Garuda Construction and Engineering Ltd
GARUDAGaruda Construction and Engineering Ltd is coiled. The quarters are improving, yet the P/E sits at the 18th percentile of its own 1-year range — the business is moving before the market.
The sharpest disagreement: profits are rising, but only −19% of the last 2 years' profit arrived as operating cash — the gap between the P&L and the bank account is the thing to watch.
The price is building a base (7 weeks in) while the P/E sits at the 18th percentile of its own 1-year range. Underneath, the last four quarters read improving — profit +88.9% year on year, and −19% of the last 2 years' profit arrived as cash. What settles it: whether the cash starts following the profit.
Price story Before the numbers, the tape. A stock price moves through four repeating seasons: a flat base (stage 1), an advance (2), a top (3), a decline (4). Where the price sits in that cycle frames everything below.
Garuda Construction and Engineering Ltd trades at ₹175, building a base and 7 weeks into that stage. That is +0.6% against its own 200-day average. It sits at 32% of a 52-week range of ₹144 to ₹242. On relative strength it has been ahead of the NIFTY 500 on a trailing-13-week view for 1 straight week.
Today the stock is building a base — week 7 of stage 1. At ₹175 it trades +0.6% versus its 200-day average and sits at 32% of its 52-week range (₹144–₹242).
Against the market, two honest reads. Cumulative: over the last 1.7 years the stock moved +66% while the NIFTY 500 moved +2% — ahead of the index over the full window. Recent form: on a trailing-13-week view the stock has been ahead for 1 straight week — the ribbon below is that same metric, week by week.
What would end the trend, mechanically: two Friday closes in a row below the 200-day line. That is the exit rule — no debates.
→ The trend is one thing; the bill is another. Are you paying up for it? Next: the P/E sits at the 18th percentile of its own range.
Valuation P/E is the price of ₹1 of annual profit: how many rupees the market pays for each rupee the company earns in a year.
Garuda Construction and Engineering Ltd trades at 13.3× P/E, near the bottom of its own range — cheaper only 18% of the time. Its long-run median P/E is 19.4×, measured across 1.2 years of weekly readings. This places the multiple against the stock’s own record, and says nothing about what the business is worth.
Today's P/E of 13.3× is near the bottom of its own range — cheaper only 18% of the time, against a long-run median of 19.4× measured over 1.2 years of weekly readings. This is a comparison against the stock's own history — not a claim about what it is worth.
Why the multiple sits where it does: over the past year annual EPS moved +146.2% against a +3.6% price move — earnings outran the price, pushing the multiple DOWN its own range.
Put together: the multiple is low against its own past, so the story rests on the earnings line underneath it, not the multiple.
A quarterly PEG curve, which only the second data source carries, is not drawn on this page: its two data sources do not share enough overlapping reported history to be compared. A figure nobody could check is not used to price growth — the gap is a decision, not missing data.
→ Cheap or dear rides on the earnings. Are they actually growing? Next: the fundamental stage — where the business sits in its arc, and how growth has compounded.
Stage: No read Every business sits somewhere on a fundamental arc, and this page names the spot before anything else. The last twelve quarters of revenue, profit and EPS growth — plus the return the business earns on its capital — are read as curves: Deteriorating (the curves are falling), Turning around (a trough has just formed and the last few quarters lift off it), Improving (the climb off the trough is sustained), Consistent (steadily positive with healthy returns), Topping out (still high but decelerating from the peak). When the curves genuinely disagree the read is Mixed; too little history is No read. CAGR (compound annual growth rate) is the smooth yearly pace that turns the starting value into the latest one — the fairest way to compare growth across different time spans. Read the columns together: if the 1-year number towers over the 10-year, recent growth is running hotter than the long-run trend. A dash means that window is not held, or the base year was a loss (where a growth rate is not meaningful).
Garuda Construction and Engineering Ltd reads as no read on its fundamental arc. Under eight usable quarters on the growth trio — not enough history for an honest trajectory read. The read is built from 4 quarters across 0 curves, on partial evidence.
Why it matters: with too little history, an honest page says so instead of guessing a trajectory.
One or more growth curves carry a base-effect spike — a large year-on-year move off a near-zero or loss-making comparable quarter. Those spikes are capped before the classifier reads the trajectory, and shown pinned on the chart, so a single distorted quarter does not drive the stage call.
Return readings here are annual, not quarterly — read as level and direction only; they can confirm the growth curves but never drive the stage on their own.
Fewer than eight usable quarters on the growth curves — this page will not guess a trajectory from a stub of history.
| 1yr | 3yr | 5yr | 10yr | |
|---|---|---|---|---|
| Revenue | +135.0% | — | — | — |
| Profit | +144.0% | — | — | — |
| EPS | +146.2% | — | — | — |
| Share price | +3.6% | — | — | — |
→ The stage names the trajectory. Next: the revenue line that produces it, quarter by quarter.
4-Factor Sector Score
73.8/100 — rank 1 of 12 in Construction & Contracting · 76% evidence confidence
Garuda Construction and Engineering Ltd scores 73.8 out of 100 against the 12 companies it is compared with in Construction & Contracting, ranking 1. Confirmed research leader: earnings, capital efficiency and relative strength agree. Move to management, catalyst and risk diligence.
The four contributions add to the total exactly: 29.8 + 21.9 + 10.6 + 11.5 = 73.8. This is the SAME number shown on the sector comparison — it is computed once, for the whole peer set, and read here.
What would change it: The read weakens if profit growth turns negative or margin improvement reverses while sector-relative strength deteriorates.
Revenue Revenue is the top line: everything the company billed its customers in the period.
Garuda Construction and Engineering Ltd reported ₹149 Cr of revenue in the Mar 26 quarter, +81.7% year on year. That is the 4th straight quarter of year-on-year growth. Over 1 years it has compounded at 135.0% a year. The last full year, FY26, came in at ₹531 Cr. The last four reported quarters add to ₹530 Cr.
Garuda Construction and Engineering Ltd reported ₹149 Cr of revenue in the Mar 26 quarter, +81.7% year on year. That is the 4th straight quarter of year-on-year growth. Over 1 years it has compounded at 135.0% a year. The last full year, FY26, came in at ₹531 Cr. The last four reported quarters add to ₹530 Cr.
FY26 revenue came in at ₹531 Cr (+135.0% on the year), capping 1 years at 135.0% compound. The latest quarter (Mar 26) printed ₹149 Cr, +81.7% year on year — the 4th consecutive quarter of year-over-year growth.
Pace check: the last four quarters averaged +152.9% growth against the decade's 135.0% — the current year is running faster than its own long-run rate.
→ Revenue grew — did margins hold as it scaled? Next: 32.0% this quarter (+2.0 pp YoY).
Operating margin Operating margin is what is left of every ₹100 of sales after running the business, before interest and tax. It is the cleanest read on pricing power and cost control.
Garuda Construction and Engineering Ltd's operating margin is 32.0% in the Mar 26 quarter, +2.0 percentage points against the same quarter a year ago.
Garuda Construction and Engineering Ltd's operating margin is 32.0% in the Mar 26 quarter, +2.0 percentage points against the same quarter a year ago.
The latest quarter's operating margin is 32.0%, +2.0 pp against the same quarter a year ago. Across 2 fiscal years the operating margin has ranged 29.0%–31.0%.
Why the margin moved: operating margin went +2.5 pp year on year while gross margin went −7.4 pp — the gain came mostly from the gross line: input costs and pricing.
→ Margins held — did that reach the bottom line? Next: profit +88.9% in the latest quarter.
Net profit Net profit is what survives every cost, interest and tax — the number EPS, dividends and book value all grow from.
Garuda Construction and Engineering Ltd earned ₹34.0 Cr of net profit in the Mar 26 quarter, +88.9% year on year. It is the 4th consecutive quarter of growth. Full-year FY26 profit was ₹122 Cr. The 1-year compound rate is 144.0%. That is 22.8% of the quarter's revenue. The same quarter a year earlier earned ₹18.0 Cr.
Garuda Construction and Engineering Ltd earned ₹34.0 Cr of net profit in the Mar 26 quarter, +88.9% year on year. It is the 4th consecutive quarter of growth. Full-year FY26 profit was ₹122 Cr. The 1-year compound rate is 144.0%. That is 22.8% of the quarter's revenue. The same quarter a year earlier earned ₹18.0 Cr.
Mar 26 profit was ₹34.0 Cr, +88.9% year on year — the 4th consecutive quarter of growth. On the full year, FY26 printed ₹122 Cr (+144.0%), and the 1-year compound rate is 144.0%.
Why profit moved: revenue contributed +81.7% and the margin +2.0 pp — the quarter was margin-led: most of the profit growth came from keeping more of each sale.
Pace comparison, last four quarters: profit +156.0% vs revenue +152.9%. Profit is growing faster than sales — fixed costs are being spread over a bigger base, and each extra rupee of revenue drops more to the bottom line.
→ Profit rose — but did the cash follow? Next: −19% of the last 2 years' profit arrived as cash.
Cash flow — the router The P&L says what was earned; the cash-flow statement says what actually arrived. Operating cash flow (CFO) against profit is the cleanest lie detector in the accounts.
Over the last 2 fiscal years −19% of Garuda Construction and Engineering Ltd's reported profit arrived as operating cash — a gap worth watching. In FY26 that was ₹78.0 Cr of operating cash against ₹122 Cr of profit. After ₹114 Cr of capital spending, ₹−36.0 Cr was left as free cash.
FY26: operating cash of ₹78.0 Cr against reported profit of ₹122 Cr, leaving free cash of ₹−36.0 Cr after ₹114 Cr of capital spending. Across the last 2 fiscal years the conversion rate is −19% of profit.
Cash-flow readings here are annual — that is the resolution our series carries, so this section moves once a year.
🚨 Why conversion sits at −19%: the cash cycle tightened 283 days between FY25 and FY26 — cash that used to wait in the cycle now reaches the bank sooner. Less than 70% of profit arriving as cash is the thing to watch on this page.
Router verdict: no single sink dominates — the next section checks both the working-capital cycle and the capital spending.
→ So follow the cash to where it goes. Next: a −8-day cycle and ₹114 Cr of building.
Where the cash goes Working capital is the cash tied up between paying suppliers and getting paid: debtor days (customers owe), inventory days (stock waits), and the cash conversion cycle (the whole loop, in days of sales).
Garuda Construction and Engineering Ltd's cash conversion cycle runs −8 days in FY26, down from 275 days in FY25. Capital spending ran ₹114 Cr over the last 1 years. At FY26 sales of ₹531 Cr each day of that cycle holds about ₹1.5 Cr, so roughly ₹−12.0 Cr sits inside the business at any moment.
FY26: debtors at 102 days, inventory at 13 days — roughly 0.4 months of stock waiting to sell; that is where the cash sits while it waits — for a full cycle of −8 days, tighter than FY25's 275.
The full loop: cash goes out to suppliers and production on day 0; stock waits 13 days to sell; customers pay about 102 days after that; and suppliers themselves are paid at 123 days — netting out to the −8-day cycle.
In money terms: at FY26 sales of ₹531 Cr, each day of the cycle holds about ₹1.5 Cr — so the −8-day loop keeps roughly ₹−12.0 Cr sitting inside the business at any moment.
On the investment side: capital spending of ₹114 Cr over the last 1 fiscal years. Capital work-in-progress stands at ₹2.0 Cr (FY26) — capacity paid for but not yet earning.
The synthesis: neither the cycle nor the build-out is hoarding the cash — the machine is reasonably clean.
→ Does all this activity actually earn its cost of capital? Next: ROCE is 42% and the ROIC − WACC spread is +17.9 pp.
Return on capital Return on capital employed (ROCE) is the profit the whole business earns on all the money in it — equity and debt together. It is the single best test of whether growth creates value or just size.⚠ unverified
Garuda Construction and Engineering Ltd earns a ROCE of 42% in FY26. Return on invested capital clears the cost of that capital by +17.9 percentage points, so growth here adds value rather than only size. The wiring behind it is 23.0% net margin on 0.82× asset turns.
FY26 ROCE is 42%.
Why the return is what it is — the wiring (FY26): 23.0% net margin × 0.82× asset turns × 1.42× balance-sheet leverage ≈ 26.8% on equity. Margin is doing the heavy lifting; leverage is modest — this is an earned return, not a borrowed one.
The capstone test — ROIC − WACC: 29.9% − 12.0% = a +17.9 pp spread. The 12.0% is a standing assumption for the cost of capital in India, not a per-stock estimate — read the sign and the size of the spread, not the decimals. A spread this wide means every rupee reinvested creates more than a rupee of value — the engine compounds.
→ Returns like these — is the balance sheet borrowing to make them? Next: debt-to-equity is 0.03.
Debt Debt-to-equity says how much of the business is funded by borrowings. Low is the safe corner; the trend matters as much as the level.⚠ unverified
Garuda Construction and Engineering Ltd carries total debt of ₹12.0 Cr against shareholder equity of ₹454 Cr as of Mar 26, a debt-to-equity of 0.03 — effectively unlevered. On the annual view that ratio went from 0.00 in FY25 to 0.03 in FY26. The returns elsewhere on this page are therefore earned rather than borrowed.
Mar 26: total debt of ₹12.0 Cr against shareholder equity of ₹454 Cr — a debt-to-equity of 0.03. On the annual view, debt-to-equity went from 0.00 (FY25) to 0.03 (FY26). The returns on this page are earned, not borrowed.
→ Who owns this, and are they adding or leaving? Next: Foreign institutions cut 4.0 points over 6 quarters.
Ownership Who owns the stock, quarter by quarter: promoters (the controlling owners), foreign and domestic institutions, and the public. Steady accumulation by people close to the numbers is a signal; a quiet register is also an answer.
Foreign institutions cut 4.0 points of Garuda Construction and Engineering Ltd over 6 quarters, the biggest move on the register. That takes foreign institutions to 2.6% of the company. Domestic institutions moved −1.2 points over the same window, to 0.2%. The register is read on the four disclosed classes only; nothing is inferred between filings.
The register over the last two years — Foreign institutions: −4.0 points over 6 quarters to 2.6%; Domestic institutions: −1.2 points over 6 quarters to 0.2%; Promoters: +0.0 points over 6 quarters to 67.6%.
🚨 Why the register moved: foreign institutions drove it (−4.0 points), alongside domestic institutions (−1.2 points) — distribution into the market’s bid.
→ One last check: does the safety math agree? Next: the balance-sheet safety line.
Safety line The Z-score estimates how far a company sits from balance-sheet distress — above roughly 3 is safe, below roughly 1.8 is the danger zone. It was built for manufacturers, so it is not applied to banks and lenders.
Garuda Construction and Engineering Ltd: the Z-score reads 8.05. A Z-score above roughly 3 reads as safe and below roughly 1.8 as the distress zone, so this sits well clear of distress. It is a distance-to-distress estimate from the balance sheet, not a forecast of failure.
Why it matters: a Z-score of 8.05 sits well clear of the distress zone — the balance sheet is not the risk here.
The safety line in one sentence: the Z-score reads 8.05.
| Company | P/E | Mkt cap | Revenue | EPS | ROCE | Stage |
|---|---|---|---|---|---|---|
| Garuda Construction and Engineering Ltd this page | 13.3× | ₹1,625 Cr | — | No read | ||
| NCC Ltd | 12.3× | ₹8,607 Cr | Mixed | |||
| Mahindra Lifespace Developers Ltd | 25.7× | ₹7,993 Cr | Turning around | |||
| PSP Projects Ltd | 72.7× | ₹4,088 Cr | Turning around | |||
| Man Infraconstruction Ltd | 21.1× | ₹3,903 Cr | Deteriorating | |||
| Ashoka Buildcon Ltd | 4.2× | ₹3,393 Cr | Mixed | |||
| RDB Infrastructure and Power Ltd | 97.8× | ₹915 Cr | Mixed | |||
| Modis Navnirman Ltd | 26.4× | ₹768 Cr | Improving | |||
| Vascon Engineers Ltd | 30.1× | ₹749 Cr | Deteriorating | |||
| BEML Land Assets Ltd | 73,261.0× | ₹733 Cr | No read | |||
| Consolidated Construction Consortium Ltd | — | ₹709 Cr | No read | |||
| Modis Navnirman Ltd | 80.2× | ₹658 Cr | No read | |||
| Jaiprakash Associates Ltd | — | ₹594 Cr | No read | |||
| RDB Infrastructure and Power Ltd | 38.9× | ₹485 Cr | Turning around |
Frequently asked questions
What is Garuda Construction and Engineering Ltd's share price today?
Garuda Construction and Engineering Ltd trades at ₹175, +3.6% over the past year. The company is valued at ₹1,625 Cr. The stock sits at 32% of its 52-week range of ₹144–₹242, +0.6% versus its 200-day average. On the tape, the price is building a base, 7 weeks in. — as of 24 July 2026.
What were Garuda Construction and Engineering Ltd's latest quarterly results?
Garuda Construction and Engineering Ltd reported revenue of ₹149 Cr and net profit of ₹34.0 Cr for the Mar 26 quarter. Revenue rose 81.7% and profit rose 88.9% year on year. Earnings per share were ₹3.70. The operating margin was 32.0%, 2.0 pp higher than a year earlier. — as of 24 July 2026.
What is Garuda Construction and Engineering Ltd's revenue?
Garuda Construction and Engineering Ltd reported revenue of ₹149 Cr in the Mar 26 quarter, +81.7% year on year. For the full FY26 fiscal year, revenue was ₹531 Cr (+135.0%). Over the last 1 years revenue compounded at 135.0% a year. — as of 24 July 2026.
What is Garuda Construction and Engineering Ltd's profit?
Garuda Construction and Engineering Ltd earned ₹34.0 Cr of net profit in the Mar 26 quarter, +88.9% year on year — the 4th straight quarter of growth. Full-year FY26 profit was ₹122 Cr. The operating margin ran 32.0% in the latest quarter. — as of 24 July 2026.
What is Garuda Construction and Engineering Ltd's market cap?
Garuda Construction and Engineering Ltd's market capitalisation is ₹1,625 Cr at a share price of ₹175. Market cap is the share price multiplied by shares outstanding, so it is restated whenever the price moves. — as of 24 July 2026.
What is Garuda Construction and Engineering Ltd's P/E ratio?
Garuda Construction and Engineering Ltd trades at a P/E of 13.3×, at the 18th percentile of its own 1-year range, against a long-run median of 19.4×. This is a comparison with the stock's own history, not a value call — as of 24 July 2026.
Does Garuda Construction and Engineering Ltd pay a dividend?
No — Garuda Construction and Engineering Ltd has recorded a dividend payout of 0% of profit in each of its last 2 reported fiscal years, so there is no payout history to quote. That is a reading of the filed annual statements, not an estimate. — as of 24 July 2026.
Is Garuda Construction and Engineering Ltd overvalued?
On its own history, Garuda Construction and Engineering Ltd looks cheap against its own history: its P/E of 13.3× has been cheaper only 18% of the time in 1 years (long-run median 19.4×). That is a percentile read against the stock's own past, not a price opinion or a direction call. — as of 24 July 2026.
Is Garuda Construction and Engineering Ltd growing?
Yes — Garuda Construction and Engineering Ltd is growing: latest-quarter revenue +81.7% year on year, profit +88.9%, and the margin +2.0 pp at 32.0%. The 1-year compound rates are 135.0% (revenue) and 144.0% (profit). The earnings engine currently reads: improving — as of 24 July 2026.
How is Garuda Construction and Engineering Ltd performing?
Garuda Construction and Engineering Ltd is building a base, 7 weeks in. Its latest quarter's revenue rose 81.7% and profit rose 88.9% year on year. Against the NIFTY 500 it has been ahead on a trailing-13-week view for 1 week. This describes what the data did, not a rating. — as of 24 July 2026.
Is Garuda Construction and Engineering Ltd in an uptrend?
No — the price is building a base (week 7 of stage 1), trading +0.6% versus its 200-day average and at 32% of its 52-week range. Price stages cycle base → advance → top → decline, and the stage names where this stock sits in that cycle — as of 24 July 2026.
Is Garuda Construction and Engineering Ltd beating the market?
On recent form, yes — Garuda Construction and Engineering Ltd has been ahead of the NIFTY 500 on a trailing-13-week view for 1 straight week, the same metric the week-by-week ribbon on this page draws. Separately, on the cumulative view: over the last 1.7 years the stock moved +66% against the NIFTY 500's +2% — ahead of the index over the full window. — as of 24 July 2026.
Will Garuda Construction and Engineering Ltd's share price go up?
This page publishes no price forecast for Garuda Construction and Engineering Ltd. What it measures instead: the share price is ₹175, the price is building a base 7 weeks in. Its P/E of 13.3× sits at the 18th percentile of its own 1-year range. — as of 24 July 2026.
Who owns Garuda Construction and Engineering Ltd?
Promoters hold 67.6% of Garuda Construction and Engineering Ltd, foreign institutions 2.6%, domestic institutions 0.2% and the public 29.6% (latest quarter). The biggest move on the register over the last two years: Foreign institutions cut 4.0 points over 6 quarters. — as of 24 July 2026.
Does Garuda Construction and Engineering Ltd have too much debt?
No — Garuda Construction and Engineering Ltd's debt-to-equity is 0.03, and operating profit covers the interest bill 55×. FY26 borrowings were ₹12.0 Cr against equity of ₹455 Cr. The returns on this page are earned, not borrowed — as of 24 July 2026.
What is Garuda Construction and Engineering Ltd's capex?
Garuda Construction and Engineering Ltd spent ₹114 Cr on capital expenditure over the last 1 fiscal year, a figure derived from the change in fixed assets plus depreciation. In FY26 alone that was ₹114 Cr, with ₹2.0 Cr in capital work-in-progress — capacity paid for but not yet earning. — as of 24 July 2026.
What is Garuda Construction and Engineering Ltd's cash flow?
Garuda Construction and Engineering Ltd generated ₹78.0 Cr of operating cash flow in FY26 and ₹−36.0 Cr of free cash flow after ₹114 Cr of capital spending. Reported profit that year was ₹122 Cr, so operating cash ran behind profit. Cash-flow resolution for India is annual. — as of 24 July 2026.
Is Garuda Construction and Engineering Ltd's profit real cash?
Not fully — over the last 2 fiscal years, −19% of Garuda Construction and Engineering Ltd's reported profit arrived as operating cash. In FY26, operating cash was ₹78.0 Cr against reported profit of ₹122 Cr. The cash then goes into a mix of the working-capital cycle and capacity. Cash-flow resolution is annual — as of 24 July 2026.
How financially safe is Garuda Construction and Engineering Ltd?
On the balance sheet, the Z-score reads 8.05 — above roughly 3 is safe, below roughly 1.8 is the distress zone. That sits well clear of trouble. — as of 24 July 2026.
Where is Garuda Construction and Engineering Ltd in its business cycle?
Garuda Construction and Engineering Ltd's FY26 operating margin was 31.0%, against a 2-year band of 29.0%–31.0%: mid-band by its own history — neither the peak that precedes mean-reversion nor the trough that precedes recovery. The latest quarter ran 32.0%. Profitability versus a company's own long band is the cleanest cycle clock this page holds — as of 24 July 2026.
What could break the Garuda Construction and Engineering Ltd story?
The sharpest disagreement: profits are rising, but only −19% of the last 2 years' profit arrived as operating cash — the gap between the P&L and the bank account is the thing to watch. Mechanically, two Friday closes in a row below the 200-day average would end the price trend — that is the exit rule this page tracks — as of 24 July 2026.
Is Garuda Construction and Engineering Ltd a stock worth studying right now?
This is not investment advice. The machine read: Garuda Construction and Engineering Ltd is coiled. The quarters are improving, yet the P/E sits at the 18th percentile of its own 1-year range — the business is moving before the market. The sharpest open question: whether the cash starts following the profit. Every number on this page is drawn deterministically from the raw series, with no forecasts and no price opinions — as of 24 July 2026.