24 Sep 2021 | −31.6% |
| 1 Oct 2021 | −23.6% |
| 8 Oct 2021 | −23.4% |
| 14 Oct 2021 | −27.3% |
| 22 Oct 2021 | −26.1% |
| 29 Oct 2021 | −25.3% |
| 4 Nov 2021 | −24.2% |
| 12 Nov 2021 | −22.0% |
| 18 Nov 2021 | −11.1% |
| 26 Nov 2021 | −16.4% |
| 3 Dec 2021 | −22.1% |
| 10 Dec 2021 | −14.8% |
| 17 Dec 2021 | −13.9% |
| 24 Dec 2021 | −13.1% |
| 31 Dec 2021 | −16.8% |
| 7 Jan 2022 | −13.4% |
| 14 Jan 2022 | −6.7% |
| 21 Jan 2022 | −5.4% |
| 28 Jan 2022 | −4.9% |
| 4 Feb 2022 | −0.9% |
| 11 Feb 2022 | +0.5% |
| 18 Feb 2022 | +2.9% |
| 25 Feb 2022 | +3.4% |
| 4 Mar 2022 | +7.9% |
| 11 Mar 2022 | +6.1% |
| 17 Mar 2022 | +0.6% |
| 25 Mar 2022 | +4.0% |
| 1 Apr 2022 | +6.7% |
| 8 Apr 2022 | +15.9% |
| 13 Apr 2022 | +12.8% |
| 22 Apr 2022 | +18.5% |
| 29 Apr 2022 | +23.7% |
| 6 May 2022 | +27.7% |
| 13 May 2022 | +15.4% |
| 20 May 2022 | +18.2% |
| 27 May 2022 | +11.3% |
| 3 Jun 2022 | +18.4% |
| 10 Jun 2022 | +26.2% |
| 17 Jun 2022 | +16.8% |
| 24 Jun 2022 | +27.6% |
| 1 Jul 2022 | +23.9% |
| 8 Jul 2022 | +20.1% |
| 15 Jul 2022 | +14.4% |
| 22 Jul 2022 | +5.5% |
| 29 Jul 2022 | −2.0% |
| 5 Aug 2022 | −12.4% |
| 12 Aug 2022 | +0.0% |
| 19 Aug 2022 | −13.6% |
| 26 Aug 2022 | −1.6% |
| 2 Sep 2022 | −6.8% |
| 9 Sep 2022 | −16.6% |
| 16 Sep 2022 | −5.9% |
| 23 Sep 2022 | −11.5% |
| 30 Sep 2022 | −18.1% |
| 7 Oct 2022 | −16.8% |
| 14 Oct 2022 | −13.8% |
| 21 Oct 2022 | −12.1% |
| 28 Oct 2022 | −8.5% |
| 4 Nov 2022 | −4.7% |
| 11 Nov 2022 | −4.8% |
| 18 Nov 2022 | −1.0% |
| 25 Nov 2022 | +0.7% |
| 2 Dec 2022 | +9.0% |
| 9 Dec 2022 | +9.0% |
| 16 Dec 2022 | +12.4% |
| 23 Dec 2022 | +7.9% |
| 30 Dec 2022 | +21.9% |
| 6 Jan 2023 | +26.9% |
| 13 Jan 2023 | +22.9% |
| 20 Jan 2023 | +30.6% |
| 27 Jan 2023 | +28.1% |
| 3 Feb 2023 | +21.8% |
| 10 Feb 2023 | +35.0% |
| 17 Feb 2023 | +30.5% |
| 24 Feb 2023 | +19.0% |
| 3 Mar 2023 | +10.8% |
| 10 Mar 2023 | +14.2% |
| 17 Mar 2023 | +13.5% |
| 24 Mar 2023 | +10.2% |
| 31 Mar 2023 | +6.8% |
| 6 Apr 2023 | −3.2% |
| 13 Apr 2023 | +0.0% |
| 21 Apr 2023 | −3.6% |
| 28 Apr 2023 | +4.0% |
| 5 May 2023 | +5.1% |
| 12 May 2023 | −4.0% |
| 19 May 2023 | +1.3% |
| 26 May 2023 | +12.7% |
| 2 Jun 2023 | +5.7% |
| 9 Jun 2023 | −1.1% |
| 16 Jun 2023 | −5.3% |
| 23 Jun 2023 | −3.4% |
| 30 Jun 2023 | −5.0% |
| 7 Jul 2023 | +3.9% |
| 14 Jul 2023 | +13.6% |
| 21 Jul 2023 | +17.8% |
| 28 Jul 2023 | +21.6% |
| 4 Aug 2023 | +15.4% |
| 11 Aug 2023 | +18.7% |
| 18 Aug 2023 | +15.8% |
| 25 Aug 2023 | +14.4% |
| 1 Sep 2023 | +31.9% |
| 8 Sep 2023 | +40.0% |
| 15 Sep 2023 | +35.2% |
| 22 Sep 2023 | +39.0% |
| 29 Sep 2023 | +35.6% |
| 6 Oct 2023 | +27.9% |
| 13 Oct 2023 | +17.4% |
| 20 Oct 2023 | +14.0% |
| 27 Oct 2023 | +4.4% |
| 3 Nov 2023 | +4.4% |
| 12 Nov 2023 | +25.6% |
| 17 Nov 2023 | +35.0% |
| 24 Nov 2023 | +34.6% |
| 1 Dec 2023 | +23.9% |
| 8 Dec 2023 | +32.0% |
| 15 Dec 2023 | +41.8% |
| 22 Dec 2023 | +35.5% |
| 29 Dec 2023 | +45.3% |
| 5 Jan 2024 | +40.9% |
| 12 Jan 2024 | +42.0% |
| 20 Jan 2024 | +40.5% |
| 25 Jan 2024 | +39.4% |
| 2 Feb 2024 | +39.8% |
| 9 Feb 2024 | +16.7% |
| 16 Feb 2024 | +9.6% |
| 23 Feb 2024 | −0.6% |
| 2 Mar 2024 | +0.7% |
| 7 Mar 2024 | −7.7% |
| 15 Mar 2024 | −19.6% |
| 22 Mar 2024 | −10.5% |
| 28 Mar 2024 | −9.9% |
| 5 Apr 2024 | −2.8% |
| 12 Apr 2024 | −2.1% |
| 19 Apr 2024 | +7.8% |
| 26 Apr 2024 | +14.8% |
| 3 May 2024 | +30.3% |
| 10 May 2024 | +25.2% |
| 18 May 2024 | +29.0% |
| 24 May 2024 | +48.3% |
| 31 May 2024 | +82.8% |
| 7 Jun 2024 | +54.1% |
| 14 Jun 2024 | +110.6% |
| 21 Jun 2024 | +92.6% |
| 28 Jun 2024 | +90.4% |
| 5 Jul 2024 | +66.2% |
| 12 Jul 2024 | +63.1% |
| 19 Jul 2024 | +49.6% |
| 26 Jul 2024 | +62.1% |
| 2 Aug 2024 | +57.2% |
| 9 Aug 2024 | +50.5% |
| 16 Aug 2024 | +37.3% |
| 23 Aug 2024 | +32.7% |
| 30 Aug 2024 | +2.5% |
| 6 Sep 2024 | +19.1% |
| 13 Sep 2024 | +2.4% |
| 20 Sep 2024 | −3.3% |
| 27 Sep 2024 | −1.2% |
| 4 Oct 2024 | +1.0% |
| 11 Oct 2024 | +16.8% |
| 18 Oct 2024 | +17.5% |
| 25 Oct 2024 | −9.6% |
| 1 Nov 2024 | −7.6% |
| 8 Nov 2024 | +1.4% |
| 14 Nov 2024 | −6.4% |
| 22 Nov 2024 | −8.2% |
| 29 Nov 2024 | −7.1% |
| 6 Dec 2024 | −2.5% |
| 13 Dec 2024 | −5.8% |
| 20 Dec 2024 | +15.1% |
| 27 Dec 2024 | +3.5% |
| 3 Jan 2025 | +13.0% |
| 10 Jan 2025 | −9.7% |
| 17 Jan 2025 | −19.3% |
| 24 Jan 2025 | −17.9% |
| 1 Feb 2025 | −29.2% |
| 7 Feb 2025 | −28.1% |
| 14 Feb 2025 | −30.1% |
| 21 Feb 2025 | −22.7% |
| 28 Feb 2025 | −21.6% |
| 7 Mar 2025 | −23.2% |
| 13 Mar 2025 | −28.6% |
| 21 Mar 2025 | −31.3% |
| 28 Mar 2025 | −30.7% |
| 4 Apr 2025 | −31.7% |
| 11 Apr 2025 | −28.7% |
| 17 Apr 2025 | −21.8% |
| 25 Apr 2025 | −4.5% |
| 2 May 2025 | +0.8% |
| 9 May 2025 | −8.1% |
| 16 May 2025 | +28.5% |
| 23 May 2025 | +10.2% |
| 30 May 2025 | +32.1% |
| 6 Jun 2025 | +40.0% |
| 13 Jun 2025 | +51.6% |
| 20 Jun 2025 | +33.6% |
| 27 Jun 2025 | +47.9% |
| 4 Jul 2025 | +44.8% |
| 11 Jul 2025 | +52.1% |
| 18 Jul 2025 | +39.0% |
| 25 Jul 2025 | +26.3% |
| 1 Aug 2025 | +30.5% |
| 8 Aug 2025 | +26.6% |
| 14 Aug 2025 | +14.9% |
| 22 Aug 2025 | +26.9% |
| 29 Aug 2025 | +7.0% |
| 5 Sep 2025 | +2.6% |
| 12 Sep 2025 | −3.1% |
| 19 Sep 2025 | −3.8% |
| 26 Sep 2025 | −17.1% |
| 3 Oct 2025 | −11.0% |
| 10 Oct 2025 | −14.0% |
| 17 Oct 2025 | −14.7% |
| 24 Oct 2025 | −13.0% |
| 31 Oct 2025 | −11.5% |
| 7 Nov 2025 | −12.0% |
| 14 Nov 2025 | −21.1% |
| 21 Nov 2025 | −29.5% |
| 28 Nov 2025 | −24.0% |
| 5 Dec 2025 | −28.5% |
| 12 Dec 2025 | −23.7% |
| 19 Dec 2025 | −25.7% |
| 26 Dec 2025 | −19.2% |
| 2 Jan 2026 | −22.9% |
| 9 Jan 2026 | −26.8% |
| 16 Jan 2026 | −22.4% |
| 23 Jan 2026 | −28.3% |
| 1 Feb 2026 | −23.5% |
| 6 Feb 2026 | −19.1% |
| 13 Feb 2026 | −13.5% |
| 20 Feb 2026 | +0.1% |
| 27 Feb 2026 | +2.8% |
| 6 Mar 2026 | +6.0% |
| 13 Mar 2026 | +5.1% |
| 20 Mar 2026 | +9.6% |
| 27 Mar 2026 | +7.4% |
| 17 Apr 2026 | +15.3% |
| 24 Apr 2026 | +24.1% |
| 30 Apr 2026 | +30.3% |
| 8 May 2026 | +43.1% |
| 15 May 2026 | +23.9% |
| 22 May 2026 | +33.6% |
| 29 May 2026 | +7.1% |
| 4 Jun 2026 | −7.6% |
| 5 Jun 2026 | −13.6% |
| 10 Jun 2026 | −12.0% |
| 12 Jun 2026 | −7.5% |
| 17 Jun 2026 | −8.2% |
| 19 Jun 2026 | −6.0% |
| 24 Jun 2026 | −13.5% |
| 25 Jun 2026 | −12.2% |
| 1 Jul 2026 | −16.4% |
| 3 Jul 2026 | −17.4% |
| 10 Jul 2026 | −15.8% |
| 17 Jul 2026 | −25.5% |
| 24 Jul 2026 | −9.2% |
| 31 Jul 2026 | −7.5% |
| 7 Aug 2026 | −0.7% |
| 14 Aug 2026 | −6.8% |
| 21 Aug 2026 | −9.1% |
| 28 Aug 2026 | −7.1% |
| 4 Sep 2026 | −9.7% |
| 11 Sep 2026 | −8.4% |
| 18 Sep 2026 | −4.0% |
| 25 Sep 2026 | −4.0% |
| 1 Oct 2026 | −1.5% |
| 9 Oct 2026 | −2.7% |
| 16 Oct 2026 | −3.9% |
| 23 Oct 2026 | −10.4% |
| 30 Oct 2026 | −8.7% |
| 4 Nov 2026 | −9.4% |
Over the last 7.9 years the share price moved +257% while the NIFTY 500 moved +143%, so it is ahead of the index over that whole period. It was last ahead over 13 weeks in the week of 29 May 2026. The chart above shows the 13-week comparison for every week.
This page treats a rise as over when the price closes below its 200-day average on two Fridays in a row.
What changed at Techno Electric & Engineering Company this quarter?
Two changes stood out: revenue up on a year earlier for 7 quarters in a row and indian funds and insurers (DIIs) cut their stake for 3 quarters in a row.
Revenue up on a year earlier for 7 quarters in a row
In the June 2026 quarter revenue was ₹630 crore, +19.8% on a year earlier.
Why: Revenue rose because the company's engineering and construction work was strong and it took in more orders.
Next results: check whether the larger order book turns into revenue, since management says most delivery depends on second-half project execution and customer land handovers.
From the earnings call on 12 Aug 2026.
Indian funds and insurers (DIIs) cut their stake for 3 quarters in a row
From 23.1% to 21.3% of the company by the September 2026 quarter.
What are Techno Electric & Engineering Company's latest quarterly results?
For April to June 2026 (the quarter ended 30 June 2026), Techno Electric & Engineering Company reported revenue of ₹630 crore, up 19.8% from ₹526 crore a year earlier, and a profit of ₹93.0 crore, down 31.6% from ₹136 crore.
Techno Electric & Engineering Company results: April to June 2026 against a year earlier
| Measure | April to June 2026 | April to June 2025 | Change |
|---|---|---|---|
| Revenue | ₹630 crore | ₹526 crore | +19.8% |
| Profit | ₹93.0 crore | ₹136 crore | −31.6% |
| Earnings per share | ₹8.02 | ₹11.70 | −31.5% |
| Operating margin | 16.0% | 18.0% | −2.0 points |
The next results, for July to September 2026, are due by 14 November 2026: listed companies must publish quarterly results within 45 days of the quarter's end (60 days for the January to March quarter).
Techno Electric & Engineering Company's management discussed these results on a call held on 12 August 2026; what it said is further down this page.
From the company's reported quarterly results (quarter ended 30 June 2026). Revenue and profit in ₹ crore.
What is the Techno Electric & Engineering Company share price history?
Techno Electric & Engineering Company closed at ₹884.40 on 4 November 2026, down 31.1% from ₹1,283.30 a year earlier (7 November 2025) and up 235.1% over five years. Its highest weekly close since December 2018 was ₹1,731.40 on 18 October 2024.
Techno Electric & Engineering Company share price: then and now
| When | Close | Change to 4 Nov 2026 |
|---|---|---|
| 1 week ago · 30 Oct 2026 | ₹829.30 | +6.6% |
| 1 month ago · 1 Oct 2026 | ₹998.60 | −11.4% |
| 6 months ago · 8 May 2026 | ₹1,257.20 | −29.7% |
| 1 year ago · 7 Nov 2025 | ₹1,283.30 | −31.1% |
| 3 years ago · 3 Nov 2023 | ₹490.15 | +80.4% |
| 5 years ago · 4 Nov 2021 | ₹263.95 | +235.1% |
| Earliest weekly close in our records · 7 Dec 2018 | ₹247.70 | +257.0% |
| Highest weekly close since December 2018 · 18 Oct 2024 | ₹1,731.40 | −48.9% |
| Lowest weekly close since December 2018 · 7 Aug 2020 | ₹174.70 | +406.2% |
| 52-week high (weekly close) · 22 May 2026 | ₹1,334.50 | −33.7% |
| 52-week low (weekly close) · 23 Oct 2026 | ₹824.60 | +7.3% |
Weekly closing prices. Each change is the move from that price to the 4 Nov 2026 close. A day's intraday high or low can go beyond these weekly closes.
417 weekly closes from 7 December 2018 to 4 November 2026.
What is the latest news on Techno Electric & Engineering Company?
4 Nov 2026: Techno Electric & Engineering Company closed at ₹884.40, up 6.6% on the week and down 11.4% on the month. 11 Sep 2026: ex-date for a dividend of ₹7 a share.
Earlier
- 12 Aug 2026: Techno Electric & Engineering Company held its results call for April to June 2026. Management guided: FY27 revenue at least ₹4,000 crore and top- and bottom-line growth at least 25%; year-end order-book goal ₹4,000 crore likely exceeded; delivery remains H2-weighted.
- Results for April to June 2026: Revenue up 19.8% and profit down 31.6% on a year earlier.
What dividend does Techno Electric & Engineering Company pay?
Techno Electric & Engineering Company paid ₹7 a share in regular dividends in the 12 months to 5 November 2026 (1 payment), a yield of 0.79% at the ₹884.40 close on 4 November 2026. The last was a dividend of ₹7 a share, ex-date 11 September 2026.
Techno Electric & Engineering Company dividends since 1 April 2021
| Ex-date | Dividend per share | Type | Record date |
|---|---|---|---|
| 11 Sep 2026Dividend | ₹7 | Dividend | same day |
| 12 Sep 2025Dividend | ₹9 | Dividend | same day |
| 13 Sep 2024Dividend | ₹7 | Dividend | same day |
| 15 Sep 2023Dividend | ₹6 | Dividend | same day |
| 15 Sep 2022Dividend | ₹2 | Dividend | 16 Sep 2022 |
| 20 Sep 2021Dividend | ₹4 | Dividend | — |
Amounts as the company declared them on the NSE. A dividend goes to whoever owns the shares before the ex-date.
Yes. Techno Electric & Engineering Company Ltd paid out 17% of its profit as dividends in FY26, and it paid a dividend in 6 of its last 10 reported years.
From the NSE corporate-actions record, read 5 November 2026.
What did Techno Electric & Engineering Company management say on the latest results call?
On the call for April to June 2026, held on 12 August 2026, Techno Electric & Engineering Company's management guided: FY27 revenue at least ₹4,000 crore and top- and bottom-line growth at least 25%; year-end order-book goal ₹4,000 crore likely exceeded; delivery remains H2-weighted.
“No, we are not buying GPUs, let me make it clear to my colleagues. We are only providing infrastructure to house GPU owned by some third party. So our- so our role will always be limited to infrastructure to house CPU or GPU.”C.P. Gupta, Chairman & Managing Director, on the call for April to June 2026
What management guided
- FY27 operating margin 13-14%.
- FY27 data-center revenue around ₹40 crore remains in place.
- FY27 data-center capital spending envelope about ₹1,000 crore; Noida/Kolkata program ₹500-600 crore, Chennai expansion demand-gated, Noida planned January to March 2027 and Kolkata not before FY28.
- Smart-meter deployment complete by December 2026; FY27 collections about ₹450 crore against about ₹400 crore deployment outflow, with no further capital spending.
Management’s own plans and goals, from our notes of the call. A plan is not a result.
Source: the call transcript.
From the call for April to June 2026, 12 August 2026.
What to watch in Techno Electric & Engineering Company's next results?
When Techno Electric & Engineering Company reports July to September 2026, these are the 4 checks that show whether the story is still on course. First: Chennai customer closures and billing conversion - test whether the current pipeline begins translating into reported segment revenue.
| What to check (from the call) |
|---|
| Chennai customer closures and billing conversion - test whether the current pipeline begins translating into reported segment revenue. |
| Transmission L1 conversion and order-book build - check continued power-heavy mix and execution visibility. |
| Ishanagar transmission-asset monetisation - check completion and cash or earnings conversion from contract assets. |
| Smart-meter completion - verify remaining installations and transition into cash-generative annuity mode. |
Which stock lists is Techno Electric & Engineering Company on?
Techno Electric & Engineering Company is on 2 of our India lists: 52 week high & low and AI & data centre stocks.
Is Techno Electric & Engineering Company profitable?
Techno Electric & Engineering Company Ltd earned ₹93.0 Cr of net profit in the Jun 2026 quarter, −31.6% on the same quarter a year earlier. Full-year FY26 profit was ₹474 Cr. Over 9 years profit has grown 26.8% a year on average. That is 14.8% of the quarter's revenue. The same quarter a year earlier earned ₹136 Cr.
Net profit is what is left after every cost, interest and tax. Earnings per share, dividends and book value all grow from it.
For the full year, FY26 profit was ₹474 Cr (+12.1% on the year before).
FY26 profit ₹474 Cr (+12.1% on the year before), 26.8% a year over 9 years
- Net profit ₹474
| Quarter | Net profit |
|---|---|
| FY17 | ₹56 |
| FY18 | ₹206 |
| FY19 | ₹193 |
| FY20 | ₹179 |
| FY21 | ₹182 |
| FY22 | ₹264 |
| FY23 | ₹187 |
| FY24 | ₹268 |
| FY25 | ₹423 |
| FY26 | ₹474 |
Growth on a year earlier
- Growth on a year earlier 12.1%
| Quarter | Growth on a year earlier |
|---|---|
| FY17 | – |
| FY18 | 267.9% |
| FY19 | −6.3% |
| FY20 | −7.3% |
| FY21 | 1.7% |
| FY22 | 45.1% |
| FY23 | −29.2% |
| FY24 | 43.3% |
| FY25 | 57.8% |
| FY26 | 12.1% |
Jun 2026: ₹93.0 Cr (−31.6% on a year earlier)
- Net profit (quarterly) ₹93.0
| Quarter | Net profit (quarterly) |
|---|---|
| Sep 2023 | ₹74 |
| Dec 2023 | ₹92 |
| Mar 2024 | ₹78 |
| Jun 2024 | ₹98 |
| Sep 2024 | ₹94 |
| Dec 2024 | ₹96 |
| Mar 2025 | ₹135 |
| Jun 2025 | ₹136 |
| Sep 2025 | ₹104 |
| Dec 2025 | ₹119 |
| Mar 2026 | ₹115 |
| Jun 2026 | ₹93 |
Growth on a year earlier
- Growth on a year earlier −31.6%
| Quarter | Growth on a year earlier |
|---|---|
| Sep 2023 | 25.4% |
| Dec 2023 | 196.8% |
| Mar 2024 | 27.9% |
| Jun 2024 | 292% |
| Sep 2024 | 27% |
| Dec 2024 | 4.3% |
| Mar 2025 | 73.1% |
| Jun 2025 | 38.8% |
| Sep 2025 | 10.6% |
| Dec 2025 | 24% |
| Mar 2026 | −14.8% |
| Jun 2026 | −31.6% |
Why profit moved: revenue changed +19.8% on a year earlier and the margin moved −2.0 percentage points. Sales did the work while the margin got thinner.
On average over the last four quarters, profit changed −3.0% and revenue +43.0%. Profit is growing slower than sales: rising costs are taking part of the growth.
How much revenue does Techno Electric & Engineering Company make, and is it growing?
Techno Electric & Engineering Company Ltd reported ₹630 Cr of revenue in the Jun 2026 quarter, +19.8% on the same quarter a year earlier. That is the 7th quarter in a row with growth on the year before. Over 9 years it has grown 44.3% a year on average. The last full year, FY26, came in at ₹3,252 Cr.
Revenue is everything the company billed its customers in the period.
The last four reported quarters add to ₹3,355 Cr.
FY26 revenue was ₹3,252 Cr, +43.3% on the year before.
FY26 revenue ₹3,252 Cr (+43.3% on the year before), 44.3% a year over 9 years
- Revenue ₹3,252
| Quarter | Revenue |
|---|---|
| FY17 | ₹120 |
| FY18 | ₹1,283 |
| FY19 | ₹986 |
| FY20 | ₹871 |
| FY21 | ₹884 |
| FY22 | ₹999 |
| FY23 | ₹830 |
| FY24 | ₹1,502 |
| FY25 | ₹2,269 |
| FY26 | ₹3,252 |
Growth on a year earlier
- Growth on a year earlier 43.3%
| Quarter | Growth on a year earlier |
|---|---|
| FY17 | – |
| FY18 | 969.2% |
| FY19 | −23.1% |
| FY20 | −11.7% |
| FY21 | 1.5% |
| FY22 | 13% |
| FY23 | −16.9% |
| FY24 | 81% |
| FY25 | 51.1% |
| FY26 | 43.3% |
Jun 2026: ₹630 Cr (+19.8% on a year earlier), the 7th quarter in a row of growth
- Revenue (quarterly) ₹630
| Quarter | Revenue (quarterly) |
|---|---|
| Sep 2023 | ₹462 |
| Dec 2023 | ₹327 |
| Mar 2024 | ₹440 |
| Jun 2024 | ₹375 |
| Sep 2024 | ₹441 |
| Dec 2024 | ₹636 |
| Mar 2025 | ₹816 |
| Jun 2025 | ₹526 |
| Sep 2025 | ₹843 |
| Dec 2025 | ₹872 |
| Mar 2026 | ₹1,010 |
| Jun 2026 | ₹630 |
Growth on a year earlier
- Growth on a year earlier 19.8%
| Quarter | Growth on a year earlier |
|---|---|
| Sep 2023 | 102.6% |
| Dec 2023 | 76.8% |
| Mar 2024 | 40.6% |
| Jun 2024 | 36.9% |
| Sep 2024 | −4.5% |
| Dec 2024 | 94.5% |
| Mar 2025 | 85.5% |
| Jun 2025 | 40.3% |
| Sep 2025 | 91.2% |
| Dec 2025 | 37.1% |
| Mar 2026 | 23.8% |
| Jun 2026 | 19.8% |
Recent pace: the last four quarters grew +43.0% on average, against 44.3% a year over the longer run, so this year is growing slower than its own long-run rate.
Is growth speeding up? Revenue over the last 12 months grew +38.7%, against +44.6% a year over the last 8 quarters (rolling over); profit over the last 12 months grew −6.5%, against +12.3% a year (rolling over).
How much of every ₹100 of sales does Techno Electric & Engineering Company keep?
Techno Electric & Engineering Company Ltd's operating margin was 16.0% in the Jun 2026 quarter, 2.0 percentage points lower than the same quarter a year ago. Across 10 years it has been between 11.0% and 91.0%. The latest quarter is within that range.
Operating margin is what is left from every ₹100 of sales after the costs of running the business, before interest and tax. It shows pricing power and cost control.
Why the margin moved: operating margin changed −1.8 percentage points on the year while gross margin changed −0.4 points. So the drop came mostly from costs below the gross margin, such as staff and overheads, measured against sales.
FY26: 14.0%, within a range of 11.0% to 91.0% over 10 years
- Operating margin 14.0%
| Quarter | Operating margin |
|---|---|
| FY17 | 91% |
| FY18 | 23% |
| FY19 | 25% |
| FY20 | 25% |
| FY21 | 24% |
| FY22 | 16% |
| FY23 | 11% |
| FY24 | 14% |
| FY25 | 15% |
| FY26 | 14% |
Change on the year before (points)
- Change on the year before (points) −1.0 pts
| Quarter | Change on the year before (points) |
|---|---|
| FY17 | – |
| FY18 | −68.0 pts |
| FY19 | +2.0 pts |
| FY20 | 0.0 pts |
| FY21 | −1.0 pts |
| FY22 | −8.0 pts |
| FY23 | −5.0 pts |
| FY24 | +3.0 pts |
| FY25 | +1.0 pts |
| FY26 | −1.0 pts |
Jun 2026: operating margin 16.0% (−2.0 points on a year earlier)
- Operating margin 16.0%
| Quarter | Operating margin |
|---|---|
| Sep 2023 | 17% |
| Dec 2023 | 17% |
| Mar 2024 | 12% |
| Jun 2024 | 14% |
| Sep 2024 | 16% |
| Dec 2024 | 14% |
| Mar 2025 | 16% |
| Jun 2025 | 18% |
| Sep 2025 | 13% |
| Dec 2025 | 14% |
| Mar 2026 | 13% |
| Jun 2026 | 16% |
Change on a year earlier (points)
- Change on a year earlier (points) −2.0 pts
| Quarter | Change on a year earlier (points) |
|---|---|
| Sep 2023 | – |
| Dec 2023 | +4.0 pts |
| Mar 2024 | +9.7 pts |
| Jun 2024 | +6.0 pts |
| Sep 2024 | −1.0 pts |
| Dec 2024 | −3.0 pts |
| Mar 2025 | +4.0 pts |
| Jun 2025 | +4.0 pts |
| Sep 2025 | −3.0 pts |
| Dec 2025 | 0.0 pts |
| Mar 2026 | −3.0 pts |
| Jun 2026 | −2.0 pts |
Is Techno Electric & Engineering Company's profit turning into cash?
Over the last 3 years Techno Electric & Engineering Company Ltd's operations used more cash than they brought in, so cash conversion was −29%, a gap worth watching. In FY26 its operations used ₹590 Cr of cash, against ₹474 Cr of profit.
The profit and loss account shows what was earned. The cash-flow statement shows the cash that actually came in. Comparing operating cash flow with profit is one of the best checks that a profit is real.
After ₹87.0 Cr of spending on assets, free cash was −₹677 Cr: it spent more than its operations brought in.
Cash-flow figures here are yearly, because quarterly cash statements are not published, so this section changes once a year.
FY26: operating cash −₹590 Cr against profit ₹474 Cr; −29% of 3 years' profit came in as cash
- Operating cash −₹590
- Net profit ₹474
- Free cash −₹677
| Quarter | Operating cash | Net profit | Free cash |
|---|---|---|---|
| FY17 | ₹160 | ₹56 | – |
| FY18 | ₹212 | ₹206 | ₹201 |
| FY19 | ₹198 | ₹193 | ₹195 |
| FY20 | ₹112 | ₹179 | ₹108 |
| FY21 | ₹125 | ₹182 | ₹125 |
| FY22 | ₹259 | ₹264 | ₹260 |
| FY23 | ₹93 | ₹187 | ₹368 |
| FY24 | −₹198 | ₹268 | −₹382 |
| FY25 | ₹453 | ₹423 | ₹285 |
| FY26 | −₹590 | ₹474 | −₹677 |
FY26: operating cash was −124% of profit (−29% over three years)
- Operating cash as % of profit −124%
- Break-even line 100%
| Quarter | Operating cash as % of profit | Break-even line |
|---|---|---|
| FY17 | 286% | 100% |
| FY18 | 103% | 100% |
| FY19 | 103% | 100% |
| FY20 | 63% | 100% |
| FY21 | 69% | 100% |
| FY22 | 98% | 100% |
| FY23 | 50% | 100% |
| FY24 | −74% | 100% |
| FY25 | 107% | 100% |
| FY26 | −124% | 100% |
Why −29% of profit came in as cash: the cash cycle got 82 days shorter between FY21 and FY26, so cash that used to wait in the business now arrives sooner. When less than 70% of profit comes in as cash, it is the thing to watch on this page.
What to look at next: the bigger use of cash is spending on new assets, at 13.3× depreciation over three years. The next section checks what that spending is building.
Where does Techno Electric & Engineering Company's cash go?
Techno Electric & Engineering Company Ltd's cash cycle, the days between paying suppliers and getting paid by customers, was 137 days in FY26, down from 219 days in FY21. It spent ₹439 Cr on assets over the last 3 years. Customers take 137 days to pay, and stock sits for 0 days on average.
Working capital is the cash tied up between paying suppliers and getting paid. Debtor days: how long customers take to pay. Inventory days: how long stock sits. The cash cycle: the whole loop, in days of sales.
At FY26 sales of ₹3,252 Cr, each day of that cycle ties up about ₹8.9 Cr, so roughly ₹1,221 Cr is tied up in the business at any time.
FY26: customers took 137 days to pay and stock sat for 0 days, about 0.0 months of sales sitting as stock, for a full cycle of 137 days, shorter than FY21's 219.
FY26: a 137-day cash cycle, −82 days compared with FY21
- Cash cycle 137d
- Inventory days 0d
- Debtor days 137d
- Payable days 173d
| Quarter | Cash cycle | Inventory days | Debtor days | Payable days |
|---|---|---|---|---|
| FY17 | 230d | – | 230d | – |
| FY18 | 34d | 3d | 216d | 185d |
| FY19 | 202d | – | 202d | – |
| FY20 | 240d | – | 240d | – |
| FY21 | 219d | – | 219d | – |
| FY22 | 22d | 13d | 213d | 205d |
| FY23 | 38d | 59d | 282d | 303d |
| FY24 | 15d | 8d | 180d | 173d |
| FY25 | 108d | 0d | 108d | – |
| FY26 | 137d | 0d | 137d | – |
Spending on assets: ₹439 Cr over the last 3 years, against ₹33.0 Cr of depreciation (the yearly wear and tear on existing assets). So it is building well beyond replacing what wears out. Work still in progress is ₹72.0 Cr (FY26): assets paid for that are not earning yet.
FY26: capex ₹87.0 Cr, work in progress ₹72.0 Cr, a build-out
- Capex ₹87.0
- Work-in-progress ₹72.0
| Quarter | Capex | Work-in-progress |
|---|---|---|
| FY18 | ₹11 | ₹0 |
| FY19 | ₹3 | ₹0 |
| FY20 | ₹4 | ₹0 |
| FY21 | ₹0 | ₹0 |
| FY22 | −₹1 | ₹0 |
| FY23 | −₹275 | ₹95 |
| FY24 | ₹184 | ₹276 |
| FY25 | ₹168 | ₹442 |
| FY26 | ₹87 | ₹72 |
In short: the cash is going into new capacity, not getting stuck in the daily cycle. The question is whether the new capacity earns.
What is Techno Electric & Engineering Company's P/E ratio, and how does it compare with its own history?
Techno Electric & Engineering Company Ltd's P/E is 23.9×, in the middle of its own history: higher than 53% of past readings. Its usual P/E (the middle reading) is 19.9×, over 7.8 years of weekly prices. This compares the share price with the company’s own past. It does not say what the business is worth.
P/E is the share price divided by a year's profit per share: how many rupees the market pays for each rupee of yearly profit.
P/E 23.9× against a usual 19.9×: in the middle of its own history: higher than 53% of past readings
- P/E 22.4×
- Median 19.9×
| Week | P/E | Median |
|---|---|---|
| 11 Jan 2019 | 13.2× | 19.9× |
| 25 Jan 2019 | 13.7× | 19.9× |
| 8 Feb 2019 | 12.7× | 19.9× |
| 22 Feb 2019 | 14.7× | 19.9× |
| 8 Mar 2019 | 12.8× | 19.9× |
| 22 Mar 2019 | 14.2× | 19.9× |
| 5 Apr 2019 | 14.4× | 19.9× |
| 18 Apr 2019 | 14.5× | 19.9× |
| 3 May 2019 | 12.6× | 19.9× |
| 17 May 2019 | 12.3× | 19.9× |
| 31 May 2019 | 13.3× | 19.9× |
| 14 Jun 2019 | 12.9× | 19.9× |
| 28 Jun 2019 | 14.4× | 19.9× |
| 12 Jul 2019 | 13.9× | 19.9× |
| 26 Jul 2019 | 13.8× | 19.9× |
| 9 Aug 2019 | 13.4× | 19.9× |
| 23 Aug 2019 | 13.4× | 19.9× |
| 6 Sep 2019 | 13.6× | 19.9× |
| 20 Sep 2019 | 15.1× | 19.9× |
| 4 Oct 2019 | 15.6× | 19.9× |
| 18 Oct 2019 | 15.1× | 19.9× |
| 1 Nov 2019 | 15.3× | 19.9× |
| 15 Nov 2019 | 15.2× | 19.9× |
| 29 Nov 2019 | 15.3× | 19.9× |
| 13 Dec 2019 | 15.7× | 19.9× |
| 27 Dec 2019 | 16.1× | 19.9× |
| 10 Jan 2020 | 16.2× | 19.9× |
| 24 Jan 2020 | 17.2× | 19.9× |
| 7 Feb 2020 | 17.1× | 19.9× |
| 20 Feb 2020 | 17.0× | 19.9× |
| 6 Mar 2020 | 16.7× | 19.9× |
| 20 Mar 2020 | 12.3× | 19.9× |
| 3 Apr 2020 | 12.4× | 19.9× |
| 17 Apr 2020 | 12.8× | 19.9× |
| 30 Apr 2020 | 11.6× | 19.9× |
| 15 May 2020 | 11.1× | 19.9× |
| 29 May 2020 | 10.3× | 19.9× |
| 12 Jun 2020 | 10.9× | 19.9× |
| 26 Jun 2020 | 11.2× | 19.9× |
| 10 Jul 2020 | 11.2× | 19.9× |
| 24 Jul 2020 | 10.9× | 19.9× |
| 7 Aug 2020 | 10.7× | 19.9× |
| 21 Aug 2020 | 12.2× | 19.9× |
| 4 Sep 2020 | 13.9× | 19.9× |
| 18 Sep 2020 | 14.1× | 19.9× |
| 1 Oct 2020 | 13.7× | 19.9× |
| 16 Oct 2020 | 13.1× | 19.9× |
| 30 Oct 2020 | 13.0× | 19.9× |
| 14 Nov 2020 | 15.4× | 19.9× |
| 27 Nov 2020 | 15.8× | 19.9× |
| 11 Dec 2020 | 16.4× | 19.9× |
| 24 Dec 2020 | 14.8× | 19.9× |
| 8 Jan 2021 | 18.5× | 19.9× |
| 22 Jan 2021 | 19.1× | 19.9× |
| 5 Feb 2021 | 19.8× | 19.9× |
| 19 Feb 2021 | 17.0× | 19.9× |
| 5 Mar 2021 | 19.0× | 19.9× |
| 19 Mar 2021 | 18.1× | 19.9× |
| 1 Apr 2021 | 19.8× | 19.9× |
| 16 Apr 2021 | 19.2× | 19.9× |
| 30 Apr 2021 | 18.4× | 19.9× |
| 14 May 2021 | 19.7× | 19.9× |
| 28 May 2021 | 20.5× | 19.9× |
| 11 Jun 2021 | 21.0× | 19.9× |
| 25 Jun 2021 | 20.9× | 19.9× |
| 9 Jul 2021 | 19.5× | 19.9× |
| 23 Jul 2021 | 19.4× | 19.9× |
| 6 Aug 2021 | 18.8× | 19.9× |
| 20 Aug 2021 | 15.6× | 19.9× |
| 3 Sep 2021 | 16.7× | 19.9× |
| 17 Sep 2021 | 15.9× | 19.9× |
| 1 Oct 2021 | 16.2× | 19.9× |
| 14 Oct 2021 | 15.6× | 19.9× |
| 29 Oct 2021 | 14.7× | 19.9× |
| 12 Nov 2021 | 14.4× | 19.9× |
| 26 Nov 2021 | 15.1× | 19.9× |
| 10 Dec 2021 | 14.6× | 19.9× |
| 24 Dec 2021 | 14.2× | 19.9× |
| 7 Jan 2022 | 15.3× | 19.9× |
| 21 Jan 2022 | 15.3× | 19.9× |
| 4 Feb 2022 | 15.7× | 19.9× |
| 18 Feb 2022 | 11.7× | 19.9× |
| 4 Mar 2022 | 10.6× | 19.9× |
| 17 Mar 2022 | 10.6× | 19.9× |
| 1 Apr 2022 | 11.5× | 19.9× |
| 13 Apr 2022 | 12.4× | 19.9× |
| 29 Apr 2022 | 13.1× | 19.9× |
| 13 May 2022 | 12.0× | 19.9× |
| 27 May 2022 | 12.1× | 19.9× |
| 10 Jun 2022 | 11.3× | 19.9× |
| 24 Jun 2022 | 11.1× | 19.9× |
| 8 Jul 2022 | 12.1× | 19.9× |
| 22 Jul 2022 | 11.7× | 19.9× |
| 5 Aug 2022 | 11.5× | 19.9× |
| 19 Aug 2022 | 12.4× | 19.9× |
| 2 Sep 2022 | 12.5× | 19.9× |
| 16 Sep 2022 | 12.1× | 19.9× |
| 30 Sep 2022 | 11.5× | 19.9× |
| 14 Oct 2022 | 12.2× | 19.9× |
| 28 Oct 2022 | 12.2× | 19.9× |
| 11 Nov 2022 | 12.4× | 19.9× |
| 25 Nov 2022 | 14.7× | 19.9× |
| 9 Dec 2022 | 15.4× | 19.9× |
| 23 Dec 2022 | 15.0× | 19.9× |
| 6 Jan 2023 | 17.5× | 19.9× |
| 20 Jan 2023 | 17.6× | 19.9× |
| 3 Feb 2023 | 16.4× | 19.9× |
| 17 Feb 2023 | 29.2× | 19.9× |
| 3 Mar 2023 | 27.3× | 19.9× |
| 17 Mar 2023 | 27.1× | 19.9× |
| 31 Mar 2023 | 27.2× | 19.9× |
| 13 Apr 2023 | 27.2× | 19.9× |
| 28 Apr 2023 | 30.0× | 19.9× |
| 12 May 2023 | 29.8× | 19.9× |
| 26 May 2023 | 32.3× | 19.9× |
| 9 Jun 2023 | 42.2× | 19.9× |
| 23 Jun 2023 | 40.3× | 19.9× |
| 7 Jul 2023 | 45.2× | 19.9× |
| 21 Jul 2023 | 52.2× | 19.9× |
| 4 Aug 2023 | 52.9× | 19.9× |
| 18 Aug 2023 | 51.7× | 19.9× |
| 1 Sep 2023 | 57.2× | 19.9× |
| 15 Sep 2023 | 54.9× | 19.9× |
| 29 Sep 2023 | 54.0× | 19.9× |
| 13 Oct 2023 | 55.3× | 19.9× |
| 27 Oct 2023 | 54.4× | 19.9× |
| 12 Nov 2023 | 47.8× | 19.9× |
| 24 Nov 2023 | 53.3× | 19.9× |
| 8 Dec 2023 | 59.5× | 19.9× |
| 22 Dec 2023 | 58.7× | 19.9× |
| 5 Jan 2024 | 59.7× | 19.9× |
| 20 Jan 2024 | 59.7× | 19.9× |
| 2 Feb 2024 | 59.6× | 19.9× |
| 16 Feb 2024 | 45.0× | 19.9× |
| 2 Mar 2024 | 40.5× | 19.9× |
| 15 Mar 2024 | 35.3× | 19.9× |
| 28 Mar 2024 | 41.8× | 19.9× |
| 12 Apr 2024 | 44.4× | 19.9× |
| 26 Apr 2024 | 52.5× | 19.9× |
| 10 May 2024 | 55.9× | 19.9× |
| 24 May 2024 | 59.7× | 19.9× |
| 7 Jun 2024 | 48.9× | 19.9× |
| 21 Jun 2024 | 57.2× | 19.9× |
| 5 Jul 2024 | 58.6× | 19.9× |
| 19 Jul 2024 | 59.7× | 19.9× |
| 2 Aug 2024 | 59.7× | 19.9× |
| 16 Aug 2024 | 59.7× | 19.9× |
| 30 Aug 2024 | 59.7× | 19.9× |
| 13 Sep 2024 | 59.7× | 19.9× |
| 27 Sep 2024 | 59.7× | 19.9× |
| 11 Oct 2024 | 59.7× | 19.9× |
| 25 Oct 2024 | 57.7× | 19.9× |
| 8 Nov 2024 | 59.7× | 19.9× |
| 22 Nov 2024 | 54.6× | 19.9× |
| 6 Dec 2024 | 55.2× | 19.9× |
| 20 Dec 2024 | 59.6× | 19.9× |
| 3 Jan 2025 | 59.7× | 19.9× |
| 17 Jan 2025 | 47.3× | 19.9× |
| 1 Feb 2025 | 38.3× | 19.9× |
| 14 Feb 2025 | 33.6× | 19.9× |
| 28 Feb 2025 | 35.3× | 19.9× |
| 13 Mar 2025 | 32.6× | 19.9× |
| 28 Mar 2025 | 36.4× | 19.9× |
| 11 Apr 2025 | 35.8× | 19.9× |
| 25 Apr 2025 | 39.9× | 19.9× |
| 9 May 2025 | 39.2× | 19.9× |
| 23 May 2025 | 44.1× | 19.9× |
| 6 Jun 2025 | 45.6× | 19.9× |
| 20 Jun 2025 | 45.5× | 19.9× |
| 4 Jul 2025 | 48.5× | 19.9× |
| 18 Jul 2025 | 47.0× | 19.9× |
| 1 Aug 2025 | 43.6× | 19.9× |
| 14 Aug 2025 | 39.9× | 19.9× |
| 29 Aug 2025 | 40.4× | 19.9× |
| 12 Sep 2025 | 38.5× | 19.9× |
| 26 Sep 2025 | 34.1× | 19.9× |
| 10 Oct 2025 | 36.5× | 19.9× |
| 24 Oct 2025 | 35.0× | 19.9× |
| 7 Nov 2025 | 34.2× | 19.9× |
| 21 Nov 2025 | 30.6× | 19.9× |
| 5 Dec 2025 | 28.7× | 19.9× |
| 19 Dec 2025 | 28.5× | 19.9× |
| 2 Jan 2026 | 29.0× | 19.9× |
| 16 Jan 2026 | 25.5× | 19.9× |
| 1 Feb 2026 | 26.0× | 19.9× |
| 13 Feb 2026 | 26.0× | 19.9× |
| 27 Feb 2026 | 29.1× | 19.9× |
| 13 Mar 2026 | 26.9× | 19.9× |
| 27 Mar 2026 | 25.6× | 19.9× |
| 10 Apr 2026 | 27.7× | 19.9× |
| 24 Apr 2026 | 30.4× | 19.9× |
| 8 May 2026 | 31.2× | 19.9× |
| 22 May 2026 | 33.1× | 19.9× |
| 4 Jun 2026 | 26.2× | 19.9× |
| 10 Jun 2026 | 25.7× | 19.9× |
| 17 Jun 2026 | 28.1× | 19.9× |
| 24 Jun 2026 | 27.8× | 19.9× |
| 1 Jul 2026 | 28.1× | 19.9× |
| 10 Jul 2026 | 27.2× | 19.9× |
| 24 Jul 2026 | 25.7× | 19.9× |
| 7 Aug 2026 | 27.6× | 19.9× |
| 21 Aug 2026 | 26.6× | 19.9× |
| 4 Sep 2026 | 26.4× | 19.9× |
| 18 Sep 2026 | 27.8× | 19.9× |
| 1 Oct 2026 | 26.9× | 19.9× |
| 16 Oct 2026 | 25.5× | 19.9× |
| 30 Oct 2026 | 22.4× | 19.9× |
Earnings per share, 12 months
- Earnings per share, 12 months ₹37
| Week | Earnings per share, 12 months |
|---|---|
| 11 Jan 2019 | – |
| 25 Jan 2019 | – |
| 8 Feb 2019 | – |
| 22 Feb 2019 | – |
| 8 Mar 2019 | – |
| 22 Mar 2019 | – |
| 5 Apr 2019 | ₹18 |
| 18 Apr 2019 | ₹18 |
| 3 May 2019 | ₹18 |
| 17 May 2019 | ₹18 |
| 31 May 2019 | ₹18 |
| 14 Jun 2019 | ₹18 |
| 28 Jun 2019 | ₹19 |
| 12 Jul 2019 | ₹19 |
| 26 Jul 2019 | ₹19 |
| 9 Aug 2019 | ₹19 |
| 23 Aug 2019 | ₹19 |
| 6 Sep 2019 | ₹19 |
| 20 Sep 2019 | ₹18 |
| 4 Oct 2019 | ₹18 |
| 18 Oct 2019 | ₹18 |
| 1 Nov 2019 | ₹18 |
| 15 Nov 2019 | ₹18 |
| 29 Nov 2019 | ₹18 |
| 13 Dec 2019 | ₹18 |
| 27 Dec 2019 | ₹18 |
| 10 Jan 2020 | ₹18 |
| 24 Jan 2020 | ₹18 |
| 7 Feb 2020 | ₹18 |
| 20 Feb 2020 | ₹18 |
| 6 Mar 2020 | ₹18 |
| 20 Mar 2020 | ₹18 |
| 3 Apr 2020 | ₹18 |
| 17 Apr 2020 | ₹18 |
| 30 Apr 2020 | ₹18 |
| 15 May 2020 | ₹18 |
| 29 May 2020 | ₹18 |
| 12 Jun 2020 | ₹18 |
| 26 Jun 2020 | ₹18 |
| 10 Jul 2020 | ₹18 |
| 24 Jul 2020 | ₹18 |
| 7 Aug 2020 | ₹18 |
| 21 Aug 2020 | ₹18 |
| 4 Sep 2020 | ₹18 |
| 18 Sep 2020 | ₹18 |
| 1 Oct 2020 | ₹15 |
| 16 Oct 2020 | ₹15 |
| 30 Oct 2020 | ₹15 |
| 14 Nov 2020 | ₹15 |
| 27 Nov 2020 | ₹15 |
| 11 Dec 2020 | ₹15 |
| 24 Dec 2020 | ₹14 |
| 8 Jan 2021 | ₹14 |
| 22 Jan 2021 | ₹14 |
| 5 Feb 2021 | ₹14 |
| 19 Feb 2021 | ₹14 |
| 5 Mar 2021 | ₹14 |
| 19 Mar 2021 | ₹14 |
| 1 Apr 2021 | ₹16 |
| 16 Apr 2021 | ₹16 |
| 30 Apr 2021 | ₹16 |
| 14 May 2021 | ₹16 |
| 28 May 2021 | ₹16 |
| 11 Jun 2021 | ₹16 |
| 25 Jun 2021 | ₹16 |
| 9 Jul 2021 | ₹16 |
| 23 Jul 2021 | ₹16 |
| 6 Aug 2021 | ₹16 |
| 20 Aug 2021 | ₹16 |
| 3 Sep 2021 | ₹16 |
| 17 Sep 2021 | ₹18 |
| 1 Oct 2021 | ₹18 |
| 14 Oct 2021 | ₹18 |
| 29 Oct 2021 | ₹18 |
| 12 Nov 2021 | ₹18 |
| 26 Nov 2021 | ₹18 |
| 10 Dec 2021 | ₹18 |
| 24 Dec 2021 | ₹18 |
| 7 Jan 2022 | ₹16 |
| 21 Jan 2022 | ₹16 |
| 4 Feb 2022 | ₹16 |
| 18 Feb 2022 | ₹16 |
| 4 Mar 2022 | ₹16 |
| 17 Mar 2022 | ₹16 |
| 1 Apr 2022 | ₹22 |
| 13 Apr 2022 | ₹22 |
| 29 Apr 2022 | ₹22 |
| 13 May 2022 | ₹22 |
| 27 May 2022 | ₹22 |
| 10 Jun 2022 | ₹22 |
| 24 Jun 2022 | ₹25 |
| 8 Jul 2022 | ₹25 |
| 22 Jul 2022 | ₹25 |
| 5 Aug 2022 | ₹25 |
| 19 Aug 2022 | ₹25 |
| 2 Sep 2022 | ₹25 |
| 16 Sep 2022 | ₹25 |
| 30 Sep 2022 | ₹23 |
| 14 Oct 2022 | ₹23 |
| 28 Oct 2022 | ₹23 |
| 11 Nov 2022 | ₹23 |
| 25 Nov 2022 | ₹23 |
| 9 Dec 2022 | ₹23 |
| 23 Dec 2022 | ₹23 |
| 6 Jan 2023 | ₹21 |
| 20 Jan 2023 | ₹21 |
| 3 Feb 2023 | ₹21 |
| 17 Feb 2023 | ₹21 |
| 3 Mar 2023 | ₹21 |
| 17 Mar 2023 | ₹21 |
| 31 Mar 2023 | ₹12 |
| 13 Apr 2023 | ₹12 |
| 28 Apr 2023 | ₹12 |
| 12 May 2023 | ₹12 |
| 26 May 2023 | ₹12 |
| 9 Jun 2023 | ₹12 |
| 23 Jun 2023 | ₹9 |
| 7 Jul 2023 | ₹9 |
| 21 Jul 2023 | ₹9 |
| 4 Aug 2023 | ₹9 |
| 18 Aug 2023 | ₹9 |
| 1 Sep 2023 | ₹9 |
| 15 Sep 2023 | ₹9 |
| 29 Sep 2023 | ₹9 |
| 13 Oct 2023 | ₹9 |
| 27 Oct 2023 | ₹9 |
| 12 Nov 2023 | ₹9 |
| 24 Nov 2023 | ₹9 |
| 8 Dec 2023 | ₹9 |
| 22 Dec 2023 | ₹9 |
| 5 Jan 2024 | ₹13 |
| 20 Jan 2024 | ₹13 |
| 2 Feb 2024 | ₹13 |
| 16 Feb 2024 | ₹13 |
| 2 Mar 2024 | ₹13 |
| 15 Mar 2024 | ₹13 |
| 28 Mar 2024 | ₹19 |
| 12 Apr 2024 | ₹19 |
| 26 Apr 2024 | ₹19 |
| 10 May 2024 | ₹19 |
| 24 May 2024 | ₹19 |
| 7 Jun 2024 | ₹19 |
| 21 Jun 2024 | ₹25 |
| 5 Jul 2024 | ₹25 |
| 19 Jul 2024 | ₹25 |
| 2 Aug 2024 | ₹25 |
| 16 Aug 2024 | ₹25 |
| 30 Aug 2024 | ₹25 |
| 13 Sep 2024 | ₹25 |
| 27 Sep 2024 | ₹26 |
| 11 Oct 2024 | ₹26 |
| 25 Oct 2024 | ₹26 |
| 8 Nov 2024 | ₹26 |
| 22 Nov 2024 | ₹26 |
| 6 Dec 2024 | ₹26 |
| 20 Dec 2024 | ₹26 |
| 3 Jan 2025 | ₹27 |
| 17 Jan 2025 | ₹27 |
| 1 Feb 2025 | ₹27 |
| 14 Feb 2025 | ₹27 |
| 28 Feb 2025 | ₹27 |
| 13 Mar 2025 | ₹27 |
| 28 Mar 2025 | ₹28 |
| 11 Apr 2025 | ₹28 |
| 25 Apr 2025 | ₹28 |
| 9 May 2025 | ₹28 |
| 23 May 2025 | ₹28 |
| 6 Jun 2025 | ₹28 |
| 20 Jun 2025 | ₹33 |
| 4 Jul 2025 | ₹33 |
| 18 Jul 2025 | ₹33 |
| 1 Aug 2025 | ₹33 |
| 14 Aug 2025 | ₹33 |
| 29 Aug 2025 | ₹33 |
| 12 Sep 2025 | ₹33 |
| 26 Sep 2025 | ₹38 |
| 10 Oct 2025 | ₹38 |
| 24 Oct 2025 | ₹38 |
| 7 Nov 2025 | ₹38 |
| 21 Nov 2025 | ₹38 |
| 5 Dec 2025 | ₹38 |
| 19 Dec 2025 | ₹38 |
| 2 Jan 2026 | ₹38 |
| 16 Jan 2026 | ₹38 |
| 1 Feb 2026 | ₹38 |
| 13 Feb 2026 | ₹38 |
| 27 Feb 2026 | ₹38 |
| 13 Mar 2026 | ₹38 |
| 27 Mar 2026 | ₹40 |
| 10 Apr 2026 | ₹40 |
| 24 Apr 2026 | ₹40 |
| 8 May 2026 | ₹40 |
| 22 May 2026 | ₹40 |
| 4 Jun 2026 | ₹40 |
| 10 Jun 2026 | ₹40 |
| 17 Jun 2026 | ₹40 |
| 24 Jun 2026 | ₹39 |
| 1 Jul 2026 | ₹39 |
| 10 Jul 2026 | ₹39 |
| 24 Jul 2026 | ₹39 |
| 7 Aug 2026 | ₹39 |
| 21 Aug 2026 | ₹39 |
| 4 Sep 2026 | ₹39 |
| 18 Sep 2026 | ₹39 |
| 1 Oct 2026 | ₹37 |
| 16 Oct 2026 | ₹37 |
| 30 Oct 2026 | ₹37 |
PEG 0.73: below 1.0, so the P/E is smaller than the earnings growth rate
- PEG 0.73×
- PEG = 1.0 1.00×
| Quarter | PEG | PEG = 1.0 |
|---|---|---|
| Q1 FY22 | 1.25× | 1.00× |
| Q2 FY22 | 1.45× | 1.00× |
| Q3 FY22 | 1.45× | 1.00× |
| Q4 FY22 | 0.48× | 1.00× |
| Q1 FY23 | 0.57× | 1.00× |
| Q2 FY23 | 0.57× | 1.00× |
| Q3 FY23 | 1.21× | 1.00× |
| Q4 FY23 | 3.00× | 1.00× |
| Q1 FY24 | 4.52× | 1.00× |
| Q2 FY24 | 4.52× | 1.00× |
| Q3 FY24 | 0.86× | 1.00× |
| Q4 FY24 | 0.75× | 1.00× |
| Q1 FY25 | 1.16× | 1.00× |
| Q2 FY25 | 1.35× | 1.00× |
| Q3 FY25 | 1.13× | 1.00× |
| Q4 FY25 | 1.08× | 1.00× |
| Q1 FY26 | 1.47× | 1.00× |
| Q2 FY26 | 1.05× | 1.00× |
| Q3 FY26 | 0.78× | 1.00× |
| Q4 FY26 | 0.75× | 1.00× |
| Q1 FY27 | 0.73× | 1.00× |
Why the multiple is where it is: over the past year earnings per share moved +12.0% while the price moved −31.1%. Earnings did better than the price, which pulled the multiple down within its own range.
Where the price move came from: over 5 years the price moved +27.4% a year; about +16.1% a year came from earnings growth and about +11.3 percentage points from the multiple (the market paying more). The split is approximate (price return minus earnings growth). It shows how much of the move came from the market paying a different multiple.
In short: the multiple is about average against its own past, so the earnings trend underneath matters more than the multiple.
Is the Techno Electric & Engineering Company business getting better or worse?
Techno Electric & Engineering Company Ltd's business is giving mixed signals. There is no clear direction across the growth lines, with ROCE falling at 13.2%; each line tells part of the story. This is based on 12 quarters of 4 measures.
Every business is somewhere on a path of getting better or worse, and this section names where. The last 12 quarters of growth in revenue, profit and earnings per share, plus the return the business earns on its capital, are read as lines. Getting worse: the lines are falling. Turning around: a low point has just formed and the last few quarters are rising from it. Getting better: the rise from the low has lasted. Growing steadily: steady growth with healthy returns. Slowing from a peak: still high, but slowing. When the lines disagree the result is mixed; too little history means no reading. CAGR (compound annual growth rate) is the steady yearly rate that would turn the starting value into the latest one. It is the fairest way to compare growth over different periods. If the 1-year figure is much bigger than the 10-year one, recent growth is running faster than the long-run trend. A dash means there is no figure for that period, or the starting year was a loss, where a growth rate means nothing.
Growth year by year: revenue +43.3% in FY26, profit +12.1%
- Revenue growth 43.3%
| Quarter | Revenue growth |
|---|---|
| FY17 | – |
| FY18 | 969.2% |
| FY19 | −23.1% |
| FY20 | −11.7% |
| FY21 | 1.5% |
| FY22 | 13% |
| FY23 | −16.9% |
| FY24 | 81% |
| FY25 | 51.1% |
| FY26 | 43.3% |
Profit growth, EPS growth
- Profit growth 12.1%
- EPS growth 12%
| Quarter | Profit growth | EPS growth |
|---|---|---|
| FY17 | – | – |
| FY18 | 267.9% | 266.7% |
| FY19 | −6.3% | 300% |
| FY20 | −7.3% | −5.1% |
| FY21 | 1.7% | 1.5% |
| FY22 | 45.1% | 45.1% |
| FY23 | −29.2% | −27.6% |
| FY24 | 43.3% | 43.7% |
| FY25 | 57.8% | 45.8% |
| FY26 | 12.1% | 12% |
Three growth lines over twelve quarters: revenue rolling over, profit rolling over
- Revenue 38.7%
| Quarter | Revenue |
|---|---|
| Sep 2023 | 26.2% |
| Dec 2023 | 54.8% |
| Mar 2024 | 67.2% |
| Jun 2024 | 60.4% |
| Sep 2024 | 28.3% |
| Dec 2024 | 37.5% |
| Mar 2025 | 50.9% |
| Jun 2025 | 50.8% |
| Sep 2025 | 78.2% |
| Dec 2025 | 61.6% |
| Mar 2026 | 43.3% |
| Jun 2026 | 38.7% |
Profit, EPS
- Profit −6.5%
- EPS −6.5%
| Quarter | Profit | EPS |
|---|---|---|
| Sep 2023 | −30.5% | −28.7% |
| Dec 2023 | 4.6% | 6.8% |
| Mar 2024 | 43.9% | 45.7% |
| Jun 2024 | 94.3% | 95.3% |
| Sep 2024 | 89.5% | 85.6% |
| Dec 2024 | 45.2% | 39.7% |
| Mar 2025 | 57.2% | 48.4% |
| Jun 2025 | 34.8% | 24.9% |
| Sep 2025 | 30.1% | 22.7% |
| Dec 2025 | 35% | 30% |
| Mar 2026 | 12.1% | 10% |
| Jun 2026 | −6.5% | −6.5% |
ROCE: the return line, worked out each quarter
- ROCE 13.2%
| Quarter | ROCE |
|---|---|
| Sep 2023 | 12.3% |
| Dec 2023 | 14.8% |
| Mar 2024 | 15% |
| Jun 2024 | 18.2% |
| Sep 2024 | 13.5% |
| Dec 2024 | 14.5% |
| Mar 2025 | 16.8% |
| Jun 2025 | 18.2% |
| Sep 2025 | 15.1% |
| Dec 2025 | 15.5% |
| Mar 2026 | 14.2% |
| Jun 2026 | 13.2% |
Why it matters: when the lines disagree, each line above matters more than any single label.
Compound annual growth rate (%)
Compound annual growth rate over each period, %. Revenue, profit and EPS come from yearly figures; the share price row is price growth over the same periods. A dash means no figure for that period, or the starting year was a loss.
| Measure | 1yr | 3yr | 5yr | 10yr |
|---|---|---|---|---|
| Revenue | +43.3% | +57.6% | +29.8% | — |
| Profit | +12.1% | +36.3% | +21.1% | — |
| EPS | +12.0% | +32.9% | +19.8% | — |
| Share price | −31.1% | +21.7% | +27.4% | — |
How much does Techno Electric & Engineering Company earn on its capital?
Techno Electric & Engineering Company Ltd earned a ROCE of 15% in FY26. That is up from a low of 8% in FY23. Its return on capital used (ROIC) is 6.2 percentage points above its cost of capital, so growth here adds value, not just size.
Return on capital employed (ROCE) is the profit the whole business earns on all the money in it, from shareholders and lenders together. It is the best single test of whether growth adds value or just size.
It comes from a 14.6% net margin and 0.55× asset turnover (sales divided by assets).
Why the return is what it is (FY26): a 14.6% net margin × 0.55× asset turnover × 1.42× leverage (assets divided by equity) ≈ 11.4% on equity. The margin does its share; borrowing plays a small part, so this return is earned, not borrowed.
The key test, return on capital used minus the cost of capital: 18.2% − 12.0% = +6.2 percentage points. The 12.0% is a standard assumption for the cost of capital in India, not an estimate for this company. Read the sign and size of the gap, not the decimals. A gap this wide means each rupee put back into the business creates more than a rupee of value.
The 18.2% ROIC above is the latest reading, as reported. The yearly chart below shows FY26 at 25.3%, and the quarterly chart works out each 12-month window from the quarterly figures, so the readings differ by date, not by method.
FY26: ROCE 15%, the climb back from FY23's 8%
- ROCE 15%
- ROIC (annual) 25.3%
- Cost of capital 12%
| Quarter | ROCE | ROIC (annual) | Cost of capital |
|---|---|---|---|
| FY18 | 26% | – | 12% |
| FY19 | 20% | – | 12% |
| FY20 | 13% | – | 12% |
| FY21 | 12% | – | 12% |
| FY22 | 18% | 14.4% | 12% |
| FY23 | 8% | 8.8% | 12% |
| FY24 | 17% | 24.9% | 12% |
| FY25 | 17% | 30.1% | 12% |
| FY26 | 15% | 25.3% | 12% |
Q4 FY26: ROCE 9.6% (last 12 months) against a 12.0% cost of capital
- ROCE (12 months) 9.6%
- ROIC (12 months) 29.2%
- Cost of capital 12.0%
| Quarter | ROCE (12 months) | ROIC (12 months) | Cost of capital |
|---|---|---|---|
| Q2 FY24 | 5.5% | 10.3% | 12% |
| Q3 FY24 | – | 15.4% | 12% |
| Q4 FY24 | 8.9% | 23.2% | 12% |
| Q1 FY25 | – | 30.1% | 12% |
| Q2 FY25 | 5.9% | 31.9% | 12% |
| Q3 FY25 | – | 28.9% | 12% |
| Q4 FY25 | 8.1% | 28.8% | 12% |
| Q1 FY26 | – | 34.2% | 12% |
| Q2 FY26 | 9.3% | 38.7% | 12% |
| Q3 FY26 | – | 38.3% | 12% |
| Q4 FY26 | 9.6% | 35.9% | 12% |
| Q1 FY27 | – | 29.2% | 12% |
Does Techno Electric & Engineering Company have too much debt?
Techno Electric & Engineering Company Ltd has total debt of ₹72.0 Cr against shareholder equity of ₹4,157 Cr as of Jun 2026, so its debt is 0.02× its equity, which is very little. Year by year, that ratio went from 0.01 in FY25 to 0.02 in FY26.
Debt-to-equity shows how much of the business is paid for with borrowed money. Lower is safer, and the direction matters as much as the level.
So the returns on this page come from the business, not from borrowed money.
FY26: debt ₹72.0 Cr, 0.02× equity
- Total debt ₹72.0
| Quarter | Total debt |
|---|---|
| FY25 | ₹39 |
| FY26 | ₹72 |
Debt-to-equity
- Debt-to-equity 0.02×
| Quarter | Debt-to-equity |
|---|---|
| FY25 | 0.01× |
| FY26 | 0.02× |
Jun 2026: debt ₹72.0 Cr, debt-to-equity 0.02
- Total debt (quarterly) ₹72.0
| Quarter | Total debt (quarterly) |
|---|---|
| Jun 2021 | ₹40 |
| Sep 2021 | ₹40 |
| Dec 2021 | ₹40 |
| Sep 2022 | ₹20 |
| Dec 2022 | ₹20 |
| Mar 2025 | ₹39 |
| Jun 2025 | ₹39 |
| Sep 2025 | ₹61 |
| Dec 2025 | ₹61 |
| Mar 2026 | ₹72 |
| Jun 2026 | ₹72 |
Debt-to-equity
- Debt-to-equity 0.02×
| Quarter | Debt-to-equity |
|---|---|
| Jun 2021 | 0.02× |
| Sep 2021 | 0.02× |
| Dec 2021 | 0.02× |
| Sep 2022 | 0.01× |
| Dec 2022 | 0.01× |
| Mar 2025 | 0.01× |
| Jun 2025 | 0.01× |
| Sep 2025 | 0.02× |
| Dec 2025 | 0.02× |
| Mar 2026 | 0.02× |
| Jun 2026 | 0.02× |
What is the Techno Electric & Engineering Company shareholding pattern?
Domestic institutions cut their stake in Techno Electric & Engineering Company Ltd by 2.8 percentage points over 8 quarters, the biggest change among its owners. Domestic institutions now own 21.3% of the company. Foreign institutions moved −1.7 points over the same period, to 8.1%. This uses the four owner groups that companies report every quarter; nothing is guessed between filings.
Who owns the company each quarter: promoters (the founders or controlling owners), foreign institutions, domestic institutions such as mutual funds, and the public. When people close to the business steadily raise their stake, that is worth noticing; a quiet list is also an answer.
Over the last two years: Domestic institutions: −2.8 points over 8 quarters, to 21.3%; Foreign institutions: −1.7 points over 8 quarters, to 8.1%; Promoters: +0.0 points over 8 quarters, to 56.9%.
Why the owners changed: domestic institutions drove it (−2.8 points), together with foreign institutions (−1.7 points). They reduced their stake.
Year ends: promoters −4.6 points from Mar 2024 to Mar 2026
- Promoters 56.93%
- Foreign inst. 8.65%
- Domestic inst. 22.72%
- Public 11.7%
| Quarter | Promoters | Foreign inst. | Domestic inst. | Public |
|---|---|---|---|---|
| Mar 2024 | 61.52% | 3.85% | 23.76% | 10.86% |
| Mar 2025 | 56.93% | 9.33% | 24.5% | 9.24% |
| Mar 2026 | 56.93% | 8.65% | 22.72% | 11.7% |
Domestic institutions cut their stake by 2.8 points over 8 quarters
- Promoters 56.93%
- Foreign inst. 8.09%
- Domestic inst. 21.33%
- Public 13.66%
| Quarter | Promoters | Foreign inst. | Domestic inst. | Public |
|---|---|---|---|---|
| Sep 2023 | 61.52% | 2.29% | 24.58% | 11.63% |
| Dec 2023 | 61.52% | 3.21% | 23.98% | 11.27% |
| Mar 2024 | 61.52% | 3.85% | 23.76% | 10.86% |
| Jun 2024 | 61.52% | 4.39% | 22.78% | 11.33% |
| Sep 2024 | 56.93% | 9.8% | 24.12% | 9.15% |
| Dec 2024 | 56.93% | 9.92% | 24.03% | 9.12% |
| Mar 2025 | 56.93% | 9.33% | 24.5% | 9.24% |
| Jun 2025 | 56.93% | 8.98% | 24.04% | 10.07% |
| Sep 2025 | 56.93% | 9.22% | 22.62% | 11.24% |
| Dec 2025 | 56.93% | 8.53% | 23.05% | 11.47% |
| Mar 2026 | 56.93% | 8.65% | 22.72% | 11.7% |
| Jun 2026 | 56.93% | 8.08% | 21.61% | 13.39% |
| Sep 2026 | 56.93% | 8.09% | 21.33% | 13.66% |
How far is Techno Electric & Engineering Company from balance-sheet trouble?
For Techno Electric & Engineering Company Ltd, the Z-score is not available, so we say so rather than guess one. It estimates how far the balance sheet is from trouble; it is not a forecast of failure. The debt, cash-flow and return sections show the balance-sheet figures we do have, each with its own date.
The Z-score estimates how far a company is from balance-sheet trouble. Above about 3 is safe; below about 1.8 is the danger zone. It was built for manufacturers, so it is not used for banks and lenders.
How does Techno Electric & Engineering Company rank in its industry?
41.3 out of 100, rank 5 of 5 in Data Centre, with 81% of the evidence available.
Techno Electric & Engineering Company Ltd scores 41.3 out of 100 against the 5 companies it is compared with in Data Centre, ranking 5. The evidence is balanced: no factor stands out, so another reported quarter is needed before the picture is clearer.
The four parts add up to the total exactly: 9.8 + 12.1 + 11.9 + 7.5 = 41.3. This is the same number shown on the industry page; it is worked out once for the whole group and read here.
What would change it: The score would fall if profit growth turns negative or margins stop improving while the share price lags its sector.
Which companies is Techno Electric & Engineering Company compared with?
Techno Electric & Engineering Company ranks 5 of 5 Data Centre companies on the 4-Factor Sector Score, with 41.3 out of 100.
- 1E2E Networks LtdE2E · leader · Evidence leans up · 74% evidence59.4out of 100
How the score adds up
Growth & earnings 27.6/35 · Revenue 100% · Profit 100% · Operating margin change 36 points · 74% evidenceCapital efficiency 9.3/25 · ROCE -0.5% · Operating margin 77% · 100% evidenceValuation 8.5/20 · P/E 91.2× · PEG — · 15% evidenceRelative strength 14.0/20 · Lead over its industry 35% · Lead over NIFTY 500 44.3% · 1 year 68.3% · 100% evidence · 12 of 12 weeks aheadExact sum: 27.6 + 9.3 + 8.5 + 14 = 59.4 · What this means: The evidence is balanced: no factor stands out, so another reported quarter is needed before the picture is clearer. - 2Netweb Technologies India LtdNETWEB · losing its lead · Evidence leans up · 83% evidence54.9out of 100
How the score adds up
Growth & earnings 20.1/35 · Revenue 100% · Profit 100% · Operating margin change 0 points · 100% evidenceCapital efficiency 17.4/25 · ROCE 37.5% · Operating margin 15% · 100% evidenceValuation 9.3/20 · P/E 67.8× · PEG — · 15% evidenceRelative strength 8.1/20 · Lead over its industry -2.2% · Lead over NIFTY 500 9.5% · 1 year 3.3% · 100% evidence · 9 of 12 weeks aheadExact sum: 20.1 + 17.4 + 9.3 + 8.1 = 54.9 · What this means: The evidence is balanced: no factor stands out, so another reported quarter is needed before the picture is clearer. - 3Black Box LtdBBOX · turning · Evidence leans up · 96% evidence51.2out of 100
How the score adds up
Growth & earnings 12.2/35 · Revenue 12.2% · Profit 6.1% · Operating margin change 1 points · 88% evidenceCapital efficiency 15.3/25 · ROCE 21.6% · Operating margin 9% · 100% evidenceValuation 4.5/20 · P/E 49.5× · PEG 2.36 · 100% evidenceRelative strength 19.2/20 · Lead over its industry 8.9% · Lead over NIFTY 500 20.5% · 1 year 50.1% · 100% evidence · 3 of 12 weeks aheadExact sum: 12.2 + 15.3 + 4.5 + 19.2 = 51.2 · What this means: Relative strength against the index is 20.5%, and revenue and profit growth are weak. - 4Anant Raj LtdANANTRAJ · quiet · Evidence leans down · 93% evidence45.2out of 100
How the score adds up
Growth & earnings 22.4/35 · Revenue 12.3% · Profit 21.3% · Operating margin change 3 points · 100% evidenceCapital efficiency 11.8/25 · ROCE 12.1% · Operating margin 30% · 100% evidenceValuation 10.2/20 · P/E 27× · PEG 1.81 · 65% evidenceRelative strength 0.8/20 · Lead over its industry -25.2% · Lead over NIFTY 500 -13.9% · 1 year -30.6% · 100% evidence · 8 of 12 weeks aheadExact sum: 22.4 + 11.8 + 10.2 + 0.8 = 45.2 · What this means: The evidence is balanced: no factor stands out, so another reported quarter is needed before the picture is clearer. - 5Techno Electric & Engineering Company Ltd this pageTECHNOE · quiet · Evidence leans down · 81% evidence41.3out of 100
How the score adds up
Growth & earnings 9.8/35 · Revenue 38.7% · Profit -6.5% · Operating margin change -2 points · 88% evidenceCapital efficiency 12.1/25 · ROCE 14.9% · Operating margin 16% · 100% evidenceValuation 11.9/20 · P/E 22.4× · PEG 1.63 · 100% evidenceRelative strength 7.5/20 · Lead over its industry — · Lead over NIFTY 500 -18.8% · 1 year -37.1% · 25% evidence · 0 of 12 weeks aheadExact sum: 9.8 + 12.1 + 11.9 + 7.5 = 41.3 · What this means: The evidence is balanced: no factor stands out, so another reported quarter is needed before the picture is clearer.
Missing figures are not scored as bad. They lower the confidence and pull the final score toward the middle. Relative strength counts only when the company has a reading for this week; with no reading, that factor is left out and its 20 points are shared across the other three in proportion. PEG is not shown when the ratio cannot mean anything: the company must be making a profit, its price-to-earnings must be positive, and its three-year earnings growth must fall between 5% and 60%. Dividing a price multiple by a loss, or by growth measured off a tiny base, produces a number that looks precise and tells you nothing. Under relative strength, one mark per week shows the last 12 weeks: a mark is filled where the company led NIFTY 500 by 5% or more over the 13 weeks ending that week, which is the same test used everywhere on this site. Price stage places the company on the same six-step path the industry is placed on (basing, turning, breaking out, leader, fading, asleep), read from how many weeks running it has led NIFTY 500 and whether that lead is growing or shrinking. It describes where the share price stands, not the direction of earnings, and it is not a recommendation; it is left blank for a company whose weekly history is too short or too stale to read.
The figures in this ranking come from the industry comparison: results through the Sep 2026 quarter, and the P/E at that quarter's end. The sections above use the latest weekly price, so a P/E or return there can differ a little from the one here. The stage words in this ranking (such as losing its lead or breaking out) describe the lead over the index, not the price phase in the price section.
Related companies: Data Centre, all 5 compared on one page.
Which companies are close to Techno Electric & Engineering Company in size?
Techno Electric & Engineering Company is the 5th largest of 5 Data Centre companies on Sector Alpha by market value (scores of 30 October 2026). Just above it: Netweb Technologies India, Anant Raj, Black Box and E2E Networks. It is the smallest.
Data Centre companies close in size
- Netweb Technologies India Ltd ₹24,805 crore
- Anant Raj Ltd ₹16,097 crore
- Black Box Ltd ₹14,150 crore
- E2E Networks Ltd ₹10,698 crore
- Techno Electric & Engineering Company Ltd ₹9,645 crore
All 5 Data Centre companies, largest first
Companies close in size in other industries
- India Cements Ltd ₹9,672 crore · Cement
- Viyash Scientific Ltd ₹9,648 crore · Pharma - Animal
- Techno Electric & Engineering Company Ltd ₹9,645 crore
- Powergrid Infrastructure Investment Trust ₹9,585 crore · Infrastructure Investment Trusts
- Can Fin Homes Ltd ₹9,582 crore · Finance - Housing
What else do people ask about Techno Electric & Engineering Company?
What is Techno Electric & Engineering Company's share price today?
Techno Electric & Engineering Company Ltd's share price is ₹884.40, −31.1% over the past year. The whole company is worth ₹10,290 Cr on the market.
In the last 52 weeks it traded between ₹825 to ₹1,335; today it is 12% of the way up from the low, 16.3% below its 200-day average (as of 4 November 2026).
What were Techno Electric & Engineering Company's latest quarterly results?
Techno Electric & Engineering Company Ltd reported revenue of ₹630 Cr and net profit of ₹93.0 Cr for the Jun 2026 quarter. Revenue rose 19.8% and profit fell 31.6% compared with a year earlier. Earnings per share were ₹8.02 (as of 4 November 2026).
What is Techno Electric & Engineering Company's market cap?
Techno Electric & Engineering Company Ltd's market capitalisation is ₹10,290 Cr at a share price of ₹884.40. Market cap is the share price times the number of shares, so it changes whenever the price moves (as of 4 November 2026).
How is Techno Electric & Engineering Company performing?
Techno Electric & Engineering Company Ltd's share price has been falling for 21 weeks. In its latest quarter, revenue rose 19.8% and profit fell 31.6% compared with a year earlier.
Over the past 13 weeks it has done worse than the NIFTY 500, for 28 weeks running (as of 4 November 2026).
Will Techno Electric & Engineering Company's share price go up?
This page does not forecast Techno Electric & Engineering Company Ltd's share price. What it shows instead: the share price is ₹884.40, and it has been falling for 21 weeks. Its P/E of 23.9× is higher than 53% of its own last 8 years (as of 4 November 2026).
Who owns Techno Electric & Engineering Company?
Promoters own 56.9% of Techno Electric & Engineering Company Ltd, foreign institutions 8.1%, domestic institutions 21.3% and the public 13.7% (latest quarter). The biggest change over the last two years: Domestic institutions cut their stake by 2.8 percentage points over 8 quarters (as of 4 November 2026).
Where is Techno Electric & Engineering Company in its business cycle?
Techno Electric & Engineering Company Ltd's FY26 operating margin was 14.0%, against a 10-year range of 11.0% to 91.0%: the low end of its own range, which is often where recoveries start. The latest quarter was 16.0%.
Comparing margins with a company's own long history is a good way to see where it is in its cycle (as of 4 November 2026).
What could break the Techno Electric & Engineering Company story?
The main question: yearly earnings per share moved +12.0% while the share price moved −31.1%. On price, this page treats a rise as over when the share price closes below its 200-day average on two Fridays in a row (as of 4 November 2026).
Is Techno Electric & Engineering Company a stock worth studying right now?
What the numbers show: Techno Electric & Engineering Company Ltd's share price, valuation and earnings point in different directions. The next one or two quarters should make it clearer. The main open question: whether the price catches up with earnings that have already grown.
Every number on this page is worked out by code from the published figures, with no forecasts and no price opinions (as of 4 November 2026).
Is there a Techno Electric & Engineering Company share price forecast for 2026?
What management itself guided: FY27 revenue at least ₹4,000 crore and top- and bottom-line growth at least 25%; year-end order-book goal ₹4,000 crore likely exceeded; delivery remains H2-weighted.
Where do these numbers come from?
Sector Alpha, written by code from the published numbers. Data as of 4 November 2026.
Every chart on this page is drawn by code from the published figures, with no forecasts and no price opinions.
See the plain-text version of this page.
More lists
Every Sector Alpha list, grouped
Stock screens
Market lists
Themes
Sectors
US stocks
X · Instagram · YouTube · About · Newsletter · Newsletter archive
This is research, not advice. We’re not SEBI-registered.