Central Mine Planning & Design Institute Ltd
CMPDICentral Mine Planning & Design Institute Ltd's three tracks disagree. Price, valuation and the earnings engine each tell a different story — the next quarter or two settles it.
Biggest watch item: the price is already 14 weeks into its uptrend — timing risk, not thesis risk.
The price is in a confirmed uptrend (14 weeks in) while the P/E sits at the 36th percentile of its own 0-year range. Underneath, the last four quarters read improving — profit +52.6% year on year, and 92% of the last 3 years' profit arrived as cash. What settles it: the next one or two quarters of delivery.
Price story Before the numbers, the tape. A stock price moves through four repeating seasons: a flat base (stage 1), an advance (2), a top (3), a decline (4). Where the price sits in that cycle frames everything below.
Central Mine Planning & Design Institute Ltd trades at ₹255, in a confirmed uptrend and 14 weeks into that stage. That is +31.7% against its own 200-day average. It sits at 77% of a 52-week range of ₹181 to ₹278. On relative strength it has no relative-strength read yet.
Today the stock is in a confirmed uptrend — week 14 of stage 2, confirmed. At ₹255 it trades +31.7% versus its 200-day average and sits at 77% of its 52-week range (₹181–₹278).
Against the market, two honest reads. Cumulative: over the last 4 months the stock moved +41% while the NIFTY 500 moved +1% — ahead of the index over the full window. Recent form: no trailing-13-week read yet — the ribbon below is that same metric, week by week.
What would end the trend, mechanically: two Friday closes in a row below the 200-day line. That is the exit rule — no debates.
→ The trend is one thing; the bill is another. Are you paying up for it? Next: the P/E sits at the 36th percentile of its own range.
Valuation P/E is the price of ₹1 of annual profit: how many rupees the market pays for each rupee the company earns in a year.
Central Mine Planning & Design Institute Ltd trades at 27.1× P/E, mid-range by its own standards (36th percentile). Its long-run median P/E is 28.1×, measured across 0.3 years of weekly readings. This places the multiple against the stock’s own record, and says nothing about what the business is worth.
Today's P/E of 27.1× is mid-range by its own standards (36th percentile), against a long-run median of 28.1× measured over 0.3 years of weekly readings. This is a comparison against the stock's own history — not a claim about what it is worth.
Put together: the multiple is unremarkable against its own past, so the story rests on the earnings line underneath it, not the multiple.
→ Cheap or dear rides on the earnings. Are they actually growing? Next: the fundamental stage — where the business sits in its arc, and how growth has compounded.
Stage: No read Every business sits somewhere on a fundamental arc, and this page names the spot before anything else. The last twelve quarters of revenue, profit and EPS growth — plus the return the business earns on its capital — are read as curves: Deteriorating (the curves are falling), Turning around (a trough has just formed and the last few quarters lift off it), Improving (the climb off the trough is sustained), Consistent (steadily positive with healthy returns), Topping out (still high but decelerating from the peak). When the curves genuinely disagree the read is Mixed; too little history is No read. CAGR (compound annual growth rate) is the smooth yearly pace that turns the starting value into the latest one — the fairest way to compare growth across different time spans. Read the columns together: if the 1-year number towers over the 10-year, recent growth is running hotter than the long-run trend. A dash means that window is not held, or the base year was a loss (where a growth rate is not meaningful).
Central Mine Planning & Design Institute Ltd reads as no read on its fundamental arc. Under eight usable quarters on the growth trio — not enough history for an honest trajectory read. The read is built from 4 quarters across 1 curve, on partial evidence.
Why it matters: with too little history, an honest page says so instead of guessing a trajectory.
One or more growth curves carry a base-effect spike — a large year-on-year move off a near-zero or loss-making comparable quarter. Those spikes are capped before the classifier reads the trajectory, and shown pinned on the chart, so a single distorted quarter does not drive the stage call.
Return readings here are annual, not quarterly — read as level and direction only; they can confirm the growth curves but never drive the stage on their own.
Fewer than eight usable quarters on the growth curves — this page will not guess a trajectory from a stub of history.
| 1yr | 3yr | 5yr | 10yr | |
|---|---|---|---|---|
| Revenue | +10.2% | +18.7% | +9.2% | — |
| Profit | −8.1% | +27.3% | +14.1% | — |
| EPS | −99.8% | −83.9% | −67.1% | — |
→ The stage names the trajectory. Next: the revenue line that produces it, quarter by quarter.
4-Factor Sector Score
62.8/100 — rank 28 of 36 in Miscellaneous · 38% evidence confidence · provisional, ranked below fully-evidenced peers
Central Mine Planning & Design Institute Ltd scores 62.8 out of 100 against the 36 companies it is compared with in Miscellaneous, ranking 28. Fill the missing evidence before acting; the ranking is deliberately pulled toward neutral.
The four contributions add to the total exactly: 22.3 + 20.3 + 10.2 + 10 = 62.8. This is the SAME number shown on the sector comparison — it is computed once, for the whole peer set, and read here.
What would change it: The read weakens if profit growth turns negative or margin improvement reverses while sector-relative strength deteriorates.
Revenue Revenue is the top line: everything the company billed its customers in the period.
Central Mine Planning & Design Institute Ltd reported ₹481 Cr of revenue in the Jun 26 quarter, +17.6% year on year. That is the 2nd straight quarter of year-on-year growth. Over 5 years it has compounded at 9.2% a year. The last full year, FY26, came in at ₹2,317 Cr. The last four reported quarters add to ₹2,246 Cr.
Central Mine Planning & Design Institute Ltd reported ₹481 Cr of revenue in the Jun 26 quarter, +17.6% year on year. That is the 2nd straight quarter of year-on-year growth. Over 5 years it has compounded at 9.2% a year. The last full year, FY26, came in at ₹2,317 Cr. The last four reported quarters add to ₹2,246 Cr.
FY26 revenue came in at ₹2,317 Cr (+10.2% on the year), capping 5 years at 9.2% compound. The latest quarter (Jun 26) printed ₹481 Cr, +17.6% year on year — the 2nd consecutive quarter of year-over-year growth.
Pace check: the last four quarters averaged +14.7% growth against the decade's 9.2% — the current year is running faster than its own long-run rate.
→ Revenue grew — did margins hold as it scaled? Next: 30.0% this quarter (+8.0 pp YoY).
Operating margin Operating margin is what is left of every ₹100 of sales after running the business, before interest and tax. It is the cleanest read on pricing power and cost control.
Central Mine Planning & Design Institute Ltd's operating margin is 30.0% in the Jun 26 quarter, +8.0 percentage points against the same quarter a year ago. Across the last four quarters the operating margin has moved −15.0 percentage points. Across 6 fiscal years the operating margin has ranged 28.0% to 42.0%. The current quarter sits inside that band.
Central Mine Planning & Design Institute Ltd's operating margin is 30.0% in the Jun 26 quarter, +8.0 percentage points against the same quarter a year ago. Across the last four quarters the operating margin has moved −15.0 percentage points. Across 6 fiscal years the operating margin has ranged 28.0% to 42.0%. The current quarter sits inside that band.
The latest quarter's operating margin is 30.0%, +8.0 pp against the same quarter a year ago. Across 6 fiscal years the operating margin has ranged 28.0%–42.0%.
🚨 Why the margin moved: operating margin went −14.8 pp year on year while gross margin went +0.2 pp — the loss came mostly below the gross line: operating leverage, with costs spread over a bigger revenue base.
→ Margins held — did that reach the bottom line? Next: profit +52.6% in the latest quarter.
Net profit Net profit is what survives every cost, interest and tax — the number EPS, dividends and book value all grow from.
Central Mine Planning & Design Institute Ltd earned ₹116 Cr of net profit in the Jun 26 quarter, +52.6% year on year. Full-year FY26 profit was ₹613 Cr. The 5-year compound rate is 14.1%. That is 24.1% of the quarter's revenue. The same quarter a year earlier earned ₹277 Cr.
Central Mine Planning & Design Institute Ltd earned ₹116 Cr of net profit in the Jun 26 quarter, +52.6% year on year. Full-year FY26 profit was ₹613 Cr. The 5-year compound rate is 14.1%. That is 24.1% of the quarter's revenue. The same quarter a year earlier earned ₹277 Cr.
Jun 26 profit was ₹116 Cr, +52.6% year on year. On the full year, FY26 printed ₹613 Cr (−8.1%), and the 5-year compound rate is 14.1%.
→ Profit rose — but did the cash follow? Next: 92% of the last 3 years' profit arrived as cash.
Cash flow — the router The P&L says what was earned; the cash-flow statement says what actually arrived. Operating cash flow (CFO) against profit is the cleanest lie detector in the accounts.
Over the last 3 fiscal years 92% of Central Mine Planning & Design Institute Ltd's reported profit arrived as operating cash — the cash follows the profit. In FY26 that was ₹716 Cr of operating cash against ₹613 Cr of profit. After ₹65.0 Cr of capital spending, ₹651 Cr was left as free cash.
FY26: operating cash of ₹716 Cr against reported profit of ₹613 Cr, leaving free cash of ₹651 Cr after ₹65.0 Cr of capital spending. Across the last 3 fiscal years the conversion rate is 92% of profit.
Cash-flow readings here are annual — that is the resolution our series carries, so this section moves once a year.
Why conversion sits at 92%: the cash cycle tightened 50 days between FY21 and FY26 — cash that used to wait in the cycle now reaches the bank sooner.
Router verdict: no single sink dominates — the next section checks both the working-capital cycle and the capital spending.
→ So follow the cash to where it goes. Next: a 169-day cycle and ₹126 Cr of building.
Where the cash goes Working capital is the cash tied up between paying suppliers and getting paid: debtor days (customers owe), inventory days (stock waits), and the cash conversion cycle (the whole loop, in days of sales).
Central Mine Planning & Design Institute Ltd's cash conversion cycle runs 169 days in FY26, down from 219 days in FY21. Capital spending ran ₹126 Cr over the last 3 years. At FY26 sales of ₹2,317 Cr each day of that cycle holds about ₹6.3 Cr, so roughly ₹1,073 Cr sits inside the business at any moment.
FY26: debtors at 169 days (an asset-light business — no inventory to speak of) — for a full cycle of 169 days, tighter than FY21's 219.
In money terms: at FY26 sales of ₹2,317 Cr, each day of the cycle holds about ₹6.3 Cr — so the 169-day loop keeps roughly ₹1,073 Cr sitting inside the business at any moment.
On the investment side: capital spending of ₹126 Cr over the last 3 fiscal years against ₹100 Cr of depreciation — building somewhat ahead of wear-and-tear. Capital work-in-progress stands at ₹42.0 Cr (FY26) — capacity paid for but not yet earning.
The synthesis: neither the cycle nor the build-out is hoarding the cash — the machine is reasonably clean.
→ Does all this activity actually earn its cost of capital? Next: ROCE is 38% and the ROIC − WACC spread is +56.8 pp.
Return on capital Return on capital employed (ROCE) is the profit the whole business earns on all the money in it — equity and debt together. It is the single best test of whether growth creates value or just size.
Central Mine Planning & Design Institute Ltd earns a ROCE of 38% in FY26. That is up from a trough of 33% in FY23. Return on invested capital clears the cost of that capital by +56.8 percentage points, so growth here adds value rather than only size. The wiring behind it is 26.5% net margin on 0.71× asset turns.
FY26 ROCE is 38%, recovered from a FY23 trough of 33% — the full ladder below shows the fall and the climb, undoctored.
Why the return is what it is — the wiring (FY26): 26.5% net margin × 0.71× asset turns × 1.43× balance-sheet leverage ≈ 26.9% on equity. Margin is doing the heavy lifting; leverage is modest — this is an earned return, not a borrowed one.
The capstone test — ROIC − WACC: 68.8% − 12.0% = a +56.8 pp spread. The 12.0% is a standing assumption for the cost of capital in India, not a per-stock estimate — read the sign and the size of the spread, not the decimals. A spread this wide means every rupee reinvested creates more than a rupee of value — the engine compounds.
→ Returns like these — is the balance sheet borrowing to make them? Next: debt-to-equity is 0.00.
Debt Debt-to-equity says how much of the business is funded by borrowings; interest cover says how many times operating profit pays the interest bill. Low and high, respectively, is the safe corner.
Central Mine Planning & Design Institute Ltd carries ₹1.0 Cr of borrowings against ₹2,283 Cr of equity in FY26, a debt-to-equity of 0.00. Over 5 years borrowings went from ₹1.0 Cr to ₹1.0 Cr. Capital spending ran ₹126 Cr across the last 3 of those years.
FY26: borrowings of ₹1.0 Cr against equity of ₹2,283 Cr — a debt-to-equity of 0.00. Over 5 years borrowings went from ₹1.0 Cr to ₹1.0 Cr while capital spending ran ₹126 Cr in just the last 3 — the build-out is being paid for out of cash, not debt.
→ Who owns this, and are they adding or leaving? Next: the register is quiet.
Ownership Who owns the stock, quarter by quarter: promoters (the controlling owners), foreign and domestic institutions, and the public. Steady accumulation by people close to the numbers is a signal; a quiet register is also an answer.
No holder of Central Mine Planning & Design Institute Ltd moved a full percentage point over the last two years — the register is quiet. The register is read on the four disclosed classes only; nothing is inferred between filings.
The register over the last two years — .
→ One last check: does the safety math agree? Next: the balance-sheet safety line.
Safety line The Z-score estimates how far a company sits from balance-sheet distress — above roughly 3 is safe, below roughly 1.8 is the danger zone. It was built for manufacturers, so it is not applied to banks and lenders.
Central Mine Planning & Design Institute Ltd: the Z-score is not available for this stock, so we say so rather than invent one. It is a distance-to-distress estimate from the balance sheet, not a forecast of failure.
The safety line in one sentence: the Z-score is not available for this stock, so we say so rather than invent one.
| Company | P/E | Mkt cap | Revenue | EPS | ROCE | Stage |
|---|---|---|---|---|---|---|
| Central Mine Planning & Design Institute Ltd this page | 27.1× | ₹17,738 Cr | — | — | — | No read |
| GMR Airports Ltd | 544.0× | ₹1.1L Cr | No read | |||
| Aegis Vopak Terminals Ltd | 104.0× | ₹32,424 Cr | No read | |||
| Sagility Ltd | 18.4× | ₹18,922 Cr | Mixed | |||
| Embassy Developments Ltd | — | ₹8,512 Cr | No read | |||
| Inox Green Energy Services Ltd | 74.6× | ₹7,703 Cr | Mixed | |||
| RattanIndia Enterprises Ltd | — | ₹4,368 Cr | No read | |||
| Kaveri Seed Company Ltd | 14.5× | ₹4,298 Cr | No read | |||
| Indiqube Spaces Ltd | — | ₹3,844 Cr | — | No read | ||
| TruAlt Bioenergy Ltd | 38.3× | ₹3,678 Cr | No read | |||
| Anzen India Energy Yield Plus Trust | — | ₹3,324 Cr | No read | |||
| Eveready Industries India Ltd | 25.9× | ₹2,595 Cr | No read | |||
| Shipping Corporation of India Land & Assets Ltd | 66.8× | ₹1,925 Cr | Turning around | |||
| Jai Corp Ltd | 10.3× | ₹1,761 Cr | Mixed | |||
| Delta Corp Ltd | 18.9× | ₹1,687 Cr | Deteriorating | |||
| Aeroflex Enterprises Ltd | 22.2× | ₹1,441 Cr | Improving | |||
| TCC Concept Ltd | 20.5× | ₹1,293 Cr | Mixed | |||
| Gulshan Polyols Ltd | 28.5× | ₹1,217 Cr | Improving | |||
| Unitech Ltd | — | ₹1,146 Cr | No read | |||
| Jindal Photo Ltd | — | ₹1,104 Cr | No read | |||
| GKW Ltd | — | ₹980 Cr | Deteriorating | |||
| Shree Vasu Logistics Ltd | 154.0× | ₹888 Cr | — | — | — | — |
| IIRM Holdings India Ltd | 36.3× | ₹886 Cr | No read | |||
| Stanley Lifestyles Ltd | 61.4× | ₹879 Cr | Deteriorating | |||
| Parin Enterprises Ltd | 125.0× | ₹810 Cr | Mixed | |||
| FlySBS Aviation Ltd | 13.3× | ₹807 Cr | — | — | — | — |
| Exhicon Events Media Solutions Ltd | 19.6× | ₹799 Cr | No read | |||
| Tandhan Industries Ltd | — | ₹746 Cr | No read | |||
| Exhicon Events Media Solutions Ltd | 19.7× | ₹731 Cr | No read | |||
| Prozone Realty Ltd | 62.5× | ₹668 Cr | No read | |||
| Aqylon Nexus Ltd | — | ₹666 Cr | No read | |||
| Take Solutions Ltd | 3,222.0× | ₹644 Cr | No read | |||
| Aqylon Nexus Ltd | — | ₹639 Cr | No read | |||
| Maagh Advertising & Marketing Services Ltd | — | ₹572 Cr | No read | |||
| IIRM Holdings India Ltd | 28.4× | ₹569 Cr | — | No read | ||
| Shree Rama Newsprint Ltd | — | ₹532 Cr | No read | |||
| Global Education Ltd | 19.6× | ₹519 Cr | Turning around | |||
| Qualitek Labs Ltd | 35.0× | ₹513 Cr | — | — | — | — |
| R K Swamy Ltd | 21.0× | ₹512 Cr | No read |
Frequently asked questions
What is Central Mine Planning & Design Institute Ltd's share price today?
Central Mine Planning & Design Institute Ltd trades at ₹255. The company is valued at ₹17,738 Cr. The stock sits at 77% of its 52-week range of ₹181–₹278, +31.7% versus its 200-day average. On the tape, the price is in a confirmed uptrend, 14 weeks in. — as of 24 July 2026.
What were Central Mine Planning & Design Institute Ltd's latest quarterly results?
Central Mine Planning & Design Institute Ltd reported revenue of ₹481 Cr and net profit of ₹116 Cr for the Jun 26 quarter. Revenue rose 17.6% and profit rose 52.6% year on year. Earnings per share were ₹1.63. The operating margin was 30.0%, 8.0 pp higher than a year earlier. — as of 24 July 2026.
What is Central Mine Planning & Design Institute Ltd's revenue?
Central Mine Planning & Design Institute Ltd reported revenue of ₹481 Cr in the Jun 26 quarter, +17.6% year on year. For the full FY26 fiscal year, revenue was ₹2,317 Cr (+10.2%). Over the last 5 years revenue compounded at 9.2% a year. — as of 24 July 2026.
What is Central Mine Planning & Design Institute Ltd's profit?
Central Mine Planning & Design Institute Ltd earned ₹116 Cr of net profit in the Jun 26 quarter, +52.6% year on year. Full-year FY26 profit was ₹613 Cr. The operating margin ran 30.0% in the latest quarter. — as of 24 July 2026.
What is Central Mine Planning & Design Institute Ltd's market cap?
Central Mine Planning & Design Institute Ltd's market capitalisation is ₹17,738 Cr at a share price of ₹255. Market cap is the share price multiplied by shares outstanding, so it is restated whenever the price moves. — as of 24 July 2026.
What is Central Mine Planning & Design Institute Ltd's P/E ratio?
Central Mine Planning & Design Institute Ltd trades at a P/E of 27.1×, at the 36th percentile of its own 0-year range, against a long-run median of 28.1×. This is a comparison with the stock's own history, not a value call — as of 24 July 2026.
Is Central Mine Planning & Design Institute Ltd overvalued?
On its own history, Central Mine Planning & Design Institute Ltd looks mid-range against its own history: its P/E of 27.1× sits at the 36th percentile of its 0-year range (long-run median 28.1×). That is a percentile read against the stock's own past, not a price opinion or a direction call. — as of 24 July 2026.
Is Central Mine Planning & Design Institute Ltd growing?
Yes — Central Mine Planning & Design Institute Ltd is growing: latest-quarter revenue +17.6% year on year, profit +52.6%, and the margin +8.0 pp at 30.0%. The 5-year compound rates are 9.2% (revenue) and 14.1% (profit). The earnings engine currently reads: improving — as of 24 July 2026.
How is Central Mine Planning & Design Institute Ltd performing?
Central Mine Planning & Design Institute Ltd is in a confirmed uptrend, 14 weeks in. Its latest quarter's revenue rose 17.6% and profit rose 52.6% year on year. This describes what the data did, not a rating. — as of 24 July 2026.
Is Central Mine Planning & Design Institute Ltd in an uptrend?
Yes — the price is in a confirmed uptrend (week 14 of stage 2), trading +31.7% versus its 200-day average and at 77% of its 52-week range. Price stages cycle base → advance → top → decline, and the stage names where this stock sits in that cycle — as of 24 July 2026.
Will Central Mine Planning & Design Institute Ltd's share price go up?
This page publishes no price forecast for Central Mine Planning & Design Institute Ltd. What it measures instead: the share price is ₹255, the price is in a confirmed uptrend 14 weeks in. Its P/E of 27.1× sits at the 36th percentile of its own 0-year range. — as of 24 July 2026.
Who owns Central Mine Planning & Design Institute Ltd?
Promoters hold 85.0% of Central Mine Planning & Design Institute Ltd, foreign institutions 0.5%, domestic institutions 7.8% and the public 6.6% (latest quarter). No holder moved a full point over the last two years — the register is quiet. — as of 24 July 2026.
Does Central Mine Planning & Design Institute Ltd have too much debt?
No — Central Mine Planning & Design Institute Ltd's debt-to-equity is 0.00. FY26 borrowings were ₹1.0 Cr against equity of ₹2,283 Cr. The returns on this page are earned, not borrowed — as of 24 July 2026.
What is Central Mine Planning & Design Institute Ltd's capex?
Central Mine Planning & Design Institute Ltd spent ₹126 Cr on capital expenditure over the last 3 fiscal years, a figure derived from the change in fixed assets plus depreciation. Depreciation over the same years was ₹100 Cr. — as of 24 July 2026.
What is Central Mine Planning & Design Institute Ltd's cash flow?
Central Mine Planning & Design Institute Ltd generated ₹716 Cr of operating cash flow in FY26 and ₹651 Cr of free cash flow after ₹65.0 Cr of capital spending. Reported profit that year was ₹613 Cr, so operating cash ran ahead of profit. Cash-flow resolution for India is annual. — as of 24 July 2026.
Is Central Mine Planning & Design Institute Ltd's profit real cash?
Yes — over the last 3 fiscal years, 92% of Central Mine Planning & Design Institute Ltd's reported profit arrived as operating cash. In FY26, operating cash was ₹716 Cr against reported profit of ₹613 Cr. The cash then goes into a mix of the working-capital cycle and capacity. Cash-flow resolution is annual — as of 24 July 2026.
Where is Central Mine Planning & Design Institute Ltd in its business cycle?
Central Mine Planning & Design Institute Ltd's FY26 operating margin was 34.0%, against a 6-year band of 28.0%–42.0%: mid-band by its own history — neither the peak that precedes mean-reversion nor the trough that precedes recovery. The latest quarter ran 30.0%. Profitability versus a company's own long band is the cleanest cycle clock this page holds — as of 24 July 2026.
What could break the Central Mine Planning & Design Institute Ltd story?
Biggest watch item: the price is already 14 weeks into its uptrend — timing risk, not thesis risk. Mechanically, two Friday closes in a row below the 200-day average would end the price trend — that is the exit rule this page tracks — as of 24 July 2026.
Is Central Mine Planning & Design Institute Ltd a stock worth studying right now?
This is not investment advice. The machine read: Central Mine Planning & Design Institute Ltd's three tracks disagree. Price, valuation and the earnings engine each tell a different story — the next quarter or two settles it. The sharpest open question: the next one or two quarters of delivery. Every number on this page is drawn deterministically from the raw series, with no forecasts and no price opinions — as of 24 July 2026.